Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Stamford Transportation Center

Coordinates:41°02′49″N73°32′29″W / 41.046937°N 73.541493°W /41.046937; -73.541493
From Wikipedia, the free encyclopedia
Railroad station in Connecticut
This article is about the United States railroad station. For other stations with similar names, seeStamford station.

‹ ThetemplateInfobox station is beingconsidered for merging. ›
Stamford
New Haven Line train at Stamford Transportation Center in 2018
General information
Location490 Washington Boulevard (30 South State Street)
Stamford, Connecticut
United States
Coordinates41°02′49″N73°32′29″W / 41.046937°N 73.541493°W /41.046937; -73.541493
Owned byConnDOT
LineConnDOTNew Haven Line (Northeast Corridor)
Platforms2island platforms
2side platforms (plus 1 side platform under construction)
Tracks5 (plus 1 under construction)
ConnectionsLocal TransitCT Transit Stamford: 311, 312, 313, 321, 324, 326, 327, 328, 331, 333, 334, 335, 336, 341, 342, 344, 345, 351, 971
Construction
Parking1,500 spaces
Accessibleyes
Other information
Station codeAmtrak:STM
IATA codeZTF
Fare zone16 (Metro-North)
History
OpenedDecember 25, 1848[1][2]
Rebuilt1861, 1890s, 1987, 2004
Passengers
FY 2024388,485 annually[3] (Amtrak)
201815,216 daily boardings[4] (Metro-North)
Services
Preceding stationAmtrakFollowing station
New YorkAcelaNew Haven
VermonterBridgeport
New RochelleNortheast RegionalBridgeport
Preceding stationCT RailFollowing station
TerminusShore Line East
limited weekday service
Bridgeport
Preceding stationMetro-North RailroadFollowing station
Old GreenwichNew Haven LineTerminus
Harlem–125th StreetNoroton Heights
TerminusNew Canaan BranchGlenbrook
Greenwich
weekday service
Harlem–125th StreetDanbury Branch
weekday service
Noroton Heights
towardDanbury
TerminusSouth Norwalk
towardDanbury
Special events service
Preceding stationMetro-North RailroadFollowing station
GreenwichNew Haven Line
Yankee Clipper
Terminus
Yankees–East 153rd Street
Terminus
Noroton Heights
towardNew Haven
Former services
Preceding stationAmtrakFollowing station
RyeMontrealerBridgeport
towardMontreal
New York
Terminus
Cape CodderNew Haven
towardHyannis
Preceding stationNew York, New Haven and Hartford RailroadFollowing station
Sound Beach
towardNew York
Main LineGlenbrook
towardNew Haven
Location
Map

Stamford station, officially known as theStewart B. McKinney Transportation Center[5] or theStamford Transportation Center, is a major railroad station in the city ofStamford, Connecticut, serving passengers traveling onMetro-North Railroad'sNew Haven Line, andAmtrak'sNortheast Corridor. In addition, it is also a major bus terminal forPeter Pan, andCTtransit buses. In 2018, the station averaged over 15,000 Metro-North boardings on weekdays, making it the second-busiest station on the network, behindGrand Central Terminal.[4] Its official name honors politicianStewart McKinney.

The split for theNew Canaan Branch is just northeast of the station.Downtown Stamford is directly north of the station; the entrance to the station on the north side is marked by theStamford Cone, a work of public sculpture situated at the top of Gateway Commons, while theSouth End is located directly south.

Station layout

[edit]

The station has a 9-car-longside platform on the south side, a 10-car-long platform on the north side and two high-level 12-car-longisland platforms.[6]: 20  The main station concourse straddles the tracks of theNortheast Corridor, and contains the ticket booth, a passenger waiting area, and shops. Below the platform level is an MTA police station, other shops, a Peter Pan office andCT Transit Customer Information Center. Stairs and escalators lead to the platform level. On the south side of the station, across an access street, is a large parking garage connected to the concourse by one pedestrian bridge and directly connected to the east end of the platforms by a second bridge (both bridges connect to Level 4 of the garage).

A bus station is located just to the north of the train station, underneath a large bridge carrying Interstate 95. Taxis pick up passengers at a stand on the south side of the station. A car rental agency is located southwest of the station building.

Services

[edit]
Stamford Transportation Center with aMetro-NorthM8 train headed towardsGrand Central.

Stamford receives very frequent rail service on the New Haven Line. During peak hours, trains at Stamford come in intervals as little as three or seven minutes apart.[7] Reverse commute trains during rush hours also operate relatively frequently, at intervals of ten to twenty minutes.[7] Off-peak trains in both directions arrive at Stamford every thirty to forty minutes, but usually within a half-hour of each other.[7] Stamford is the busiest Metro-North Railroad station other thanGrand Central Terminal, averaging 15,000 boardings on weekdays in 2018.[4]

The station divides the New Haven Line into an "inner zone" and an "outer zone". "Inner zone" trains run local, serving all stations between Grand Central and Stamford. "Outer zone" trains run express between Grand Central and Stamford (withHarlem 125th Street as the only intermediate stop), before running local between Stamford and New Haven. This gives passengers the ability to transfer between "inner zone" and "outer zone" trains at Stamford. In addition,New Canaan Branch shuttle trains originate in Stamford, where passengers can transfer to mainline trains.

In the 2000s, Stamford andGreenwich received increasing numbers ofreverse commuters who work in Stamford but live in New York City. Reverse commuting doubled from 1997 to 2007, with 1,900 daily reverse commuters by 2007. Metro-North added trains and express service to serve these commuters. As financial companies moved to Stamford from Manhattan, some employees became reverse commuters. Larger companies farther away than a few minutes walk from the station routinely provided shuttle service for their workers.[8]

As of 2014, Stamford has been a central stop for a special "Yankee Clipper" Train. The direct train runs to and from all weeknight and weekend games toYankees–East 153rd Street to serveNew York Yankees baseball games andNew York City FC soccer matches atYankee Stadium. The trains are timed to arrive between 45 minutes and 2 hours prior to the start of the game, and depart between 20 and 45 minutes after they end.[9]

Due to ridership growth, ConnDOT announced on March 19, 2007 that it would extend moreShore Line East trains to Stamford during peak hours.[10] To coincide with the extension of this service,Metro-North added another five trains on the New Haven Line to cope with the increases in passenger demand at Stamford.[10] Shore Line East service to Stamford was suspended indefinitely on March 16, 2020, due to thecoronavirus pandemic.[11][12] Service resumed on October 7, 2024.[13]

Amtrak also operates three routes which stop at Stamford: theAcela, the onlyhigh-speed rail service in theUnited States, theNortheast Regional, providing local service along theNortheast Corridor, on which Stamford is a vital station, and theVermonter, the only train from Connecticut that goes toVermont. Stamford is now the second-busiest Amtrak station in Connecticut, afterNew Haven's Union Station.[14]

History

[edit]
The 1861-built depot in 1868
The 1890s-built station in 1983

Regular daily train service began inStamford on January 1, 1849. In 1867, a depot was built one block east of the present location. The railroad at that time consisted of two tracks and passed through town on ground level (crossing the streets at grade). In the mid-1890s, two more tracks were added to the line and most crossings were elevated and bridged; the 1867 depot was razed and replaced.[15]

In 1980, the Federal Railroad Administration (FRA) awarded $50 million for a new station and parking garage in Stamford. The cost was paid 70% by the FRA, 20% by the state, and 10% by the city. Construction began in 1983. Garage construction was soon halted due to cracks in support beams caused by a contractor omitting components. Additional of a support column failed to solve the issue; the FRA took over the project. The garage and station opened in 1987.[16]

Architecture criticPaul Goldberger, writing forThe New York Times in 1987, criticized the station for "a harshness almost unequaled in contemporary architecture" as well as for cost overruns and many functional failings, including the lack of shelter for the track platforms. The route from the cross-tracks waiting room to the platform was so long and indirect that passengers who waited indoors until a train's arrival was announced could not get to the platform in time to board it.[17] Despite these issues, Stamford became the line's busiest station aside from Grand Central by 1989.[16]

A complete renovation of the station in the early 2000s, provided for in the original design of the overhead structure, addressed the problems. The two platforms were made island platforms, capable of serving four tracks. Added features included platform canopies, stairs and escalators directly from the waiting room for the tracks, and a new platform crossover, connecting to a 1,200-space addition to the parking garage.[18]

In 2006, the state indicated plans to replace the 1987-built garage.[19] That plan was cancelled in 2008; by 2012, the state planned to pursue privately-funded transit-oriented development on the garage parcel, with replacement parking possibly located up to a quarter-mile away.[20] Temporary repairs to the deteriorating original garage were made in 2015; even so, only 200 of the 727 spaces were usable by 2019.[18]

Construction of a new 928-space, $82 million parking garage northwest of the station began in October 2021.[21] Located over State Street includes a 320-foot (98 m)-long footbridge connecting to the main waiting room plus a ramp to the southbound (Track 5) side platform.[22][16] After delay, the new garage opened on February 26, 2024.[23][24] This allowed demolition of the 1980s-built garage and footbridge (at a cost of $9 million) to begin.[22] Demolition of the footbridge took place from March 11 to late April 2024, followed by demolition of the garage. Demolition was expected to be complete by late 2024.[25] ArtistRafael Blanco was selected in May 2025 to paint a mural on the facade of the new garage.[26] It was finished in June 2025.[27]

The Connecticut Department of Transportation (CTDOT) began work in 2022 on a master plan for the station and surrounding area. It was released in February 2024.[28] In July 2025, the agency indicated that relocation of the station was being considered as part of the project.[29] CTDOT issued arequest for proposals in August 2025.[30]

References

[edit]
  1. ^Jenkins, Stephen (1912).The Story of the Bronx from the Purchase Made by the Dutch from the Indians in 1639 to the Present Day. New York, New York: G.P. Putnam's Sons. p. 235.
  2. ^"Special Express Notice".The Evening Post. New York, New York. February 12, 1849. p. 3. RetrievedDecember 9, 2019 – via Newspapers.com.Open access icon
  3. ^"Amtrak Fact Sheet, Fiscal year 2024: State of Connecticut"(PDF).Amtrak. March 2025. RetrievedJune 2, 2025.
  4. ^abcMetro-North 2018 Weekday Station Boardings. Metro-North Railroad Market Analysis/Fare Policy Group. April 2019. p. 6.
  5. ^NEW BUSES HIT THE ROAD ON MONDAY IN STAMFORDArchived May 27, 2013, at theWayback Machine January 11, 2001
  6. ^"Metro-North Railroad Track & Structures Department Track Charts Maintenance Program Interlocking Diagrams & Yard Diagrams 2015"(PDF). Metro-North Railroad. 2015. RetrievedJanuary 28, 2019.
  7. ^abc"New Haven Line Weekday Timetable"(PDF).Metro-North. March 18, 2018. RetrievedJuly 23, 2018.
  8. ^Prevost, Lisa (August 12, 2007)."Now Arriving: Reverse Commuters".The New York Times. RetrievedJuly 16, 2011.
  9. ^"2018 Yankees "Train to the Game" Service".Metro-North Railroad. RetrievedJuly 23, 2018.
  10. ^ab"Metro-North, Shore Line East to operate more commuter trains in Connecticut".Progressive Railroading. March 19, 2007. RetrievedAugust 18, 2007.
  11. ^@SLEalerts (March 13, 2020)."Effective 3/16/20, ALL weekday (Monday - Friday) CTrail Shore Line East trains will operate on an enhanced weekend schedule until further notice" (Tweet) – viaTwitter.
  12. ^"Shore Line East Service Information"(PDF). April 20, 2020. Archived fromthe original(PDF) on September 20, 2020. RetrievedApril 29, 2020.
  13. ^"Stamford Through Service Returns to the Schedule" (Press release). Connecticut Department of Transportation. September 30, 2024.
  14. ^"Amtrak Fact Sheet, FY2017, State of Connecticut"(PDF).Amtrak. November 2017. RetrievedJanuary 1, 2018.
  15. ^"Photo Archivist's Selection of the Month: December 2000 / What would be a suitable selection for December? How about the railroad?".Stamford Historical Society. RetrievedMarch 24, 2007.
  16. ^abcCarella, Angela (November 24, 2023)."As Stamford Garage Comes Down, Future Plans Remain Uncertain".CT Examiner. Archived fromthe original on November 28, 2023.
  17. ^Goldberger, Paul (December 7, 1987)."A Hard-Edged Station for Stamford".The New York Times. RetrievedJuly 16, 2011.
  18. ^abLytton, Barry (January 18, 2019)."Stamford commuters seek answers to decrepit garage from new state leaders".Stamford Advocate. RetrievedOctober 9, 2023.
  19. ^Holtz, Jeff (October 29, 2006)."THE WEEK; Old Garage at Stamford Station to Be Replaced".The New York Times.
  20. ^Cassidy, Martin B. (July 16, 2012)."State requests railroad garage plans".Stamford Advocate. RetrievedOctober 9, 2023.
  21. ^Del Valle, Verónica (October 25, 2021)."Stamford's soon-to-be $81.7M, 928-spot commuter garage project gets official debut".CT Insider. Archived fromthe original on February 11, 2023. RetrievedFebruary 10, 2023.
  22. ^abLaguarda, Ignacio (October 9, 2023)."How Stamford's gonna spend $17M from state: From train station garage demolition to new playscapes".Stamford Advocate. RetrievedOctober 9, 2023.
  23. ^"Governor Lamont Announces Grand Opening of New Parking Garage at the Stamford Transportation Center, Releases Master Plan for Future Investments in the City" (Press release). Office of Governor Ned Lamont. February 26, 2024. Archived fromthe original on February 27, 2024.
  24. ^Weber, Jared (January 31, 2024)."When will Stamford's new train station parking garage open? State blames delays on suppliers".Stamford Advocate. Archived fromthe original on February 1, 2024.
  25. ^"Demolition of the 1985 Parking Garage and Pedestrian Bridge at the Stamford Transportation Center" (Press release). Connecticut Department of Transportation. April 12, 2024. Archived fromthe original on May 15, 2024.
  26. ^Kaufman, Richard (May 23, 2025)."Renowned Muralist Selected For Stamford Train Station Garage Project".Stamford Patch. Archived fromthe original on June 24, 2025.
  27. ^Kaufman, Richard (June 20, 2025)."Stamford Unveils New Train Station Garage Mural".Stamford Patch. Archived fromthe original on June 24, 2025.
  28. ^Vanasse Hangen Brustlin, Inc. (February 2024)."Stamford Transportation Center Master Plan"(PDF). Connecticut Department of Transportation.
  29. ^Fedor, Tyler (August 3, 2025)."Stamford train station could be relocated as CT considers adding housing to redesign plan".Stamford Advocate. Archived fromthe original on August 3, 2025.
  30. ^"CTDOT Issues Request for Proposals for Redevelopment of Stamford Transportation Center" (Press release). Connecticut Department of Transportation. August 14, 2025.

External links

[edit]
Wikimedia Commons has media related toStamford Transportation Center.
Active stations
Former stations
Park Avenue main line
Harlem Line
Hudson Line
Penn Station service (planned)
New Haven Line
New Canaan Branch
Danbury Branch
Waterbury Branch
Penn Station service (planned)
Pascack Valley Line
Port Jervis Line
Former route
  • Italics denote closed/future stations and line segments. Asterisks indicate stations closed prior to the formation of Metro-North
Retrieved from "https://en.wikipedia.org/w/index.php?title=Stamford_Transportation_Center&oldid=1323852830"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp