Tellico Dam

Coordinates:35°46′40″N84°15′35″W / 35.77778°N 84.25972°W /35.77778; -84.25972
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
(Redirected fromTellico Lake)
Dam in Tennessee, United States
"Timberlake, Tennessee" redirects here. For the retirement community rooted from the City of Timberlake plan, seeTellico Village, Tennessee.

Dam in Tennessee, U.S. near Lenoir City
Tellico Dam
The main concrete gravity structure for Tellico Dam (2013)
Map
Interactive map of Tellico Dam
Official nameTellico Dam
CountryUnited States
LocationLoudon County, Tennessee, U.S. nearLenoir City
Coordinates35°46′40″N84°15′35″W / 35.77778°N 84.25972°W /35.77778; -84.25972
Purpose
Construction beganMarch 7, 1967; 58 years ago (1967-03-07)[2]
Opening dateNovember 29, 1979; 46 years ago (1979-11-29)[3]
Construction cost$116 million[3][4] (503 million in 2024 dollars[5])
Dam and spillways
Type of damConcretegravity dam andearthembankment dam
ImpoundsLittle Tennessee River
Height129 ft (39 m)[1]
Length3,238 ft (987 m)[1]
Reservoir
CreatesTellico Reservoir
Total capacity467,600 acre⋅ft (576,800,000 m3)[1]
Catchment area2,627 mi2 (6,800 km2)[1]
Surface area14,200 acres (5,700 ha)[1]
Normal elevation810 ft (247 m)[6]

Tellico Dam is aconcrete gravity andearthenembankmentdam on theLittle Tennessee River that was built by theTennessee Valley Authority (TVA) inLoudon County, Tennessee. Planning for a dam structure on the Little Tennessee was reported as early as 1936 but was deferred for development until 1942. Completed in 1979, the dam created the Tellico Reservoir and is the last dam to be built by the Tennessee Valley Authority.

Unlike the agency's previous dams built forhydroelectric power andflood control, the Tellico Dam was primarily constructed as aneconomic development and tourism initiative through theplanned city concept ofTimberlake, Tennessee. The development project aimed to support a population of 42,000 in a rural region in poor economic conditions.

Referred to as apork barrel, the Tellico Dam is the subject of several controversies regarding the need of its construction and the impacts the structure had on the surrounding environment. Inundation of the Little Tennessee required the acquisition of thousands of acres, predominantly multi-generational farmland and historic sites such as theFort Loudoun settlement and severalCherokee tribal villages includingTanasi, the origin of Tennessee's name. Most of the acreage around the final lakeshore, originally seized througheminent domain, was sold to private developers to create retirement-oriented golf resort communities such asTellico Village andRarity Bay.

The Tellico Dam project was also controversial because of the risk it was believed to pose to the endangeredsnail darter fish species. Environmentalist groups took the TVA to court as a means to halt the project and protect the snail darter. The court action delayed the final completion of the dam for over two years. In the 1978 caseTennessee Valley Authority v. Hill heard by theSupreme Court of the United States, the court ruled in favor of the environmental groups and declared that the completion of Tellico Dam was illegal.[7] However, the dam was completed and filling of the reservoir commenced in November 1979, after the project was exempted from the Endangered Species Act with the passing of the 1980 public works appropriations bill by theUnited States Congress and signed by PresidentJimmy Carter.

Background

[edit]
Conceptual model of the planned City of Timberlake, part of the justification for Tellico Dam

Preliminary planning and Timberlake initiative

[edit]

TheTennessee Valley Authority (TVA) is afederally ownedelectric utility company created byU.S. Code Title 16, Chapter 12A, the Tennessee Valley Authority Act of 1933. Despite its shares being owned by the federal government, TVA operates like a private corporation, and receives no taxpayer funding.[8] The TVA was formally established in 1933 as part of programs under theNew Deal.

The agency was initially tasked with modernizing theTennessee Valley region, using experts in economic development, engineering, planning, and agriculture. Nonetheless, the TVA focused primarily on electricity generation,flood control, and combatting human andeconomic problems.[9]

In 1936, TVA began studies for hydroelectric dam sites as part of its Unified Development of the Tennessee River (UDTR) plan. Early TVA plans suggested the construction of a dam along theLittle Tennessee River at its mouth at theTennessee River adjacent toBussell Island.[10] This later became known as the Fort Loudoun Extension, an expansion of the adjacentFort Loudoun Dam. However, the project was canceled on October 20, 1942, due to a lack of federal funding resulting from financial constraints imposed byUS involvement in World War II.[2]

Original 1975land-use plan for the City of Timberlake project

In 1959, the TVA reapproved development of the Fort Loudoun Extension, now called the Tellico Project. The justification for the project was to improve the economic conditions of the Little Tennesseewatershed, throughland andrecreational development.[11] This project, which encompassed acreage in Loudon,Blount, andMonroe counties, became known as the City of Timberlake Plan, named for journalistHenry Timberlake, who explored the Cherokee villages that once occupied the area.[12] Timberlake, the TVA's ambitious attempt atcreating a city from scratch, had a projected population of 42,000. The project was promoted as a demonstration of economic development for the rural poor, transforming the Little Tennessee Valley into a thriving urban center.[12] The Tellico Dam would provide a large reservoir for recreation and for freight transport to proposed industrial sites with access to the Tennessee River through a canal. The dam would not produce electricity, but the canal would enable an additional 23 MW of power generation at the Fort Loudoun Dam by diverting flow from the Little Tennessee River.[4][13] The Timberlake project was initially supported with congressional aid and investment from the Americanaerospace manufacturing company, theBoeing Corporation. In 1974, the Tennessee state legislature unsuccessfully proposed a bill seeking toincorporate the Timberlake area into a city. Boeing determined that the project was not economically feasible and withdrew in 1975; the plans never fully materialized.[14][2]

Property acquisition and eminent domain

[edit]
Morganton site pre-Tellico
Morganton site post-Tellico
The town ofMorganton was one of several communities seized andinundated by the TVA for the Tellico Project.

The Tellico Dam project required the acquisition of nearly 38,000 acres (15,000 ha) of property for its development. The reservoir created by the dam was forecast to extend over 16,500 acres (6,700 ha) with an extra 2,900 acres (1,200 ha) inflood control reserves. For the remaining area, TVA allocated 16,500 acres (6,700 ha) for residential, recreational, and industrial development as part of the proposed Timberlake planned city project. The remaining land served as buffer zones between development areas and the reservoir.[15] When the TVA began to approach property owners in the Lower Tennessee Valley for the development of Tellico Dam, several communities that TVA sought to"modernize" through this project were at the time in touch with most of the modernAppalachian society that TVA had contributed to since the 1930s. Members of the river shed communities least impacted by modernization reacted most positively to TVA's plans, compared with the more modern communities. Historians of the project have suggested that most TVA personnel did not understand the complexity of the communities that they were intruding into with the Tellico project, leading to more heated opposition.[16]: 62–63 

The Little Tennessee River inSwain County, North Carolina, in 2010. Prior to the Tellico Dam, the river resembled this portion in the Little Tennessee Valley.

The Tellico Project was revealed to the public as early as 1960, with reactions similar to previous TVA projects. Public meetings commenced throughout the Little Tennessee Valley in the mid-1960s at civic spaces inLoudon,Blount, andMonroe counties to address concerns raised by citizens about the Tellico and Timberlake projects. At the time, TVA officials did not expect that the Tellico Project would be met with anything more than token opposition.[17] In 1963, small clusters of Little Tennessee Valley landowners and businesspeople formed a community group known as the Fort Loudoun Association opposing the Tellico project. Extensive local opposition emerged at a public forum on September 22, 1964, at Greenback High School in the town ofGreenback, located on the proposed eastern shore of the Tellico reservoir. Four hundred residents attended with over 90% reporting strong opposition. Attendees grew hostile, perceiving the Tellico project as an intrusion. One month after the contentious meeting at Greenback High School, anti-Tellico individuals formed a larger opposition group, the Association for the Preservation of the Little Tennessee River. This move showed that project opposition was not one that "would easily buckle and roll over before the mighty presence of the Tennessee Valley Authority".[16]: 64–86 

The property acquisition phase of the project required the use ofeminent domain, a statutory right granted to TVA at its establishment by Congress in 1933. This legal authority allowed TVA to take ownership of private property for uses the TVA deemed to be for public benefit.[18] Many property owners concerned about seizure of land reported that TVA personnel provided "taking lines" about the extent of private land acquisition that was planned. Many viewed these actions as TVAoverreaching their authority, provoking more public opposition to the project.[16]: 125–129  Compared with TVA's early hydroelectric projects, the documentation of residents to be relocated was poorly executed. TVA officials did not document the exact number of families that were affected, even after the property acquisition process had started in 1963. Initial estimates suggested the removal of 600 families, whereas the actual number was closer to 350 families. The individuals in each of these 350 families were not recorded.[16]: 125–129  Most of the families who were required to move complied, but three unwilling property owners were evicted byU.S. Marshals and watched their houses being demolished as they were evicted.[19] The Tellico project also had a significant impact on farming, with 330 farms along the Little Tennessee River lost following inundation.[20] In total, $25.5 million was spent by the TVA for land acquisition.[4]

Engineering and construction

[edit]
Construction on the Tellico Dam concrete structure in 1967

The engineering design of the Tellico Dam project consisted of a 600 ft-long (180 m) by 129 ft-high (39 m) concretegravity dam with flood gates, a 2,500 ft-long (760 m)earthen dam, and an 850 ft-long (260 m), 500 ft-wide (150 m) navigablecanal connecting the Tellico Reservoir impoundment to the Fort Loudoun impoundment of the Tennessee River.[17] The dam itself created the Tellico Reservoir impoundment of the Little Tennessee River. The Tellico Reservoir with afull pool water capacity of 467,600 acre⋅ft (576,800,000 m3), adrainage basin of 2,627 mi2 (6,800 km2), and a watersurface area of 14,200 acres (5,700 ha).[1] Along the shoreline of the proposed reservoir, roughly 23,600 acres (9,600 ha) would be acquired to be cleared and graded for future residential, commercial, industrial, and recreational area development.[21]

Construction on the Tellico Project began on March 7, 1967, with clearing work for the main dam structure. Work on the concrete structure of the dam was complete by October of the next year.[22][23] Other portions of the dam constructed withearth fill were complete by August 1975, with the river flow from the original Little Tennessee soon forced via pump through the completedsluice gates of the main concrete dam.[22] Around this time, work oncoffer dams to assist with the main dam were complete.[22] By the time of the forced closure of construction, work on the Tellico Project was nearly 90% complete, aside from final land clearing, recreational facility preparation, and a highway system that was nearly finished.[4][22]

TVA engineers monitoringhydraulics on aprototype of Tellico Dam

In total, $63 million was endowed for the construction of the concrete dam and spillway, the main earth dam, coffer dams, roadway and railroad facilities, reservoir clearing, utility relocations, access roads, a canal with access to the Tennessee River, public use facilities, and general yard improvements.[24][4] Most of this funding was used for the dam, over 65 miles (105 km) of state, county, and local access roads, and three large-scale bridge replacement projects. The TVA also invested another $3.6 million for two major road projects scheduled for initial work starting after the completion and opening of the Tellico Dam structure. Officials with theTennessee Department of Transportation expressed doubt about the completion of theTellico Parkway (State Route 444), one of these major road projects.[4]

The TVA received nearly $665,000 in revenue as the project was underway. Timber cleared for the project provided $99,000 and farmland and housing seized by the agency was leased with a revenue close to $566,000.[4] Labor costs for the project totaled $24.7 million, with most of this associated with the construction of the main Tellico Dam structure. Engineering, planning, and administrative services for the project cost $14.7 million.[4]

Environmental impacts and legal action

[edit]
"Tellico Dam controversy" redirects here. For more details about the snail darters, seeSnail darter controversy.
Thesnail darter fish, endangered at the time of the Tellico project's construction, was the subject ofcalls to halt work on the dam, and aSupreme Court decision regarding theEndangered Species Act.

Prior to any construction work, the Tennessee Fish and Game Commission addressed concerns to TVA personnel that the construction of Tellico Dam would bring the demise oftrout fishing on the Little Tennessee.[17]

TVA attempted to control and defuse local controversy regarding the Tellico Project with the formation of local group known as the Little Tennessee River Valley Development Association (LTRVDA) in 1963. However, within a year, the LTRVDA was unable to control local opposition. Citing the loss of prime farmland, in December 1964 the Tennessee Farm Bureau Association passed resolutions protesting the completion of Tellico Dam. One year later, delegates from the Cherokee Nation filed a petition protesting the desecration of their ancestral lands that were proposed to be flooded for the Tellico Dam. This petition was sent to the office of Supreme Court Associate JusticeWilliam O. Douglas, who forwarded the petition to PresidentLyndon B. Johnson.[2]

In 1971,University of Tennessee, Knoxville (UTK) economics professor Keith Phillips criticized TVA's plans for Tellico Dam in a reappraisal of the project. Phillips found fault with the cost and benefits evaluation conducted by the TVA, and suggested that the agency's officials on the project were technically incompetent.[2]

Following continued press of TVA's excessive and "abusive" power regarding the agency's property acquisition methods for the Tellico Project,Republican governorWinfield Dunn wrote in a 1971letter of dissent to TVA chair Wagner to stop construction of Tellico Dam, stating that the TVA should recognize "that the Little Tennessee as it now exists is a waterway too valuable for the State of Tennessee to sacrifice."[2] TVA rejected Dunn's request in a letter of response one year later.[2]

Finding an opportunity, Little Tennessee Valley farmers and environmentalists formed a joint activist group known as the Environmental Defense Fund (EDF) in 1972. The EDF brought suit against TVA under theNational Environmental Policy Act (NEPA), claiming that noenvironmental impact statement (EIS) had been made, violating the NEPA. In court, TVA personnel presented an EIS completed prior to the lawsuit by the EDF. The case was dismissed, allowing construction to continue without disruption.[25]

Discovery of the snail darter

[edit]
U.S. senator from TennesseeHoward Baker openly supported the completion of the Tellico Dam, and had referred to the snail darter as his "nemesis."[26]

On August 12, 1973, a group of students led by UTK biology professor David Etnier conducted a study for possibleendangered species via snorkeling in the Little Tennessee River during construction operations on Tellico Dam. Prior to the expedition, Etnier predicted up to ten endangered species occupied the proposed Tellico Reservoir basin. In the Coytee Springs shoal area of the Little Tennessee, Etnier identified severalsnail darters, to which in a later interview with theKnoxville News Sentinel suggested he "knew nobody had ever seen it before."[11] Four months later, theNixon administration passed theEndangered Species Act of 1973 (ESA), providing federal protection for endangered species from potential habitat destructions. By this point, the dam was well under construction and already over US$53 million (equivalent to $285 million in 2024[27]) had been spent on the construction work, requiring an injunction to stop the building from continuing and the flooding to happen.[11] On November 10, 1975, the snail darter was placed on the Endangered Species list by theUnited States Fish and Wildlife Service (FWS).

Litigation to protect the snail darter

[edit]
Main article:Tennessee Valley Authority v. Hill

Seeking to protect the snail darter, UTK law student Hiram "Hank" Hill, in collaboration with David Etnier, filed the caseTennessee Valley Authority v. Hill,437 U.S. 153 in federal court, citing that the TVA was in violation of the ESA. District Court Judge Robert Taylor declined aninjunction to order the cessation of construction work on Tellico Dam on May 25, 1976.[2]

However, on January 31, 1977, the District Court's decision was reversed and construction on the dam was ordered to stop, following an injunction from theUnited States Court of Appeals for the Sixth Circuit.[4] The TVA then petitioned the U.S. Fish and Wildlife Service to remove the snail darter as an endangered species on February 28. The FWS denied this request in December. On behalf of the TVA, theUnited States Department of Justice filed an appeal against the decision of the 6th Circuit regardingTennessee Valley Authority v. Hill on January 25, 1978, to theSupreme Court of the United States.[28] InHill, the Supreme Court affirmed, by a 6–3 vote, the injunction issued by the 6th Circuit Appeals Court to stop construction of the dam. Citing explicit wording of the Endangered Species Act (ESA) to ensure thathabitat forlisted species is not disrupted, the Court said "it is clear that the TVA's proposed operation of the dam will have precisely the opposite effect, namely the eradication of an endangered species."[29]

Aftermath of Supreme Court decision

[edit]
Greenback resident Nellie McCall on her 90-acre farm; McCall was evicted by U.S. Marshals and watched as her home was demolished after refusing TVA offers. McCall had strongly opposed Tellico Dam following her husband's death, brought on from a Tellico-induced heart attack.[3]

In the ensuing controversy over the snail darter, theEndangered Species Committee (also known as the "God Squad") was convened to issue a waiver of ESA protection of the snail darter. In a unanimous decision, the Committee refused to exempt the Tellico Dam project. Charles Schultze, the chairman of thePresident'sCouncil of Economic Advisers, later cited economic assessments concluding that, despite the Tellico Dam being 95% complete, "if one takes just the cost of finishing it against the benefits and does it properly, it doesn't pay, which says something about the original design."[30] Following publication of a story byThe New York Times (NYT) regarding the death of nearly 100 snail darters during an October 1977translocation operation, the TVA Director of Information John Van went ondamage control in a subsequent NYT editorial, directing the blame towards the lack of adequate netting by the FWS.[31]

Intervention by Carter, exemption from ESA

[edit]

After a long battle, Congress exempted the Tellico Dam from the Endangered Species Act by adding arider clause to an unrelatedpublic works bill. On September 25, 1979, PresidentJimmy Carter signed the bill exempting the Tellico project from the ESA. Carter had previously and publicly opposed the completion of the dam, but administration officials speculated that an attempt to veto the bill would result in legislative retaliation against Carter's plans for revising treaties for thePanama Canal Zone's ownership, and the establishment of afederal department for educational affairs, two issues the Carter administration prioritized for passing.[32]

Flooding of Cherokee native land

[edit]
Main article:Sequoyah v. Tennessee Valley Authority
1765 map of Overhill Cherokee tribal towns, the river shown is the Little Tennessee prior to its inundation for the Tellico Project.

In 1979, three Cherokee individuals and two Cherokee bands/organizations filed suit against the TVA to restrain the flooding of sacred homeland inSequoyah v. Tennessee Valley Authority, to no avail. Archeological surveys and salvage excavations were conducted in some areas because this area was known to have contained numerous 18th-centuryOverhill Cherokee towns. But the sites of Tanasi,Chota,Toqua,Tomotley,Citico,Mialoquo andTuskegee were all flooded by the reservoir behind the dam.[33] Some of these had been occupied by ancestors of the Cherokee for up to 1,000 years, based on the earthworkplatform mounds built at their centers by people of theSouth Appalachian Mississippian culture. In their succeeding long occupancy, the Cherokee had built councilhouses on top of the mounds. In addition, other prehistoric sites, dating to as early as theArchaic period, were flooded.

Other impacts

[edit]

The town ofMorganton and its port was submerged by the Tellico reservoir.[34] The British colonialFort Loudoun was relocated from its original site by excavation of soil required to raise the site by 17 ft (5 m), and the fort was reconstructed into astate park.[35] The creation of Tellico Lake also resulted in the prehistoricIcehouse Bottom site being submerged.

Translocation of snail darters

[edit]

Remnant populations of the snail darter were later removed from the Little Tennessee River and translocated into other streams.[30] In total, 219 snail darters were removed from the Tellico basin.[3] Most of these were transferred to theHiwassee River inPolk County in southeast Tennessee, and were established by 1982. TheHolston,French Broad,Nolichucky rivers of centralEast Tennessee have also been established as habitats for the snail darter.[36]

Completion and recent history

[edit]
Log buildings along a reservoir shoreline
Concrete monument with view of reservoir in the background
The original location of two historic sites,Fort Loudoun, the first British outpost in Tennessee,[37] and Tanasi, a Cherokee tribal village that Tennessee's naming originated from,[38] were permanently lost with Tellico Project's completion. Fort Loudoun would be reconstructed on a new site (top image), and a monument was constructed near the original site of Tanasi (bottom image).[39]

Tellico Reservoir began filling on November 29, 1979, after the gates were closed on the dam.[17]

Still intent on development projects to improve the economic conditions of the Little Tennessee Valley, TVA began sales on lakefront acreage that the agency seized through eminent domain.[40] Many impacted landowners were unable to qualify to bid on their former properties.[41] Respective analysis of TVA's acquisition methods with the Tellico Project have been cited asabuse of property rights.[42]

In April 1982, the Tellico Reservoir Development Agency (TRDA) was established by the Tennessee state legislature with state and TVA funding, to promote economic development initiatives in the Tellico region.[2] The TRDA assisted in the creation of severalindustrial parks for corporate investment seeking to reduce local unemployment. In September of the same year, the TVA proposed constructingtoxic waste dumps on Tellico-acquired sites.[2] One of these development sites known as the Tellico Peninsula, was billed as the prime site in the Tellico area.[10] Despite several attempts, the Tellico Peninsula site has remained largely undeveloped since site preparation work was completed in the 1980s, aside from aChristensen Shipyards facility which closed following theGreat Recession in 2011.[43] In 2017, proposals were announced for the site to beredeveloped into amixed-use community.[43]

The TVA's surplus witnessed substantial growth following the years of the Tellico Dam's completion partly due to the profits from the sale of Tellico-acquired land for private development.[41]

Resort development

[edit]
See also:Tellico Village, Tennessee andRarity Bay, Tennessee

The residential component of the failed Timberlake project was relaunched in late 1984 with the purchase of roughly 4,800 acres (1,900 ha) along the western shore of the Tellico Reservoir by Cooper Communities Inc. (CCI), a real estate firm based out ofBella Vista, Arkansas.[44] The development became a plannedretirement community known asTellico Village that officially opened in March 1986.[13] CCI promoted Tellico Village and the Tellico Reservoir at golf and boat conventions across theMidwestern United States. Since the development of Tellico Village, the Tellico area has drawn retirees from the Midwest andFlorida, initiating a retirement-oriented real estate boom in the area.[45]

By the late 1990s and into the 2000s, the TVA was pressured by private development groups to release additional acreage that had been seized via eminent domain along the shoreline of several reservoirs. The intention was for predominantlygolf course-based residential resorts. In 1995, a 960-acre community known asRarity Bay was constructed, including an equestrian center and 18-hole golf course. Mike Ross, the developer behind Rarity Bay built several additional resort developments on TVA's shoreline property, before being charged in federal court with mail fraud and money laundering in 2012.[46]

In 2002, the TVA board of directors approved the sale of preserved land on the eastern shore of Tellico Reservoir for a $750 million golf-course community known as Rarity Pointe.[47] In 2012, Rarity Pointe was purchased by WindRiver Management LLC, leading to expansion of the site and the renaming of the community from Rarity Pointe to WindRiver.[48]

Snail darter post-Tellico

[edit]

The snail darter was removed from the Endangered Species list by the U.S. Fish & Wildlife Service on August 6, 1983. The fish was still classified as a threatened species because the Hiwassee River, where the snail darters from the Little Tennessee had been translocated, had a previous history of acid spills from freight train accidents.[2] By 2021, the snail darter was removed as a threatened species, with the FWS reporting the snail darter population had recovered from any risk of endangerment.[49]

Aftermath of the Tellico project

[edit]
The relocated Morganton Cemetery; the cove in the background is the former site ofMorganton

As of 2022, the Tellico Dam remains the last dam to be built by the TVA.[50][51] Until the events of the Tellico Project, the moral and economic value of building a dam was rarely questioned; dams were widely considered to represent progress and technological prowess. Throughout the 20th-century, the United States had built thousands of dams, often to generate hydroelectric power and provide flood control.[52] By the 1950s, most of the adequate dam sites in the United States had been used, and it became increasingly difficult to justify new dam projects. Government agencies such as TVA, theBureau of Reclamation, and theArmy Corps of Engineers continued to construct new dams, often at the behest of congressional representatives of impacted areas such as in the case of Tellico Dam. However, by the 1970s, the era of dam-building effectively ended in the U.S. with the Tellico Dam case illustrating changing attitudes.[52] Retrospective analysis of the Tellico Dam case has referred to the project as apork barrel.[21]

From 1933, with the beginning of the pivotalNorris Project to the end of the Tellico project in 1979, TVA had forcibly removed more than 125,000 residents of theTennessee Valley.[53] The removal of people remains a controversial talking point on the methods and morality of TVA's dam projects.[39] In the 1980s, TVA attempted the construction of a $83 million dam with an intent similar to Tellico, for tourism and economic development on theDuck River near the city ofColumbia, Tennessee. The Columbia project resulted in failure, and the 1999 demolition of the unfinished dam as a result of environmental concerns and the escalating costs of completing the project.[54] In 2001, the 13,000-acre area set aside for the project was transferred for public use to the state of Tennessee.[55]

See also

[edit]

References

[edit]
  1. ^abcdef"Tellico Dam".National Performance of Dams Program, National Inventory of Dams. Stanford University.Archived from the original on February 22, 2014. RetrievedOctober 10, 2012.
  2. ^abcdefghijkPlater, Zygmunt J.B. (May 9, 2013)."Annotated Timeline ofTVA v. Hill and Related Events"(PDF).University of Tennessee.Boston College Law School.Archived(PDF) from the original on August 6, 2022. RetrievedAugust 6, 2022.
  3. ^abcd"A watery end: Tellico Dam fueled debate, lawsuits, tears".Knoxville News Sentinel. August 26, 2012.Archived from the original on July 27, 2022. RetrievedJuly 26, 2022.
  4. ^abcdefghi"The Tennessee Valley Authority's Tellico Dam Project--Costs, Alternatives, and Benefits"(PDF).U.S. Government Accountability Office. U.S. Government Printing Office. October 14, 1977.Archived(PDF) from the original on July 27, 2022. RetrievedJuly 26, 2022.
  5. ^1634–1699:McCusker, J. J. (1997).How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States: Addenda et Corrigenda(PDF).American Antiquarian Society. 1700–1799:McCusker, J. J. (1992).How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States(PDF).American Antiquarian Society. 1800–present:Federal Reserve Bank of Minneapolis."Consumer Price Index (estimate) 1800–". RetrievedFebruary 29, 2024.
  6. ^U.S. Geological Survey Geographic Names Information System: Tellico Dam
  7. ^Morrissey, Connor (December 11, 2018)."The Tennessee Valley Authority: A Timeline of Controversy".Medium.com.Archived from the original on July 26, 2022. RetrievedJuly 25, 2022.
  8. ^"About TVA".tva.com. Tennessee Valley Authority. 2018. RetrievedJanuary 7, 2018.
  9. ^Schulman, Bruce J. (1991).From Cotton Belt to Sunbelt: Federal policy, economic development, and the transformation of the South, 1938–1980. New York: Oxford University Press.ISBN 978-0-19-536344-9.OCLC 300412389.
  10. ^ab"Telling the Story of Tellico: It's Complicated".Tennessee Valley Authority.Archived from the original on June 16, 2022. RetrievedJuly 24, 2022.
  11. ^abcWilson, Robert (April 13, 2008)."Tellico Dam still generating debate".Knoxville News Sentinel.Archived from the original on October 13, 2016. RetrievedJuly 24, 2022.
  12. ^abTennessee Valley Authority (1976)."Timberlake New Community: Environmental Statement"(PDF).Boston College Law School.Knoxville, Tennessee: U.S. Government Printing Office.Archived from the original on August 12, 2022. RetrievedJuly 25, 2022.
  13. ^abJack Neely, "Tellico Dam Revisited." Originally published in theMetro Pulse Online. Accessed at the Internet Archive, October 2, 2015. (.doc format)
  14. ^Van West, Carroll (October 8, 2017)."Monroe County".Tennessee Encyclopedia.Tennessee Historical Society.Archived from the original on August 9, 2022. RetrievedJuly 25, 2022.
  15. ^Tennessee Valley Authority (February 10, 1972). "Land Use and Aesthetics".Tellico Project Environmental Impact Statement · Volume 1. U.S. Government Printing Office.Archived from the original on January 11, 2023. RetrievedJuly 24, 2022.
  16. ^abcdWheeler, William Bruce; McDonald, Michael J. (1986).TVA and the Tellico Dam, 1936-1979 A Bureaucratic Crisis in Post-Industrial America.Knoxville, Tennessee:University of Tennessee Press.ISBN 9780870494925.Archived from the original on January 11, 2023. RetrievedJuly 24, 2022.
  17. ^abcdMillsaps, Tommy (November 30, 2009)."A look back: Closing the Tellico Dam gates".The Advocate Democrat.Archived from the original on January 11, 2023. RetrievedJuly 24, 2022.
  18. ^Muldowny, John; McDonald, Michael (1981).TVA and the Dispossessed: The Resettlement of Population in the Norris Dam Area.University of Tennessee Press.ISBN 9781572331648.Archived from the original on January 11, 2023. RetrievedJuly 4, 2021.
  19. ^Rawls Jr., Wendell (November 11, 1979)."Forgotten People of the Tellico Dam Fight".The New York Times.Archived from the original on July 26, 2022. RetrievedJuly 25, 2022.
  20. ^""The Snail Darter and the Dam" Author Speaks at Eastern".Eastern Connecticut State University. April 6, 2016.Archived from the original on August 5, 2022. RetrievedAugust 5, 2022.
  21. ^abPlater, Zygmunt J.B. (June 18, 2013).The Snail Darter and the Dam: How Pork-Barrel Politics Endangered a Little Fish and Killed a River.Yale University Press.ISBN 9780300195262. RetrievedAugust 10, 2023.
  22. ^abcdTennessee Valley Authority (December 1978).Alternatives for Completing the Tellico Project.Knoxville, Tennessee: U.S. Government Printing Office.Archived from the original on January 11, 2023. RetrievedAugust 7, 2022.
  23. ^Tennessee Valley Authority (1972).Environmental Statement, Tellico Project Volume 1.Knoxville, Tennessee: U.S. Government Printing Office. pp. I-1-1-I-1-5.Archived from the original on January 11, 2023. RetrievedAugust 6, 2022.
  24. ^Dorward, Frances Brown (2009).Dam Greed. Xlibris Corporation.ISBN 9781436379472.Archived from the original on January 11, 2023. RetrievedAugust 7, 2022.
  25. ^"Environmental Defense Fund v. Tennessee Valley Auth., 339 F. Supp. 806 (E.D. Tenn. 1972)".Justia Law.Archived from the original on August 10, 2020. RetrievedJanuary 1, 2021.
  26. ^Matthiessen, Peter (February 7, 1980)."How to Kill a Valley".The New York Review.Archived from the original on August 7, 2022. RetrievedAugust 6, 2022.
  27. ^Johnston, Louis; Williamson, Samuel H. (2023)."What Was the U.S. GDP Then?".MeasuringWorth. RetrievedNovember 30, 2023. United StatesGross Domestic Product deflator figures follow theMeasuringWorth series.
  28. ^Urschel, Donna (February 21, 2014)."Zygmunt Plater to Discuss His BookThe Snail Darter and the Dam, March 13". Library of Congress.Archived from the original on March 1, 2014. RetrievedFebruary 21, 2014.
  29. ^"Decision in TVA v. Hill"Archived September 22, 2004, at theWayback Machine, U.S. Supreme Court, 437 U.S. 153, decided June 15, 1978
  30. ^abZygmunt Plater, "Tiny Fish/Big BattleArchived September 7, 2008, at theWayback Machine."Tennessee Bar Journal 44, no. 4 (April 2008). Retrieved: April 21, 2008.
  31. ^Van, John (December 3, 1977)."Why 98 Snail Darters Died".The New York Times.Archived from the original on July 28, 2022. RetrievedJuly 27, 2022.
  32. ^Hornblower, Margot (September 26, 1979)."Carter Signs Bill Forcing Tellico Dam Completion".Washington Post.Archived from the original on March 5, 2022. RetrievedJuly 24, 2022.
  33. ^Gilmer, Robert A. (2011).In the shadow of removal:historical memory, Indianness, and the Tellico Dam Project(PDF).University of Michigan (Thesis). University of Michigan.hdl:11299/107657.Archived from the original on December 7, 2021. RetrievedAugust 6, 2022.
  34. ^Jefferson Chapman,Tellico Archaeology: 12,000 Years of Native American History (Tennessee Valley Authority, 1985).
  35. ^Vicki Rozema,Footsteps of the Cherokees: A Guide to the Eastern Homelands of the Cherokee Nation (Winston-Salem: John F. Blair), 135.
  36. ^"Percina tanasi Etnier, 1976".Nonindigenous Aquatic Species -United States Geological Survey. RetrievedJanuary 11, 2023.
  37. ^James C. Kelly, "Fort Loudoun: A British Stronghold in the Tennessee Country," East Tennessee Historical SocietyPublications, Vol. 50 (1978), pp. 72-92.
  38. ^Bales, Stephen Lyn (2007).Natural Histories: Stories from the Tennessee Valley. Knoxville: University of Tennessee Press. pp. 85–86.ISBN 978-1572335615.Archived from the original on January 11, 2023. RetrievedAugust 6, 2022 – via Google Books.
  39. ^abCallahan, North (1980).TVA: Bridge Over Troubled Waters. A. S. Barnes.ISBN 9780498024900.Archived from the original on January 11, 2023. RetrievedAugust 5, 2022.
  40. ^Madden, Tom (July 2, 1981)."Private land TVA claimed for lake to be given away to developers".UPI.Archived from the original on October 25, 2021. RetrievedJuly 25, 2022.
  41. ^abHolland, Steve (November 26, 1982)."TVA sold the shores of Tellico Lake to a..."UPI. RetrievedAugust 6, 2022.
  42. ^Venable, Sam (October 13, 2022)."Many decades later, ramifications of the Tellico project endure".Knoxville News Sentinel. RetrievedAugust 10, 2023.
  43. ^abNash, Jeremy (September 6, 2017)."Tellico peninsula to be reworked".News-Herald.Archived from the original on January 11, 2023. RetrievedJuly 25, 2022.
  44. ^Wilkerson, Worth."Tellico Village: Its Origins and History"(PDF).Tellico Village.Archived(PDF) from the original on November 17, 2022. RetrievedJuly 25, 2022.
  45. ^Chamberlain, Lisa (July 9, 2006)."Drawn to Eastern Tennessee's Natural Beauty".The New York Times.Archived from the original on July 28, 2022. RetrievedJuly 27, 2022.
  46. ^Schaffer, Marian (December 7, 2012)."Rarity Communities Founder, Mike Ross Indicted".Southeast Discovery.Archived from the original on July 28, 2022. RetrievedJuly 27, 2022.
  47. ^"TVA awash in pressure on lakefront development".moccasinbend.net.Associated Press. December 8, 2004.Archived from the original on July 28, 2022. RetrievedJuly 27, 2022.
  48. ^"Rarity Pointe Commercial Recreation and Residential Development on Tellico Reservoir, Loudon and Monroe Counties, Tennessee"(PDF).Federal Register. U.S. Government Printing Office. September 15, 2017.Archived(PDF) from the original on November 17, 2022. RetrievedJuly 27, 2022.
  49. ^Kruesi, Kimberlee (August 31, 2021)."Snail darter, tiny and notorious, is no longer endangered".ABC News. Associated Press.Archived from the original on August 6, 2022. RetrievedAugust 6, 2022.
  50. ^"Building a Better Life for the Tennessee Valley".Tennessee Valley Authority.Archived from the original on July 26, 2022. RetrievedJuly 25, 2022.
  51. ^"Tellico Reservoir Land Management Plan".Tennessee Valley Authority. March 4, 2022.Archived from the original on August 1, 2022. RetrievedJuly 31, 2022.
  52. ^abMarc Reisner,Cadillac Desert: The American West and Its Disappearing Water, (1986), p. 165
  53. ^John Gaventa (1982). "Book Review, 'TVA and the Dispossessed: The Resettlement of Population in the Norris Dam Area'".Tennessee Law Review. Symposium, the Tennessee Valley Authority.Knoxville, Tennessee: Tennessee Law Review Association:979–983.Over the past fifty years the agency has had many opportunities to learn from its mistakes. Since 1933, over 125,000 residents have been displaced from their homesteads by TVA dam construction projects.
  54. ^Aldrich, Marta W. (October 10, 1999)."$83 Million Later, Unfinished Dam Being Dismantled".Seattle Times.Archived from the original on August 6, 2022. RetrievedAugust 6, 2022.
  55. ^"'Happy ending' to TVA dam controversy".Chicago Tribune. August 15, 2001.Archived from the original on August 6, 2022. RetrievedAugust 6, 2022.

External links

[edit]
Wikimedia Commons has media related toTellico Dam.

Official website

Dams andhydroelectric
generating stations
Coal-fired power plants
Gas turbine plants
Nuclear power plants
International
National
Other
Retrieved from "https://en.wikipedia.org/w/index.php?title=Tellico_Dam&oldid=1331837495"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp