This article is about a spacecraft system used by NASA. For space shuttles in general, seespacecraft andspaceplane. For the spaceplane component of the Space Shuttle, seeSpace Shuttle orbiter.
The first (STS-1) of four orbital test flights occurred in 1981, leading to operational flights (STS-5) beginning in 1982. Five complete Space Shuttle orbiter vehicles were built and flown on a total of 135 missions from 1981 to 2011. They launched from theKennedy Space Center (KSC) inFlorida. Operational missions launched numeroussatellites,interplanetary probes, and theHubble Space Telescope (HST), conducted science experiments in orbit, participated in theShuttle-Mir program with Russia, and participated in the construction and servicing of theInternational Space Station (ISS). The Space Shuttle fleet's total mission time was 1,323 days.[11]
The first orbiter,Enterprise, was built in 1976 and used inApproach and Landing Tests (ALT), but had no orbital capability. Four fully operational orbiters were initially built:Columbia,Challenger,Discovery, andAtlantis. Of these, two were lost in mission accidents:Challenger in 1986 andColumbia in 2003, with a total of 14 astronauts killed. A fifth operational (and sixth in total) orbiter,Endeavour, was built in 1991 to replaceChallenger. The three surviving operational vehicles were retired from service followingAtlantis'sfinal flight on July 21, 2011. The U.S. relied on the RussianSoyuz spacecraft to transport astronauts to the ISS from the last Shuttle flight until the launch of theCrew Dragon Demo-2 mission in May 2020.[12]
In the late 1930s, the German government launched the "Amerikabomber" project, andEugen Sanger's idea, together with mathematicianIrene Bredt, was a winged rocket called theSilbervogel (German for "silver bird").[13] During the 1950s, theUnited States Air Force proposed using a reusable piloted glider to perform military operations such as reconnaissance, satellite attack, and air-to-ground weapons employment. In the late 1950s, the Air Force began developing the partially reusableX-20 Dyna-Soar. The Air Force collaborated withNASA on the Dyna-Soar and began training six pilots in June 1961. The rising costs of development and the prioritization ofProject Gemini led to the cancellation of the Dyna-Soar program in December 1963. In addition to the Dyna-Soar, the Air Force had conducted a study in 1957 to test the feasibility of reusable boosters. This became the basis for theaerospaceplane, a fully reusable spacecraft that was never developed beyond the initial design phase in 1962–1963.[8]: 162–163
Beginning in the early 1950s, NASA and the Air Force collaborated on developinglifting bodies to test aircraft that primarily generated lift from their fuselages instead of wings, and tested theNASA M2-F1,Northrop M2-F2,Northrop M2-F3,Northrop HL-10,Martin Marietta X-24A, and theMartin Marietta X-24B. The program tested aerodynamic characteristics that would later be incorporated in design of the Space Shuttle, including unpowered landing from a high altitude and speed.[14]: 142 [15]: 16–18
On September 24, 1966, as the Apollo space program neared its design completion, NASA and the Air Force released a joint study concluding that a new vehicle was required to satisfy their respective future demands and that a partially reusable system would be the most cost-effective solution.[8]: 164 The head of the NASA Office of Manned Space Flight,George Mueller, announced the plan for a reusable shuttle on August 10, 1968. NASA issued arequest for proposal (RFP) for designs of the Integral Launch and Reentry Vehicle (ILRV) on October 30, 1968.[16] Rather than award a contract based upon initial proposals, NASA announced a phased approach for the Space Shuttle contracting and development; Phase A was a request for studies completed by competing aerospace companies, Phase B was a competition between two contractors for a specific contract, Phase C involved designing the details of the spacecraft components, and Phase D was the production of the spacecraft.[17][15]: 19–22
In December 1968, NASA created the Space Shuttle Task Group to determine the optimal design for a reusable spacecraft, and issued study contracts toGeneral Dynamics,Lockheed,McDonnell Douglas, andNorth American Rockwell. In July 1969, the Space Shuttle Task Group issued a report that determined the Shuttle would support short-duration crewed missions and space station, as well as the capabilities to launch, service, and retrieve satellites. The report also created three classes of a future reusable shuttle: Class I would have a reusable orbiter mounted on expendable boosters, Class II would use multiple expendable rocket engines and a single propellant tank (stage-and-a-half), and Class III would have both a reusable orbiter and a reusable booster. In September 1969, the Space Task Group, under the leadership of U.S. vice presidentSpiro Agnew, issued a report calling for the development of a space shuttle to bring people and cargo to low Earth orbit (LEO), as well as aspace tug for transfers between orbits and the Moon, and a reusablenuclear upper stage for deep space travel.[8]: 163–166 [9]
After the release of the Space Shuttle Task Group report, many aerospace engineers favored the Class III, fully reusable design because of perceived savings in hardware costs.Max Faget, a NASA engineer who had worked to design theMercury capsule, patented a design for a two-stage fully recoverable system with a straight-winged orbiter mounted on a larger straight-winged booster.[18][19] The Air Force Flight Dynamics Laboratory argued that a straight-wing design would not be able to withstand the high thermal and aerodynamic stresses during reentry, and would not provide the required cross-range capability. Additionally, the Air Force required a larger payload capacity than Faget's design allowed. In January 1971, NASA and Air Force leadership decided that a reusable delta-wing orbiter mounted on an expendable propellant tank would be the optimal design for the Space Shuttle.[8]: 166
After they established the need for a reusable, heavy-lift spacecraft, NASA and the Air Force determined the design requirements of their respective services. The Air Force expected to use the Space Shuttle to launch large satellites, and required it to be capable of lifting 29,000 kg (65,000 lb) to an eastward LEO or 18,000 kg (40,000 lb) into apolar orbit. The satellite designs also required that the Space Shuttle have a 4.6 by 18 m (15 by 60 ft) payload bay. NASA evaluated theF-1 andJ-2 engines from theSaturn rockets, and determined that they were insufficient for the requirements of the Space Shuttle; in July 1971, it issued a contract toRocketdyne to begin development on theRS-25 engine.[8]: 165–170
NASA reviewed 29 potential designs for the Space Shuttle and determined that a design with two side boosters should be used, and the boosters should be reusable to reduce costs.[8]: 167 NASA and the Air Force elected to usesolid-propellant boosters because of the lower costs and the ease of refurbishing them for reuse after they landed in the ocean. In January 1972, PresidentRichard Nixon approved the Shuttle, and NASA decided on its final design in March. The development of the Space Shuttle Main Engine (SSME) remained the responsibility of Rocketdyne, and the contract was issued in July 1971, and updated SSME specifications were submitted to Rocketdyne that April.[20] The following August, NASA awarded the contract to build the orbiter to North American Rockwell, which had by then constructed a full-scale mock-up, later namedInspiration.[21][22] In August 1973, NASA awarded the external tank contract toMartin Marietta, and in November the solid-rocket booster contract toMorton Thiokol.[8]: 170–173
Columbia undergoing installation of its ceramic tiles
On June 4, 1974, Rockwell began construction on the first orbiter, OV-101, dubbed Constitution, later to be renamedEnterprise.Enterprise was designed as a test vehicle, and did not include engines or heat shielding. Construction was completed on September 17, 1976, andEnterprise was moved to theEdwards Air Force Base to begin testing.[8]: 173 [23] Rockwell constructed theMain Propulsion Test Article (MPTA)-098, which was a structural truss mounted to the ET with three RS-25 engines attached. It was tested at theNational Space Technology Laboratory (NSTL) to ensure that the engines could safely run through the launch profile.[24]: II-163 Rockwell conducted mechanical and thermal stress tests on Structural Test Article (STA)-099 to determine the effects of aerodynamic and thermal stresses during launch and reentry.[24]: I-415
The beginning of the development of the RS-25 Space Shuttle Main Engine was delayed for nine months whilePratt & Whitney challenged the contract that had been issued to Rocketdyne. The first engine was completed in March 1975, after issues with developing the first throttleable, reusable engine. During engine testing, the RS-25 experienced multiple nozzle failures, as well as broken turbine blades. Despite the problems during testing, NASA ordered the nine RS-25 engines needed for its three orbiters under construction in May 1978.[8]: 174–175
NASA experienced significant delays in the development of the Space Shuttle'sthermal protection system. Previous NASA spacecraft had usedablative heat shields, but those could not be reused. NASA chose to use ceramic tiles for thermal protection, as the shuttle could then be constructed of lightweightaluminum, and the tiles could be individually replaced as needed. Construction began onColumbia on March 27, 1975, and it was delivered to the KSC on March 25, 1979.[8]: 175–177 At the time of its arrival at the KSC,Columbia still had 6,000 of its 30,000 tiles remaining to be installed. However, many of the tiles that had been originally installed had to be replaced, requiring two years of installation beforeColumbia could fly.[15]: 46–48
On January 5, 1979, NASA commissioned a second orbiter. Later that month, Rockwell began converting STA-099 to OV-099, later namedChallenger. On January 29, 1979, NASA ordered two additional orbiters, OV-103 and OV-104, which were namedDiscovery andAtlantis. Construction of OV-105, later namedEndeavour, began in February 1982, but NASA decided to limit the Space Shuttle fleet to four orbiters in 1983. After theloss ofChallenger, NASA resumed production ofEndeavour in September 1987.[15]: 52–53
After it arrived at Edwards AFB,Enterprise underwent flight testing with theShuttle Carrier Aircraft, a Boeing 747 that had been modified to carry the orbiter. In February 1977,Enterprise began theApproach and Landing Tests (ALT) and underwent captive flights, where it remained attached to the Shuttle Carrier Aircraft for the duration of the flight. On August 12, 1977,Enterprise conducted its first glide test, where it detached from the Shuttle Carrier Aircraft and landed at Edwards AFB.[8]: 173–174 After four additional flights,Enterprise was moved to theMarshall Space Flight Center (MSFC) on March 13, 1978.Enterprise underwent shake tests in the Mated Vertical Ground Vibration Test, where it was attached to an external tank and solid rocket boosters, and underwent vibrations to simulate the stresses of launch. In April 1979,Enterprise was taken to the KSC, where it was attached to an external tank and solid rocket boosters, and moved toLC-39. Once installed at the launch pad, the Space Shuttle was used to verify the proper positioning of the launch complex hardware.Enterprise was taken back to California in August 1979, and later served in the development of theSLC-6 atVandenberg AFB in 1984.[15]: 40–41
On November 24, 1980,Columbia was mated with its external tank and solid-rocket boosters, and was moved to LC-39 on December 29.[24]: III-22 The first Space Shuttle mission,STS-1, would be the first time NASA performed a crewed first-flight of a spacecraft.[24]: III-24 On April 12, 1981, the Space Shuttle launched for the first time, and was piloted byJohn Young andRobert Crippen. During the two-day mission, Young and Crippen tested equipment on board the shuttle, and found several of the ceramic tiles had fallen off the top side of theColumbia.[25]: 277–278 NASA coordinated with the Air Force to use satellites to image the underside ofColumbia, and determined there was no damage.[25]: 335–337 Columbia reentered the atmosphere and landed at Edwards AFB on April 14.[24]: III-24
NASA conducted three additional test flights withColumbia in 1981 and 1982. On July 4, 1982,STS-4, flown byKen Mattingly andHenry Hartsfield, landed on a concrete runway at Edwards AFB. PresidentRonald Reagan and his wifeNancy met the crew, and delivered a speech. After STS-4, NASA declared its Space Transportation System (STS) operational.[8]: 178–179 [26]
The Space Shuttle was the first operational orbital spacecraft designed forreuse. Each Space Shuttle orbiter was designed for a projected lifespan of 100 launches or ten years of operational life, although this was later extended.[27]: 11 At launch, it consisted of theorbiter, which contained thecrew and payload, theexternal tank (ET), and the twosolid rocket boosters (SRBs).[3]: 363
Responsibility for the Space Shuttle components was spread among multiple NASA field centers. The KSC was responsible for launch, landing, and turnaround operations for equatorial orbits (the only orbit profile actually used in the program). The U.S. Air Force at theVandenberg Air Force Base was responsible for launch, landing, and turnaround operations for polar orbits (though this was never used). TheJohnson Space Center (JSC) served as the central point for all Shuttle operations and the MSFC was responsible for the main engines, external tank, and solid rocket boosters. TheJohn C. Stennis Space Center handled main engine testing, and theGoddard Space Flight Center managed the global tracking network.[28]
The orbiter had design elements and capabilities of both a rocket and an aircraft to allow it to launch vertically and then land as a glider.[3]: 365 Its three-part fuselage provided support for the crew compartment, cargo bay, flight surfaces, and engines. The rear of the orbiter contained the Space Shuttle Main Engines (SSME), which provided thrust during launch, as well as the Orbital Maneuvering System (OMS), which allowed the orbiter to achieve, alter, and exit its orbit once in space. Its double-delta wings were 18 m (60 ft) long, and were swept 81° at the inner leading edge and 45° at the outer leading edge. Each wing had an inboard and outboardelevon to provide flight control during reentry, along with a flap located between the wings, below the engines to controlpitch. The orbiter'svertical stabilizer was swept backwards at 45° and contained arudder that could split to act as aspeed brake.[3]: 382–389 The vertical stabilizer also contained a two-partdrag parachute system to slow the orbiter after landing. The orbiter usedretractable landing gear with a nose landing gear and two main landing gear, each containing two tires. The main landing gear contained two brake assemblies each, and the nose landing gear contained an electro-hydraulic steering mechanism.[3]: 408–411
The Space Shuttle crew varied per mission. They underwent rigorous testing and training to meet thequalification requirements for their roles. The crew was divided into three categories: Pilots, Mission Specialists, and Payload Specialists. Pilots were further divided into two roles: the Space Shuttle Commander, who would seat in the forward left seat and the Space Shuttle Pilot who would seat in the forward right seat.[29] The test flights, STS-1 through STS-4 only had two members each, the commander and pilot. The commander and the pilot were both qualified to fly and land the orbiter. The on-orbit operations, such as experiments, payload deployment, and EVAs, were conducted primarily by the mission specialists who were specifically trained for their intended missions and systems. Early in the Space Shuttle program, NASA flew with payload specialists, who were typically systems specialists who worked for the company paying for the payload's deployment or operations. The final payload specialist,Gregory B. Jarvis, flew onSTS-51-L, and future non-pilots were designated as mission specialists. An astronaut flew as a crewed spaceflight engineer on bothSTS-51-C andSTS-51-J to serve as a military representative for aNational Reconnaissance Office payload. A Space Shuttle crew typically had seven astronauts, withSTS-61-A flying with eight.[24]: III-21
The crew compartment comprised three decks and was the pressurized, habitable area on all Space Shuttle missions. The flight deck consisted of two seats for the commander and pilot, as well as an additional two to four seats for crew members. The mid-deck was located below the flight deck and was where the galley and crew bunks were set up, as well as three or four crew member seats. The mid-deck contained the airlock, which could support two astronauts on anextravehicular activity (EVA), as well as access to pressurized research modules. An equipment bay was below the mid-deck, which stored environmental control and waste management systems.[15]: 60–62 [3]: 365–369
On the first four Shuttle missions, astronauts wore modified U.S. Air Force high-altitude full-pressure suits, which included a full-pressure helmet during ascent and descent. From the fifth flight,STS-5, until the loss ofChallenger, the crew wore one-piece light bluenomex flight suits and partial-pressure helmets. After theChallenger disaster, the crew members wore the Launch Entry Suit (LES), a partial-pressure version of the high-altitude pressure suits with a helmet. In 1994, the LES was replaced by the full-pressureAdvanced Crew Escape Suit (ACES), which improved the safety of the astronauts in an emergency situation.Columbia originally had modifiedSR-71zero-zero ejection seats installed for theALT and first four missions, but these were disabled after STS-4 and removed afterSTS-9.[3]: 370–371
The flight deck was the top level of the crew compartment and contained the flight controls for the orbiter. The commander sat in the front left seat, and the pilot sat in the front right seat, with two to four additional seats set up for additional crew members. The instrument panels contained over 2,100 displays and controls, and the commander and pilot were both equipped with aheads-up display (HUD) and aRotational Hand Controller (RHC) togimbal the engines during powered flight and fly the orbiter during unpowered flight. Both seats also hadrudder controls, to allow rudder movement in flight and nose-wheel steering on the ground.[3]: 369–372 The orbiter vehicles were originally installed with the MultifunctionCRT Display System (MCDS) to display and control flight information. The MCDS displayed the flight information at the commander and pilot seats, as well as at the aft seating location, and also controlled the data on the HUD. In 1998,Atlantis was upgraded with the Multifunction Electronic Display System (MEDS), which was aglass cockpit upgrade to the flight instruments that replaced the eight MCDS display units with 11 multifunction colored digital screens. MEDS was flown for the first time in May 2000 onSTS-101, and the other orbiter vehicles were upgraded to it. The aft section of the flight deck contained windows looking into the payload bay, as well as an RHC to control theRemote Manipulator System during cargo operations. Additionally, the aft flight deck had monitors for aclosed-circuit television to view the cargo bay.[3]: 372–376
The mid-deck contained the crew equipment storage, sleeping area, galley, medical equipment, and hygiene stations for the crew. The crew used modular lockers to store equipment that could be scaled depending on their needs, as well as permanently installed floor compartments. The mid-deck contained a port-side hatch that the crew used for entry and exit while on Earth.[24]: II–26–33
Theairlock is a structure installed to allow movement between two spaces with different gas components, conditions, or pressures. Continuing on the mid-deck structure, each orbiter was originally installed with an internal airlock in the mid-deck. The internal airlock was installed as an external airlock in the payload bay onDiscovery,Atlantis, andEndeavour to improve docking withMir and theISS, along with theOrbiter Docking System.[24]: II–26–33 The airlock module can be fitted in the mid-bay, or connected to it but in the payload bay.[15]: 81 With an internal cylindrical volume of 1.60 metres (5 feet 3 inches) diameter and 2.11 metres (6 feet 11 inches) in length, it can hold two suited astronauts. It has two D-shaped hatchways 1.02 m (40 in) long (diameter), and 0.91 m (36 in) wide.[15]: 82
The orbiter was equipped with anavionics system to provide information and control during atmospheric flight. Its avionics suite contained threemicrowave scanning beam landing systems, threegyroscopes, threeTACANs, threeaccelerometers, tworadar altimeters, twobarometric altimeters, threeattitude indicators, twoMach indicators, and twoMode Ctransponders. During reentry, the crew deployed twoair data probes once they were traveling slower than Mach 5. The orbiter had threeinertial measuring units (IMU) that it used for guidance and navigation during all phases of flight. The orbiter contains twostar trackers to align the IMUs while in orbit. The star trackers are deployed while in orbit, and can automatically or manually align on a star. In 1991, NASA began upgrading the inertial measurement units with aninertial navigation system (INS), which provided more accurate location information. In 1993, NASA flew aGPS receiver for the first time aboardSTS-51. In 1997, Honeywell began developing an integrated GPS/INS to replace the IMU, INS, and TACAN systems, which first flew onSTS-118 in August 2007.[3]: 402–403
While in orbit, the crew primarily communicated using one of fourS band radios, which provided both voice and data communications. Two of the S band radios werephase modulationtransceivers, and could transmit and receive information. The other two S band radios werefrequency modulationtransmitters and were used to transmit data to NASA. As S band radios can operate only within theirline of sight, NASA used theTracking and Data Relay Satellite System and theSpacecraft Tracking and Data Acquisition Network ground stations to communicate with the orbiter throughout its orbit. Additionally, the orbiter deployed a high-bandwidthKu band radio out of the cargo bay, which could also be utilized as a rendezvous radar. The orbiter was also equipped with twoUHF radios for communications withair traffic control and astronauts conducting EVA.[3]: 403–404
AP-101S (left) and AP-101B general purpose computers
The Space Shuttle'sfly-by-wire control system was entirely reliant on its main computer, the Data Processing System (DPS). The DPS controlled the flight controls and thrusters on the orbiter, as well as the ET and SRBs during launch. The DPS consisted of five general-purpose computers (GPC), two magnetic tape mass memory units (MMUs), and the associated sensors to monitor the Space Shuttle components.[3]: 232–233 The original GPC used was the IBMAP-101B, which used a separatecentral processing unit (CPU) and input/output processor (IOP), andnon-volatilesolid-state memory. From 1991 to 1993, the orbiter vehicles were upgraded to the AP-101S, which improved the memory and processing capabilities, and reduced the volume and weight of the computers by combining the CPU and IOP into a single unit. Four of the GPCs were loaded with the Primary Avionics Software System (PASS), which was Space Shuttle-specific software that provided control through all phases of flight. During ascent, maneuvering, reentry, and landing, the four PASS GPCs functioned identically to produce quadruple redundancy and would error check their results. In case of a software error that would cause erroneous reports from the four PASS GPCs, a fifth GPC ran the Backup Flight System, which used a different program and could control the Space Shuttle through ascent, orbit, and reentry, but could not support an entire mission. The five GPCs were separated in three separate bays within the mid-deck to provide redundancy in the event of a cooling fan failure. After achieving orbit, the crew would switch some of the GPCs functions from guidance, navigation, and control (GNC) to systems management (SM) and payload (PL) to support the operational mission.[3]: 405–408 The Space Shuttle was not launched if its flight would run from December to January, as its flight software would have required the orbiter vehicle's computers to be reset at the year change. In 2007, NASA engineers devised a solution so Space Shuttle flights could cross the year-end boundary.[30]
Space Shuttle missions typically brought a portable general support computer (PGSC) that could integrate with the orbiter vehicle's computers and communication suite, as well as monitor scientific and payload data. Early missions brought theGrid Compass, one of the first laptop computers, as the PGSC, but later missions broughtApple andIntel laptops.[3]: 408 [31]
The payload bay comprised most of the orbiter vehicle'sfuselage, and provided the cargo-carrying space for the Space Shuttle's payloads. It was 18 m (60 ft) long and 4.6 m (15 ft) wide, and could accommodate cylindrical payloads up to 4.6 m (15 ft) in diameter. Two payload bay doors hinged on either side of the bay, and provided a relatively airtight seal to protect payloads from heating during launch and reentry. Payloads were secured in the payload bay to the attachment points on thelongerons. The payload bay doors served an additional function as radiators for the orbiter vehicle's heat, and were opened upon reaching orbit for heat rejection.[15]: 62–64
The orbiter could be used in conjunction with a variety of add-on components depending on the mission. This included orbital laboratories,[24]: II-304, 319 boosters for launching payloads farther into space,[24]: II-326 the Remote Manipulator System (RMS),[24]: II-40 and optionally the EDO pallet to extend the mission duration.[24]: II-86 To limit the fuel consumption while the orbiter was docked at the ISS, theStation-to-Shuttle Power Transfer System (SSPTS) was developed to convert and transfer station power to the orbiter.[24]: II-87–88 The SSPTS was first used on STS-118, and was installed onDiscovery andEndeavour.[24]: III-366–368
The Remote Manipulator System (RMS), also known as Canadarm, was a mechanical arm attached to the cargo bay. It could be used to grasp and manipulate payloads, as well as serve as a mobile platform for astronauts conducting an EVA. The RMS was built by the Canadian companySpar Aerospace and was controlled by an astronaut inside the orbiter's flight deck using their windows and closed-circuit television. The RMS allowed for six degrees of freedom and had six joints located at three points along the arm. The original RMS could deploy or retrieve payloads up to 29,000 kg (65,000 lb), which was later improved to 270,000 kg (586,000 lb).[3]: 384–385
The Spacelab module was a European-funded pressurized laboratory that was carried within the payload bay and allowed for scientific research while in orbit. The Spacelab module contained two 2.7 m (9 ft) segments that were mounted in the aft end of the payload bay to maintain the center of gravity during flight. Astronauts entered the Spacelab module through a 2.7 or 5.8 m (8.72 or 18.88 ft) tunnel that connected to the airlock. The Spacelab equipment was primarily stored in pallets, which provided storage for both experiments as well as computer and power equipment.[3]: 434–435 Spacelab hardware was flown on 28 missions through 1999 and studied subjects including astronomy, microgravity, radar, and life sciences. Spacelab hardware also supported missions such as Hubble Space Telescope (HST) servicing and space station resupply. The Spacelab module was tested on STS-2 and STS-3, and the first full mission was on STS-9.[32]
Three RS-25 engines, also known as the Space Shuttle Main Engines (SSME), were mounted on the orbiter's aft fuselage in a triangular pattern. The engine nozzles could gimbal ±10.5° in pitch, and ±8.5° inyaw during ascent to change the direction of their thrust to steer the Shuttle. Thetitanium alloy reusable engines were independent of the orbiter vehicle and would be removed and replaced in between flights. The RS-25 is a staged-combustion cycle cryogenic engine that used liquid oxygen and hydrogen and had a higher chamber pressure than any previous liquid-fueled rocket. The original main combustion chamber operated at a maximum pressure of 226.5 bar (3,285 psi). The engine nozzle is 287 cm (113 in) tall and has an interior diameter of 229 cm (90.3 in). The nozzle is cooled by 1,080 interior lines carrying liquid hydrogen and is thermally protected by insulative and ablative material.[24]: II–177–183
The RS-25 engines had several improvements to enhance reliability and power. During the development program, Rocketdyne determined that the engine was capable of safe reliable operation at 104% of the originally specified thrust. To keep the engine thrust values consistent with previous documentation and software, NASA kept the originally specified thrust at 100%, but had the RS-25 operate at higher thrust. RS-25 upgrade versions were denoted as Block I and Block II. 109% thrust level was achieved with the Block II engines in 2001, which reduced the chamber pressure to 207.5 bars (3,010 psi), as it had a largerthroat area. The normal maximum throttle was 104 percent, with 106% or 109% used for mission aborts.[15]: 106–107
The Orbital Maneuvering System (OMS) consisted of two aft-mountedAJ10-190 engines and the associated propellant tanks. The AJ10 engines usedmonomethylhydrazine (MMH) oxidized bydinitrogen tetroxide (N2O4). The pods carried a maximum of 2,140 kg (4,718 lb) of MMH and 3,526 kg (7,773 lb) of N2O4. The OMS engines were used after main engine cut-off (MECO) for orbital insertion. Throughout the flight, they were used for orbit changes, as well as the deorbit burn prior to reentry. Each OMS engine produced 27,080 N (6,087 lbf) of thrust, and the entire system could provide 305 m/s (1,000 ft/s) ofvelocity change.[24]: II–80
The orbiter was protected from heat during reentry by the thermal protection system (TPS), athermal soaking protective layer around the orbiter. In contrast with previous US spacecraft, which had used ablative heat shields, the reusability of the orbiter required a multi-use heat shield.[15]: 72–73 During reentry, the TPS experienced temperatures up to 1,600 °C (3,000 °F), but had to keep the orbiter vehicle's aluminum skin temperature below 180 °C (350 °F). The TPS primarily consisted of four types of tiles. The nose cone and leading edges of the wings experienced temperatures above 1,300 °C (2,300 °F), and were protected by reinforced carbon-carbon tiles (RCC). Thicker RCC tiles were developed and installed in 1998 to prevent damage frommicrometeoroid and orbital debris, and were further improved after RCC damage caused in theColumbia disaster. Beginning withSTS-114, the orbiter vehicles were equipped with the wing leading edge impact detection system to alert the crew to any potential damage.[24]: II–112–113 The entire underside of the orbiter vehicle, as well as the other hottest surfaces, were protected with tiles of high-temperature reusable surface insulation, made ofborosilicate glass-coatedsilica fibers that trapped heat in air pockets and redirected it out. Areas on the upper parts of the orbiter vehicle were coated in tiles of white low-temperature reusable surface insulation with similar composition, which provided protection for temperatures below 650 °C (1,200 °F). The payload bay doors and parts of the upper wing surfaces were coated in reusableNomex felt surface insulation or inbeta cloth, as the temperature there remained below 370 °C (700 °F).[3]: 395
The ET fromSTS-115 after separation from the orbiter. The scorch mark near the front end of the tank is from the SRB separation motors.
The Space Shuttle external tank (ET) carried the propellant for the Space Shuttle Main Engines, and connected the orbiter vehicle with the solid rocket boosters. The ET was 47 m (153.8 ft) tall and 8.4 m (27.6 ft) in diameter, and contained separate tanks for liquid oxygen and liquid hydrogen. The liquid oxygen tank was housed in the nose of the ET, and was 15 m (49.3 ft) tall. The liquid hydrogen tank comprised the bulk of the ET, and was 29 m (96.7 ft) tall. The orbiter vehicle was attached to the ET at two umbilical plates, which contained five propellant and two electrical umbilicals, and forward and aft structural attachments. The exterior of the ET was covered in orange spray-on foam to allow it to survive the heat of ascent.[3]: 421–422
The ET provided propellant to the Space Shuttle Main Engines from liftoff until main engine cutoff. The ET separated from the orbiter vehicle 18 seconds after engine cutoff and could be triggered automatically or manually. At the time of separation, the orbiter vehicle retracted its umbilical plates, and the umbilical cords were sealed to prevent excess propellant from venting into the orbiter vehicle. After the bolts attached at the structural attachments were sheared, the ET separated from the orbiter vehicle. At the time of separation, gaseous oxygen was vented from the nose to cause the ET to tumble, ensuring that it would break up upon reentry. The ET was the only major component of the Space Shuttle system that was not reused, and it would travel along a ballistic trajectory into the Indian or Pacific Ocean.[3]: 422
For the first two missions, STS-1 andSTS-2, the ET was covered in 270 kg (595 lb) of white fire-retardant latex paint to provide protection against damage from ultraviolet radiation. Further research determined that the orange foam itself was sufficiently protected, and the ET was no longer covered in latex paint beginning on STS-3.[24]: II-210 A light-weight tank (LWT) was first flown on STS-6, which reduced tank weight by 4,700 kg (10,300 lb). The LWT's weight was reduced by removing components from the hydrogen tank and reducing the thickness of some skin panels.[3]: 422 In 1998, a super light-weight ET (SLWT) first flew onSTS-91. The SLWT used the 2195 aluminum-lithium alloy, which was 40% stronger and 10% less dense than its predecessor, 2219 aluminum-lithium alloy. The SLWT weighed 3,400 kg (7,500 lb) less than the LWT, which allowed the Space Shuttle to deliver heavy elements to ISS's high inclination orbit.[3]: 423–424
Two SRBs on the mobile launcher platform prior to mating with the ET and orbiter forSTS-134
The Solid Rocket Boosters (SRB) provided 71.4% of the Space Shuttle's thrust during liftoff and ascent, and were the largestsolid-propellant motors ever flown.[6] Each SRB was 45 m (149.2 ft) tall and 3.7 m (12.2 ft) wide, weighed 68,000 kg (150,000 lb), and had a steel exterior approximately 13 mm (.5 in) thick. The SRB's subcomponents were the solid-propellant motor, nose cone, and rocket nozzle. The solid-propellant motor comprised the majority of the SRB's structure. Its casing consisted of 11 steel sections which made up its four main segments. The nose cone housed the forward separation motors and the parachute systems that were used during recovery. The rocket nozzles could gimbal up to 8° to allow for in-flight adjustments.[3]: 425–429
The rocket motors were each filled with a total 500,000 kg (1,106,640 lb) of solid rocket propellant (APCP+PBAN), and joined in theVehicle Assembly Building (VAB) at KSC.[3]: 425–426 In addition to providing thrust during the first stage of launch, the SRBs provided structural support for the orbiter vehicle and ET, as they were the only system that was connected to themobile launcher platform (MLP).[3]: 427 At the time of launch, the SRBs were armed at T−5 minutes, and could only be electrically ignited once the RS-25 engines had ignited and were without issue.[3]: 428 They each provided 12,500 kN (2,800,000 lbf) of thrust, which was later improved to 13,300 kN (3,000,000 lbf) beginning onSTS-8.[3]: 425 After expending their fuel, the SRBs werejettisoned approximately two minutes after launch at an altitude of approximately 46 km (150,000 ft). Following separation, they deployed drogue and main parachutes, landed in the ocean, and were recovered by the crews aboard the shipsMVFreedom Star andMVLiberty Star.[3]: 430 Once they were returned to Cape Canaveral, they were cleaned and disassembled. The rocket motor, igniter, and nozzle were then shipped to Thiokol to be refurbished and reused on subsequent flights.[15]: 124
The SRBs underwent several redesigns throughout the program's lifetime.STS-6 andSTS-7 used SRBs 2,300 kg (5,000 lb) lighter due to walls that were 0.10 mm (.004 in) thinner, but were determined to be too thin to fly safely. Subsequent flights untilSTS-26 used cases that were 0.076 mm (.003 in) thinner than the standard-weight cases, which reduced 1,800 kg (4,000 lb). After theChallenger disaster as a result of anO-ring failing at low temperature, the SRBs were redesigned to provide a constant seal regardless of the ambient temperature.[3]: 425–426
MVFreedom Star towing a spent SRB (STS-133) to Cape Canaveral Air Force Station
The Space Shuttle's operations were supported by vehicles and infrastructure that facilitated its transportation, construction, and crew access. Thecrawler-transporters carried the MLP and the Space Shuttle from the VAB to the launch site.[33] TheShuttle Carrier Aircraft (SCA) were two modifiedBoeing 747s that could carry an orbiter on its back. The original SCA (N905NA) was first flown in 1975, and was used for theALT and ferrying the orbiter from Edwards AFB to the KSC on all missions prior to 1991. A second SCA (N911NA) was acquired in 1988, and was first used to transportEndeavour from the factory to the KSC. Following the retirement of the Space Shuttle, N905NA was put on display at the JSC, and N911NA was put on display at theJoe Davies Heritage Airpark inPalmdale, California.[24]: I–377–391 [34] TheCrew Transport Vehicle (CTV) was a modified airportjet bridge that was used to assist astronauts to egress from the orbiter after landing, where they would undergo their post-mission medical checkups.[35] TheAstrovan transported astronauts from the crew quarters in the Operations and Checkout Building to the launch pad on launch day.[36] TheNASA Railroad comprised three locomotives that transported SRB segments from theFlorida East Coast Railway inTitusville to the KSC.[37]
The crawler-transporter withAtlantis on the ramp to LC-39A forSTS-117
The Space Shuttle was prepared for launch primarily in the VAB at the KSC. The SRBs were assembled and attached to the external tank on the MLP. The orbiter vehicle was prepared at theOrbiter Processing Facility (OPF) and transferred to the VAB, where a crane was used to rotate it to the vertical orientation and mate it to the external tank.[15]: 132–133 Once the entire stack was assembled, the MLP was carried for 5.6 km (3.5 mi) toLaunch Complex 39 by one of thecrawler-transporters.[15]: 137 After the Space Shuttle arrived at one of the two launchpads, it would connect to the Fixed and Rotation Service Structures, which provided servicing capabilities, payload insertion, and crew transportation.[15]: 139–141 The crew was transported to the launch pad at T−3 hours and entered the orbiter vehicle, which was closed at T−2 hours.[24]: III–8 Liquid oxygen and hydrogen were loaded into the external tank via umbilicals that attached to the orbiter vehicle, which began at T−5 hours 35 minutes. At T−3 hours 45 minutes, the hydrogen fast-fill was complete, followed 15 minutes later by the oxygen tank fill. Both tanks were slowly filled up until the launch as the oxygen and hydrogen evaporated.[24]: II–186
Thelaunch commit criteria considered precipitation, temperatures, cloud cover, lightning forecast, wind, and humidity.[38] The Space Shuttle was not launched under conditions where it could have been struck bylightning, as its exhaust plume could have triggered lightning by providing a current path to ground after launch, which occurred onApollo 12.[39]: 239 The NASA Anvil Rule for a Shuttle launch stated that ananvil cloud could not appear within a distance of 19 km (10 nmi).[40] The Shuttle Launch Weather Officer monitored conditions until the final decision to scrub a launch was announced. In addition to the weather at the launch site, conditions had to be acceptable at one of theTransatlantic Abort Landing sites and the SRB recovery area.[38][41]
Early ignition and lift-off view of main-engines and SRB (ground-camera view)
The mission crew and the Launch Control Center (LCC) personnel completed systems checks throughout the countdown. Two built-in holds at T−20 minutes and T−9 minutes provided scheduled breaks to address any issues and additional preparation.[24]: III–8 After the built-in hold at T−9 minutes, the countdown was automatically controlled by the Ground Launch Sequencer (GLS) at the LCC, which stopped the countdown if it sensed a critical problem with any of the Space Shuttle's onboard systems.[41] At T−3 minutes 45 seconds, the engines began conducting gimbal tests, which were concluded at T−2 minutes 15 seconds. The groundLaunch Processing System handed off the control to the orbiter vehicle's GPCs at T−31 seconds. At T−16 seconds, the GPCs armed the SRBs, the sound suppression system (SPS) began to drench the MLP and SRB trenches with 1,100,000 L (300,000 U.S. gal) of water to protect the orbiter vehicle from damage byacoustical energy and rocket exhaust reflected from the flame trench and MLP during lift-off.[42][43] At T−10 seconds, hydrogen igniters were activated under each engine bell to quell the stagnant gas inside the cones before ignition. Failure to burn these gases could trip the onboard sensors and create the possibility of an overpressure and explosion of the vehicle during the firing phase. The hydrogen tank's prevalves were opened at T−9.5 seconds in preparation for engine start.[24]: II–186
Shuttle lift-off via on-board camera view.
Beginning at T−6.6 seconds, the main engines were ignited sequentially at 120-millisecond intervals. All three RS-25 engines were required to reach 90% rated thrust by T−3 seconds, otherwise the GPCs would initiate anRSLS abort. If all three engines indicated nominal performance by T−3 seconds, they were commanded to gimbal to liftoff configuration and the command would be issued to arm the SRBs for ignition at T−0.[44] Between T−6.6 seconds and T−3 seconds, while the RS-25 engines were firing but the SRBs were still bolted to the pad, the offset thrust would cause the Space Shuttle to pitch down 650 mm (25.5 in) measured at the tip of the external tank; the 3-second delay allowed the stack to return to nearly vertical before SRB ignition. This movement was nicknamed the "twang." At T−0, the eightfrangible nuts holding the SRBs to the pad were detonated, the final umbilicals were disconnected, the SSMEs were commanded to 100% throttle, and the SRBs were ignited.[45][46] By T+0.23 seconds, the SRBs built up enough thrust for liftoff to commence, and reached maximum chamber pressure by T+0.6 seconds.[47][24]: II–186 At T−0, the JSCMission Control Center assumed control of the flight from the LCC.[24]: III–9
On-board camera-view of SRB separation.
At T+4 seconds, when the Space Shuttle reached an altitude of 22 meters (73 ft), the RS-25 engines were throttled up to 104.5%. At approximately T+7 seconds, the Space Shuttle rolled to a heads-down orientation at an altitude of 110 meters (350 ft), which reduced aerodynamic stress and provided an improved communication and navigation orientation. Approximately 20–30 seconds into ascent and an altitude of 2,700 meters (9,000 ft), the RS-25 engines were throttled down to 65–72% to reduce the maximum aerodynamic forces atMax Q.[24]: III–8–9 Additionally, the shape of the SRB propellant was designed to cause thrust to decrease at the time of Max Q.[3]: 427 The GPCs could dynamically control the throttle of the RS-25 engines based upon the performance of the SRBs.[24]: II–187
On-board camera-view of external-tank separation
At approximately T+123 seconds and an altitude of 46,000 meters (150,000 ft), pyrotechnic fasteners released the SRBs, which reached anapogee of 67,000 meters (220,000 ft) before parachuting into theAtlantic Ocean. The Space Shuttle continued its ascent using only the RS-25 engines. On earlier missions, the Space Shuttle remained in the heads-down orientation to maintain communications with thetracking station inBermuda, but later missions, beginning withSTS-87, rolled to a heads-up orientation at T+6 minutes for communication with thetracking and data relay satellite constellation. The RS-25 engines were throttled at T+7 minutes 30 seconds to limit vehicle acceleration to 3g. At 6 seconds prior to main engine cutoff (MECO), which occurred at T+8 minutes 30 seconds, the RS-25 engines were throttled down to 67%. The GPCs controlled ET separation and dumped the remaining liquid oxygen and hydrogen to prevent outgassing while in orbit. The ET continued on a ballistic trajectory and broke up during reentry, with some small pieces landing in the Indian or Pacific Ocean.[24]: III–9–10
Early missions used two firings of the OMS to achieve orbit; the first firing raised the apogee while the second circularized the orbit. Missions afterSTS-38 used the RS-25 engines to achieve the optimal apogee, and used the OMS engines to circularize the orbit. The orbital altitude and inclination were mission-dependent, and the Space Shuttle's orbits varied from 220 to 620 km (120 to 335 nmi).[24]: III–10
Endeavour docked at ISS during the STS-134 mission
The type of mission the Space Shuttle was assigned to dictate the type of orbit that it entered. The initial design of the reusable Space Shuttle envisioned an increasingly cheap launch platform to deploy commercial and government satellites. Early missions routinely ferried satellites, which determined the type of orbit that the orbiter vehicle would enter. Following theChallenger disaster, many commercial payloads were moved to expendable commercial rockets, such as theDelta II.[24]: III–108, 123 While later missions still launched commercial payloads, Space Shuttle assignments were routinely directed towards scientific payloads, such as theHubble Space Telescope,[24]: III–148 Spacelab,[3]: 434–435 and theGalileo spacecraft.[24]: III–140 Beginning withSTS-71, the orbiter vehicle conducted dockings with theMir space station.[24]: III–224 In its final decade of operation, the Space Shuttle was used for the construction of theInternational Space Station.[24]: III–264 Most missions involved staying in orbit several days to two weeks, although longer missions were possible with theExtended Duration Orbiter pallet.[24]: III–86 The 17 day 15 hourSTS-80 mission was the longest Space Shuttle mission duration.[24]: III–238
Approximately four hours prior to deorbit, the crew began preparing the orbiter vehicle for reentry by closing the payload doors, radiating excess heat, and retracting the Ku band antenna. The orbiter vehicle maneuvered to an upside-down, tail-first orientation and began a 2–4 minute OMS burn approximately 20 minutes before it reentered the atmosphere. The orbiter vehicle reoriented itself to a nose-forward position with a 40° angle-of-attack, and the forwardreaction control system (RCS) jets were emptied of fuel and disabled prior to reentry. The orbiter vehicle's reentry was defined as starting at an altitude of 120 km (400,000 ft), when it was traveling at approximately Mach 25. The orbiter vehicle's reentry was controlled by the GPCs, which followed a preset angle-of-attack plan to prevent unsafe heating of the TPS. During reentry, the orbiter's speed was regulated by altering the amount of drag produced, which was controlled by means of angle of attack, as well as bank angle. The latter could be used to control drag without changing the angle of attack. A series of roll reversals[c] were performed to control azimuth while banking.[48] The orbiter vehicle's aft RCS jets were disabled as its ailerons, elevators, and rudder became effective in the lower atmosphere. At an altitude of 46 km (150,000 ft), the orbiter vehicle opened itsspeed brake on the vertical stabilizer. At 8 minutes 44 seconds prior to landing, the crew deployed the air data probes, and began lowering the angle-of-attack to 36°.[24]: III–12 The orbiter's maximumglide ratio/lift-to-drag ratio varied considerably with speed, ranging from 1.3 athypersonic speeds to 4.9 at subsonic speeds.[24]: II–1 The orbiter vehicle flew to one of the two Heading Alignment Cones, located 48 km (30 mi) away from each end of the runway's centerline, where it made its final turns to dissipate excess energy prior to its approach and landing. Once the orbiter vehicle was traveling subsonically, the crew took over manual control of the flight.[24]: III–13
The approach and landing phase began when the orbiter vehicle was at an altitude of 3,000 m (10,000 ft) and traveling at 150 m/s (300 kn). The orbiter followed either a -20° or -18° glideslope and descended at approximately 51 m/s (167 ft/s). The speed brake was used to keep a continuous speed, and crew initiated a pre-flare maneuver to a -1.5° glideslope at an altitude of 610 m (2,000 ft). The landing gear was deployed 10 seconds prior to touchdown, when the orbiter was at an altitude of 91 m (300 ft) and traveling 150 m/s (288 kn). A final flare maneuver reduced the orbiter vehicle's descent rate to 0.9 m/s (3 ft/s), with touchdown occurring at 100–150 m/s (195–295 kn), depending on the weight of the orbiter vehicle. After the landing gear touched down, the crew deployed a drag chute out of the vertical stabilizer, and began wheel braking when the orbiter was traveling slower than 72 m/s (140 kn). After the orbiter's wheels stopped, the crew deactivated the flight components and prepared to exit.[24]: III–13
The primary Space Shuttle landing site was theShuttle Landing Facility at KSC, where 78 of the 133 successful landings occurred. In the event of unfavorable landing conditions, the Shuttle could delay its landing or land at an alternate location. The primary alternate was Edwards AFB, which was used for 54 landings.[24]: III–18–20 STS-3 landed at theWhite Sands Space Harbor inNew Mexico and required extensive post-processing after exposure to thegypsum-rich sand, some of which was found inColumbia debris afterSTS-107.[24]: III–28 Landings at alternate airfields required the Shuttle Carrier Aircraft to transport the orbiter back toCape Canaveral.[24]: III–13
In addition to the pre-planned landing airfields, there were 85 agreed-uponemergency landing sites to be used in different abort scenarios, with 58 located in other countries. The landing locations were chosen based upon political relationships, favorable weather, a runway at least 2,300 m (7,500 ft) long, andTACAN orDME equipment. Additionally, as the orbiter vehicle only had UHF radios, international sites with only VHF radios would have been unable to communicate directly with the crew. Facilities on the east coast of the US were planned for East Coast Abort Landings, while several sites in Europe and Africa were planned in the event of a Transoceanic Abort Landing. The facilities were prepared with equipment and personnel in the event of an emergency shuttle landing but were never used.[24]: III–19
Discovery being prepared after landing for crew disembarkment followingSTS-114
After the landing, ground crews approached the orbiter to conduct safety checks. Teams wearing self-contained breathing gear tested for the presence ofhydrogen,hydrazine, monomethylhydrazine,nitrogen tetroxide, andammonia to ensure the landing area was safe.[49] Air conditioning and Freon lines were connected to cool the crew and equipment and dissipate excess heat from reentry.[24]: III-13 Aflight surgeon boarded the orbiter and performed medical checks of the crew before they disembarked. Once the orbiter was secured, it was towed to the OPF to be inspected, repaired, and prepared for the next mission.[49] The processing included:
removal and installation of mission-specific items and payloads
draining of waste and leftover consumables, and refilling of new consumables
inspection and (if necessary) repair of the thermal protection system
checkout and servicing of main engines (done in theMain Engine Processing Facility to facilitate easier access, necessitating their removal from the orbiter)
The Space Shuttle flew from April 12, 1981,[24]: III–24 until July 21, 2011.[24]: III–398 Throughout the program, the Space Shuttle had 135 missions,[24]: III–398 of which 133 returned safely.[24]: III–80, 304 Throughout its lifetime, the Space Shuttle was used to conduct scientific research,[24]: III–188 deploy commercial,[24]: III–66 military,[24]: III–68 and scientific payloads,[24]: III–148 and was involved in the construction and operation ofMir[24]: III–216 and the ISS.[24]: III–264 During its tenure, the Space Shuttle served as the only U.S. vehicle to launch astronauts, of which there was no replacement until the launch ofCrew Dragon Demo-2 on May 30, 2020.[50]
The overall NASA budget of the Space Shuttle program has been estimated to be $221 billion (in 2012 dollars).[24]: III−488 The developers of the Space Shuttle advocated for reusability as a cost-saving measure, which resulted in higher development costs for presumed lower costs-per-launch. During the design of the Space Shuttle, the Phase B proposals were not as cheap as the initial Phase A estimates indicated; Space Shuttle program manager Robert Thompson acknowledged that reducing cost-per-pound was not the primary objective of the further design phases, as other technical requirements could not be met with the reduced costs.[24]: III−489−490 Development estimates made in 1972 projected a per-pound cost of payload as low as $1,109 (in 2012) per pound, but the actual payload costs, not to include the costs for the research and development of the Space Shuttle, were $37,207 (in 2012) per pound.[24]: III−491 Per-launch costs varied throughout the program and were dependent on the rate of flights as well as research, development, and investigation proceedings throughout the Space Shuttle program. In 1982, NASA published an estimate of $260 million (in 2012) per flight, which was based on the prediction of 24 flights per year for a decade. The per-launch cost from 1995 to 2002, when the orbiters and ISS were not being constructed and there was no recovery work following a loss of crew, was $806 million. NASA published a study in 1999 that concluded that costs were $576 million (in 2012) if there were seven launches per year. In 2009, NASA determined that the cost of adding a single launch per year was $252 million (in 2012), which indicated that much of the Space Shuttle program costs are for year-round personnel and operations that continued regardless of the launch rate. Accounting for the entire Space Shuttle program budget, the per-launch cost was $1.642 billion (in 2012).[24]: III−490
On January 28, 1986,STS-51-L disintegrated 73 seconds after launch, due to the failure of the right SRB, killing all seven astronauts on boardChallenger. The disaster was caused by the low-temperature impairment of an O-ring, a mission-critical seal used between segments of the SRB casing. Failure of the O-ring allowed hot combustion gases to escape from between the booster sections and burn through the adjacent ET, leading to a sequence of catastrophic events which caused the orbiter to disintegrate.[51]: 71 Repeated warnings from design engineers voicing concerns about the lack of evidence of the O-rings' safety when the temperature was below 53 °F (12 °C) had been ignored by NASA managers.[51]: 148
On February 1, 2003,Columbia disintegrated during re-entry, killing all seven of theSTS-107 crew, because of damage to thecarbon-carbon leading edge of the wing caused during launch. Ground control engineers had made three separate requests for high-resolution images taken by the Department of Defense that would have provided an understanding of the extent of the damage, while NASA's chief TPS engineer requested that astronauts on boardColumbia be allowed to leave the vehicle to inspect the damage. NASA managers intervened to stop the Department of Defense's imaging of the orbiter and refused the request for the spacewalk,[24]: III–323 [52] and thus the feasibility of scenarios for astronaut repair or rescue byAtlantis were not considered by NASA management at the time.[53]
The partial reusability of the Space Shuttle was one of the primary design requirements during its initial development.[8]: 164 The technical decisions that dictated the orbiter's return and re-use reduced the per-launch payload capabilities. The original intention was to compensate for this lower payload by lowering the per-launch costs and a high launch frequency. However, the actual costs of a Space Shuttle launch were higher than initially predicted, and the Space Shuttle did not fly the intended 24 missions per year as initially predicted by NASA.[54][24]: III–489–490
The Space Shuttle was originally intended as a launch vehicle to deploy satellites, which it was primarily used for on the missions prior to theChallenger disaster. NASA's pricing, which was below cost, was lower than expendable launch vehicles; the intention was that the high volume of Space Shuttle missions would compensate for early financial losses. The improvement of expendable launch vehicles and the transition away from commercial payloads on the Space Shuttle resulted in expendable launch vehicles becoming the primary deployment option for satellites.[24]: III–109–112 A key customer for the Space Shuttle was theNational Reconnaissance Office (NRO) responsible for spy satellites. The existence of NRO's connection was classified through 1993, and secret considerations of NRO payload requirements led to lack of transparency in the program. The proposedShuttle-Centaur program, cancelled in the wake of theChallenger disaster, would have pushed the spacecraft beyond its operational capacity.[55]
The fatalChallenger andColumbia disasters demonstrated the safety risks of the Space Shuttle that could result in the loss of the crew. The spaceplane design of the orbiter limited the abort options, as the abort scenarios required the controlled flight of the orbiter to a runway or to allow the crew to egress individually, rather than the abort escape options on theApollo andSoyuz space capsules.[56] Early safety analyses advertised by NASA engineers and management predicted the chance of a catastrophic failure resulting in the death of the crew as ranging from 1 in 100 launches to as rare as 1 in 100,000.[57][58] Following the loss of two Space Shuttle missions, the risks for the initial missions were reevaluated, and the chance of a catastrophic loss of the vehicle and crew was found to be as high as 1 in 9.[59] NASA management was criticized afterwards for accepting increased risk to the crew in exchange for higher mission rates. Both theChallenger andColumbia reports explained that NASA culture had failed to keep the crew safe by not objectively evaluating the potential risks of the missions.[58][60]: 195–203
Atlantis after its final landing, marking the end of the Space Shuttle Program
The Space Shuttle retirement was announced in January 2004.[24]: III-347 PresidentGeorge W. Bush announced hisVision for Space Exploration, which called for the retirement of the Space Shuttle once it completed construction of the ISS.[61][62] To ensure the ISS was properly assembled, the contributing partners determined the need for 16 remaining assembly missions in March 2006.[24]: III-349 One additional Hubble Space Telescope servicing mission was approved in October 2006.[24]: III-352 Originally,STS-134 was to be the final Space Shuttle mission. However, theColumbia disaster resulted in additional orbiters being prepared forlaunch on need in the event of a rescue mission. AsAtlantis was prepared for the final launch-on-need mission, the decision was made in September 2010 that it would fly asSTS-135 with a four-person crew that could remain at the ISS in the event of an emergency.[24]: III-355 STS-135 launched on July 8, 2011, and landed at the KSC on July 21, 2011, at 5:57 a.m. EDT (09:57 UTC).[24]: III-398 From then until the launch ofCrew Dragon Demo-2 on May 30, 2020, the US launched its astronauts aboard Russian Soyuz spacecraft.[63]
Following each orbiter's final flight, it was processed to make it safe for display. The OMS and RCS systems used presented the primary dangers due to their toxichypergolic propellant, and most of their components were permanently removed to prevent any dangerous outgassing.[24]: III-443 Atlantis is on display at theKennedy Space Center Visitor Complex in Florida,[24]: III-456 Discovery is on display at theSteven F. Udvar-Hazy Center in Virginia,[24]: III-451 Endeavour is on display at theCalifornia Science Center in Los Angeles,[24]: III-457 andEnterprise is displayed at theIntrepid Museum in New York.[24]: III-464 Components from the orbiters were transferred to the US Air Force, ISS program, and Russian and Canadian governments. The engines were removed to be used on theSpace Launch System, and spare RS-25 nozzles were attached for display purposes.[24]: III-445
^In this case, the number of successes is determined by the number of successful Space Shuttle missions.
^STS-1 andSTS-2 were the only Space Shuttle missions that used a white fire-retardant coating on the external tank. Subsequent missions did not use the latex coating to reduce the mass, and the external tank appeared orange.[15]: 48
^A roll reversal is a maneuver where the bank angle is altered from one side to another. They are used to control the deviation of the azimuth from the prograde vector that results from using high bank angles to create drag.
^ab"Inertial Upper Stage". Rocket and Space Technology. November 2017.Archived from the original on August 7, 2020. RetrievedJune 21, 2020.
^Woodcock, Gordon R. (1986).Space stations and platforms. Orbit Book co.ISBN978-0-89464-001-8. RetrievedApril 17, 2012.The present limit on Shuttle landing payload is 14,400 kg (31,700 lb). This value applies to payloads intended for landing.
^Kyle, Ed."STS Data Sheet".spacelaunchreport.com. Archived from the original on August 7, 2020. RetrievedMay 4, 2018.
^abcdefghijklmnWilliamson, Ray (1999)."Developing the Space Shuttle"(PDF).Exploring the Unknown: Selected Documents in the History of the U.S. Civil Space Program, Volume IV: Accessing Space. Washington, D.C.: NASA.Archived(PDF) from the original on May 31, 2020. RetrievedApril 23, 2019.
^Guilmartin JF, Mauer JW (1988).A shuttle chronology 1964–1973: Abstract concepts to letter contracts (5 vols.). Houston, TX.: NASA Lyndon B. Johnson Space Center, Houston, TX.
^Cook, Richard (2007).Challenger Revealed: An Insider's Account of How the Reagan Administration Caused the Greatest Tragedy of the Space Ag. Basic Books.ISBN978-1560259800.
This template lists historical, current, and future space rockets that at least once attempted (but not necessarily succeeded in) an orbital launch or that are planned to attempt such a launch in the future
Symbol† indicates past or current rockets that attempted orbital launches but never succeeded (never did or has yet to perform a successful orbital launch)