Techren Solar Project

Coordinates:35°47′00″N115°01′00″W / 35.78333°N 115.01667°W /35.78333; -115.01667
From Wikipedia, the free encyclopedia
Solar power plant located near Boulder City, Nevada

Techren Solar Project
CountryUnited States
LocationBoulder City, Nevada
Coordinates35°47′00″N115°01′00″W / 35.78333°N 115.01667°W /35.78333; -115.01667
StatusOperational
Construction began2017 (TS1)
2018 (TS2)
Commission dateMarch 2019 (TS1)
September 2019 (TS2)
OperatorSwinerton Renewable Energy
Solar farm
TypeFlat-panel PV
single-axis tracking
Site area2,300 acres (930 ha)
Power generation
Nameplate capacity400 MWAC
External links
Map

TheTechren Solar Project is a 400 megawatt (MWAC) solarphotovoltaic power plant nearBoulder City, Nevada. Electricity production began with completion of the two building phases in 2019–2020.[1][2] The project is co-located with several other largesolar power projects in theEldorado Valley.

Project details

[edit]

The project was originally founded and developed by SECP (Sustainable Energy Capital Partners)[3] and further developed by 174 Power Global, the US subsidiary of the South Korean company,Hanwha Group. The project was constructed in two phases: the 100 MW Techren 1 began in 2017 and the 200 MW Techren 2 began in 2018.[4]

Both units are built to a 1.5 kVdc maximum system voltage standard.[5][6] This increase from the previous 1.0 kVdc standard enables the inverter to operate at higher efficiency and reliability, and is expected to reduce overallbalance of system costs over the lifetime of the facility.[7]Swinerton Renewable Energy was theEPC contractor, and Clenera providedasset management services.[8] Project completion in September 2019 was as scheduled.[9]

Map of solar farms in the Eldorado Valley

NV Energy is purchasing the electricity from both facilities, which are eligible for further customer participation under theNV GreenEnergy Rider opportunity.[10] As withBoulder Solar and theFort Churchill Solar Array,Apple Inc. helped to motivate the project through participation of its northern Nevadadata centers in the program.[11]

An additional 100 MW was developed: the 25 MW Techren 3, the 25 MW Techren 4 which were completed in October 2020, and the 50 MW Techren 5 completed in December 2020.[12][13][14][15]

See also

[edit]

References

[edit]
  1. ^"Techren Solar 1, Monthly".Electricity Data Browser.Energy Information Administration. Retrieved30 November 2020.
  2. ^"Techren Solar 2, Monthly".Electricity Data Browser.Energy Information Administration. Retrieved30 November 2020.
  3. ^"SECP Partners with POSCO Power to Build the World's Largest Solar Power Plant".www.businesswire.com. 21 December 2010.
  4. ^Techren Solar, 174 Power Global
  5. ^"JinkoSolar Supplies 132 MW to Techren Solar 1 Project". PR Newswire. December 6, 2018. RetrievedMarch 10, 2019.
  6. ^Kelsey Misbrener (January 31, 2019)."Sungrow Ships 1500 V Central Inverters to Techren 2 Solar Project". Solar Power World.
  7. ^"GE Partners with Looop, Bringing 1.5kV Solar Inverter Technology to Japan"(PDF). gepowerconversion.com. July 19, 2016. RetrievedFebruary 20, 2019.
  8. ^"Techren 1". Swinerton Renewable Energy. RetrievedMarch 14, 2019.
  9. ^"Techren II - State of Nevada Renewable Energy Tax Abatement Application"(PDF). energy.nv.gov.
  10. ^"Solar Resources". NV Energy. RetrievedMarch 14, 2019.
  11. ^"NV Energy Starts Power Delivery from 50 MW Boulder Solar II Project in Nevada, US". powerinfotoday.com. 13 February 2017. RetrievedMarch 14, 2019.
  12. ^"NV Energy boasts 'lowest-cost' PPAs for 2 proposed solar projects". Utility Dive. November 8, 2017.
  13. ^"Nevada Utility is Putting $2 Billion into Solar Power and Storage". Renewable Energy World. June 1, 2018.
  14. ^"Commission Approves Largest Clean Energy Investment in Nevada History". T&D World. January 8, 2019.
  15. ^"Table 6.3. New Utility Scale Generating Units by Operating Company, Plant, and Month, 2020, Electric Power Monthly, U.S. Energy Information Administration, February 25, 2021". RetrievedMarch 8, 2021.
Energy resource facilities in Nevada
Coal fired
Gas fired
Geothermal
Hydroelectric
Solar
Wind
Natural gas pipelines
Petroleum pipelines
Transmission lines
Substations
Other
By state
Power plants
Companies
Organizations
Other


Stub icon

This article aboutrenewable energy plants is astub. You can help Wikipedia byexpanding it.