Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

STS-133

From Wikipedia, the free encyclopedia
2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Discovery

STS-133
Canadarm2 installs the PMMLeonardo
NamesSpace Transportation System-133
Mission typeISS assembly
OperatorNASA
COSPAR ID2011-008AEdit this at Wikidata
SATCATno.37371Edit this on Wikidata
Mission duration12 days, 19 hours, 4 minutes, 50 seconds
Distance travelled8,536,190 kilometres (5,304,140 mi)
Spacecraft properties
SpacecraftSpace Shuttle Discovery
Launch massOrbiter: 121,840 kilograms (268,620 lb)
Stack: 2,052,610 kilograms (4,525,220 lb)
Dry mass92,867 kilograms (204,736 lb)[1]
Crew
Crew size6
Members
Start of mission
Launch dateFebruary 24, 2011, 21:53:24 (2011-02-24UTC21:53:24Z) UTC[2][3][4]
Launch siteKennedy,LC-39A
End of mission
Landing dateMarch 9, 2011, 16:58:14 (2011-03-09UTC16:58:15Z) UTC
Landing siteKennedy,SLF Runway 15
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Perigee altitude208 kilometres (129 mi)[5]
Apogee altitude232 kilometres (144 mi)[5]
Inclination51.6°[5]
Period88.89 minutes[5]
EpochFebruary 25, 2011[5]
Docking withISS
Docking portPMA-2
(Harmony forward)
Docking dateFebruary 26, 2011, 19:14 UTC
Undocking dateMarch 7, 2011, 12:00 UTC
Time docked8 days, 16 hours, 46 minutes

From left to right: Alvin Drew, Nicole Stott, Eric Boe, Steven Lindsey, Michael Barratt and Steve Bowen
← STS-132
STS-134 →

STS-133 (ISS assembly flightULF5)[6] was the 133rd mission inNASA'sSpace Shuttle program; during the mission,Space ShuttleDiscovery docked with theInternational Space Station. It wasDiscovery's 39th and final mission. The mission launched on February 24, 2011, and landed on March 9, 2011. The crew consisted of six Americanastronauts, all of whom had been on prior spaceflights, headed by CommanderSteven Lindsey. The crew joined the long-duration six person crew ofExpedition 26, who were already aboard the space station.[7] About a month before lift-off, one of the original crew members,Tim Kopra, was injured in a bicycle accident. He was replaced byStephen Bowen.

The mission transported several items to the space station, including thePermanent Multipurpose ModuleLeonardo, which was left permanently docked to one of the station's ports. The shuttle also carried the third of fourExPRESS Logistics Carriers to the ISS, as well as ahumanoid robot calledRobonaut.[8] The mission marked both the 133rd flight of the Space Shuttle program and the 39th and final flight ofDiscovery, with the orbiter completing a cumulative total of a whole year (365 days) in space.

The mission was affected by a series of delays due to technical problems with the external tank and, to a lesser extent, the payload. The launch, initially scheduled for September 2010, was pushed back to October, then to November, then finally to February 2011.

Crew

[edit]
PositionAstronaut[9][10]
CommanderSteven Lindsey
Fifth and last spaceflight
PilotEric Boe
Second and last spaceflight
Mission Specialist 1Nicole Stott
Second and last spaceflight
Mission Specialist 2
Flight Engineer
Alvin Drew
Second and last spaceflight
Mission Specialist 3Michael Barratt
Second spaceflight
Mission Specialist 4Stephen Bowen
Third spaceflight

NASA announced the STS-133 crew on September 18, 2009, and training began in October 2009. The original crew consisted of commanderSteven Lindsey, pilotEric Boe, and mission specialistsAlvin Drew,Timothy Kopra,Michael Barratt, andNicole Stott. However, on January 19, 2011, about a month before launch, it was announced thatStephen Bowen would replace original crew member Tim Kopra, after Kopra was injured in a bicycle accident.[11] All six crew members had flown at least one spaceflight before; five of the crew members, all but commander Steven Lindsey, were part of NASA'sAstronaut Group 18, all being selected in the year 2000.[12]

The mission commander, Steven Lindsey, handed over his position asChief of the Astronaut Office position toPeggy Whitson in order to lead the mission.[13] For the first time, two mission crew members were in space when a crew assignment announcement was made, as Nicole Stott and Michael Barratt were aboard the ISS as part of theExpedition 20 crew.[13] During STS-133, Alvin Drew became the lastAfrican-American astronaut to fly on the Space Shuttle, as no African-Americans were among the crews ofSTS-134 andSTS-135. Having flown onboardAtlantis'STS-132 mission, Bowen became the first and the only NASA astronaut to be launched on two consecutive missions, untilDoug Hurley launched aboardCrew Dragon Demo-2 in May 2020, after having previously launched onSTS-135.

  • The crew poses for a photo at the KSC (including Bowen).
    The crew poses for a photo at the KSC (including Bowen).
  • Mission poster (with Kopra instead of Bowen).
    Mission poster (with Kopra instead of Bowen).
  • Lindsey, far left, presents a montage to Barack Obama as crew members Barratt, Boe, Stott and Bowen look on.
    Lindsey, far left, presents a montage toBarack Obama as crew members Barratt, Boe, Stott and Bowen look on.

Crew seat assignments

[edit]
Seat[14]LaunchLanding
Seats 1–4 are on the flight deck.
Seats 5–7 are on the mid-deck.
1Lindsey
2Boe
3StottDrew
4DrewStott
5Barratt
6Bowen
7Unused

Mission payload

[edit]

Permanent Multipurpose Module

[edit]
Main article:Permanent Multipurpose Module
PMMLeonardo at theSpace Station Processing Facility (SSPF).

STS-133 leftLeonardo (named after the famed ItalianRenaissance inventorLeonardo da Vinci), one of the threeMulti-Purpose Logistics Modules (MPLMs), on the space station as aPermanent Multipurpose Module (PMM).[15][16] PMMLeonardo added much-needed storage space on the ISS, and was launched with a near-full load of payloads.

The construction of theLeonardo MPLM by the Italian Space Agency commenced in April 1996. In August 1998, after the completion of primary construction,Leonardo was delivered to the Kennedy Space Center (KSC). In March 2001,Leonardo made its first mission onDiscovery as part of theSTS-102 flight. The liftoff ofLeonardo insideDiscovery's payload bay on STS-102 marked the first of seven MPLM flights prior to STS-133.

With the landing ofDiscovery after theSTS-131 mission,Leonardo was transferred back to the Space Station Processing Facility at Kennedy Space Center.Leonardo began receiving modifications and reconfigurations immediately to convert it for permanent attachment to the space station and to facilitate on-orbit maintenance.[17] Some equipment was removed to reduce the overall weight ofLeonardo. These removals resulted in a net weight loss of 178.1 lb (80.8 kg). Additional modifications toLeonardo included the installation of upgradedmulti-layer insulation (MLI) andMicro Meteoroid Orbital Debris (MMOD) shielding to increase the ability of the PMM to handle potential impacts ofmicrometeoroids ororbital debris; a Planar Reflector was installed at the request of theJapanese Space Agency (JAXA).

Following berthing to the space station, the contents ofLeonardo were emptied and moved to appropriate locations on the ISS. Once JAXA'sKounotori 2 (HTV-2) arrived in February 2011,Leonardo's now-unnecessary launch hardware was transferred to HTV2 for ultimate destruction in Earth's atmosphere.

Activities to reconfigureLeonardo following STS-133 spanned multiple station crew increments.

ExPRESS Logistics Carrier 4

[edit]
Main article:Express Logistics Carrier
The ELC-4 being lifted from its work stand in the SSPF.
The ELC-4 in its launch configuration.

TheExpress Logistics Carrier (ELC) is a steel platform designed to support external payloads mounted to the space station starboard and port trusses with either deep space or Earthward views. On STS-133,Discovery carried the ELC-4 to the station to be positioned on the starboard 3 (S3) truss' lower inboard passive attachment system (PAS). The total weight of the ELC-4 is approximately 8,235 pounds.

The Express Logistics Carrier 4 (ELC-4) carried several Orbital Replacement Units (ORUs). Among these were a Heat Rejection System Radiator (HRSR) Flight Support Equipment (FSE), which takes up one whole side of the ELC. The other primary ORUs were the ExPRESS Pallet Controller Avionics 4 (ExPCA #4). The HRSR launching on ELC4 was a spare, if needed, for one of the six radiators that are part of the station's external active thermal control system.

Robonaut2

[edit]
Main article:Robonaut
The Robonaut2 and STS-133 crewmembers pose for a picture near a Destiny lab trainer. (The photo includes original crew member Tim Kopra, who was later replaced by Stephen Bowen).

Discovery carried thehumanoid robotRobonaut2 (also known as R2) to theInternational Space Station (ISS). The microgravity conditions aboard the space station provide an ideal opportunity for robots like R2 to work with astronauts. Although the robot's primary initial task is teaching engineers how dexterous robots behave in space, it may eventually, through upgrades and advancements, assist spacewalking astronauts to perform scientific work once it has been verified as functional on the space station.[18] It was the first humanoid robot in space, and was stowed on board theLeonardo PMM. Once Robonaut2 was unpacked, it began initial operation inside theDestiny module for operational testing, but over time, both its location and its applications could expand.

Robonaut2 was initially designed as a prototype to be used on Earth. For its journey to the ISS, R2 received a few upgrades. Outer skin materials were exchanged to meet the ISS's strict flammability requirements. Shielding was added to reduce electromagnetic interference and onboard processors were upgraded to increase R2's radiation tolerance. The original fans were replaced with quieter ones to accommodate the station's restrictive noise environment, and the power system was rewired to run on the station's direct current system. Tests were conducted to make sure the robot could both endure the harsh conditions in space and exist in it without doing damage. R2 also underwent vibration testing that simulated the conditions it would experience during its launch onboardDiscovery.

The robot weighs 300 pounds (140 kg) and is made out of nickel-plated carbon fiber and aluminum. The height of R2 from waist to head is 3 feet 3.7 inches (100.8 cm), and it has a shoulder width of 2 feet 7.4 inches (79.8 cm). R2 is equipped with 54 servo motors and has 42 degrees of freedom.[19] Powered by 38PowerPC processors, R2's systems run at 120 volts DC.

SpaceX DragonEye sensor

[edit]
The DragonEye sensor, as seen by an Expedition 26 crew member.

Space ShuttleDiscovery also carried the Developmental Test Objective (DTO) 701B payload using Advanced Scientific Concepts, Inc.'s DragonEye 3D Flash LiDAR detection and ranging (LIDAR) sensor. The addition of the pulsed laser navigation sensor was the third time a Space Shuttle provided assistance to the commercial space companySpaceX, followingSTS-127 andSTS-129. The DragonEye on STS-133 incorporated several design and software improvements from the version flown on STS-127 to provide increased performance. Its inclusion on STS-133 was part of a final test run ahead of being fully implemented on SpaceX'sDragon spacecraft, which had its maiden flight in December 2010.[20]

The navigation sensor provides a three-dimensional image based on the time of flight of a single laser pulse from the sensor to the target and back. It provides both range and bearing information from targets that can reflect the light back such as the pressurized mating adapter 2 (PMA2) and those on the station's JapaneseKibo laboratory.

The DragonEye DTO was mounted ontoDiscovery's existing trajectory control system carrier assembly on the orbiter's docking system. SpaceX took data in parallel withDiscovery'sTrajectory Control Sensor (TCS) system. Both the TCS and DragonEye "looked" at theretroreflectors that are on the station. After the mission, SpaceX compared the data DragonEye collected against the data collected by the TCS to evaluate DragonEye's performance.

The sensor was installed ontoDiscovery two weeks later than planned, following a laser rod failure during testing.[21]

Other items

[edit]

STS-133 carried the signatures of more than 500,000 students who participated in the 2010 Student Signatures in Space program, which was jointly sponsored by NASA andLockheed Martin. The students added their signatures to posters in May 2010 as part of the annualSpace Day celebration. Through their participation, students also received standards-based lessons that contained a space theme.[citation needed] Student Signatures in Space has been active since 1997. In that time, nearly seven million student signatures from 6,552 schools were flown on ten Space Shuttle missions.[22]

Also carried aboardDiscovery were hundreds of flags, bookmarks and patches which were distributed when the shuttle returned to Earth. The mission also flew two smallLego Space Shuttles, in honor of an educational partnership between Lego and NASA. Astronauts also carried personal mementos including medallions with connections to their schools or military careers, as well as aWilliam Shakespeare "action figure" from the English Department of theUniversity of Texas, a stuffed giraffe mascot from theHermann Children's Hospital at the University of Texas, T-shirts from Lomax Junior High School inLa Porte, Texas, a blueHawaiian shirt from NASAJohnson Space Center's Education Office, and a shirt from avolunteer fire department.[23]

Crew training

[edit]

Terminal countdown demonstration test

[edit]

On October 12, 2010, the STS-133 crew arrived at the Kennedy Space Center to conduct the Terminal Countdown Demonstration Test (TCDT). The TCDT consisted of training for both the crew and the launch team that simulated the final hours up until launch. During the TCDT, the crew went through a number of exercises that included rescue training and a launch day simulation that included everything that would happen on launch day – except the launch. Commander Steve Lindsey and Pilot Eric Boe also performed abort landings and other flight aspects in theShuttle Training Aircraft (STA). For the TCDT, the crew also received a briefing from NASA engineers, outlining the work that had been carried out onDiscovery during the STS-133 processing flow. After successfully completing all the TCDT tasks, the crew returned to theJohnson Space Center on October 15, 2010.[24]

Flying aboard NASAT-38 training jets, the six astronauts returned to Kennedy Space Center on October 28, 2010, for final pre-launch preparations.[25]

  • The crew gathered for the Terminal Countdown Demonstration Test.
    The crew gathered for the Terminal Countdown Demonstration Test.
  • The Launch Pad 39A during the Terminal Countdown Demonstration Test.
    TheLaunch Pad 39A during the Terminal Countdown Demonstration Test.

On January 15, 2011, Timothy Kopra, scheduled as the lead spacewalker for the mission at the time, was injured in a bicycle accident near hisHouston-area home, reportedly breaking hiship.[26] He was replaced by Stephen Bowen on January 19, 2011. The replacement did not affect the targeted launch date.[11] This is to date the closest to a scheduled launch that a Space Shuttle crewmember has been replaced. During theApollo program,Jack Swigert replacedKen Mattingly three days prior to the launch ofApollo 13.[26]

Shuttle processing

[edit]

STS-133 was originally manifested for launch on September 16, 2010. In June 2010, the launch date was moved to the end of October 2010 and the mission was set to take place before STS-134, which in turn had been rescheduled to February 2011. STS-133 had the longest vertical flow period (170 days) sinceSTS-35 (185 days).

Discovery was moved from its hangar in the Orbiter Processing Facility (OPF)-3 to the nearby 52-storyVehicle Assembly Building (VAB) on September 9, 2010. The shuttle emerged from OPF-3 at 06:54 EDT and the rollover was done at 10:46 EDT whenDiscovery came to a rest in the VAB's transfer aisle.[27] The quarter-mile trip between the OPF-3 and VAB was the 41st rollover for Discovery. The rollover was originally planned at 06:30 EDT on September 8, 2010. The move did not commence due to the unavailability of fire suppression systems because of a broken water main near the VAB and turn basin that runs out to the shuttle launch pads.[28][29]

The two SRBs were designated as flight set 122 by contractorAlliant Techsystems and were made up from one new segment and remaining segments reused across 54 earlier shuttle missions dating back toSTS-1.[30] Inside the VAB, engineers attached a large sling toDiscovery and the orbiter was rotated vertically. The orbiter was lifted into the high bay where its external tank (ET-137) and boosters were waiting to be mated. During the mating operations, an internal nut pre-positioned inside the aft compartment of the orbiter slipped out of position and fell away inside the compartment.[31] Engineers initially were worried that the orbiter would have to be removed from the ET and placed back in a horizontal orientation to make repairs. However, later they successfully accessed the area inside the aft compartment, and re-positioned the nut to complete the repairs. The bolting of the orbiter to its ET ('hard mate') was completed early on the morning of September 11, 2010, at 09:27 EDT.

The shuttle's 44th rollout to the launch pad was scheduled to begin at 20:00 EDT on September 20, 2010.[32] NASA sent out more than 700 invitations to shuttle workers so they could bring their families to watchDiscovery's journey to the pad. However, the shuttle began the 3.4-mile trek from the VAB to the pad earlier than planned at about at 19:23 EDT on September 20, 2010.[33]Discovery took about six hours to arrive at Pad 39A. The shuttle was secured on the launch pad by 01:49 EDT the next day.

  • Discovery being lowered onto its external fuel tank and solid rocket boosters in High Bay 3 of the Vehicle Assembly Building.
    Discovery being lowered onto its external fuel tank and solid rocket boosters in High Bay 3 of the Vehicle Assembly Building.
  • The Space Shuttle Discovery attached to Launch Pad 39A on 21 September 2010.
    The Space ShuttleDiscovery attached to Launch Pad 39A on 21 September 2010.
  • Discovery at Launch Pad 39A on 1 February 2011.
    Discovery at Launch Pad 39A on 1 February 2011.
  • Discovery is seen shortly after the Rotating Service Structure was rolled back on 23 February 2011.
    Discovery is seen shortly after theRotating Service Structure was rolled back on 23 February 2011.

Orbital Maneuvering System vapor leak

[edit]

On October 14, 2010, engineers at the launch pad first discovered a small leak in a propellant line forDiscovery's orbital maneuvering system (OMS) engines. The leak was detected after they noticed a fishy smell coming from the aft of the shuttle, thought of as a sign of fuel vapor in the air.[24] Upon inspection, the leak was found at a flange located at the interface where two propellant lines met inDiscovery's aft compartment. The line carriedmonomethyl hydrazine (MMH) propellant, one of two chemicals (the other is an oxidizer,nitrogen tetroxide) used to ignite the OMS engines. Engineers replaced an Air Half Coupling (AHC) flight cap. However, the new cap failed to solve the problem since vapor checks still showed signs of a leak. An aspirator was activated to collect the vapor at the leak-site allowing work to continue in other locations around the aft segment ofDiscovery.

It was believed that the leak was in the crossfeed flange area – a problem with associated seals. On October 18, 2010, after an afternoon review, engineers were asked to double-check the torque on six bolts around the suspected leaky flange fitting and tighten if necessary.[34] Subsequent leak tests showed again signs of seepage, and the task of solving the issue required the draining of both the left and right OMS tanks of the shuttle and a unique in-situ repair at the pad to avoid a rollback.[35] On October 23, 2010, engineers completed the removal and replacement of the two seals on the right OMS crossfeed flange, after the education (a vacuum-related procedure, used to completely clear the plumbing of the toxic MMH) of the plumbing was completed ahead of the schedule by over a day.[36] Later, testing indicated that the new seals were properly seated and holding pressure with no signs of additional seepage.[37] Normal pad operations commenced soon after allowing managers to press forward with the confirmation of a November 1, 2010, target launch date, with fuel reloading into the OMS tanks beginning on the morning of October 24, 2010.

Main engine controller problem

[edit]

On November 2, while readyingDiscovery for launch, engineers reported an electrical issue on the backup Main Engine Controller (MEC) mounted on Engine No. 3 (SSME-3). Earlier in the morning, engineers said that the problem had been solved, however, another glitch in the system raised concerns and additional troubleshooting was ordered. Troubleshooting followed and indicated the problem was related to "transient contamination" in a circuit breaker. NASA Test Director Steve Payne, addressing reporters, told that after troubleshooting and power cycles, the controller powered up normally. However, at the same time the problem was thought to be a non-issue, an unexpected voltage drop was observed.[38]

In a Mission Management Team (MMT) meeting held later that day, managers decided to scrub the launch for at least 24 hours to work towards flight rationale.[39]

Ground Umbilical Carrier Plate leak

[edit]
A technician begins to remove the leaky GUCP's quick disconnect.

On November 5, 2010,Discovery's launch attempt, a hydrogen leak was detected at theGround Umbilical Carrier Plate (GUCP) during the fueling process. The plate was an attachment point between the external tank and a 17-inch pipe that carried gaseous hydrogen safely away from the tank to the flare stack, where it was burned off. All had been proceeding to plan with the tank "fast filled" during tanking, until the first leak indication was revealed. Firstly, a 33,000 ppm leak then reduced to a level below 20,000 ppm was recorded. The Launch Commit Criteria limit was 40–44,000 ppm. The leak was only being observed during the cycling of the vent valve to "open" to release the gaseous hydrogen from the tank to the flare stack. Controllers decided to stop valve cycling in order to increase the pressure and attempt to force a seal before attempting to complete the fast-fill process. At this stage, the leak spiked and remained at the highest 60,000 ppm level (likely even at a higher value), indicating a serious problem with the GUCP's seal.

Technicians install a new GUCP on the external tank.

Shuttle launch director Mike Leinbach characterized the leak as "significant," similar to what was seen onSTS-119 andSTS-127, although the rate was higher in magnitude and occurred earlier in the fueling process.

After the day required to make the tank safe by purging remaining hydrogen gas with helium gas, NASA engineers prepared for the disconnection of the vent arm and the significant number of lines prior to taking their first look at the GUCP. On the night of November 9, technicians began disconnecting the GUCP by unhooking and lowering the hydrogen vent line. Teams performed an initial inspection of the flight seal and a quick disconnect prior to sending them to labs for thorough engineering analysis. Engineers reported an unevenly (asymmetrically) compressed internal seal and the quick disconnect hardware also seemed to have a less concentric fit than pre-fueling measurements indicated.[40] Inspections also confirmed the condition of the hardware did not match the observations documented when it was installed on the external tank inside the VAB.[41]

On the morning of November 12, teams began installing a new GUCP and completed the GUCP work over the next two days. The new plate was previously fit checked on the external tank at theMichoud Assembly Facility and yielded substantially better concentricity values than was obtained with the old and removed GUCP. Technicians took extra measurements to ensure the best possible alignment of the newly installed GUCP. Teams began installing the flight seal and quick disconnect on November 15.

Cracks in the external tank

[edit]
The intertank section foam crack.

Additional inspection of the tank revealed cracks in foam insulation in the flange between the intertank and liquid oxygen tank. The cracks are believed to have occurred about an hour after super-cold propellants began flowing into the external tank for the November 5 launch attempt. The cracks in the tank were the first to be found at the launch pad.

Trilion ARAMIS Optical Strain result showing the displacement of ET during the cryogenic fueling of Space Shuttle Discovery on the launch pad.
Optical Strain over 6-hour cryogenic test showing the displacements of various areas on the ET near the SRB thrust beam where fracture occurred.

In December 2010, with the Shuttle still on the launch pad, a full tanking test was performed to understand that failure modes of the SOFI foam fracturing. The ET Tanking Test involved a full flight loading of the ET (External Tank) with liquid hydrogen and liquid oxygen fuels, while monitoring the ET near the SRB Thrust Beam where the fracture(s) occurred. External Tank Photogrammetry Team used two full-field Optical Strain systems, specifically configured for the tests by NASA Glenn and Trilion Quality Systems. The Trilion Optical Strain systems (ARAMIS) measured the full-field displacements and strains of the ET from the cryogenic fuel loading during the 6-hour test (see data images). The Trilion Optical Strain cameras were fiber optically linked to the control room in the Launch Control Center 3 miles (4.8 km) away from the launch pad, where the data was monitored during the test. Trilion Quality Systems worked with NASA Marshall over the next week to understand the data, compare with ET computer models, allowing NASA to understand the failure modes and to be able implement the repairs. The Optical Strain patterning was still on the ET during launch on February 24, 2011, travelling with it into space. The External Tank Photogrammetry Team was, later that year, awarded the Space Flight Awareness Award, and Trilion's Tim Schmidt, the Silver Snoopy Award, by astronaut Mike Foreman.[42]

The structural cracks in external fuel tank.
The technicians spray foam insulation on a section of repaired stringers.

The insulation was cut away for additional inspection, revealing two additional 9-inch metal cracks on either side of an underlying structural rib called "stringer S-7-2". NASA managers then decided to cut away additional foam and observed two more cracks on a stringer known as S-6-2 adjacent to the two original cracks. They were found on the far left of removed foam on the flange area between the intertank and the liquid oxygen tank. However, these cracks appeared to have suffered less stress than the others found.[43][44] No cracks were found in stringers on the right side. NASA suspected the use of a lightweightaluminum-lithium alloy in the tanks contributed to the crack problem. Repairs commenced while the shuttle remained on the pad.[45] An environmental enclosure was erected around the known damage site to facilitate the ongoing repairs and eventually to apply fresh foam insulation. On November 18, as part of the repairs, technicians installed new sections of metal, called "doublers" because they are twice as thick as the original stringer metal providing additional strength, to replace the two cracked stringers onDiscovery's external tank.

Scanning of the stringers on the liquid oxygen/intertank flange was completed on November 23.[46] NASA also performedbackscatter scanning of the lower liquid hydrogen/intertank flange stringers on November 29.

Program managers identified the analysis and repairs that were required to safely launch the shuttle, and this analysis was reviewed at a special Program Requirements Control Board (PRCB) held on November 24. Managers announced at that meeting that the launch window available in early December would be passed up, with a new target of December 17 set, but cautioned that the launch could slip into February 2011. After reviewing the space station's December traffic model following the realignedJohannes Kepler ATV's launch date, NASA had identified a potential launch window in mid-/late-December 2010. The December 17, 2010, date was preferred because it would have allowed the shuttle to carry more stored oxygen to the International Space Station to help it deal with oxygen generation issues, which the crew had dealt with for several months.[47] "What we've told the agency leadership is that clearly we're not ready for the 3 to 7 December window that's coming up next week," John Shannon, NASA's SSP manager, said in a news conference held after the special PCRB. "We'll leave the option open for a launch window for 17 December, but a lot of data has to come together to support that".[48]

Johannes Kepler ATV rescheduled

[edit]

The launch date of February 24, 2011, was officially set after the Flight Readiness Review meeting on February 18, 2011. Reviews of previous problems, including the GUP vent line connection, external tank foam and external tank stringer cracks, were found to be positive. Additionally, flight rules which required a 72-hour separation between dockings at the International Space Station threatened to delay the launch by at least a day due to the delayed launch of theESA's uncrewedJohannes Kepler ATV supply craft. Managers instead decided to press ahead with the countdown allowing for a possible stand down; had docking issues arisen with the ATV, STS-133 would have stood down for 48 hours.[49] The Kepler ATV docked successfully at 15:59 UTC, February 24, 2011.[50]

Launch attempts

[edit]
All times Eastern Time, first 5 are while daylight saving time was in effect (EDT), attempt 6 is during outside of daylight saving (EST). Because of this, the final "turnaround" category should be 111 days,2 hours, 49 minutes, it is not due to automatic formatting.
AttemptPlannedResultTurnaroundReasonDecision pointWeather go (%)Notes
11 Nov 2010, 4:40:00 pmScrubbed[37]Technical[51]29 Oct 2010, 10:00 am ​(T−11 hour hold)80%OMS pod leak[51]
22 Nov 2010, 4:18:00 pmScrubbed[52]0 days 23 hours 38 minutesTechnical[52] ​(T−11 hour hold)70%OMS pod leak[52]
33 Nov 2010, 3:52:00 pmScrubbed[53]0 days 23 hours 34 minutesTechnical[53]2 Nov 2010, 5:40 am ​(T−11 built-in hold)70%Electrical fault in backupSSME controller.[54]
44 Nov 2010, 3:29:54 pmScrubbed[55]0 days 23 hours 38 minutesWeather[56]4 Nov 2010, 6:25 am20%Decision made at pre-tanking weather briefing to reset clock to T−11 hold and delay ~24 hours due to rainy conditions.[56][57]
55 Nov 2010, 3:04:01 pmScrubbed0 days 23 hours 34 minutesTechnical5 Nov 2010, 12:00 pm ​(T−6 hour hold)60%Hydrogen leak detected atground umbilical carrier plate (GUCP)[58]
624 Feb 2011, 4:53:24 pmSuccess111 days 1 hour 49 minutes90%The clock was held at T−5 minutes to allow time to resolve a computer issue at theRange Safety Officer's console. The issue was resolved and the clock restarted in time to allowDiscovery to launch with just two seconds left in thelaunch window.[59][60]

Mission timeline

[edit]
Section source: NASA Press Kit[61] and NASA TV Live[2] The original nominal mission of twelve days was eventually extended by two days, one at a time.

February 24 (Flight Day 1 – Launch)

[edit]

Space ShuttleDiscovery successfully lifted off fromKennedy Space Center'sLaunch Pad 39A at 16:53:24 EST on February 24, 2011. Liftoff was initially set for 16:50:24 EST, but was delayed for 3 minutes by a minor glitch in a computer system used by theRange Safety Officer (RSO) for theEastern Range. OnceDiscovery was cleared for launch, it took 8 minutes and 34 seconds to reach orbit. At approximately four minutes into the flight, a piece of foam was seen breaking away from the External Tank. This foam was deemed not to be a threat, since it was liberated after the shuttle had left Earth's atmosphere. DuringDiscovery's ascent, NASA managers also reported that they saw three more additional instances of foam liberation.[62] These losses also occurred after aerodynamic sensitive times when debris could seriously damage the shuttle, and so were deemed non-threatening. NASA's engineers accounted for the foam losses to a condition called "cryo-pumping". When the external tank is loaded with liquid hydrogen, the air trapped in the foam first liquifies. During the ride into orbit, as the hydrogen level in the tank drops, it warms up and the liquefied air turns back into a gas. The pressure generated due to the state change of hydrogen can cause parts of foam in the tank to come off.[63]

Once on orbit, the crew of STS-133 opened the payload bay doors and activated the Ku band antenna for high-speed communications with Mission Control. While the Ku band antenna was being activated, Alvin Drew and Pilot Eric Boe activated the Shuttle Remote Manipulator System (SRMS), also known as theCanadarm. Later in the day, imagery of the External Tank during launch was downlinked for analysis.[64]

  • The Space Shuttle Discovery rockets into orbit for the final time, 24 February 2011.
    The Space ShuttleDiscovery rockets into orbit for the final time, 24 February 2011.
  • A STS-133 launch video (2 min 32 s).
  • Discovery lifts off from Launch Pad 39A.
    Discovery lifts off from Launch Pad 39A.
  • Close up of the launch from Pad 39A.
    Close up of the launch from Pad 39A.

February 25 (Flight Day 2 – OBSS inspection)

[edit]

Flight Day 2 saw the crew ofDiscovery begin their preparations to dock with theInternational Space Station (ISS). The day started with a firing of theOrbital Maneuvering System (OMS) engine, called the NC2 burn, to helpDiscovery catch up to the ISS. Commander Steve Lindsey, Pilot Eric Boe and Mission Specialist Al Drew began the day performing an inspection of the Re-enforced Carbon-Carbon (RCC) panels with theOrbital Boom Sensor System (OBSS). Lindsey and Boe started the inspection on the starboard wing and nose cap, and continued on with the port wing; the whole survey took about six hours to complete. Drew joined up with Michael Barratt and Steve Bowen to checkout and get their twoExtravehicular Mobility Units (EMUs) ready for the two spacewalks that would be conducted during the mission. Later in the day, the crew checked out the rendezvous tools to ensure they were operational. At the end of the day, another OMS engine firing, known as the NC3 burn, took place.[65]

February 26 (Flight Day 3 – ISS rendezvous)

[edit]

The orbiter docked to the ISS on Flight Day 3, marking the 13th timeDiscovery had visited the ISS. The docking occurred on time at 19:14UTC. A hard mate between the two vehicles was delayed by about 40 minutes because of relative motion between the station and shuttle, thus putting the crew behind the timeline for the day. The hatches were finally opened at 21:16 UTC, and theExpedition 26 crew greeted the crew of STS-133.[66] After the welcome ceremony and safety briefing, the crew's main task of the day was to transfer theExPRESS Logistics Carrier 4 (ELC-4). ELC-4 was taken out ofDiscovery's payload bay by the Space Station Remote Manipulator (SSRMS), also known asCanadarm2, which was operated by Nicole Stott and Michael Barratt. The SSRMS handed it to the Space Shuttle Remote Manipulator System (SSRMS), which was being controlled by Boe and Drew, while the SSRMS moved to the Mobile Base System (MBS). Once there, the SSRMS took ELC-4 back from the SSRMS, and installed it at its location on theS3 truss location. ELC-4 was installed in its final location at 03:22 UTC on February 27.[67] While the robotic transfer was going on, Bowen and Lindsey were transferring items that were needed for Flight Day 4 and the spacewalk on Flight Day 5.

  • A view of the nose, the forward underside and crew cabin of Discovery during the Rendezvous Pitch Maneuver.
    A view of the nose, the forward underside and crew cabin ofDiscovery during theRendezvous Pitch Maneuver.
  • A view of the aft portion of Discovery's main engines, part of the payload bay, vertical stabilizer and Orbital Maneuvering System pods during the RPM.
    A view of the aft portion ofDiscovery's main engines, part of the payload bay, vertical stabilizer and Orbital Maneuvering System pods during the RPM.
  • Video of the RPM.
  • Discovery shortly after docking with the International Space Station on 26 February 2011.
    Discovery shortly after docking with the International Space Station on 26 February 2011.
  • The docked Discovery and Dextre are featured in this photograph.
    The dockedDiscovery and Dextre are featured in this photograph.

February 27 (Flight Day 4)

[edit]

On Flight Day 4, Stott and Barratt grappled theOrbiter Boom Sensor System (OBSS) using the Canadarm2 and removed it from the starboard sill ofDiscovery's payload bay. Once it was grappled and out of the payload bay, the Shuttle Remote Manipulator System grappled the end of the OBSS and took a handoff from the Canadarm2. The OBSS was grappled by the space station arm, because the SRMS could not reach it due to clearance issues, and it needed to be moved out of the way so that thePermanent Multipurpose Module (PMM) could be removed from the payload bay. After the OBSS handoff, the entire STS-133 crew was joined by ISSExpedition 26 commanderScott Kelly and flight engineerPaolo Nespoli for a series of in-flight media interviews. The interviews were conducted with theWeather Channel,WBZ radio inBoston, Massachusetts,WSB-TV inAtlanta, Georgia, andWBTV inCharlotte, North Carolina.[68] The crew also completed more cargo transfers to and from the ISS. Throughout the day, Drew and Bowen prepared tools that they would use on their spacewalk on Flight Day 5. Later in the day, they were joined by the shuttle crew and ISS commander Kelly and Flight Engineer Nespoli, for a review of the spacewalk procedures. After the review, Bowen and Drew donned oxygen masks and entered the crew lock of theQuest airlock for the standard pre-spacewalk campout. The airlock was lowered to 10.2 psi for the night. This was done to help the spacewalkers purgenitrogen from their blood and help preventdecompression sickness, also known as the bends.[69]

February 28 (Flight Day 5 – EVA 1)

[edit]

Steve Bowen and Alvin Drew performed the mission's firstextra-vehicular activity (EVA), or spacewalk, on Flight Day 5. After waking up at 06:23 EST, the crew immediately began EVA preparations.[70] A conference was held between the crew of the station and Mission Control at about 08:20 EST, followed by further EVA preparation work, including the depressurization of the airlock. Bowen and Drew switched their spacesuits to internal battery power at 10:46 EST, marking the beginning of EVA 1.[70]

During the EVA, Bowen and Drew installed a power cable linking theUnity andTranquility modules in order to provide a contingency power source, should it become required. They then moved a failed ammonia pump, which was replaced in August 2010, from its temporary location to theExternal Stowage Platform 2. Later, operations with the SSRMS robotic arm were delayed to due technical problems with the robotic control station in theCupola module.[70]

After installing a wedge under a camera on theS3 truss to provide clearance from the newly installedExPRESS Logistics Carrier-2, performing a Japanese experiment called "Message in a Bottle" to collect a sample of vacuum, and other minor tasks, the EVA ended after six hours and 34 minutes at 17:20 EST.

  • Bowen and Drew (partially obscured at centre) during EVA 1.
    Bowen and Drew (partially obscured at centre) during EVA 1.
  • Bowen and Drew during EVA 1.
    Bowen and Drew during EVA 1.

March 1 (Flight Day 6 – PMM installation)

[edit]
[icon]
This sectionneeds expansion. You can help byadding to it.(May 2011)

Flight Day 6 saw the installation of theLeonardo Permanent Multipurpose Module (PMM) to the nadir, or Earth-facing, port of the station'sUnity module. Once the installation was complete, the external outfitting ofLeonardo, to integrate it into the ISS as a permanent module, was begun. Bowen and Drew conducted the procedure review for the mission's second spacewalk, before beginning their pre-EVA campout in the Quest airlock.

March 2 (Flight Day 7 – EVA 2)

[edit]
[icon]
This sectionneeds expansion. You can help byadding to it.(May 2011)

Bowen and Drew conducted STS-133's second EVA on Flight Day 7. Drew removed thermal insulation from a platform, while Bowen swapped out an attachment bracket on theColumbus module. Bowen then installed a camera assembly on theDextre robot and removed insulation from Dextre's electronics platform. Drew installed a light on a cargo cart and repaired some dislodged thermal insulation from a valve on the truss. Meanwhile, the ISS and shuttle crew entered theLeonardo PMM to commence the internal outfitting of the module.

March 3 (Flight Day 8)

[edit]
[icon]
This sectionneeds expansion. You can help byadding to it.(May 2011)

On Flight Day 8, the transfer of theLeonardo PMM's cargo to the interior of the ISS began. The crew also received some off-duty time on this day.

March 4 (Flight Day 9)

[edit]
[icon]
This sectionneeds expansion. You can help byadding to it.(May 2011)

On Flight Day 9, the equipment used on Drew and Bowen's spacewalk was reconfigured. A joint crew news conference was also conducted via satellite, after which the crew received more off-duty time.

March 5 (Flight Day 10)

[edit]
[icon]
This sectionneeds expansion. You can help byadding to it.(May 2011)

The internal outfitting of theLeonardo PMM continued on Flight Day 10.[71] Furthermore, a photo shoot of the ISS with multiple spacecraft docked was considered, but rejected by mission planners.[71][72]

March 6 (Flight Day 11)

[edit]
[icon]
This sectionneeds expansion. You can help byadding to it.(May 2011)

As well as the continued outfitting of theLeonardo Permanent Multipurpose Module,[71] a checkout ofDiscovery's rendezvous tools was conducted on Flight Day 11, before the shuttle crew said their farewells to the ISS crew, exited the station and sealed the hatch between the orbiter and the ISS. The installation of a center-line camera was also conducted on this day.

March 7 (Flight Day 12 – Undocking)

[edit]
[icon]
This sectionneeds expansion. You can help byadding to it.(May 2011)

Discovery conducted its final undocking from the ISS on Flight Day 12, and its last fly-around preceded the final separation from the station. A late inspection ofDiscovery'sThermal Protection System was conducted using theOBSS, before the OBSS was berthed.

March 8 (Flight Day 13)

[edit]
[icon]
This sectionneeds expansion. You can help byadding to it.(May 2011)

The crew ofDiscovery stowed their equipment in the sle's cabin before conducting a checkout of the flight control system and a hot-fire test of thereaction control system. A final deorbit preparation briefing was carried out before the shuttle's Ku band antenna was stowed.

March 9 (Flight Day 14 – Re-entry and landing)

[edit]
[icon]
This sectionneeds expansion. You can help byadding to it.(May 2011)

On the final day of the mission,Discovery's crew carried out further deorbit preparations, and closed the shuttle's payload bay doors. A successful deorbit burn and re-entry ended withDiscovery landing atKennedy Space Center'sShuttle Landing Facility for the final time on March 9, 2011, at 11:58:14 EST. The shuttle was retired at wheel-stop. It was the final shuttle landing to occur in daylight, the remaining two missions landed at night.

  • Space Shuttle Discovery lands for the final time, at the Shuttle Landing Facility on 9 March 2011.
    Space ShuttleDiscovery lands for the final time, at theShuttle Landing Facility on 9 March 2011.
  • A video recording of the STS-133 landing.
    (2 min 30 s)

Spacewalks

[edit]

Two spacewalks (EVAs) were conducted during the mission.[73]

EVASpacewalkersStart (UTC)End (UTC)Duration
EVA 1Steve Bowen
Alvin Drew
February 28, 2011
15:46
February 28, 2011
22:20
6 hours 34 minutes
Drew and Bowen installed a power extension cable between the Unity and Tranquility nodes to provide a contingency power source should it be required. The spacewalkers then moved the failed ammonia pump module that was replaced in August from its temporary location to theExternal Stowage Platform 2 adjacent to theQuest airlock. Drew and Bowen then installed a wedge under a camera on theS3 truss to provide clearance from the newly installed ELC-4. They next replaced a guide for the rail cart system used for moving the station robotic arm along the truss. The guides had been removed when astronauts were performing work on the station's starboardSolar Alpha Rotary Joint (SARJ), which rotates the solar arrays to track the sun. The final task was to "fill" a special bottle with the vacuum of space for a Japanese education payload. The bottle will be part of a public museum exhibit.
EVA 2Steve Bowen
Alvin Drew
March 2, 2011
15:42
March 2, 2011
21:56
6 hours 14 minutes
Drew removed thermal insulation from a platform, while Bowen swapped out an attachment bracket on theColumbus module. Bowen then installed a camera assembly on theDextre robot and removed insulation from Dextre's electronics platform. Drew installed a light on a cargo cart and repaired some dislodged thermal insulation from a valve on the truss.

Wake-up calls

[edit]

NASA began a tradition of playing music to astronauts during theGemini program, and first used music to wake up a flight crew duringApollo 15. Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[74]

NASA opened the selection process to the public for the first time for STS-133. The public was invited to vote on two songs used to wake up astronauts on previous missions to wake up the STS-133 crew.[75]

Flight DaySongArtistPlayed for
Day 2"Through Heaven's Eyes"Brian Stokes MitchellMichael R. Barratt
Day 3"Woody's Roundup"Riders in the SkyAlvin Drew
Day 4"Java Jive"The Manhattan TransferSteven Lindsey
Day 5"Oh What a Beautiful Morning"Davy Knowles &Back Door SlamNicole Stott
Day 6"Happy Together"The TurtlesStephen Bowen
Day 7"Speed of Sound"ColdplayEric Boe
Day 8"City of Blinding Lights"U2STS-133 Crew
Day 9"The Ritual/Ancient Battle/2nd Kroykah"Gerald Fried -(Composer)STS-133 Crew
Day 10"Ohio (Come Back to Texas)"Bowling for SoupSTS-133 Crew
Day 11"Spaceship Superstar"PrismSTS-133 Crew
Day 12Theme to "Star Trek"Voice-over byWilliam Shatner
Song byAlexander Courage
STS-133 Crew
Day 13"Blue Sky" (Live)Big Head Todd and the MonstersSTS-133 Crew
Day 14"Coming Home"Gwyneth PaltrowSTS-133 Crew

See also

[edit]

References

[edit]

Public Domain This article incorporatespublic domain material from websites or documents of theNational Aeronautics and Space Administration.

  1. ^"STS-133 Press Kit"(PDF). NASA. Archived fromthe original(PDF) on November 6, 2010. RetrievedOctober 21, 2010.
  2. ^ab"NASA TV "Live Events, Mission Coverage" [STS-133]". NASA TV. February 24, 2011. RetrievedFebruary 25, 2011.
  3. ^@NASA (February 24, 2011)."Shuttle Discovery lifted off at 4:53pmET from NASA's Kennedy Space Center in Florida. The shuttle is safely in orbit" (Tweet).Archived from the original on March 7, 2011. RetrievedFebruary 24, 2011 – viaTwitter.
  4. ^"Discovery in Orbit". NASA. February 24, 2011. Archived fromthe original on October 16, 2009. RetrievedFebruary 24, 2011.
  5. ^abcdeMcDowell, Jonathan."Satellite Catalog".Jonathan's Space Page. RetrievedMay 28, 2013.
  6. ^NASA (September 24, 2009)."Consolidated Launch Manifest". NASA. Archived fromthe original on March 7, 2009. RetrievedOctober 16, 2009.
  7. ^"NASA's Shuttle and Rocket Missions".NASA. October 14, 2009. Archived fromthe original on October 14, 2009. RetrievedOctober 15, 2009.
  8. ^Greg (February 19, 2011)."Last Flight of Space Shuttle Discovery STS-133".Outer Space Universe.Archived from the original on May 31, 2025. RetrievedFebruary 20, 2011.
  9. ^"NASA Assigns Crew for Final Space Shuttle Mission". NASA. Archived fromthe original on November 22, 2013. RetrievedFebruary 20, 2011.
  10. ^Harwood, William."CBSNews – STS-133 Quick Look 1".CBS News. Archived fromthe original on February 6, 2011. RetrievedFebruary 20, 2011.
  11. ^abBergin, Chris (January 19, 2011)."STS-133 launch remains on track as Bowen replaces the injured Kopra".NASASpaceflight.Archived from the original on March 15, 2025. RetrievedJanuary 19, 2011.
  12. ^"Active Astronauts". NASA. February 11, 2015.
  13. ^abMalik, Tariq (September 18, 2009)."NASA Reveals Crew for Last Scheduled Shuttle Mission".Space.com.Archived from the original on May 22, 2025. RetrievedSeptember 18, 2009.
  14. ^"STS-133". Spacefacts. RetrievedApril 25, 2024.
  15. ^Gebhardt, Chris (August 5, 2009)."STS-133 refined to a five crew, one EVA mission – will leave MPLM on ISS". NASAspaceflight.com.
  16. ^Curie, Michael; Braukus, Michael, eds. (February 26, 2010)."NASA and Italian Space Agency Find New Use for Module" (Press release).NASA. 10-044.Archived from the original on March 1, 2025. RetrievedFebruary 26, 2010.
  17. ^Gebhardt, Chris (October 6, 2010)."PMM Leonardo: The Final Permanent U.S. Module for the ISS".NASASpaceflight.Archived from the original on January 26, 2025. RetrievedNovember 15, 2010.
  18. ^Stevens, Tim (April 14, 2010)."NASA and GM's humanoid Robonaut2 blasting into space this September".Engadget.Archived from the original on March 22, 2025.
  19. ^Diftler, Myron (November 18, 2010).Robonaut 2 (R2) Overview(PDF). ISS Increment 27-28 Science Symposium.NASA. Houston, TX.hdl:2060/20100039862. JSC-CN-22168.Archived(PDF) from the original on August 8, 2025. RetrievedDecember 12, 2010.
  20. ^"Spaceflight mission report: STS-133".www.spacefacts.de. RetrievedMay 7, 2024.
  21. ^Bergin, Chris (July 19, 2010)."STS-133: SpaceX's DragonEye set for late installation on Discovery".NASASpaceflight.Archived from the original on July 12, 2025. RetrievedJuly 21, 2010.
  22. ^"Student Signatures in Space (S3)". Archived fromthe original on May 11, 2008. RetrievedSeptember 8, 2010.
  23. ^"STS-133: What's Going Up".1 November 2010. NASA. Archived fromthe original on November 3, 2010. RetrievedNovember 1, 2010.
  24. ^abBergin, Chris (October 15, 2010)."STS-133: TCDT completed – Engineers troubleshooting leaky flight cap".NASASpaceflight.Archived from the original on July 7, 2025. RetrievedOctober 19, 2010.
  25. ^Chow, Dennis (November 1, 2010)."Shuttle Discovery's Final Crew is an Experienced Astronaut Bunch".Space.com.Archived from the original on June 25, 2025. RetrievedNovember 1, 2010.
  26. ^ab"Space veteran to sub for injured astronaut".USA Today. January 20, 2011. RetrievedJanuary 28, 2011.
  27. ^Pearlman, Robert Z. (September 9, 2010)."Space shuttle Discovery departs hangar for final flight".collectSPACE.Archived from the original on July 20, 2025. RetrievedSeptember 12, 2010.
  28. ^James Dean (September 8, 2010)."Shuttle rollover delayed by water leak". Florida TODAY. RetrievedSeptember 12, 2010.
  29. ^vertical flow refers to the period of time between rollout from the Shuttle Processing Facility and launch.
  30. ^ATK."STS-133 SRB Use History"(PDF). Spaceflight Now.
  31. ^Bergin, Chris (September 10, 2010)."STS-133: Engineers complete repair on Discovery following ET mate issue".NASASpaceflight.Archived from the original on March 26, 2025. RetrievedSeptember 12, 2010.
  32. ^Harwood, William (September 11, 2010)."Shuttle Discovery finally bolted to external tank".Spaceflight Now. Archived fromthe original on December 28, 2024. RetrievedSeptember 12, 2010.
  33. ^Pearlman, Robert Z. (September 21, 2010)."Space shuttle Discovery makes last trip to launch pad".collectSPACE.Archived from the original on January 19, 2025. RetrievedSeptember 22, 2010.
  34. ^William Harwood (October 18, 2010)."Technicians working on tiny fuel leak in Discovery pod". Spaceflight Now. RetrievedOctober 19, 2010.
  35. ^Bergin, Chris (October 18, 2010)."STS-133: Discovery to undergo unique leak repair to avoid rollback".Archived from the original on March 25, 2025. RetrievedOctober 19, 2010.
  36. ^Bergin, Chris (October 22, 2010)."STS-133: Crossfeed flange seal R&R complete – OMS reload in work".NASASpaceflight.Archived from the original on June 29, 2025. RetrievedOctober 30, 2010.
  37. ^abHarwood, William (October 25, 2010)."Shuttle Discovery cleared for blastoff next Monday".Spaceflight Now. Archived fromthe original on December 28, 2024. RetrievedOctober 30, 2010.
  38. ^Harwood, William (November 2, 2010)."Shuttle engine controller glitch being assessed".Spaceflight Now. Archived fromthe original on December 28, 2024. RetrievedNovember 20, 2010.
  39. ^Bergin, Chris (November 2, 2010)."STS-133: Launch delayed at least 24 hours due to Main Engine Controller issue".NASASpaceflight.Archived from the original on March 25, 2025.
  40. ^Harwood, William (November 11, 2010)."Apparent seal problem found in leaking shuttle vent line".Spaceflight Now. Archived fromthe original on December 28, 2024. RetrievedNovember 14, 2010.
  41. ^Bergin, Chris (November 11, 2010)."STS-133: Closing in on GUCP root cause – ET repair at pad still positive".NASASpaceflight.Archived from the original on July 13, 2025. RetrievedNovember 15, 2010.
  42. ^"Silver Snoopy Award".NASA. October 7, 2015.Archived from the original on May 20, 2025. RetrievedNovember 4, 2022.
  43. ^Bergin, Chris (November 12, 2010)."STS-133: More cracks found on ET-137 as managers debate forward plan".NASASpaceflight.Archived from the original on July 12, 2025. RetrievedNovember 20, 2010.
  44. ^Harwood, William (November 15, 2010)."Fourth crack found on shuttle Discovery's external tank".Spaceflight Now. Archived fromthe original on March 28, 2025. RetrievedNovember 20, 2010.
  45. ^Harwood, William (November 10, 2010)."Underlying metal cracks found on Discovery's tank".Spaceflight Now. Archived fromthe original on February 2, 2023. RetrievedNovember 20, 2010.
  46. ^Bergin, Chris; Gebhardt, Chris (November 24, 2010)."STS-133: NASA managers decide to slip to a NET December 17 target".NASASpaceflight.Archived from the original on February 18, 2025. RetrievedNovember 26, 2010.
  47. ^Harwood, William (November 24, 2010)."Discovery's launch delayed until at least mid-December".Spaceflight Now. Archived fromthe original on July 12, 2025.
  48. ^Chow, Denise (November 24, 2010)."Latest Launch Delay May Push Shuttle Discovery's Final Flight into Christmas".Space.com.Archived from the original on April 21, 2025. RetrievedNovember 26, 2010.
  49. ^Bergin, Chris (February 18, 2011)."STS-133: FRR approves Discovery's launch for next Thursday".NASASpaceflight.Archived from the original on July 9, 2025.
  50. ^Malik, Tariq (February 24, 2011)."Huge Cargo Ship Arrives at Space Station Ahead of Shuttle Discovery".Space.com.Archived from the original on May 31, 2025. RetrievedAugust 10, 2025.
  51. ^abBergin, Chris (October 29, 2010)."STS-133: Pressurization complete – into checks, expected countdown preps".NASASpaceflight.Archived from the original on February 18, 2025.
  52. ^abc"Countdown to Start Sunday for Targeted Launch Wednesday".NASA. Archived fromthe original on November 4, 2010. RetrievedOctober 30, 2010.
  53. ^abBlock, Robert (November 2, 2010)."Shuttle Discovery won't launch today".Chicago Tribune.Orlando Sentinel. Archived fromthe original on November 7, 2010. RetrievedNovember 2, 2010.
  54. ^Chow, Denise (November 2, 2010)."Electrical Glitch Delays Space Shuttle Discovery's Launch to Thursday".Space.com.Archived from the original on April 26, 2025. RetrievedAugust 10, 2025.
  55. ^Ray, Justin."STS-133 coverage".Spaceflight Now. Archived fromthe original on July 20, 2025.
  56. ^abGebhardt, Chris; Bergin, Chris (November 4, 2010)."STS-133: Discovery delayed ahead of tanking for 24 hours".NASASpaceflight.Archived from the original on March 25, 2025.
  57. ^Chow, Denise (November 4, 2010)."Stormy Weather Delays Space Shuttle Discovery's Launch At Least 24 Hours".Space.com.Archived from the original on June 17, 2025. RetrievedAugust 10, 2025.
  58. ^Chow, Denise."NASA Postpones Shuttle Discovery Launch to Nov. 30 for Repairs".Space.com.Archived from the original on May 21, 2025. RetrievedAugust 10, 2025.
  59. ^Harwood, William (July 27, 2010)."STS-133 Countdown Timeline".Spaceflight Now. Archived fromthe original on September 8, 2010.
  60. ^Atkinson, Nancy (February 24, 2011)."STS-133 Launches on Historic Final Mission for Shuttle Discovery".Universe Today.Archived from the original on October 23, 2015.
  61. ^"STS-133 Press Kit"(PDF).NASA. February 2011.Archived(PDF) from the original on June 17, 2025. RetrievedOctober 21, 2010.
  62. ^Pearlman, Robert Z. (February 25, 2011)."Crew checks Discovery's heat shield, spacesuits".collectSPACE.Archived from the original on July 20, 2025. RetrievedFebruary 26, 2011.
  63. ^Harwood, William (February 25, 2011)."'Cryopumping' likely cause of Discovery tank foam loss".Spaceflight Now. Archived fromthe original on December 28, 2024. RetrievedFebruary 26, 2011.
  64. ^Bergin, Chris; Gebhardt, Chris (February 24, 2011)."Discovery launches after dramatic range fix late in countdown".NASASpaceflight.Archived from the original on March 22, 2025. RetrievedFebruary 25, 2011.
  65. ^Bergin, Chris (February 25, 2011)."STS-133 – Healthy Discovery completes FD2 inspections on RCC panels".NASASpaceflight.Archived from the original on April 22, 2025. RetrievedFebruary 26, 2011.
  66. ^"STS-133 MCC Status Report #05" (Press release).NASA. February 26, 2011. STS-133-05. Archived fromthe original on August 5, 2020. RetrievedFebruary 27, 2011.
  67. ^Harwood, William (February 26, 2011)."Discovery pulls into port for her final space station visit".Spaceflight Now. Archived fromthe original on February 19, 2025. RetrievedFebruary 27, 2011.
  68. ^"STS-133 MCC Status Report #07" (Press release).NASA. February 27, 2011. STS-133-07. Archived fromthe original on September 20, 2020. RetrievedFebruary 28, 2011.
  69. ^Harwood, William (February 27, 2011)."Astronauts having on busy Sunday aboard the station".Spaceflight Now. Archived fromthe original on March 9, 2025. RetrievedFebruary 28, 2011.
  70. ^abcGebhardt, Chris (February 28, 2011)."STS-133: EVA-1 completed; Endeavour Rolls to VAB one last time".NASASpaceflight.Archived from the original on July 8, 2025. RetrievedMarch 7, 2011.
  71. ^abcHarwood, William (February 28, 2011)."Mission extended one day".Spaceflight Now. Archived fromthe original on July 12, 2025. RetrievedMarch 1, 2011.
  72. ^Harwood, William (March 1, 2011)."Proposed Ultimate Space Station Photo Op Rejected".Spaceflight Now. Archived fromthe original on July 12, 2025. RetrievedMarch 1, 2011.
  73. ^Gebhardt, Chris (June 11, 2010)."STS-133: Three Flight Days and two EVAs added to Discovery's mission".NASASpaceflight.Archived from the original on July 11, 2025. RetrievedJune 11, 2010.
  74. ^Fries, Colin (August 2, 2005)."Chronology of Wakeup Calls"(PDF). NASA. pp. 74–76. Archived fromthe original(PDF) on December 20, 2023. RetrievedFebruary 10, 2023.
  75. ^"NASA's Space Rock". NASA. Archived fromthe original on October 10, 2010.

External links

[edit]
Wikimedia Commons has media related toSTS-133.
January
February
March
April
May
June
July
August
September
October
November
December
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ).
Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).
Completed flights
Status
  • Retired
On display
Related
1998–2004
International Space Station Emblem
International Space Station Emblem
2005–2009
2010–2014
2015–2019
2020–2024
Since 2025
Future
Individuals
Vehicles
  • Ongoing spaceflights are inunderline
  • † - mission failed to reach ISS
Completed
(crews)
1970s
1980s
1990s
2000s
2010s
Cancelled
Orbiters
  • indicates failure missions.

Retrieved from "https://en.wikipedia.org/w/index.php?title=STS-133&oldid=1320427848"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp