This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Shell Haven" – news ·newspapers ·books ·scholar ·JSTOR(February 2021) (Learn how and when to remove this message) |
| Shell Haven | |
|---|---|
Aerial view of Shell Haven 19 October 2007 | |
Location withinEssex | |
| OS grid reference | TQ728815 |
| Unitary authority | |
| Ceremonial county | |
| Region | |
| Country | England |
| Sovereign state | United Kingdom |
| Post town | STANFORD-LE-HOPE |
| Postcode district | SS17 |
| Dialling code | 01375 |
| Police | Essex |
| Fire | Essex |
| Ambulance | East of England |
| UK Parliament | |
| 51°30′19″N0°29′25″E / 51.5052°N 0.4902°E /51.5052; 0.4902 | |
Shell Haven was a port on the north bank of theThames Estuary at the eastern end ofThurrock, Essex, England and then anoil refinery. The refinery closed in 1999 and the site was purchased byDP World who received planning consent in May 2007 for the newLondon Gateway deep water container port at the site. The neighbouringCoryton Refinery remained in operation until 2012.
Shell Haven appears on the 1596 edition of Saxton's Map 'Essexiae Comitat' Nova vera ac absaluta descriptio' It was possibly mentioned earlier.[1]Shell Haven was mentioned inSamuel Pepys' Diary on 10 June 1667.[2]
The site, historically also referred to as Shellhaven was originally an inlet on the north bank of the Thames, about a mile to the west ofCanvey Island. This was the mouth of Shell Haven Creek, which runs east and south of the village ofFobbing, and originally separated Corringham Marsh from Fobbing Marsh. To the east was Shell Haven House. Sources differ on when Shell Haven first became associated with the oil industry; the first editionOrdnance Survey map of the early 19th century shows Oil Mill Farm a mile or so up Shell Haven Creek. Shell Haven was for over 80 years the site of a largeShell oil refinery, but there seems to be no evidence for the company taking its name from the site.
In the 1850s, abranch line was constructed from theLondon Tilbury & Southend Railway (LT&SR) to a new port immediately to the east of Shell Haven, to be known asThames Haven (sometimes written Thameshaven). The name of Shell Haven would probably have been eclipsed, but for the failure of Thames Haven to prosper, and the later arrival ofShell.
In 1895, the ammunition firmKynochs purchased Borley Farm, to the east of Shell Haven Creek, to build an explosives factory. This opened in 1897, with a small estate called Kynochtown. Kynochs also built theCorringham Light Railway (CLR), with a passenger branch from the works toCorringham and a goods branch to the LT&SR at Thames Haven. The Kynoch works closed in 1919. The site and CLR were taken over by coal merchants Cory Brothers ofCardiff to build an oil storage depot, with Kynochtown being renamed Coryton. The oil depot eventually becameCoryton Refinery (run from 1950 until recently byMobil and its antecedents), which remains in production, between Shell Haven Creek and Hole Haven to the east.
Shell Oil first arrived in the form of theAsiatic Petroleum Company, a sales company formed by Royal Dutch Petroleum and the British company Shell Transport and Trading Company, prior to their merger as Royal Dutch Shell. A licence was obtained in 1912 to store petroleum at Shell Haven, in iron tanks, each containing not more than 4,000 tonnes. The maximum storage allowed for the whole site was 80,000 tonnes. Refinery operations began on a 40 hectares (99 acres) site in 1916 with adistillation plant which producedfuel oil for theAdmiralty. In 1919, this unit was converted to manufacture road surfacingbitumen. In 1925, a bench still was erected for the manufacture oflubricating oils; the first high viscosity oils were produced in 1937. Other plants were erected before the outbreak of war, including a blending plant for producing horticultural chemical products.
During World War II the refineries and oil storage tanks at Thames Haven, Shell Haven and Coryton became a sitting target for air raids, notably in September 1940, during theBattle of Britain.
In 1946, a plant producing high gradeParaffin Wax for candles, paper, etc. was commissioned. In 1947, expansion began on a 400 hectares (990 acres) site west of the original refinery.
In 1948, financial sanction was approved by the board of Shell Petroleum Co Ltd for the construction of a new large crude oil refinery, based primarily on the processing of Kuwait crude.

The facilities were to include:
In 1950, the Crude Distillation Unit, the Doctor Treater and MP Boilers 3, 5 and 6 were commissioned.

Subsequently, various units were added to produce valuable hydrocarbons from the distillation residue. In 1956, acatalytic reforming 'Platformer' was brought into service and in the same year, a petroleum chemicals unit to manufacturealkylbenzenes, the basis of household detergents. A second crude distillation unit was commissioned in 1959, and a second catalytic reformer in 1967. A kerosenehydrotreater was commissioned in 1972 and in 1977 a third reformer. In 1979, ahydrocracking unit was added to increase the proportion of light distillates. A new bitumen plant started production in 1981.

In 1992, a major capital investment was completed, adding a 'Naphtha Minus' complex which contained anisomerisation unit,benzene recovery andgas turbine power generation. A new Control Centre was added. By then the plant had a capacity of 4.6 million tonnes per annum, and covered 800 hectares (2,000 acres), with a 27 km (17 mi) perimeter and its own generating plant, emergency and other services. It had five jetties, handling tankers of up to 300,000 tons capacity. The refinery delivered products by road and ship andUK oil pipeline network.
In the period of 1970–1973, major fires broke out at the refinery three times.[3]
The Shell refinery closed in 1999. A team consisting of operations and engineering personnel were picked from the workforce to carry out decommissioning and oversee the demolition of the refinery. Shell Haven Refinery was decommissioned and demolished, apart from The Bitumen Plant and some Storage Tanks. The two reactors from the Hydrocracker Unit were transferred to the Shell Rhineland Refinery in Cologne, Germany in July 2004 and added to an already existing unit of four crackers of the same type. The two Shellhaven reactors continued operation in 2005 and are operational until today.
In 2006, the site was purchased byDP World, one of the largest marine terminal operators in the world, as part of the company's purchase ofP&O. In May 2007, DP World received outline planning consent for a major new deepwater port on the site, known asLondon Gateway. In addition to the new port, the development will include one of Europe's largest logistics parks, providing access to London, the South East and the rest of the UK.
In May 2008, theDepartment for Transport issued a 'Harbour Empowerment Order' forLondon Gateway, which provided official and statutory powers for the new port and established London Gateway as a legally recognised authority.DP World is now set to invest over £1.5bn to develop the project over the next 10 to 15 years.
The Bitumen Unit was in the process of being decommissioned in 2010.
The site is currently being remediated by Hydrock as part of the redevelopment to an industrial and distribution park.
The Refinery was used as a location in the filmQuatermass 2.
![]() | Crude Distiller 1 Once the tanks had been checked for water it was then pumped to the Crude Distiller. It was passed through aDesalter unit which washed out salt from the crude oil before it entered the distillation unit. The distiller produced long residue, waxy distillate,butane,propane,kerosene,gas oil (Heavy and Medium)andnaphtha. methane and other waste gases produced went to the refinery flare system to be recovered and burnt as fuel in the refinery furnaces. |
Flare System The Flare System was designed to deal with any excess gas produced by the process units. The process units that produced gas exported that to either the high pressure gas main run at 10bar or the low pressure gas main run at 4 bar. The process units could also export directly to the flare system. Relief valves set to protect linework or equipment also would open into the flare system should the pressure exceed the set pressure. There were two flare stacks, each with its own knock out vessels.These were designed to remove anyhydrocarbons from the gas. There was a compressor in the system downstream of the knock out vessels that sent any gas back to the refinery gas mains. Should the refinery furnaces be unable to deal with this gas, it would then be burnt via the stacks. When this happenedsteam at a preset ratio would be injected with the gas to allow it to burn cleanly. The priority of these stacks were determined by a water level in the vessels that the gas passed through prior to entering the stacks. |