Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Samsun Tram

From Wikipedia, the free encyclopedia
Mainline route in turkey
Samsun Tramway
Overview
OwnerSamsun Metropolitan Municipality
LocaleSamsun
Transit typeLight Rail
Number of lines1
Number of stations43
Daily ridership90,000
Chief executiveEnver Sedat Tamgacı
Websitesamulas.com.tr/hizmetler light-rail-system/
Operation
Began operation2016
Operator(s)Samulaş
Number of vehicles29
Train length32/40 m
Technical
System length36.5
Track gauge1435 mm
Average speed62
Top speed70
System map

Mainline rail interchange Stadyum
Tekkeköy
Cumhiyet
Kerimbey
Organize Sanayi
19 Mayıs Sanayi
İlkadım Sanayi
Örnek Sanayi
Kirazlık
Asarağaç
Balıkçı Barınağı Tekkeköy
Mavi Işıklar
Belediye Evleri
Samsunspor Canik
Kılıçdede
Mainline rail interchange Train Station
Bus interchange Republic Square
Büyük Cami / Opera
Port
Youth Park
Samsun Museum / Fener
Bus interchange Baruthane / Kalkancı
Güzel Sanatlar
Kürtün River
Depot
Ankara Road
Bus interchange Karayolları
Denizevleri / Esenevler
Atakum Belediyesi
Mimar Sinan Mahallesi
Bus interchange Türk-iş
Bus interchange Ömürevleri
Çobanlı
Bus interchange Atakent
Bus interchange Yeni Mahalle
Kurupelit
Bus interchange Pelitköy
Körfez
Bus interchange Eczaneler (Pharmacies)
OMÜ Lojmanlar
Tıp Fakültesi
Diş Hekimliği
Sağlık Bilimleri
Yaşam Merkezi
Eğitim Fakültesi
OMÜ Yurtlar Atakum
This diagram:

TheSamsun Light Rail Transit System (Samsun Tramway) is alight rail transit system located inSamsun andAtakum, Turkey. The 36.5 km (22.7 mi) Samsun Tramway connectsOndokuz Mayıs University toSamsun Stadium. The system was constructed in three phases between 2010 and 2019. The tram line is the only urban rail system in theBlack Sea Region pending the construction of theTrabzon Tram. The system carries 90,000 passengers daily and is one of the busiest tram systems inTurkey.[1][2]

History

[edit]

In 2008,Samsun Province governorYusuf Ziya Yılmaz announced the construction of a light rail transit line to be completed by 2010. The project was to include 21 stations and connect Samsun's central train station operated byTurkish State Railways with the rectorate ofOndokuz Mayıs University. This route was previously served by private and public bus and van operators but ridership figures were reviewed and led local and national officials to determine that construction of a light rail transit system connecting these destinations was warranted. The rapid growth ofAtakum to the west ofSamsun City Center further warranted investment in a transit system capable of moving a high numbers of riders. Construction of the first phase of the Samsun Tram began in 2008 and completed in 2010 to much fanfare.

As a result of heavy ridership and the political popularity of the first phase of the Samsun Tram, a second phase was announced in 2013. Phase two of the project entailed the construction 15 additional stations between Samsun Central Train Station (Gar) andSamsun Stadium home to the regional soccer clubSamsunspor. Construction of the second phase of the Tramway concluded on October 10, 2016. In additional to connectingSamsun Stadium to the City Center, the tram also connected the large industrial park and suburbs ofTekkeköy and left open the possibility of a future extension toSamsun-Çarşamba Airport.

Shortly after the completion of Phase II of the Samsun Tram, a third phase of the project was announced. The third phase is the only portion of the project that goes above ground. The tram primarily operates at grad with the exception of overpasses that were built a particularly busy road crossings in the first two phases. The third phase of the tramway was built on theOndokuz Mayıs University campus and connects the Rectorate to the Residential Dormitories on the western edge of the campus. The third phase of the Samsun Tram was completed on July 5, 2019.[3]

Future Extensions

[edit]

A future extension toSamsun-Çarşamba Airport is in the planning stages though make take the form of an electric bus depending on cost considerations.[4]

Track

[edit]

Two types of rail are used on the length of the Tramway. The primary track gauge for the first phase of the project is S49 which comprises 13.49 km (8.38 mi) of the route while 2.2 km (1.37 mi) is of Rİ60 grooved rail. The tram primarily runs at-grade with the exception of two overpasses and one 420 m (1,377 ft 11 in) long underground condition atOndokuz Mayıs University.[5] There are 74 at-grade crossings which have been the source of frequent collisions with automobiles and pedestrians. The majority of at-grade crossings are inAtakum to the west ofSamsun. Despite the tendency for collisions, the tram is widely regarded as a successful and efficient project that has reduced traffic congestion in the region.

Stations

[edit]

The project includes 43 stations. All stations offer safe and clearly identified at-grade pedestrian crossings. Five stations have pedestrian overpasses. Most stations are defined by simple at-grade platforms with fare collection machines and security staff. Shelters are provided at all stations in case of inclement weather. None of the system's stations are fully enclosed nor underground. All 43 stations are handicapped accessible. Fares are collected by turnstile ahead of boarding and stations are staffed with security guards to ensure fare payment. Fares are between 2.30 and 4.00 TL depending on the age of the rider.

The Samsun Tram connects several major destinations in the Samsun Region including:Samsun Stadium,Republic Square (Samsun), Piazza Samsun,Samsun Saathane Square,Samsun Clock Tower,Atakum andOndokuz Mayıs University.

NameStationDistrict
1OMÜ YurtlarAtakum
2Eğitim Fakültesi
3Yaşam Merkezi
4Sağlık Bilimleri
5Diş Hekimliği
6Tıp Fakültesi
7OMÜ Lojmanlar
8OMÜ Rektörlük / Batı Garajı
9Körfez
10Pelitköy
11Kurupelit
12Yeni Mahalle
13Atakent
14Çobanlı
15Ömürevleri
16Türk-İş
17Mimar Sinan Mahallesi
18Atakum Belediyesi
19Denizevleri / Esenevler
20Karayolları
21Güzel Sanatlarİlkadım
22Baruthane / Kalkancı
23Fener
24Gençlik Parkı
25Liman
26Büyük Cami
27Cumhuriyet Meydanı
28Gar
29Kılıçdede
30SamsunsporCanik
31Belediye Evleri
32Mavi Işıklar
33Balıkçı BarınağıTekkeköy
34Asarağaç
35Kirazlık
36Örnek Sanayi
37İlkadım Sanayi
3819 Mayıs Sanayi
39Organize Sanayi
40Kerimbey
41Cumhuriyet
42Tekkeköy
43Stadyum

Rolling stock

[edit]

The system is served by 16AnsaldoBredaSirio trams, each of which can carry 270 passengers.[6]

In early 2013, additional trams were supplied byCNR Tangshan. 8 DurmarayPanorama trams were added between 2016 and 2017.[7]

  • Tram interior
    Tram interior
  • Gara Station
    Gara Station
  • Samsun Stadium Station - a typical station condition
    Samsun Stadium Station - a typical station condition
  • Samsun Tram Overpass
    Samsun Tram Overpass

References

[edit]
  1. ^"Samsun Raylı Sistem 10.10.2010 Saat 10.00'da Start Verdi". samsun.bel.tr. 11 October 2010. Archived fromthe original on 5 February 2014. Retrieved5 February 2014.
  2. ^"Samsun Tramvay Saatleri Ücretleri ve Güzergah Haritası".RayHaber (in Turkish). 30 October 2019. Archived fromthe original on 11 December 2019. Retrieved13 January 2021.
  3. ^"Samsun tram line reaches Ondokuz Mayis University". 9 July 2019.
  4. ^"Samsun raylı sistemi 'troleybüs' ile uzatılacak".
  5. ^"Samsun´da OMÜ tramvay hattı için ilk kazma vuruldu". 7 March 2017.
  6. ^"Trains of Turkey | Urban / Samsun".www.trainsofturkey.com. Retrieved2021-08-06.
  7. ^"Samsun Tram Tramway Streetcar Trolley Strassenbahn".ymtram.mashke.org. October 2017. Retrieved2021-08-06.
Districts
Transportation
Landmarks
Sports
Clubs
Current
Defunct
Venues
Current
Former
Events
Education
Public spaces
Turkey Urbanpublic transport networks and systems inTurkey
Suburban rail
Current
Future
A Bombardier Flexity Swift, Istanbul.
Rapid transit
Current
Future
BRT
Current
Future
Tram
Current
Future
Ferry
Current
Retrieved from "https://en.wikipedia.org/w/index.php?title=Samsun_Tram&oldid=1286665117"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp