Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Taff Vale Railway

From Wikipedia, the free encyclopedia
This article is about the railway company and line. For the landmark legal case against a trade union, seeTaff Vale Rly Co v Amalgamated Society of Rly Servants.
Railway company and line in South Wales

Taff Vale Railway
Overview
HeadquartersQueen Street,Cardiff
(Workshops: West Yard, Butetown, Cathays)
Reporting markTV
LocaleSouth Wales
Dates of operation1840 (1840)–1921 (1921)
SuccessorGreat Western Railway
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Length124 miles 42 chains (200.4 km) (1919)[1]
Track length403 miles41+12 chains (649.40 km) (1919)[1]
Route map

Cyfartha Iron Works
Merthyr Tydfil
Merthyr Plymouth Street
Pentre-bach
Troed-y-rhiw
Merthyr Vale
Quakers Yard
Low Level │ High Level
Maerdy Colliery
Maerdy
Treherbert
Ferndale
Ynyswen
Tylorstown
Treorchy
Pontygwaith Halt
Pentre Platform
Wattstown Platform
Ton Pentre
Ynyshir
Ystrad Rhondda
Taff Valley Collieries
andTower Colliery
Gelli Platform
Aberdare
Llwynypia
Cwmbach
Tonypandy
Fernhill
Dinas Rhondda
Mountain Ash
Pandy
Penrhiwceiber
Rhondda Fach Junction
Matthewstown Halt
Porth
Pontycynon Halt
Hafod
Abercynon North
Trehafod
Abercynon South
Old Ynysybwl
Ynysybwl
Robertstown Halt
Stormstown sidings
Ynysybwl New Road Halt
Cilfynydd
Clydach Court Halt
Coedpenmaen
Berw Road Halt
Gyfeillon Platform
Pontypridd
Treforest
Maesmawr
Treforest Estate
Taffs Well
Radyr
Llandaff
Danescourt
Maindy Halt
Llantrisant & Taff Vale Jn Rly
Waterhall Junction
Cathays depot
Carriage & Wagon works
Fairwater
Woodville Road Halt
Waun-Gron Park
Cathays
Cardiff Queen Street
Cardiff Central
Bute Road
Queen Alexandra Dock
P & A Campbell ferries
Cardiff Canton TMD
Grangetown
Ninian Park
Penarth Dock
Dingle Road
Penarth
Alberta Place Halt
Lower Penarth
Lavernock
Swanbridge
Sully
This diagram:
Motto
Cymru a fu a Chymru fydd[2]

(Wales hath been, and Wales shall be)

Milestones
12 October 1835Resolution passed to formThe Taff Vale Railway Company
21 June 1836Act of Incorporation
16 September 1836First company General Meeting, directors appointed
9 October 1840Opened Cardiff to Navigation House (Abercynon)
12 April 1841Opened Navigation House to Merthyr Tydfil
10 June 1865Penarth Dock opened, TVR took out a 999-year lease
1900Strike led toTaff Vale case (1901)
1903"Motor cars" (steam railway passenger coaches) introduced
1 January 1922Became constituent company of theGWR
Railways worked/leased
1847Aberdare Railway
1862Penarth Harbour & Dock Railway
1863Llantrisant & TV Railway
1889Cowbridge & Aberthaw Railway

TheTaff Vale Railway (TVR) was astandard gauge railway inSouth Wales, built by the Taff Vale Railway Company to serve the iron and coal industries aroundMerthyr Tydfil and to connect them withdocks inCardiff. It was opened in stages in 1840 and 1841.

In the railway's first years, thecoal mining industries expanded considerably and branches were soon opened in theRhondda valleys and theCynon Valley. The conveyance of coal for export and for transport away fromSouth Wales began to dominate and the docks in Cardiff and the approach railway became extremely congested. Alternatives were sought and competing railway companies were encouraged to enter the trade.

In the following decades further branch lines were built and the TVR used "motor cars" (steam railway passenger coaches) from 1903 to encourage local passenger travel.

From 1922 the TVR was a constituent of the newGreat Western Railway (GWR) at thegrouping of the railways, imposing its own character on the larger organisation. The decline in the coal and iron industries took its toll on the mainstay of the network, but passenger trains still operate on most of the main line sections.

Before the Taff Vale Railway

[edit]

Minerals

[edit]

Coal mining andiron smelting had been carried out on a small scale in South Wales down to the 18th century; it was encouraged by the plentiful availability of coal, at first at a shallow depth; timber (for pit props and forcharcoal); andlimestone (forfluxing). The coal was primarily used in iron production and it was only gradually that surplus coal began to be used for power (in industrial stationary steam engines) and for domestic use.

In timecoke replacedcharcoal in the smelting process. The availability of the raw materials at the heads of the South Wales valleys led to a number of ironworks being founded there between 1750 and 1800; these included theCyfarthfa Ironworks,Plymouth Ironworks, andDowlais Ironworks in theMerthyr Tydfil area.[3]

A major difficulty was transport; conveying the finished product away to market was effected by coastal shipping, but the primitive road network made reaching the coast expensive and difficult; and the limestone, plentiful as it was, was located some distance north of the location of the ironworks.

In 1767, Anthony Bacon of Cyfarthfa persuaded his fellow ironmasters to join in a scheme to build a trunk roadway from Merthyr Tydfil to Cardiff. He usedmule-hauled trains.[4]

Tramroads

[edit]

A solution to the difficulty of local transport around the area of the ironworks was thetramroad. Wooden railways had been extensively used elsewhere, but seem not to have been much used in South Wales. The local tramroads were almost all short-distanceplateways (in which the rails are L-shaped plates, carrying wagons with plain wheels) and in many cases were simple extensions of plateways used underground in mines.[5]

Canals

[edit]

Canals were built down some of the valleys, to bring the iron down to the coast for shipping elsewhere. TheGlamorganshire Canal was opened in 1794; it ran from Merthyr Tydfil toCardiff, a distance of 25 miles (40 km). Local mine owners within 4 miles (6 km) of the canal were authorised to build tramroads to connect to the canal. About 350 miles (560 km) of tramroad were built in South Wales under this and similar arrangements[6] before the coming of modern railways.[4][3] 200,000 tons of coal were brought down by the canal in 1839 to the dock that becameBute West Dock.[3]

The Penydarren engine

[edit]

In 1802 theMerthyr Tramroad was opened, connecting theDowlais and other ironworks with the Glamorganshire Canal.Richard Trevithick was employed atPenydarren Ironworks, served by the tramroad, and he built a steam locomotive engine. In 1804 a demonstration run took place in which 10 tons of iron and 70 people were transported 9 miles (14 km). This was the first use of a steam locomotive engine in the world.[a] However many of thecast-iron tramplates were broken due to the weight of the engine.[7]

A railway proposed

[edit]

For the first decades of the nineteenth century, the transport situation for Merthyr and the surrounding area changed relatively little; the Glamorganshire Canal prospered, but became overwhelmed by the volume of trade. Tramways continued with horse haulage and plateway tracks. Mule trains carried iron down the turnpike road.

Edge railways, evolved directly from earlier wooden railways, had continued in use in Northumberland and elsewhere in the country;[6] theStockton and Darlington Railway of 1825[8] and theLiverpool and Manchester Railway of 1830[9] demonstrated the capabilities of the current technology.

Planning and construction

[edit]
The Taff Vale Railway in 1841

Early in 1835,Anthony Hill, owner of thePlymouth Ironworks at Merthyr, asked the engineerIsambard Kingdom Brunel, a personal friend, to estimate the cost of building a railway from Merthyr toBute Docks in Cardiff. Brunel's estimate was £190,649. However, by the following year Brunel had revised his estimate upwards, to £286,031, to accommodate improved gradients, mineral branches and shippingstaithes.[10]

In October 1835 a meeting of 'the Proprietors of Iron Works, Collieries, and others interested in the Minfral and other Property of the Vallies [sic] of the Taff, Rhondda, Cynon, Bargoed, and other adjacent places, and the Trade of the Town of Merthyr Tydvil and Port of Cardiff' was held at the Castle Inn in Merthyr Tydfil, chaired byJohn Josiah Guest, theMP for Merthyr. The meeting resolved to form "The Taff Vale Railway Company" and a provisional committee was appointed, consisting of J. J. Guest, W. Thompson, T. R. Guest, Richard Hill, Anthony Hill, William Forman,Walter Coffin, E. I. Hutchins, Edward Morgan, Robert Beaumont,Thomas Powell, W. Thomas, D. W. James, David Evans,George Insole, W. Jones, Henry Charles, andDavid Davis.[11][12]

Act of Parliament

[edit]
Taff Vale Railway Act 1836
Act of Parliament
Long titleAn Act for making a Railway from Merthyr Tydfil to Cardiff, to be called "The Taff Vale Railway," with Branches.
Citation6 & 7 Will. 4. c. lxxxii
Dates
Royal assent21 June 1836
Text of statute as originally enacted

The promoters agreed to go forward with a parliamentary bill in the 1836 session. The Glamorganshire Canal Company opposed the bill, but it was passed and obtainedroyal assent on 21 June 1836 as theTaff Vale Railway Act 1836 (6 & 7 Will. 4. c. lxxxii).[13] The TVR Company was incorporated with capital of £300,000. The directors were Josiah Guest (who became its first chairman), Walter Coffin, Edward Lee, Thomas Guest, Thomas Guppy, Thomas Powell, Christopher James, Thomas Carlisle, Henry Rudhall, William Wait, William Watson, and Peter Maze. However, at the company's first general meeting on 16 September 1836[14] the following were appointed as directors: J. J. Guest, Walter Coffin, T. R. Guest, Thomas Powell, T. Carlisle, E. H. Lee, Henry Rudhall, C. E. Bernard, Chris. James, W. K. Wait,Elijah Waring, and R. H. Webb.

Taff Vale Railway Act 1840
Act of Parliament
Long titleAn Act to amend the Acts relating to the Taff Vale Railway.
Citation3 & 4 Vict. c. cx
Dates
Royal assent23 July 1840
Text of statute as originally enacted

The act authorised a railway fromMerthyr Tydfil toCardiff, to be known as the Taff Vale Railway, with several branches: to connect with the tramroad toDowlais and other ironworks nearby; to collieries atLlancaiach; to the tramroad servingDinas collieries (in theRhondda); and toCogan Pill. Company profits were limited to 7%; this could be augmented to 9% if the tolls for use of the line were substantially reduced. Independent carriers as well as the Company itself were potentially able to use the line. The act also limited the speed of the trains on the line to 12 mph (19 km/h), with stiff penalties for any speeding. (These two clauses were repealed by theTaff Vale Railway Act 1840 (3 & 4 Vict. c. cx)) Locomotive operation and the carriage of passengers were permitted by the Taff Vale Railway Act 1836.[12]

The Merthyr terminus was to be on an open space south of the town, between theRiver Taff and Cardiff Road. The Cardiff terminal was to be at or near the ship canal which theMarquis of Bute proposed to build. This became Bute West Dock; he had obtained powers to build it in 1830 but had held off from actually doing so.[12]

Brunel, as the engineer for the line, designed it as astandard gauge line. He told the directors,

As regards the gauge or width of the rails, I see no reason in our case for deviating materially from the ordinary width of 4' 8+12″. The general gradients, theinclined planes, and still more the nature and the immediate extent of the peculiar class of traffic to which the line must always be devoted, not only render high speeds unnecessary, but must almost prevent their being attempted, while the same causes operate to diminish any advantage that may be gained in reducing friction by increased diameter of carriage wheels.[b] The curves also which the nature of the ground render unavoidable would be unfit for a wider gauge…[15]

Construction and opening of the first main line

[edit]

The construction of the line posed no great engineering challenges as its course followed the valley of the River Taff. The line was24+14 miles (39 km) in length. AtQuakers Yard there was a sudden steep change of ground level and Brunel used 50-horsepower (37 kW) stationary winding engines; the inclined section was12 mile (800 m) in length with gradients of 1 in 19 and 1 in 22. Locomotives did not ascend the incline. There was a 1 in 13 gradient on thePwllyrhebog branch, nearTonypandy; it too was rope-worked with special locomotives. Inevitably there were some stiff gradients elsewhere. There were two stone viaducts on the route: the first, atPontypridd, crosses theRiver Rhondda, and the second bridges theTaff valley between Goetre-coed and Quakers Yard.[12]

As well as the avoiding the use ofbroad gauge, Brunel adopted a different form of track for the line: "parallel rails" weighing 55 pounds per yard (27 kg/m), fixed inchairs with compressed wooden keys. The chairs were fixed to transversesleepers by screws inserted prior to laying, "ensuring accuracy of gauge".[16]

A ceremonial opening of the line between Cardiff and Navigation House,Abercynon, took place on 8 October 1840,[12][3] when the directors and shareholders travelled on the line; the full public opening of that section was on 9 October 1840. On 20 April 1841 the line was inspected by Sir Frederick Smith for theBoard of Trade, and on 21 April 1841 the main line was opened throughout to Merthyr.[c] Passenger stations were atCardiff,Llandaff, Pentyrch (laterRadyr),Taffs Well, Newbridge (laterPontypridd),Navigation House,Troed-y-rhiw andMerthyr. There were two passenger trains each way daily, seven days a week. The line was single throughout with passing places at the stations. On double track sections and at crossing loops, right-hand running was employed for several years.[12][3][17]

Early branches

[edit]

A mineral branch from Pontypridd toDinas Rhondda opened in June 1841.

TheLlancaiach Branch was authorised in the original Taff Vale Railway Act 1836 (6 & 7 Will. 4. c. lxxxii). It opened on 25 November 1841 for mineral traffic only, from Stormstown south of Abercynon to three adjacent collieries at Llancaiach. There was a self-acting rope-worked incline 600 yards (550 m) long on a 1 in 8 gradient. Use of the line was less than expected, traders finding that the charges on the canal were substantially lower.[17]

The TVR hesitated to build the authorised branch to the tramroad toDowlais and the clause in the act enabled the Dowlais Iron Company to take over the construction and the branch, which they did.[12][3]

First years of operation

[edit]

The line was open between Merthyr Tydfil and Cardiff, but almost immediately thought was given to improving the capacity of the main line and of serving the coal production of adjacent valleys.

Widenings

[edit]

The line was originally single, except for the Quaker's Yard and Llancaiach inclines, which were double. Cardiff toTaffs Well was doubled in 1846 and through to Navigation House (Abercynon) in 1847. The doubling was completed to Merthyr in 1862.[3]

Extending to Aberdare

[edit]

The original purpose of the TVR had been deeply connected with the ironworks of Merthyr. In the years immediately following the railway's authorisation, the rich seams of high-quality coal in theAberdare area came into prominence and began to outshine the Merthyr trade. Sixteen steam coalpits were sunk there between 1840 and 1853. Those collieries required transport to the sea and the proprietors of the TVR responded by sponsoring the Aberdare Railway, a nominally independent company.

Aberdare Railway Act 1845
Act of Parliament
Long titleAn Act for making a Railway from the Taff Vale Railway near Ynys Meyrick to Aberdare, with a Branch therefrom, to be called "The Aberdare Railway."
Citation8 & 9 Vict. c. clix
Territorial extent United Kingdom
Dates
Royal assent31 July 1845
Other legislation
Relates to
Text of statute as originally enacted

The Aberdare Railway was incorporated on 31 July 1845 to make a7+12-mile (12 km) branch from Navigation House toAberdare. It was worked by the TVR from the outset and leased to it from 1 January 1847. It opened for passenger and goods and mineral traffic on 6 August 1846.[18] Navigation House station was renamed Aberdare Junction on the opening of the branch. There was a 49-chain (3,200 ft; 990 m) branch off the Aberdare line fromCwmbach toAbernant colliery, also opened in 1846; it crossed theRiver Cynon to get access.[12][3]

Left-hand running

[edit]

In 1847 theNewport, Abergavenny and Hereford Railway obtained powers to build itsTaff Vale Extension westwards fromPontypool to connect the TVR at Quakers Yard. This would be the first connection with the rest of the standard-gauge railway network; the TVR reviewed its policy of right-hand running and decided to change to left-hand running in preparation for the connection.[19]

Taff Vale Extension Railway

[edit]

The Newport, Abergavenny and Hereford Railway reachedQuakers Yard on 11 January 1858, making a connection with the TVR there. This gave a route for minerals from the TVR network to reach much further afield, but reduced the haul length on the TVR system.[20] The Taff Vale Extension Railway was later extended toMiddle Duffryn, nearAberdare, opening in April 1864.[d] The extension crossed theLlancaiach colliery sections of the TVR on the level and Llancaiach coal was transported via Quakers Yard on the TVER in preference to using the Llancaiach line inclined plane.[17]

The coalfield around Aberdare was proving to have abundant resources of high-quality coal. The Taff Vale Extension line was able to take the output direct to London (viaHereford—theSouth Wales Main Line was still broad gauge at this time) and to the ports atBirkenhead andSouthampton, where bunkering of seafaring ships was an important market.[21]

Rhondda

[edit]

TheRhondda valleys also began to be the source of excellent coal and that trade started to exceed that of Merthyr. The branch line from Pontypridd to the tramroad leading to the collieries called Dinas had been opened in 1841 which stimulated interest in mining in the valley.

Spurred by the threat of a possible broad-gauge line fromEly, the TVR obtained authorisation on 26 August 1846 for the Rhondda Fawr Valley Extension, in time reaching what is nowTreherbert, opening to there on 7 August 1856. Passenger services were not started until 7 January 1863.[22][3]

In 1849 the company offered a £500 premium for proving the existence of deep-seam coal in theTreherbert area. At the same time a 77-chain (1.5 km) extension fromPorth toYnyshir was opened for mineral traffic; that stub was extended toFerndale in 1856 and later toMaerdy, which at 900 feet (270 m) above sea level was the most elevated location on the TVR system.[12]

In 1854 theEirw Branch was opened; under 1 mile (1.6 km) long it left the Rhondda line atTrehafod to serve nearby collieries.

In 1857 the TVR board authorised the doubling of the Rhondda Fawr as far as Porth; by February 1858 eight collieries were sending their coal down the extension of the Rhondda branch.[22]

In the subsidiary Rhondda valley, the Rhondda Fach, the line was opened from Porth to Ferndale in the summer of 1876 and to Maerdy in 1889.[12]

Pwllyrhebog

[edit]

ThePwllyrhebog branch (as it became known) was authorised in 1857 to reach intoCwm Clydach from Tonypandy. Its actual construction was much delayed, a contract being let in December 1861; it was opened early in 1863.

It climbed away from the Rhondda very steeply, on a 1 in 13 gradient for34 mile (1.2 km) and then on toBlaenclydach.

At first, the Pwllyrhebog incline was worked on the balanced load system but the TVR refused to install a stationary engine even though increasing volumes of output were putting a strain on the capacity of the system.

At this stage the Pwllyrhebog branch served two collieries, Cwm Clydach and Blaenclydach, but in 1871 Thomas, Riches & Co sank an important new pit further up the Clydach Valley atClydach Vale. In November 1871 the TVR agreed to extend the Pwllyrhebog branch to the new pit; in fact the colliery company built the line and transferred it when completed to the TVR. The company also undertook to send all their traffic out via the TVR.

The new pit was at a much higher altitude even than the previous connections so azigzag arrangement immediately above the Pwllyrhebog incline was necessary to gain further height.[e]

Taff Vale Railway Act 1899
Act of Parliament
Long titleAn Act to enlarge the powers of the Taff Vale Railway Company with reference to the construction of works and the acquisition of lands and for other purposes.
Citation62 & 63 Vict. c. cii
Dates
Royal assent13 July 1899
Text of statute as originally enacted

TheTaff Vale Railway Act 1899 (62 & 63 Vict. c. cii) 13 July 1899 formalised the ownership.

Writing in 1951, Casserley refers to a later time when astationary engine had been installed:

The incline was worked on thecounterbalance system, but there were two separate ropes for the ascending and descending trains, in contrast to the endless loop rope more commonly used in this situation.[23]

The winding engine worked at a pressure of 25 psi (170 kPa) and the speed on the incline was about 5 mph (8 km/h). The TVR used three0-6-0tank engines specially designed for the incline, acquired fromKitson and Company in 1884. They hadtaper boilers to ensure that thefirebox crown was covered when on the gradient; Casserley speculates that they probably were the first engines anywhere with taper boilers. The TVR gave them numbers 141 to 143; after 1922 they became GWR nos. 792 to 794. and were nos. 193 to 195 inBritish Railways days. Under the GWR a spare engine was kept as a standby; it was a standardpannier tank, no. 7722. Casserley does not explain how the firebox crown was kept covered in the case of this locomotive.[23]

In 1889 the line was extended privately to Clydach Colliery, making a little over 2 miles (3.2 km) in all; the private extension was acquired by the TVR in 1896.[12]

Blaenrhondda

[edit]
Rhondda Valley and Hirwain Junction Railway Act 1867
Act of Parliament
Long titleAn Act for making Railways in the County of Glamorgan to be called the Rhondda Valley and Hirwain Junction Railway; and for other Purposes.
Citation30 & 31 Vict. c. clxxxviii
Dates
Royal assent12 August 1867
Text of statute as originally enacted

In 1867 a bill was presented for a railway fromTreherbert toHirwaun. TheRhondda Valley and Hirwain Railway was authorised by an act of Parliament, theRhondda Valley and Hirwain Junction Railway Act 1867 (30 & 31 Vict. c. clxxxviii), of 12 August 1867. It was nominally independent. It opened a short section from immediately northwest of Treherbert toBlaenrhondda, with a short spur toBlaencwm Colliery, in June 1878 for mineral traffic only. It abandoned its ambition to cross the 1,561-foot-altitude (476 m) pass to Hirwaun and leased its line to the TVR company from 1878. On 26 August 1889 it was absorbed by the TVR.[12][3]

Widening the main line

[edit]
Taff Vale Railway Act 1857
Act of Parliament
Citation20 & 21 Vict. c. cliii
Dates
Royal assent17 August 1857
Text of statute as originally enacted

TheTaff Vale Railway Act 1857 (20 & 21 Vict. c. cliii) gave the TVR authority for a number of improvements over the coming years. The line was doubled throughout from 1858 to 1862 and later quadrupled between Pontypridd and Cardiff to accommodate the growth in traffic. New viaducts were built alongside the existing structures at Pontypridd and Quakers Yard to carry the second track. In 1864 work started on bypassing the incline with a gentler bank (but still steep at 1 in 40). This required significant earthworks and inclement weather meant that it was not completed until August 1867.Top of Incline station had already closed in 1858, replaced with a new station atQuakers Yard.Pontypridd station was greatly extended during the 1860s.[12]

Developing the system

[edit]

Cardiff docks and Penarth

[edit]

TheCogan Pill branch authorised in the original act was deferred, chiefly due to considerable opposition by theMarquis of Bute. Instead, the TVR company was coerced into accepting a long lease ofBute West Dock; in 1848 a branch, known as the East Branch, was opened to connect to it. The lease was expensive and not entirely convenient. The company was further put out when the rivalRhymney Railway was given access to the east side of the East Dock on considerably more favourable terms. This dock was commissioned in stages between 1855 and 1859 and the TVR was excluded from using it, except as a subtenant of the Rhymney. From 1866 the TVR was permitted access to the East Dock, but it had to run its line over the Rhymney's line from Crockherbtown Junction, just north of the present-dayQueen Street station, to reach it, paying the Rhymney for the privilege. Moreover, congestion, for shipping and for railways, in the Bute Docks was becoming an increasing problem.

Ely Tidal Harbour and Railway (Glamorgan) Act 1856
Act of Parliament
Citation19 & 20 Vict. c. cxxii
Penarth Harbour, Dock and Railway Act 1857
Act of Parliament
Citation20 & 21 Vict. c. lxix
Penarth Harbour, Dock and Railway Act 1861
Act of Parliament
Citation24 & 25 Vict. c. cxxiv
Penarth Harbour, Dock and Railway Act 1881
Act of Parliament
Long titleAn Act to empower the Penarth Harbour Dock and Railway Company to extend their existing Dock and to execute other works in connexion therewith and to raise additional capital; and for other purposes.
Citation44 & 45 Vict. c. li
Dates
Royal assent3 June 1881
Text of statute as originally enacted

These dissatisfactions led to the company sponsoring the Ely Tidal Harbour and Railway, which was authorised by Parliament on 21 July 1856. TheEly Tidal Harbour and Railway (Glamorgan) Act 1856 (19 & 20 Vict. c. cxxii) enabled construction of a tidal harbour atPenarth, southwest of Cardiff, and an approach railway fromRadyr on the TVR line. The route was modified by thePenarth Harbour, Dock and Railway Act 1857 (20 & 21 Vict. c. lxix) the following year, on 27 July 1857, and the name of the railway changed to the Penarth Harbour, Dock and Railway. The railway leading to Tidal Harbour, east of Cardiff, was just over 6 miles (10 km) long and opened in August 1859, but the dock was not completed until 1865.[12][3]

The Penarth scheme experienced determined hostility from the Bute Docks interest and there was protracted litigation over the validity of the powers. Although the final outcome was in favour of the TVR, theHouse of Lords' decision bound it to charge shipping rates no lower than the Cardiff rates. A major extension was later made, opening in 1884.[clarification needed]

The opening of the Penarth Docks proved a huge benefit to the company, not only in bringing in direct revenue, but in easing congestion on the main line as mineral trains were diverted from Radyr. Enormous volumes were moved through the docks: 2.8 million tons in 1885.[clarification needed] The Penarth Harbour, Dock and Railway was leased to the company, although its owning company retained its independent existence until 1922.[12]

Llantrisant lines

[edit]
Main articles:Llantrisant and Taff Vale Junction Railway andLlantrisant–Aberthaw line

In 1857 a competitive threat emerged when theEly Valley Railway was incorporated to build a broad-gauge line from Llantrisant, on theSouth Wales Railway between Cardiff andBridgend, towards theRhondda valley. The line opened in August 1860 as far asTonyrefail and in 1862 it was extended toPenygraig, close to the TVR atTonypandy. It was leased to the GWR from 1 January 1861; the GWR wanted it as a source for locomotive coal and the lease was independent of the local broad gauge railway, the South Wales Railway.[22]

The company saw this as a threat and promoted the nominally-independentLlantrissant and Taff Vale Junction Railway, which obtained its act of incorporation, theLlantrissant and Taff Vale Junction Railway Act 1861 (24 & 25 Vict. c. li) on 7 June 1861. It was to build from the TVR main line nearTrefforest[f] to make a junction with the Ely Valley Railway at Maesaraul, nearLlantrisant. The line opened in December 1863 for freight traffic. A passenger service was operated from Pontypridd toLlantrisant from 21 January 1875.[24]

The nominally-independentCowbridge Railway was authorised on 29 July 1862 to build from theGreat Western Railway (former South Wales Railway) station atLlantrisant toCowbridge. This was another TVR dependency as it failed to generate the necessary subscriptions to build the line itself. The line opened in February 1865. The GWR line was broad-gauge and the branch to Cowbridge was accessed from the Llantrisant and Taff Vale Junction Railway. Trains from Pontypridd ran over the final section of the Ely Valley Railway and across the South Wales Main Line to the Cowbridge Railway terminus where they had to reverse to continue.[25]

Bypassing the Quakers Yard incline and opening Pontypridd north curve

[edit]

The incline atQuakers Yard had become increasingly busy to the point of serious congestion and in 1864 the decision was taken to bypass it. A new route with a gradient of 1 in 40 was installed nearby and was commissioned in mid-1867. The TVR had running powers over the GWR'sTaff Vale Extension line between Quakers Yard andLlancaiach. The mineral output from the mines there could now more conveniently be brought out via Quakers Yard, avoiding the incline on the Llancaiach branch, which was closed except for a short section at the north end. A north curve at Pontypridd was opened in October 1872, also facilitating the transfer of mineral output between the branches of the TVR system.[17]

Dare Valley

[edit]
Dare Valley Railway Act 1863
Act of Parliament
Long titleAn Act for making a Railway from the Aberdare Railway in the Parish of Aberdare in the County of Glamorgan, with a Branch therefrom to be called "The Dare Valley Railway;" and for other Purposes.
Citation26 & 27 Vict. c. clxxi
Dates
Royal assent21 July 1863
Text of statute as originally enacted

There was intensive mining activity in the hills to the south ofAberdare and theVale of Neath Railway had already opened a branch there.[clarification needed] In 1866 theDare Valley Railway, incorporated by theDare Valley Railway Act 1863 (26 & 27 Vict. c. clxxi), was opened from Aberdare to theBwllfa Colliery.[g] The line was worked by and leased to the TVR.[3]

Reaching Dowlais

[edit]

Iron production in South Wales peaked in 1871, after which the process was remorseless decline. An exception was at Dowlais, where theBessemer process of steel making was instigated from 1865. This required a different quality ofiron ore, not available locally, and the potential traffic flow of imported ore encouraged thoughts of improved railway connections. Several unsuccessful schemes were put forward, but a joint venture between the Rhymney Railway and the Great Western Railway (by now owner of the Taff Vale Extension line) resulted in theTaff Bargoed Joint Line. This opened on 10 January 1876 for goods and minerals from Taff Bargoed Junction, immediately west of Llancaiach station, to Dowlais. Passenger operation started on 1 February 1876.

The Taff Bargoed Joint Line had been authorised in 1867 and there were certain protections in its act for the company, including running powers over it. In 1872 the company presented a parliamentary bill to build on that,[clarification needed] making a new railway to Llancaiach, with new connections to the Taff Vale Extension line. The intention was to run to Dowlais over the Llancaiach line and the Taff Bargoed line. The Company already had access to Dowlais over the Dowlais Railway, but this route seemed more attractive, linking in the Navigation Colliery and possible traffic from the Taff Bargoed line itself.

In fact, the terms of the running powers did not permit through running at Llancaiach and the TVR company's intentions were frustrated when the GWR declined the facility, so the Llancaiach branch was not brought into full use.[17]

Later extensions to the system

[edit]

Merthyr station

[edit]

The TVR's original station inMerthyr Tydfil atPlymouth Street was opened on 12 April 1841 and was a short distance south of the town. This was joined in 1853 by theHigh Street station of theVale of Neath Railway. A short joint line (TVR and GWR) was built to connect the TVR line to the new station in 1877. A year later, in August 1878, the TVR transferred all of its passenger services to the High Street station and used Plymouth Street as a goods depot instead. High Street station thus became the only passenger station in Merthyr and was used by a total of six separate companies prior to the 1922 grouping. The TVR also opened stations atMerthyr Vale in 1883 andPentrebach in 1886.[3]

Penarth Town

[edit]

A short branch from the Penarth Dock line into the town was opened on 20 February 1878. Known as thePenarth Extension Railway, it was a mile long, running up a gradient of 1 in 40 from Cogan Junction toPenarth Town.[12][3]

Treferig Valley Railway and the L&TVJR line

[edit]

Seeking further expansion north of Llantrisant, the Company encouraged the formation of theTreferig Valley Railway, incorporated on 21 July 1879. This opened a 2-mile-56-chain (4.3 km) branch fromTreferig Junction, near Common Branch Junction on the Llantrisant and Taff Vale Junction line, to Treferig and Glyn Collieries in April 1883 for mineral trains only.[24]

In 1865 theOgmore Valley Railway was opened. It was a standard gauge line and there appeared to be enormous potential to bring standard gauge mineral trains to Penarth. The Company obtained authority to build a northwest to southeast diagonal line across the Llantrisant and Taff Vale Junction Railway system to handle this traffic. Financial difficulties delayed construction and in the meantime theSouth Wales main line of the GWR was converted tostandard gauge.

Now a mainline railway was available for the Ogmore Valley traffic viaBridgend and at a stroke most of the as yet unbuilt diagonal line was of little value. However, there were severe penalties in the legislation if it were not constructed, so the TVR used delaying tactics. However, it was eventually built, the section from Common Branch Junction to Waterhall Junction between Radyr and Penarth, giving direct access to the docks, opened in 1886 for goods and mineral traffic only.[24]

Roath branch

[edit]

The volume of mineral traffic exported through Penarth Docks had continued to grow and the capacity of the railway and the docks was overwhelmed. On 23 April 1888 the TVR opened a branch railway to theRoath Dock, itself opened in 1887, on the east side of the Cardiff complex of docks. The line diverged from the main line at Roath Branch Junction and arched round the east of the built-up area of the city of Cardiff as it was at that time, connecting with theCardiff Railway's lines at the docks.[3]

TheQueen Alexandra Dock was opened in 1907 and was also served from the branch.[12][3]

Ynysybwl branch

[edit]
Main article:Ynysybwl branch line railway

The Company obtained powers to build a branch to collieries in the Clydach Valley in 1872, but then lost enthusiasm for the project when anticipated colliery development in the area did not materialise.

However,Lady Windsor Colliery nearYnysybwl was sunk in 1885 and promised to be a substantial activity. The TVR decided to build a branch line to serve it. The branch ran from a north-facing junction around 1 mile (1.6 km) south ofAbercynon to collieries nearLlanwonno, some way west of Ynysybwl itself. It was 4 miles 67 chains (7.8 km) in length and opened for goods and mineral traffic in 1886, though some informal use may have taken place in 1884. The passenger service as far as Ynysybwl started from Aberdare Junction station (known asAbercynon from 1896) on 1 January 1890.[17]

In 1900 a south curve connection to the main line was opened but the TVR was concerned about congestion at Pontypridd and held off from starting the southward passenger service. After some delay, arailmotor passenger service connecting Pontypridd and Ynysybwl was started on 17 October 1904, the northward service to Abercynon being then discontinued.[17]

Llancaiach

[edit]
Main article:Llancaiach Branch

The original Llancaiach branch, opened in 1841, had left the Merthyr main line at Stormstown Junction, just south of Abercynon, crossed the River Taff and swung east to reach its objective. After a period of dormancy, in 1878 a deviation was built to avoid the rope-worked incline, but due to a dispute over running rights with the GWR the new line was little used.

Several decades later other collieries required to be connected on the east side of the Taff, in particularAlbion Colliery (productive from 1887) andCardiff Dowlais Colliery (productive from 1889). The decision was taken to make a branch from a junction further south at Pont Shon Norton at the northern margin of Pontypridd. This was opened in 1887 as far asCilfynydd.

In 1900 the branch was extended northward to join the earlier Llancaiach branch, at Ynysdwr Junction, opening to traffic on 1 June 1900. A passenger service operated from Pontypridd to Nelson on the TVR line a little short of the junction with the Taff Vale Extension line and did not use the GWR Llancaiach station there.[h] A railmotor service was inaugurated on 10 August 1904.[17]

Cowbridge to Aberthaw

[edit]
Main article:Llantrisant–Aberthaw line

The Cowbridge and Aberthaw Railway was authorised on 12 August 1889 to build from the end of the Cowbridge Railway toAberthaw on theBristol Channel coast, where there were importantlimestone quarries. The Cowbridge terminus was not aligned to permit the extension so a new Cowbridge passenger station was opened on the Aberthaw line, the old terminus reverting to goods status. The Aberthaw line opened on 1 October 1892. The little company was vested in the TVR company effective from 1 January 1895. Later that year, the opening of theVale of Glamorgan Railway connecting Aberthaw directly toPenarth and Cardiff took much of the potential mineral traffic away from this line.[25]

Pontypridd improvements

[edit]

Relief lines were constructed at Pontypridd in the 1890s, enabling goods trains to pass the station and wait for a clear path without interfering with passenger trains. Between 1907 and 1914 the station was rebuilt as a single long island platform with numerous bays. This work included raising the level of the entire station by nearly 5 feet (1.5 m). The new station had over 8,200 square yards (6,900 m2) of platform. Passenger numbers starting or finishing a journey there exceeded 10,000 daily by 1920.[3]

Congestion was also serious atStormstown and layout enhancements were installed there in 1906. The opportunity was taken to shift Berw Road Platform from the site onto the Llancaiach branch.[17]

Competing railways

[edit]

The TVR had been the first railway to serve the valleys of South Wales, at first chiefly to handle the iron products of Merthyr but soon to bring the coal output of the area served to the docks of Cardiff. As the coal production of the region grew so greatly it was inevitable that competing companies would enter.

Rhymney Railway

[edit]
Main article:Rhymney Railway

The Rhymney Railway was the main competitor to the TVR in bringing coal down from the valleys. For many years, until 1871, this involved Rhymney Railway coal trains running over the TVR main line from Walnut Tree to Cardiff. The line was extremely congested.[3]

In 1867 the Rhymney Railway obtained running powers over the Taff Vale Extension line betweenHengoed on the Rhymney system, throughAberdare toHirwaun, giving it direct competitive access to the Aberdare coalfield.[17][26]

Cardiff Dock congestion and Barry

[edit]
Main article:Barry Railway

The phenomenal increase in volume of coal shipped out of the various Cardiff docks had long been such that their capacity was overwhelmed. There were constant complaints that congestion on the railway and in the harbour resulted in unacceptable delays and costs. One outcome of the situation was the promotion and construction of docks atBarry, as well as the Barry Railway which ran direct from the Rhondda collieries to Barry. The Barry Railway was authorised in 1884 andBarry Docks opened on 18 July 1889.

The Barry Railway went on to promote a direct Cardiff, Penarth and Barry Junction Railway, which would run direct and also have a roundabout line following the coast. The TVR opposed this and promoted its own alternative lines. Parliament decided on a compromise in which the Barry Railway could build the direct line from a junction with the TVR andCogan, while the TVR would build the coastal route fromPenarth Town, joining the Barry Railway at Biglis Junction nearCadoxton. The TVR scheme was authorised by theCardiff, Penarth and Cadoxton-juxta-Barry Junction Railway Act 1885 (48 & 49 Vict. c. clxxv) of 6 August 1885. The line was ready and opened on 1 December 1887 but the junction connection at Biglis was not made at first. For the sake of diplomacy it had to wait until the Cogan connection of the Barry line was ready. Both lines opened on 20 December 1888. TVR passenger trains ran through to the Biglis Junction station of the Barry Railway from August 1889. (The station was renamedCadoxton on 1 June 1890). The Cardiff, Penarth and Barry Junction Railway became vested in the Taff Vale Railway Company by theTaff Vale Railway (Amalgamation and Capital) Act 1889 (52 & 53 Vict. c. cxciii) of 26 August 1889.[12][3][19]

Pontypridd to Newport

[edit]
Main article:Pontypridd, Caerphilly and Newport Railway

The extensive and modern facilities atNewport Docks were serving theMonmouthshire valleys well enough, but there was a natural desire to handle some of the profitable business of the Glamorgan valleys too.[clarification needed] The docks at Newport were operated by theAlexandra (Newport and South Wales) Docks and Railway, the railway part of their operation being confined to the docks area. They encouraged the formation of a nominally independent railway, the Pontypridd, Caerphilly and Newport Railway (PC&NR), authorised in 1878. The line ran from a junction immediately south of the TVR station at Pontypridd to nearCaerphilly, relying on running powers from there over theRhymney Railway and theBrecon and Merthyr Railway to reach Newport. The line was opened in July 1884. Seeing this as an opportunity, the TVR company worked the mineral trains for the PC&NR (until 1906).[3][27]

Rhondda and Swansea Bay

[edit]
Main article:Rhondda and Swansea Bay Railway

Swansea docks also expanded its facilities and the newPrince of Wales Dock opened in 1881. During construction the owners saw that attracting coal shipments from the Rhondda valley could be beneficial. The result was the promotion of the Rhondda and Swansea Bay Railway which was to run fromTreherbert at the head of the Rhondda Fawr, through a long tunnel to cross thewatershed, and then down the valley of theRiver Afan. The construction of the tunnel took a long time and the line opened in 1890.[3]

Cardiff Railway

[edit]
Main article:Cardiff Railway

The Bute Docks Company was created on 1 June 1887 and the Bute Docks properties were vested in the new company. In 1897 it succeeded in getting authorisation via theCardiff Railway Act 1897 (60 & 61 Vict. c. ccvii) to build a railway, which became the Cardiff Railway, fromHeath on the Rhymney Railway toTrefforest on the TVR, and a southward line from Heath to the docks atRoath. It took until 1911 to construct the line from Heath as far as a point close to the TVR line at Treforest, but the Company succeeded in fending off the incursion. The connection was never made and the Cardiff Railway never achieved its potential.[12][17]

Financial performance

[edit]

In the period 1870 to 1888 the dividend on the ordinary shares averaged 12.5 per cent.[3]

The twentieth century

[edit]

Steam railcars

[edit]

The emphasis throughout the 19th century existence of the TVR had been on mineral traffic. When Ammon Beasley became General Manager in 1891 he sought to increase the passenger income of the company, particularly in the face of street-running passenger tramcars. In 1903 he introduced steam "motor cars" on the TVR. These were self-contained passenger coaches incorporating a small steam engine. The intention was to adopt a low-cost means of serving wayside communities by opening very basic stopping places (referred to as "platforms" rather than "stations") and having a more frequent timetable.

Consideration was given to whether the "platforms" could be at ground level, accessed by folding steps on the vehicle, but the decision was taken to make them elevated.[17]

The first experimental run was on the Penarth branch on 21 December 1903.

The TVR used the system in both rural and suburban situations. It was commercially successful for some time, the TVR had nineteen steam railcars at the peak and offered first and third class accommodation. The railcars had the disadvantage of inflexibility at busy times and the small traction units became worn out after a decade and a half. At that stage the TVR converted the coaches to push-and-pull control trailers, using small independent locomotives as the power unit.

As well as introducing steam railcars in 1903, the TVR obtained Parliamentary powers in that year to installelectric traction equipment. However, the powers were never used.[12]

From 1922

[edit]
The Taff Vale Railway system in 1922

FollowingWorld War I the government decided to restructure most of the railways of Great Britain into one or other of four large companies. The process was called the "Grouping" and was legislated in theRailways Act 1921. The old Great Western and six of the South Wales railway companies were constituents of the newGreat Western Railway. The other smaller railways in the GWR area were "subsidiaries", the old GWR being the largest and the TVR the second largest. The TVR was amalgamated into the putative GWR on 1 January 1922 (effectively from 25 March 1922).[12]

Immediately prior to the amalgamation, the trading position of the TVR compared to the old GWR was:[28]

TVRGWR
Issued capital£6.42 million£101 million
Net income in 1921£464,654£6,188,433
Annual dividend on ordinary stock in 19224%7.25%
Route length112 mi (180 km)2,784 mi (4,480 km)
Number of employees5,69091,985

The Grouping meant that the competitive situation with the Rhymney Railway no longer existed and in July 1928 a new connection was installed at Cardiff Queen Street to enable the Rhymney trains to use Queen Street instead of the unsatisfactoryParade station adjacent.

The production of steel atDowlais ceased in 1930. The inward haul of iron ore had sustained theCilfynydd line and the GWR decided that the thinly patronised passenger service was unsustainable so it was taken off and the line closed completely above Cilfynydd from 12 September 1932.[17]

From 1948

[edit]

The mainline railways of Great Britain were taken into nationalised ownership at the beginning of 1948, following theTransport Act 1947. The former TVR area became part of theWestern Region of British Railways. The end ofWorld War II had brought to notice what had become inefficient working methods andBritish Railways immediately set about some closures.

The mineral line aboveOld Ynysybwl had never reached its potential and was closed completely on 22 September 1949; the passenger service was closed on 28 July 1952 and all ordinary traffic ceased in November 1959.Lady Windsor Colliery continued in business, served from the Stormstown direction, until closure of the colliery on 26 March 1988 and of the mineral trains after 20 May 1988.[i][12][17]

ThePwllyrhebog branch was closed on 1 July 1951.[23][22] The Pontypridd to Llantrisant passenger service ceased on 31 March 1952; the goods service closed in 1959. TheCowbridge line closed to passengers on 26 November 1951.[3][22]

In June 1952 a new connection was made atTaffs Well to the colliery atNantgarw, enabling closure of the Cardiff Railway connection beyondCoryton.[3]

By the 1960s more passenger closures took place and the rationalisation of some over-provision of infrastructure was also implemented. The Aberdare branch was closed to passengers on 16 March 1964 and the line was singled in 1968. The Maerdy (Rhondda Fach) branch passenger service was withdrawn on 15 June 1964 and the branch was singled later that year. The Blaenrhondda branch was closed in 1966 and in June 1966 theBute Road branch was singled. The Penarth branch was singled in February 1967 and the west-to-north curve at Pontypridd was closed on 5 August 1968.[12]

The Roath branch was closed on 6 May 1968. In addition, the now-freight-only Cowbridge line closed completely in November 1965 (except for iron ore traffic toLlanharry) until 1975. The Penarth to Cadoxton line closed completely on 6 May 1968 together with the Roath Dock branch on the same day.[12][3]

Closures in the mid-20th century left the TVR as the only railway route intoMerthyr Tydfil. Plymouth Street goods station was closed in 1968. The line from Black Lion signal box (Merthyr Vale) to Merthyr Tydfil was singled in February 1971. As mineral traffic declined, the quadruple track south of Pontypridd became unnecessary and it was reduced to double line in 1980.

TheAlbion Colliery branch, served from Pont Shon Norton, closed completely in September 1970.[12][3]

The Merthyr line from Abercynon was singled in 1971 and the Treherbert line above Cwmparc was singled in 1972.[12][3]

On 10 August 1973 the extremity of theAberdare branch was altered; approaching from Abercynon, the line crossed theRiver Cynon at Cwmbach along the alignment of the much earlier Cwmbach colliery spur and joined the former Taff Vale Extension and Vale of Neath line into Aberdare. The line from the point of divergence to Aberdare TVR station was closed.

The Eirw branch closed in 1977 when the last colliery finished operation. The Rhondda Fach branch also lost its freight service in 1987.[12][3]

The network today

[edit]

As of 2020[update], the main routes of the TVR are currently in use with passenger operation predominant.Merthyr Tydfil,Aberdare,[j] andTreherbert have train services toCardiff Queen Street. TheCardiff Bay branch operates the majority of the former Cardiff Docks branch. ThePenarth branch and theRadyr to Ninian Park line complete the surviving passenger routes. In 2020 the passenger operation is under the management ofTransport for Wales.

There is a very limited freight service, consisting only of trains fromTower Colliery above Aberdare.

Accidents

[edit]

On 19 October 1878 an empty passenger train was turning on the Pontypridd triangle. It was propelling on the wrong line from North Junction to Rhondda Cutting Junction and collided with a down Rhondda train. There were thirteen fatalities.[3]

On 12 August 1893 the 3:50 pm train from Merthyr to Cardiff derailed at Trefforest, Llantrisant Junction. The train was conveying through coaches fromAberystwyth when a pin forming part of the suspension of the locomotive fractured and the locomotive collapsed and six passenger vehicles ran down the embankment and were smashed. Thirteen people were killed and twelve were injured.[29]

On 23 January 1911 a passenger train ran into the rear of a coal train at Coke Ovens, near Pontypridd. The accident was due to irregularities in the block working by the signalman who forgot that he had admitted the first train into the section and had not received "Train Out of Section" for it. The block instruments were of the two-position type. Eleven people were killed and five were seriously injured.[30]

In common with other railway companies of the time, operating the system was dangerous for staff. Between 1900 and 1923, the Railway Inspectorate investigated accidents to 75 employees, 12 of which were fatal.[31]

Topography

[edit]
Note: theLlantrisant and Taff Vale Junction line, theCowbridge and Aberthaw branch, theYnysybwl branch and theLlancaiach line are dealt with on their respective main pages.

Main line

[edit]
Cardiff to Merthyr Tydfil
24+28
Merthyr (Plymouth Street)
Merthyr High Street
Dowlais Incline
toDowlais Ironworks
23+3
Pentre-bach
21+68
Troed-y-rhiw
19+77
Merthyr Vale
17+73
Quakers Yard
Incline Top
Aberdare Branch
toAberdare
16+28
Abercynon
Llancaiach Branch
toNelson
Ynysybwl Branch
toYnysybwl
Llancaiach Branch
toNelson viaCilfynydd
Rhondda Branch
toTreherbert &Maerdy
12+74
Pontypridd
12+1
Treforest
11+14
Maesmawr
Llantrisant Branch
toLlantrisant
7+24
Taff's Well
Rhymney Railway
Walnut Tree Branch
5+31
Radyr
Llandaff
Roath Branch
Maindy Halt
Woodville Road Halt
Cathays
Crockherbtown Junction
1+8
Cardiff Queen Street
to Cardiff East Docks
Cardiff
Bute West Dock
0+0
Cardiff Docks (Bute Road)
  • Merthyr (Plymouth Street); opened 21 April 1841; closed 1 August 1877; passenger trains transferred to High Street station;
  • Brandy Bridge Junction; convergence of line fromMerthyr High Street;
  • Pentrebach; opened 1 August 1886; renamedPentre-Bach 1980;
  • Troed-y-rhiw; opened by December 1841; still open;
  • Merthyr Vale; opened 1 June 1883; still open;
  • Quaker's Yard; opened 11 January 1858; renamed Quaker's Yard Low Level 1924; renamed Quaker's Yard 1968; nowQuakers Yard; still open;
  • Incline Top; opened 29 September 1841; closed December 1857;
  • Navigation House; opened 9 October 1840; renamed Aberdare Junction 1849; renamed Abercynon 1896; renamed Abercynon South 1988; renamedAbercynon; still open
  • Llancaiach Branch Junction / Stormstown Junction;
  • Clydach Court Junction;
  • Berw Road Platform; opened 17 October 1904; closed 1 July 1906;
  • Pont Shon Norton Junction; convergence of Llancaiach branch;
  • Pontypridd Northern Junction; divergence of Pontypridd Loop towards Porth;
  • Newbridge Junction; opened 9 October 1840; renamedPontypridd 1886; still open;
  • PC&N Junction; divergence of Caerphilly line;
  • Treforest; opened by December 1846; later renamedTrefforest; still open;
  • Treforest Junction; divergence of line to Llantrisant, and of Cardiff Railway;
  • Maesmawr; opened 30 October 1840; closed 20 April 1841;
  • Treforest Estate; opened 5 January 1942; later renamedTrefforest Estate; still open;
  • Taff's Well; opened 9 October 1840; alternatively known as Walnut Tree Bridge and Walnut Tree Junction; nowTaffs Well; still open; convergence of Nantgarw branch; convergence of Walnut Tree Branch from Penrhos Junction;
  • Radyr; opened 1 June 1883; still open; divergence of Radyr Branch (to Penarth);
  • Llandaff Loop Junction; convergence of Llandaff Loop;
  • Llandaff; opened 9 October 1840; renamedLlandaf; still open;
  • Roath Branch Junction;
  • Maindy North Road Platform; opened May 1907; renamed Maindy North Road Halt 1922; renamedMaindy Halt 1952; closed 15 September 1958;
  • Cathays Woodville Road Platform; opened July 1906; renamed Cathays Woodville Road Halt 1922; renamedWoodville Road Halt; closed 15 September 1958;
  • Cathays; opened 3 October 1983; still open;
  • Crockherbtown Lower Junction; divergence of line to Cardiff East Dock;
  • Queen Street North Junction; convergence of connection from Heath line;
  • Cardiff; opened 9 October 1840; later known asCardiff Queen Street; still open;
  • Cardiff East Branch Junction; divergence of Cardiff East branch;
  • Cardiff Bute Dock; opened after April 1841; renamed Cardiff Docks, then Cardiff Bute Road, more recentlyCardiff Bay; still open.

Merthyr High Street

[edit]
  • Merthyr (Vale of Neath Railway station); opened 2 November 1853; TVR passenger services transferred in 1 August 1877; renamedMerthyr Tydfil 1980; still open;
  • Mardy Junction; divergence of line to Vale of Neath Railway;
  • Brandy Bridge Junction; above.

Aberdare line

[edit]
  • Mill Street Platform; opened 5 April 1847; closed 21 November 1852; reopened 26 November 1904; closed to public June 1912 but miners' use continued until 1940s;
  • Dare Valley Junction; convergence of line from Nantmelyn;
  • Commercial Street Platform; opened 26 November 1904; closed June 1912;
  • Aberdare; opened 6 August 1846; renamedAberdare Low Level 1924; closed 16 March 1964;
  • Treaman; opened January 1857; renamedAberaman 1888; closed 16 March 1964;
  • Aberaman first station opened 5 April 1847; closed 14 July 1856; divergence of Aberaman Colliery branch;
  • Convergence of line from Aberaman colliery; convergence of Cwmbach branch;
  • Abercwmboi Platform; opened 26 December 1904; renamedAbercwmboi Halt 1922; closed 2 April 1956;
  • Fernhill; opened 3 October 1988; still open;
  • Mountain Ash; opened 6 August 1846; renamed Mountain Ash Oxford Street 1924; closed 16 March 1964; reopened asMountain Ash 3 October 1988; still open;
  • Penrhiwceiber; opened 1 |June 1883; renamed Penrhiwceiber Low Level 1924; closed 16 March 1964; reopened asPenrhiwceiber 3 October 1988; still open;
  • Matthewstown Halt; opened 1 October 1910; closed 16 March 1964;
  • Pontcynon Bridge Platform; opened 26 December 1904; later renamed Pontcynon Halt: closed 16 March 1964;
  • Abercynon North; opened 3 October 1988; closed 2008;
  • Abercynon; above.

Dare Valley Branch

[edit]
  • Bwllfa Colliery;
  • Nantmelyn Platform; opened 1 July 1904 for miners only; closed 1 April 1949;
  • Aberdare LL (above)

Rhondda Fawr

[edit]
Rhondda Valley
Blaenrhondda Branch
Blaen-Rhondda
Blaencwm Branch
 
Treherbert
23-50
Ynyswen
23-2
Treorchy
22-2
22-46
Maerdy
Ton Pentre
21-50
Ystrad Rhondda
20-75
20-60
Ferndale
Llwynypia
19-7
Clydach Vale
Tylorstown
Pwllyrhebog Branch Jn
Pontygwaith Halt
Tonypandy
18-3
Wattstown Platform
Dinas Rhondda
17-40
17-11
Ynyshir
Pandy (Glamorgan)
16-55
Rhondda Fach Junction
Porth
16-10
Cymer Colliery
Aerw Branch Junction
Hafod
15-82
Trehafod
14-74
Hafod Junction
Pontypridd
12-74
  • Fernhill Colliery, Blaenrhondda;
  • Fernhill Colliery; opened 1875 for miners; closure date uncertain;
  • R&SB Junction; convergence of Rhondda & Swansea Bay line;
  • Treherbert; opened 12 January 1863; still open;
  • Tylacoch Halt; opened October 1906; closed November 1912; reopened asYnyswen 29 September 1986; still open;
  • Treorky; opened 27 September 1869; relocated by 30 chains 3 March 1884; renamedTreorchy 1892; still open;
  • Pentre Platform; opened October 1906; closed November 1912;
  • Ystrad; opened 4 February 1861; renamedTon Pentre 29 September 1986; still open;
  • Ystrad Rhondda; opened 29 September 1986; still open;
  • Llwynypia; opened May 1871; still open;
  • Tonypandy and Trealaw; opened 9 March 1908; renamedTonypandy 1973; still open; convergence of Pwllyrhebog branch;
  • Dinas Rhondda; opened 2 August 1886; closed 12 April 1917; reopened July 1919; nowDinas (Rhondda); still open
  • Pandy (Glamorgan); opened 1 May 1861; closed 2 August 1886;
  • Porth; opened 4 February 1861; still open;
  • Hafod; opened 30 August 1861; closed 17 October 1892;
  • Hafod; opened 17 October 1892 over 1 mile (2 km) down from previous station; renamedTrehafod 1905; still open; convergence or Airw Branch;
  • Trehafod Junction; divergence of Barry Railway line;
  • Gyfeillon Platform; opened 5 June 1905; closed July 1918;
  • Rhondda Cutting; divergence of north curve towards Merthyr;
  • Pontypridd; above.

Rhondda Fach

[edit]
  • Maerdy Colliery;
  • Maerdy; opened 18 June 1889; closed 15 June 1964;
  • Ferndale; opened 1868 as private station for workers of D Davis & Sons; closed 13 March 1875; opened to public 5 June 1876; closed 15 June 1964;
  • Tylorstown; opened 24 May 1882; closed 15 June 1964;
  • Pontygwaith Platform; opened 5 June 1905; closed 1 October 1914;
  • Wattstown Platform; opened 5 June 1905; closed 12 July 1920;
  • Ynyshir; opened by July 1885; closed 15 June 1964;
  • Porth (above).

Roath branch

[edit]

Radyr to Penarth Harbour

[edit]
  • Radyr; above;
  • Quarry Junction; divergence of Llandaff Loop;
  • Danescourt; opened 5 October 1987; still open;
  • Waterhall Junction; convergence of Llantrisant No 1 Branch (L&TVJR from Common Branch Junction);
  • Fairwater; opened 5 October 1987; still open;
  • Waun-Gron Park; opened 2 November 1987; still open;
  • Ninian Park Platform; opened by July 1934 although probably for football matches from 1912; closed 3 September 1939; reopened asNinian Park 5 October 1987; still open; convergence of Leckwith Loop; divergence of line to Cardiff Central;
  • Penarth South Junction; convergence of line from Cardiff Central;
  • Grangetown; opened 29 May 1882; still open;
  • Penarth Harbour Branch Junction; divergence of line to Penarth Town;
  • Penarth Dock; opened 20 February 1878; closed 1 January 1962.

Penarth Branch

[edit]
  • Penarth Harbour Branch Junction;
  • Llandough Platform; opened 13 June 1904; closed 3 June 1918;
  • Penarth Dock Branch Junction; divergence of line to Penarth Dock;
  • Cogan Junction; divergence of Barry Railway;
  • Dingle Road; opened 1 March 1904; still open;
  • Penarth Town; opened 20 February 1878; laterPenarth; still open;
  • Alberta Place Halt; opened 19 September 1904; closed 6 May 1968;
  • Lower Penarth; opened 1 February 1897; renamed Lower Penarth Halt 1935; closed 14 June 1954;
  • Lavernock; opened 1 December 1887; closed 6 May 1968;
  • Swanbridge; opened by July 1906; closed 6 May 1968;
  • Sully; opened 24 December 1888; closed 6 May 1968;
  • Biglis Junction; convergence with Barry Railway.[32][33][34]

Locomotives

[edit]
Main article:Locomotives of the Great Western Railway
TVR steam railmotor

Prior to 1873 TVR locomotives were designed and built by outside contractors. The TVRlocomotive engineers and superintendents were:[35][36]

  • George Bush (to September 1841)
  • Edward Bage (1841 – December 1842)
  • William Brunton (December 1842–?)
  • Richard Gregory
  • William Craig
  • Alexander Colville (?–1846)
  • Henry Clements (December 1846 – January 1858)
  • Joseph Tomlinson (January 1858 – July 1869)
  • B. S. Fisher (1869–1873)
  • Tom Hurry Riches (1 October 1873 – 4 September 1911)
  • John Cameron (1911–1922)

Locomotive classes

[edit]

Two 2-2-2 locomotives were supplied bySharp, Roberts and Co. for the opening of the first section of the TVR on 8 October 1840. As further sections were opened, and traffic increased, additional locomotives were obtained. Most were bought from various private locomotive manufacturers such asR. & W. Hawthorn & Co.,Kitson, Thompson and Hewitson, andStothert, Slaughter & Co but some were acquired secondhand. The TVR began building locomotives in its own workshops atCardiff (West Yard) in 1856, but was never self-sufficient – many locomotives continued to be supplied by private builders, and the last Cardiff-built locomotive entered service in 1903. Until 1863, locomotives were named, but not numbered; in that year, the existing fleet were allotted the numbers 1–50 and as these were applied, the names were removed. The earliest locomotives all had tenders, tank locomotives first appeared in 1865 and the last tender locomotives were delivered in 1889; some of these remained in service until the 1920s.

The TVR possessed over 460 locomotives at one time or another.[37] There were 275 in service at the start of 1922, when the TVR amalgamated with the GWR and other railways.[38] 104 of these lasted long enough to be inherited by British Railways (BR) at the start of 1948.

Later locomotive classes of the Taff Vale Railway
ClassWheelsIntroducedQuantityFinal TVR nos.To GWRFirst GWR nos.To BRExtinctNotesRef
A0-6-2T1914583, 7, 10–12, 20, 42/5, 52, 75, 80, 90/1, 120/2–5/7–130/2–6/8–140/4/9, 154/6–160/2/4/5, 400–41658335/7, 343–9, 351/2/6/7, 360–2/4–8, 370–391/3/4/7–9, 401–4/6/8, 438–441581957GWR nos. 401 up allotted 303–9, 312/6, 322 in 1946, renumbered 1947–50[39]
C4-4-2T18886170–561301–61927[40]
D0-6-0ST18658250/7, 260/8–2722797/81926Six withdrawn 1906–19[41]
E0-6-0ST[k]18734262–52795/61927Two withdrawn 1906[42]
F0-6-0ST[l]1871485, 255/6, 2771905[43]
G0-6-0T1873490/1/9, 2761901Secondhand, built 1868[44]
H0-6-0T18843141–33792–431953Renumbered 193–5 during 1948/49[45]
I4-4-0T18843285–73999, 1133, 11841925[46]
J0-4-4T18764260/1, 277/81906Rebuilt from 0-6-0 builtc. 1861[47]
K & L0-6-0187485201–3/6–213/7/9, 220, 235/6/9, 242/5/6/8/9, 252–6/8[m]/9, 261, 273–6/8/9, 281–4/8, 295/7/8, 301/2/4/5/8–316/8–325/7–330/2–340, 354/6–36042912–933/5/6/8/9, 941–4/6/8, 968–970/4/8, 984, 1000–2[n]193043 withdrawn 1907–20[48]
M &M10-6-2T1885414, 5, 14–16, 22/4, 50/1/3/4, 71/4, 86–89, 145–8, 150–3, 163/6–9, 176–181, 344/9, 362/4/541442–5, 462/6, 478, 481–4/7–493, 503/5–8, 511/3/5/6, 520, 552, 560/7, 573/7–580/2–61934[49]
N0-6-2T189110106/7, 182–910485/6, 494–6, 498–5021934[50]
O0-6-2T1894621/5/6, 33/4, 1906446–8, 452/3, 5811930[51]
O10-6-2T18941427–29, 37, 41, 60–65, 70/3/814449–451/4/5, 471–7/9, 4801931[52]
O20-6-2T1899931/2, 44, 66, 81–59412/3/5/9, 421/3–61928[53]
O30-6-2T19021518/9, 47, 55/7, 92/3/6, 103, 117, 126, 131/7, 155, 16115410/1/6–8, 427–35/721948Nos. 410/1 to BR[54]
O40-6-2T1907411, 2, 6, 8, 9, 13/7, 35/6/8/9, 43/6/8/9, 56/8/9, 67–9, 94/5/7/8, 101/2/4/5/8–116/8/9, 12141236, 278–302, 310/1/3–5/7–321/4, 333, 409, 414, 420411955Nos. 300 up allotted 200–211, 215–220 in 1946; except for 301/2, 314 these were renumbered in 1946–50.[55]
S & T0-4-0ST18762266/721342/31926[56]
U & U10-6-2T18951523, 30, 40, 72/6/7/9, 191–19815587–593/5–600/2/31931[57]
V0-6-0ST1899699, 100, 275, 280, 290/16786–7911930[58]
0-6-01866469, 154, 254/71888[59]
2-4-018743255/6, 2691895[60]
0-6-0ST189212681899Secondhand, built 1876[61]

In addition to these, sixteensteam railmotors were introduced from 1903. The engine portions were of the 0-2-2T wheel arrangement, and numbered 1–18 - two being spare. No. 1 was the last locomotive built by the TVR. They were extinct by the end of 1921, and so none passed to the GWR or BR.[62][63]

Locomotive depots

[edit]

The principal locomotive depot on the TVR was at Cardiff Cathays, which had a sub-shed at Roath Branch Junction. Other main depots were at Abercynon, Aberdare, Coke Ovens (near Pontypridd), Cowbridge, Ferndale, Merthyr, Penarth Dock, Radyr and Treherbert (which had a sub-shed at Pwllyrhebog). The steam railmotors were based at Coke Ovens, in a shed separate from the main depot.[64] Several of these were closed by the GWR after Grouping: Merthyr and Roath Branch Junction closed in 1923; Cowbridge in 1924; Aberdare in 1927; Abercynon and Penarth Dock in 1929; Radyr and Treherbert in 1931; Coke Ovens in 1933. In the cases of Abercynon, Radyr and Treherbert, the TVR sheds were all replaced by new GWR sheds on nearby sites, and that at Abercynon also accommodated the locomotives from Coke Ovens when that closed in 1933. Only three TVR locomotive depots survived to be inherited by British Railways: Pwllyrhebog (closed July 1951); Ferndale (closed September 1964) and Cathays (closed November 1964); and of these, only Cathays was given a BR code in 1949 - 88A.[65][66][67]

Lawsuit against a trade union

[edit]
Main article:Taff Vale Rly Co v Amalgamated Society of Rly Servants

In 1901 the Company successfully sued theAmalgamated Society of Railway Servants, a trade union, for damages due to losses accrued during a strike by their members who were seeking to compel the company to recognise the union. The company was awarded £23,000 by decision of the court, reversing the belief that trade unions were immune to damages from the actions of their members. Following the change of government in 1906, theTrade Disputes Act 1906 was passed, giving trade unions immunity from such claims.[68]

Preserved locomotives, rolling stock and paraphernalia

[edit]

Carriages and wagons

[edit]

A selection of original TVR rolling stock has survived into the present day.

TVR Coaches nos. 220, 153, 145, 52, and 31 are preserved at theGwili Railway in west Wales in the care of the Gwili Vintage Carriage group.[69] TVR coach no. 73 has also been restored to service on theSwindon and Cricklade Railway.[70] Coaches nos. 277, 210, and 112 stand in a private residence. Coaches nos. 203, 48, and 51 are now owned by the National Museums & Galleries of Wales.

TVR four wheel 7-plank mineral wagon 10153

Only one mineral wagon is known to exist today, at theDidcot Railway Centre.[71]

One six-wheel brake van body is also known to exist, in a private residence inWiltshire.[72]

Locomotives

[edit]

Two locomotives are preserved.

ImageTVR No.TVR ClassTypeManufacturerSerial No.DateNotes
28O1 class0-6-2TCardiff West Yard Locomotive Works3061897Stored at theGwili Railway
85O2 class0-6-2TNeilson and Company54081899Operational at theKeighley & Worth Valley Railway

Paraphernalia

[edit]

The Cynon Valley Museum,Aberdare, contains a small collection of items that belonged to the Taff Vale Railway Company. These include a railway lamp, milestone and signs for a level crossing and weak bridge.

Notes

[edit]
  1. ^Trevithick had experimented with steam engines atCoalbrookdale in 1802.
  2. ^Brunel originally chose the broad gauge for theGreat Western Railway on the basis that large-diameter carriage wheels could be located outside the width of the body, as instagecoaches. The larger-diameter wheels would give smoother running at high speed. In fact Brunel abandoned that idea when the rolling stock for the GWR was being produced.
  3. ^Barrie says 12 April 1841; Barrie revised Baughan, and Chapman say 21 April, deferred from 12 April.
  4. ^TheNewport, Abergavenny and Hereford Railway amalgamated with others to form theWest Midland Railway in 1860, and that company amalgamated with theGreat Western Railway in 1863.
  5. ^The zigzag was in front of Jones Street,Tonypandy, on the land now occupied byGlan-y-llyn.
  6. ^The junction there was known as "Llantrisant Junction".
  7. ^Some authors spell this Bwlffa, but that is a mistake.
  8. ^The GWR later opened a station namedNelson & Llancaiach replacing their Llancaiach station.
  9. ^An enthusiasts' special train ran on 15 October 1988.
  10. ^The Aberdare line uses the former TVR line as far as Cwmbach.
  11. ^Built as 0-6-0; rebuilt 1892
  12. ^Built as 0-6-0; rebuilt 1885–86
  13. ^The number 258 was borne by two different locomotives of Class L
  14. ^TVR no. 333 was not allotted a GWR number

References

[edit]
  1. ^abThe Railway Year Book for 1920. London: The Railway Publishing Company Limited. 1920. p. 253.
  2. ^"Volume One – Into the Victorian Age – The Taff Vale Railway (TVR)".Penarth Dock: Penarth Dock, South Wales – the heritage & legacy. Retrieved17 January 2020.
  3. ^abcdefghijklmnopqrstuvwxyzaaabacBarrie, D. S. M. (1994). Baughan, Peter E. (ed.).A Regional History of the Railways of Great Britain. Volume 12: South Wales (2nd ed.). Nairn: David St John Thomas.ISBN 0-946537-69-0.
  4. ^abHadfield, Charles (1957).The Canals of South Wales and the Border (2nd ed.). Newton Abbot: David & Charles.ISBN 0-7153-4027-1.{{cite book}}:ISBN / Date incompatibility (help)
  5. ^Lewis, M. J. T. (1970).Early Wooden Railways. London: Routledge and Kegan Paul.ISBN 0-7100-7818-8.
  6. ^abLee, Charles E (1943).The Evolution of Railways. Private collection: The Railway Gazette. p. 67.
  7. ^Guy, Andy; Rees, Jim (2011).Early Railways. Oxford: Shire Library.ISBN 978-0-74780-811-4.
  8. ^Tomlinson, William Weaver (1915).The North Eastern Railway: Its Rise and Development. Andrew Reid and Co.
  9. ^Donaghy, Thomas (1972).Liverpool and Manchester Railway Operations, 1831–1845. Newton Abbot: David and Charles.ISBN 0-7153-5705-0.
  10. ^Jones, Stephen K. (2005).Brunel in South Wales. Volume 1: In Trevithick's Tracks. Stroud: Tempus Publishing.ISBN 0-7524-3236-2.
  11. ^"At a Meeting of the Proprietors of Iron Works, Collieries..."The Cambrian. 17 October 1835. p. 3. Retrieved16 January 2020.
  12. ^abcdefghijklmnopqrstuvwxyzaaBarrie, D. S. M. (1982) [1950].The Taff Vale Railway (2nd ed.). Tisbury: Oakwood Press.
  13. ^"Westminster, June 21, 1836".The London Gazette. No. 19394. 24 June 1836. p. 1157. Retrieved16 January 2020.
  14. ^"TAFF VALE RAILWAY".The Glamorgan Monmouth and Brecon Gazette. 24 September 1836. p. 2. Retrieved16 January 2020.
  15. ^Brunel, reporting to board meeting, August 1838, quoted in Jones, p. 127
  16. ^Railway Times, page 138, volume not stated, quoted in Jenkins, p. 180 and 181
  17. ^abcdefghijklmnChapman, Colin (1997).The Nelson and Ynysybwl Branches of the Taff Vale Railway. Headington: Oakwood Press.ISBN 0-85361-512-8.
  18. ^Correction note in Barrie, page 45
  19. ^abBarrie, D. S. M. (1978).The Barry Railway. Oakwood Press.ISBN 978-0853612360.
  20. ^MacDermot, E. T. (1927).History of the Great Western Railway. Volume I: 1833–1863, Part 2. London: Great Western Railway.
  21. ^Christiansen, Rex (1981).A Regional History of the Railways of Great Britain. Volume 13: Thames and Severn. Newton Abbot: David & Charles Ltd.ISBN 0-7153-8004-4.
  22. ^abcdeChapman, Colin (2000).The Ely Valley Railway: Llantrisant – Penygraig. Usk: Oakwood Press.ISBN 0-85361-558-6.
  23. ^abcCasserley, H. C. (November 1951). "The Pwllyrhebog Incline".The Railway Magazine.
  24. ^abcChapman, Colin (1996).The Llantrisant Branches of the Taff Vale Railway: A History of the Llantrissant and Taff Vale Junction Railway and the Treferig Valley Railway. Headington: The Oakwood Press.ISBN 0-85361-481-4.
  25. ^abChapman, Colin (1984).The Cowbridge Railway. Poole: Oxford Publishing Company.ISBN 0-86093-284-2.
  26. ^Kidner, R. W. (1995).The Rhymney Railway. Headington: The Oakwood Press.ISBN 0-85361-463-6.
  27. ^Hutton, John (2002).The Newport Docks and Railway Company. Kettering: Silver Link Publishing Ltd.ISBN 1-85794-163-2.
  28. ^Semmens, Peter (1990) [1985].History of the Great Western Railway. Volume 1: Consolidation, 1923–1929 (reprinted ed.). London: George Allen and Unwin.ISBN 0-04385104-5.
  29. ^Major Marindin, Report on the Circumstances of an Accident at Treforest on 12 August 1893
  30. ^"Report by Lieutenant-Colonel Druitt on the Fatal Collision that occurred on 23 January 1911, between a passenger train and a mineral train, at Coke Ovens, near Pontypridd, on the Taff Vale Railway"
  31. ^"The Accidents".Railway Work, Life & Death project accident database. Retrieved5 January 2023.
  32. ^Quick, M. E. (2002).Railway Passenger Stations in England, Scotland and Wales—A Chronology. The Railway and Canal Historical Society.
  33. ^Cooke, R. A. (1997).Atlas of the Great Western Railway, 1947. Didcot: Wild Swan Publications Ltd.ISBN 1-874103-38-0.
  34. ^Cobb, M. H. (2003).The Railways of Great Britain—A Historical Atlas. Shepperton: Ian Allan Publishing Ltd.ISBN 0-7110-3003-0.
  35. ^Davies, F.K.; Firth, J.M.; Lucking, J.H.; Thomas, R.E.; Allcock, N.J.; Sterndale, A.C.; Barrie, D.S.M.; Reed, P.J.T.; Mountford, E.R. (April 1966). White, D.E. (ed.).The Locomotives of the Great Western Railway, part ten: Absorbed Engines, 1922-1947.RCTS. p. K137.ISBN 0-901115-20-7.
  36. ^Marshall, John (1978).A Biographical Dictionary of Railway Engineers. Newton Abbot:David & Charles. pp. 48,181–182,216–217.ISBN 0-7153-7489-3.LCCN 77085011.
  37. ^Baxter, Bertram (1977). Baxter, David (ed.).British Locomotive Catalogue 1825-1923, volume 1: General Summary; Index of Locomotive-Owning Companies. Ashbourne: Moorland Publishing. p. 61.ISBN 0-903485-50-8.LCCN 78322204.OCLC 60034555.OL 4294329M.
  38. ^Allcock, N.J.; Davies, F.K.; le Fleming, H.M.; Maskelyne, J.N.; Reed, P.J.T.; Tabor, F.J. (June 1951). White, D.E. (ed.).The Locomotives of the Great Western Railway, part one: Preliminary Survey. Kenilworth:RCTS. fold-out sheet opposite p. 17.ISBN 0-901115-17-7.OCLC 650412984.{{cite book}}:ISBN / Date incompatibility (help)
  39. ^Davies et al. 1966, pp. K187–K191.
  40. ^Davies et al. 1966, pp. K176–K177.
  41. ^Davies et al. 1966, pp. K149–K150.
  42. ^Davies et al. 1966, pp. K151–K152.
  43. ^Davies et al. 1966, p. K151.
  44. ^Davies et al. 1966, pp. K152–K153.
  45. ^Davies et al. 1966, pp. K169–K171.
  46. ^Davies et al. 1966, pp. K171–K172.
  47. ^Davies et al. 1966, pp. K160–K161.
  48. ^Davies et al. 1966, pp. K153–K159.
  49. ^Davies et al. 1966, pp. K172–K176.
  50. ^Davies et al. 1966, pp. K177–K178.
  51. ^Davies et al. 1966, p. K179.
  52. ^Davies et al. 1966, pp. K179–K181.
  53. ^Davies et al. 1966, pp. K183–K184.
  54. ^Davies et al. 1966, pp. K184–K185.
  55. ^Davies et al. 1966, pp. K185–K187.
  56. ^Davies et al. 1966, pp. K159–K160.
  57. ^Davies et al. 1966, pp. K181–K182.
  58. ^Davies et al. 1966, pp. K182–K183.
  59. ^Davies et al. 1966, pp. K150–K151.
  60. ^Davies et al. 1966, p. K153.
  61. ^Davies et al. 1966, pp. K178–K179.
  62. ^Davies et al. 1966, p. K185.
  63. ^Davies, F.K. (May 1956) [1952]. White, D.E. (ed.).The Locomotives of the Great Western Railway, part eleven: The Rail Motor Vehicles and Internal Combustion Locomotives (2nd ed.).RCTS. p. L14.ISBN 0-901115-38-X.OCLC 655440794.{{cite book}}:ISBN / Date incompatibility (help)
  64. ^Davies et al. 1966, p. K137.
  65. ^Rowledge, J.W.P. (1986).GWR Locomotive Allocations: First and Last Sheds 1922-1967. Newton Abbot:David & Charles. p. 7.ISBN 0-7153-8820-7.
  66. ^Sterndale, A.C.; Parker, L.T.; Smith, C.; Reed, P.J.T.; Tabor, F.J.; Davies, F.K.; Allcock, N.J.; Lucking, J.H. (May 1974). White, D.E. (ed.).The Locomotives of the Great Western Railway, part twelve: A Chronological and Statistical Survey. Kenilworth:RCTS. p. M26.ISBN 0-901115-28-2.OCLC 499807460.
  67. ^Lyons, E.T. (1974) [1972].An Historical Survey of Great Western Engine Sheds 1947. Headington: Oxford Publishing Co. pp. 235, 236, 246,248–250.ISBN 0-902888-16-1.
  68. ^Docherty, James C.; Van der Velden, Sjaak (2012).Historical Dictionary of Organized Labor (3rd ed.). Plymouth: Scarecrow Press.ISBN 978-0-8108-6196-1.
  69. ^"Gwili Vintage Carriage Group - GVCG".www.gvcg.co.uk.Archived from the original on 19 April 2018. Retrieved7 May 2018.
  70. ^"Swindon & Cricklade Railway restoring Taff Vale Railway coach No 73".www.swindon-cricklade-railway.org.Archived from the original on 25 October 2017. Retrieved7 May 2018.
  71. ^"TVR 10153 Mineral Wagon".www.ws.vintagecarriagestrust.org. Archived fromthe original on 1 December 2021. Retrieved7 May 2018.
  72. ^"TVR Six-wheel Full Brake (body only)".Railway Heritage Register Partnership (Wagon Survey). Archived fromthe original on 1 December 2021. Retrieved17 January 2020.

External links

[edit]
Historic Welsh railway companies
Great Western
Railway
London and North
Western Railway
Joint lines
Independent lines
Industrial railways
Railways
Railway stations
Bridges and viaducts
Tunnels and earthworks
Ships, harbours and waterways
Other building and engineering
Personal
Legacy and commemoration
Retrieved from "https://en.wikipedia.org/w/index.php?title=Taff_Vale_Railway&oldid=1310996957"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp