Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

STS-128

From Wikipedia, the free encyclopedia
2009 American crewed spaceflight to the ISS

STS-128
Discovery approaches the ISS withLeonardo in its payload bay
NamesSpace Transportation System-128
Mission typeISS assembly
OperatorNASA
COSPAR ID2009-045AEdit this at Wikidata
SATCATno.35811Edit this on Wikidata
Mission duration13 days, 20 hours, 54 minutes, 55 seconds
Distance travelled9,262,217 kilometres (5,755,275 mi)
Orbits completed219
Spacecraft properties
SpacecraftSpace Shuttle Discovery
Launch mass121,422 kilograms (267,689 lb)[1]
Crew
Crew size7
Members
Launching
Landing
Start of mission
Launch dateAugust 29, 2009, 03:59 (2009-08-29UTC03:59Z) UTC[2]
Launch siteKennedy,LC-39A
End of mission
Landing dateSeptember 12, 2009, 00:53 (2009-09-12UTC00:54Z) UTC[citation needed]
Landing siteEdwards, Runway 22
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Perigee altitude219 kilometres (136 mi)[3]
Apogee altitude264 kilometres (164 mi)[3]
Inclination51.6 degrees[3]
Period89.33 minutes[3]
EpochAugust 29, 2009[3]
Docking withISS
Docking portPMA-2
(Harmony forward)
Docking dateAugust 31, 2009 00:54 UTC
Undocking dateSeptember 8, 2009 19:26 UTC
Time docked8 days, 18 hours, 32 minutes

Seated (l–r) Ford and Sturckow. Standing (l–r) are Hernández, Olivas, Stott, Fuglesang and Forrester.
← STS-127
STS-129 →

STS-128 (ISS assembly flight17A) was aNASASpace Shuttle mission to theInternational Space Station (ISS) that launched on August 28, 2009.Space Shuttle Discovery carried theMulti-Purpose Logistics ModuleLeonardo as its primary payload. It was Discovery's 37th flight.Leonardo contained a collection of experiments for studying the physics and chemistry ofmicrogravity. Threespacewalks were carried out during the mission, which removed and replaced a materials processing experiment outside ESA'sColumbus module, and returned an emptyammonia tank assembly.[4]

The mission's first launch attempt was delayed due to weather concerns, including multiple weather violations in NASA's launch rules, beginning over two hours before the scheduled launch.[5][6][7] The second launch attempt, scheduled for August 26, 2009, at 01:10:22 EDT, was called off the previous evening due to an anomaly in one of the orbiter's fuel valves.[8][9][10] The launch finally took place on August 28, 2009, at 23:59 EDT.Discovery landed on September 11, 2009, atEdwards Air Force Base, which was the last landing of a shuttle to occur at theCalifornia site.

Crew

[edit]
Position[4]Launching astronautLanding astronaut
CommanderUnited StatesFrederick W. Sturckow
Fourth (last NASA) spaceflight
PilotUnited StatesKevin A. Ford
First spaceflight
Mission Specialist 1United StatesPatrick G. Forrester
Third and last spaceflight
Mission Specialist 2
Flight Engineer
United StatesJosé M. Hernández
Only spaceflight
Mission Specialist 3United StatesJohn D. Olivas
Second and last spaceflight
Mission Specialist 4SwedenChrister Fuglesang,ESA
Second and last spaceflight
Mission Specialist 5United StatesNicole Stott
Expedition 20
First spaceflight
United StatesTimothy Kopra
Expedition 20
First spaceflight
Crew notes

Nicole Stott was originally scheduled to return aboardSoyuz TMA-15, but a change in the flight plan was made due to the possible flight delays in futureshuttle missions, which could have extended Canadian astronautRobert Thirsk's mission beyond the six-month duration preferred for station crew members.[11]

STS-128 was the final Space Shuttle flight used for ISS crew rotation, with Nicole Stott replacingTim Kopra. Stott returned onSTS-129, but that flight did not bring her replacement.

The mission ofChrister Fuglesang was namedAlissé by theEuropean Space Agency.[12] The name was proposed by Jürgen Modlich fromBaierbrunn, Germany. The name refers to the 15th-century explorers who used the trade winds to followChristopher Columbus across the oceans to the New World.

STS-128 also marked the first time twoHispanic Americans were on the same crew.John "Danny" Olivas ofEl Paso, Texas, made his second trip into space, andJosé M. Hernández ofStockton, California, made his first. Both are of Mexican heritage.

Crew seat assignments

[edit]
Seat[13]LaunchLanding
Seats 1–4 are on the flight deck.
Seats 5–7 are on the mid-deck.
1Sturckow
2Ford
3Forrester
4Hernandez
5Olivas
6Fuglesang
7StottKopra

Mission payload

[edit]
LocationCargoMass
Bays 1–2Orbiter Docking System
EMU 3009 / EMU 3015
1,800 kilograms (4,000 lb)
~260 kilograms (570 lb)
Bay 3PShuttle Power
Distribution Unit (SPDU)
~17 kilograms (37 lb)
Bay 4PAPC/MISSE Carrier57 kilograms (126 lb)
Bay 5PAPC/MISSE Carrier57 kilograms (126 lb)
Bay 7SROEU umbilical~79 kilograms (174 lb)
Bays 7–12Leonardo (MPLM FM-1)12,131 kilograms (26,744 lb)
Bay 13Lightweight MPESS Carrier (LMC)1,780 kilograms (3,920 lb)
Starboard SillOrbiter Boom Sensor System~382 kilograms (842 lb)
Port SillCanadarm410 kilograms (900 lb)
Total:16,973 kilograms (37,419 lb)

Multi-Purpose Logistics Module (MPLM)Leonardo

[edit]
Leonardo, as flown onSTS-102.

The primary payload of STS-128 was theMulti-Purpose Logistics ModuleLeonardo to assist with establishing a six-man crew capacity by bringing extra supplies and equipment to the station. The Multi-Purpose Logistics Module contained three racks for life support, a crew quarter to be installed inKibo, a newtreadmill (COLBERT) that will temporarily be placed inNode 2 and later inNode 3, and anAir Revitalization System (ARS) that will temporarily be placed in Kibo and later in Node 3.

Leonardo Specifications
  • Length: 21 feet (6.4 m)
  • Diameter: 15 feet (4.6 m)
  • Payload Mass (launch): 27,510 pounds (12,480 kg)
  • Payload Mass (return): 16,268 pounds (7,379 kg)
  • Empty Weight: 9,810 pounds (4,450 kg)

Lightweight Multi-Purpose Carrier (LMC)

[edit]
LMC with ATA and EuTEF STS-128

The shuttle carried aLightweight Multi-Purpose Experiment Support Structure Carrier (LMC) with Ammonia Tank Assembly (ATA).[1] The new ammonia tank replaced an empty tank during an EVA.

TriDAR

[edit]

The shuttle flew the first test flight of theTriDAR, a 3D dual-sensing laser camera, intended for potential use as an autonomous rendezvous and docking sensor. The TriDAR successfully tracked the ISS position and orientation from the shuttle during docking operations.[14]

Other science packages

[edit]

It also contained three racks dedicated to science, FIR (Fluids Integrated Rack) and the firstMaterials Science Research Rack (MSRR-1) to be placed inDestiny andMELFI-2 (Minus Eighty Laboratory Freezer for ISS) to be placed in Kibo. The FIR enabled detailed study of how liquids behave in microgravity, a crucial detail for many chemical reactions. One experiment, for instance, examined how mixtures known as colloids behave without being stirred by sedimentation and convection. Another using theLight Microscopy Module (LMM) will examine how an ideal heat pipe works without the distortions of gravity.[15]

Mission experiments

[edit]

The STS-128 mission (as didSTS-125 andSTS-127) took part in crew seat vibration tests designed to help engineers on the ground understand how astronauts experience launch. They will use the information to help design the crew seats that will be used in future NASA spacecraft.

STS-128 repeated the Boundary Layer Transition (BLT) Detailed Test Objective (DTO) experiment that was done by the same shuttle duringSTS-119. In this experiment, one of the thermal protection systems was raised to create aboundary layer transition in which the air flow becomes turbulent beyond a certain speed. During STS-119 the tile was raised 0.25 inches (6.4 mm) above the others, tripping the flow atMach 15 during reentry. In the modification being done, the tile has been raised 0.35 inches (8.9 mm) to trip at Mach 18 producing more heat.

Discovery undertook the testing of a catalytic coating which was meant to be used by theOrion spacecraft. Two TPS tiles located in the protuberance downstream from the BLT tile had been fully coated with the catalytic material in order to understand the entry heating performance. The tiles were instrumented to collect a wide variety of data.[16]

Mission milestones

[edit]

The mission marked:

  • 159th NASA crewed space flight
  • 128th Space Shuttle mission sinceSTS-1
  • 37th flight ofDiscovery
  • 30th shuttle mission to the ISS
  • 103rd post-Challenger mission
  • 15th post-Columbia mission
  • 32nd shuttle night launch
  • NASA's first Space Shuttle launch to take place during two calendar days
  • 25th anniversary ofDiscovery's first flight,STS-41-D (August 30, 1984)

Shuttle processing

[edit]

Discovery rolled out from theOrbiter Processing Facility to theVehicle Assembly Building after the external tank was cleared for use and was mated with it.[17][18] The foam insulation on the tank underwent stringent pull tests after the foam liberated and hit the orbiter during STS-127.[19] The STS-128's tank initially exhibited no concerns while theSTS-127 case was determined to be a one-off case due to surface contamination prior to foam application.[20][21]

The main change from previous missions is the change of the Ground Umbilical Carrier Plate (GUCP) vent housing. The quick release vents exhibited leaks duringSTS-119 and STS-127, which were determined to be due to a misalignment in the vent. This led to the one part rigid seal in the external tank being replaced with a two part flexible seal.[22]

Discovery later rolled out from the VAB to Launch Complex 39A on August 4, 2009, in a slow drive on the top of theCrawler-transporter. The 3.4-mile (5.5 km) rollout began at 02:07 EDT, and ended with the launch platform secured in place at about 13:50 EDT. The move took longer than expected due to adverse weather conditions, which included lightning warnings. The crawler also had to pause occasionally so mud could be removed from its treads and bearings. Technicians then quickly prepared the shuttle to host the crew's countdown dress rehearsal known as the Terminal Countdown Demonstration Test (TCDT).[23]Discovery's seven astronauts flew to Kennedy on August 5, 2009, for the training activity which concludes later in the week with a complete practice countdown, minus liftoff, involving the crew and the launch team.[24] Meanwhile, in an unprecedented operation, modifications were made to the leftSolid rocket booster on the pad.[25] The modifications involved replacement of a check valve filter assembly in the booster which was found to have broken.[26] In a potentially delaying factor, in depth testing of the external tank withX-ray revealed voids in the foam which might have formed during theinjection molding of the foam. This has also been decided as a suspect factor in the foam shedding during STS-127. The air in the voids could have expanded due to the high temperatures generated during ascent thus breaking the foam. The reviews considered a rollback as an option since the defect could not be set right in the pad.[26][27][28] Later, the tank was cleared for launch as is without any additional inspections.[29]

Launch attempts

[edit]

The first launch attempt was delayed by 24 hours due to weather concerns, including multiple weather violations in NASA's launch rules beginning over 2 hours before the scheduled launch.[5][6][7] During the second attempt on Wednesday morning, a problem with aLH2 fill-and-drain fuel valve insideDiscovery's aft compartment led to another scrubbing. The problem arose when sensors did not detect the closure of the valve when commanded to do so. The issue was thought to be with the sensors rather than the valve itself.[8][9][10] After inerting the orbiter's tank, which involved draining it, tests were conducted on the valves. Despite the valves working normally, another delay was called for to have more confidence in the system, and to give the console operators who performed the test some rest.[30][31][32] The launch team evaluated the issue, passing on a possible launch window on August 27, 2009, at 01:10 EDT. The launch was delayed until 23:59 EDT, August 28, 2009, to allow the engineers to be fully satisfied with the vehicle.[33] Later the mission was cleared for launch which involved a flight rule waiver for cycling the valve and a discussion to analyze the test failure of an Ares-1 booster that was similar to the SRBs used for the mission.[34] NASA feared another delay when storms formed near the Kennedy Space Center on August 28, 2009, but the weather cleared in time for a successful launch ofDiscovery at 23:59 EDT.[35][36][37]

AttemptPlannedResultTurnaroundReasonDecision pointWeather go (%)Notes
125 Aug 2009, 1:36:05 amScrubbedWeather25 Aug 2009, 1:25 am ​(T−9:00 hold)80%[38]Precipitation and lightning in launch and landing area[5][6][7]
226 Aug 2009, 1:10:01 amScrubbed0 days 23 hours 34 minutesTechnical25 Aug 2009, 5:52 pm70%[38]Failure indicator on LH2 inboard fill and drain valve[30][31][32]
328 Aug 2009, 11:59:37 pmSuccessful2 days 22 hours 50 minutes60%; later 80%[34]

Mission timeline

[edit]

August 28 (Flight Day 1 – Launch)

[edit]
Space ShuttleDiscovery launches from Kennedy Space Center, August 28, 2009

After launch at 23:59 EDT,Discovery opened her payload bay doors. Once the doors were opened the crew deployed theKu-band antenna and activated theShuttle Remote Manipulator System (SRMS). Once the Ku-band antenna was deployed and activated, the crew then down-linked photos from the External Tank Umbilical Well Camera system, so controllers on the ground could see how the tank performed and how much if any foam was shed during ascent.

August 29 (Flight Day 2 – TPS survey)

[edit]

DuringDiscovery's first full day on orbit, the crew used the SRMS to grapple theOrbiter Boom Sensor System (OBSS) and survey the wing leading edges, nose and other parts of theThermal Protection System (TPS), as well as theOrbital Maneuvering System (OMS) Pods. During this time some of the crew were preparing the space suits that will be used during the 3Extra-vehicular activities (EVA) and setting up the tools that will be used during the docking. This includes installing the Centerline Camera and extending the Orbiter Docking system Ring Extension.

August 30 (Flight Day 3 – Docking)

[edit]

Discovery docked with thePressurized Mating Adapter (PMA) 2 on the front of theHarmony connecting module. Before the shuttle docked, Commander Rick Sturckow performed what is known as theRendezvous Pitch Maneuver whileExpedition 20 CommanderGennady Padalka and Flight EngineerMichael Barratt took photos of the shuttle's belly. The photos were down-linked to mission control for review. After docking,Nicole Stott andTim Kopra switched Soyuz seat liners, making Stott an Expedition 20 Flight Engineer and Tim Kopra an STS-128 Mission Specialist. The joint crews also performed some transfers from the shuttle mid-deck and checked on the pressure in theMPLM Leonardo.

August 31 (Flight Day 4 – MPLM berthing)

[edit]

During flight day 4, the MPLMLeonardo was berthed to the Nadir (the Earth-facing port on Harmony) using theSpace Station Remote Manipulator System (SSRMS). Once it was berthed, the crews activated it and opened the hatch for ingress. Some more items were transferred from the shuttle mid-deck, including the MDS experiment and the space suitsDanny Olivas and Nicole Stott would use during EVA 1. The pair also prepared all the tools that would be used during the EVA with some help from Tim Kopra. Later, during the night, when the crews were asleep, the team of ground controllers vented the Port 1 (P1) Ammonia Tank Assembly (ATA)Nitrogen Vent lines in preparation for the ATA to be removed during EVA 1.

September 1 (Flight Day 5 – EVA 1)

[edit]
Nicole Stott during the STS-128 mission's first space-walk.

EVA 1 was performed, and saw the removal of the empty Ammonia Tank Assembly, and the removal and stowage of the EuTef and MISSE 6 experiments. While the spacewalk was going on crew members inside were transferring the Crew Quarters, C.O.L.B.E.R.T treadmill and theNode 3Air Revitalization System rack (ARS). The treadmill and ARS were temporarily stowed, while the crew Quarters was installed in theKibo Module where setup and activation was begun.

September 2 (Flight Day 6)

[edit]

During flight day 6, the joint crews continued the activation of the new crew quarters. The last of the major transfer items, the Fluids Integrated Rack (FIR), Materials Science Research Rack, and the Minus Eighty Laboratory Freezer ISS 2 (MELFI-2), were transferred from theMulti-Purpose Logistics Module (MPLM) Leonardo. AstronautsDanny Olivas andJosé M. Hernández answered some questions submitted onYouTube andTwitter. Olivas andChrister Fuglesang also prepared for the second EVA and "camped out" in the air lock at a lower pressure to help get ready for EVA 2 on flight day 7.

September 3 (Flight Day 7 – EVA 2)

[edit]
Composite of images showing the Russian Segment during the EVA

On flight day 7,Danny Olivas andChrister Fuglesang performed the second spacewalk of the STS-128 mission. Olivas and Fuglesang installed and connected the new Ammonia Tank Assembly (ATA), and also performed two get aheads. The get ahead tasks included installing protective lens covers on theSpace Station Remote Manipulator System (SSRMS) End B cameras . Once the ATA was installed, the tank was integrated into the cooling loop. While Olivas and Fuglesang were outside, the rest of the crew continued on transferring items to and from both the shuttle mid-deck andMPLM.

September 4 (Flight Day 8)

[edit]

The first part of the crew day was spent off duty. The crews enjoyed a meal, took a crew photo and took part in a PAO event. More transfer was completed by both crews. The space station crew calibrated the Oxygen Generation System (OGS)H2 sensor.Timothy Kopra andNicole Stott continued their hand over activities, helping Stott who is taking over from Kopra.Danny Olivas andChrister Fuglesang got theirspace suits ready for the third and final space walk. The pair spent the night in theQuest Joint Airlock, at a lower pressure of 10.2 psi instead of 14.7 psi.

September 5 (Flight Day 9 – EVA 3)

[edit]
Danny Olivas during EVA 3.
Highlights from the third spacewalk (2 min 21 secs)

During flight day 9,Danny Olivas andChrister Fuglesang performed EVA 3. The pair completed all tasks that were to be done, including installing twoGPSantennas and deploying theStarboard 3 (S3) Payload Attach System (PAS), a new Rate Gyro Assembly (RGA) 2, and routing ofNode 3 Avionics cables. The joint crew also completed more transfer, mostly transfer for return to Earth in the MPLM and Space Shuttle mid-deck. The ISS crew also replaced a bolt on theCommon Berthing Mechanism (CBM) so that the MPLM won't get stuck, and also to ensure correct capture of theHTV.

September 6 (Flight Day 10 – Off duty)

[edit]

Flight day 10 saw the joint crews transfer samples from the space station to the shuttle freezer known as Glacier. The samples will be returned to Earth for examination by scientists who will develop ways to prevent bone and muscle loss in space as well as cures for other illnesses on Earth. The crews also completed some close outs of theMulti-Purpose Logistics ModuleLeonardo. The last portion of the crew day was spent off duty.

September 7 (Flight Day 11 – Hatch closure)

[edit]

On flight day 11, the joint ISS/shuttle crews completed transfers and closed the hatches with the MPLM. Once the hatches were closed, the MPLM was deactivated, demated and berthed back in the payload bay of the space shuttle. During this process,José M. Hernández andNicole Stott took part in a PAO event. The end of the crews work days saw the two crews say goodbye in a farewell ceremony and close the hatches between the shuttle and ISS. Once the hatches were closed, thePressurized Mating Adapter 2 was depressurized, in advance of undocking. The shuttle crew setup and checked out the rendezvous tools before going to bed.

September 8 (Flight Day 12 – Undocking)

[edit]

On flight day 12, Space ShuttleDiscovery successfully undocked from theInternational Space Station at 19:26UTC. After undocking, the shuttle backed out and performed a fly around of the ISS. The Space Shuttle then performed two separation burns using its thrusters. After the separation burns, astronautsKevin Ford,José M. Hernández, andChrister Fuglesang used theOrbiter Boom Sensor System (OBSS) to inspect the shuttle's Thermal Protection System (TPS). When they completed that task, the OBSS was berthed on the starboard sill of the payload bay and theShuttle Remote Manipulator System (SRMS) was powered down.

Space Shuttle Discovery and International Space Station on September 8, 2009, after undocking

September 9 (Flight Day 13 – End of mission prep)

[edit]

On flight day 13, the Space Shuttle crew began stowing items for landing. During the course of the day, commanderFrederick W. Sturckow and pilotKevin A. Ford performed standard checks of the Flight Control Systems (FCS),Reaction Control System (RCS) jets, and communications with the ground. The crew also deactivated theWing Leading Edge System (WLES), stowed theKu-band antenna, and reviewed landing procedures.

September 10 (Flight Day 14 – Landing postponed)

[edit]

On flight day 14,Discovery was scheduled to land at Kennedy Space Center at 19:04EDT (23:04UTC). The landing was postponed due to weather conditions, and the second opportunity at 20:40 EDT (00:40 UTC) was also postponed due to weather conditions.

September 11 (Flight Day 15 – Landing)

[edit]
After weather delayed two landing opportunities at Kennedy Space Center,Discovery lands atEdwards Air Force Base, California.

On flight day 15, at 19:47EDT (23:47UTC),Discovery started the de-orbit burn for landing atEdwards Air Force Base after its two landing attempts at Kennedy Space Center the previous day were waved off.Discovery touched down safely at 20:53 EDT (17:53 PDT/00:53 UTC).

The landing marked the final time a Space Shuttle mission concluded at Edwards Air Force Base, as well as the last time a ferry flight would be needed for an operational orbiter.Discovery returned to KSC on Monday, September 21, 2009, after refueling stops at Amarillo International Airport, Fort Worth Naval Station, and Barksdale Air Force Base on September 20. The last seven missions of the shuttle all touched down at Kennedy Space Center.

Spacewalks

[edit]

Each spacewalk was planned to last approximately 6.5 hours.[39]

EVASpacewalkersStart (UTC)End (UTC)Duration
EVA 1John D. Olivas
Nicole Stott
September 1, 2009
21:49UTC
September 2, 2009
04:24UTC
6 hours, 35 minutes
Prepared for the replacement of an empty ammonia tank on the station's port truss by releasing its bolts. Retrieved theMaterials International Space Station Experiment andEuropean Technology Exposure Facility mounted outside theColumbus laboratory, and stowed them inDiscovery's cargo bay for their return to Earth.
:Robotic Arm Operators: Ford and Thirsk[1]
EVA 2John D. Olivas
Christer Fuglesang
September 3, 2009
22:13UTC
September 4, 2009
04:51UTC[40]
6 hours, 39 minutes
Removed the new ammonia tank from the shuttle's payload bay and replaced it with the used tank from the station. The new tank, weighing about 1,800 pounds (820 kg), was the most mass ever moved by spacewalking astronauts.

With this spacewalk, ESA astronaut Fuglesang became the first person, who is not from either an American or Russian space program, to have participated in four or more spacewalks.
:Robotic Arm Operators: Ford and Stott

EVA 3John D. Olivas
Christer Fuglesang
September 5, 2009
20:39UTC
September 6, 2009
03:40UTC
7 hours, 01 minutes
Preparations for the arrival of theTranquility node by attaching cables between the starboard truss and theUnity node, the area whereTranquility will be installed.Tranquility is targeted to arrive on STS-130 in February 2010. The spacewalkers also replaced a communications sensor device, installed two new GPS antennas, and replaced a circuit breaker.

Wake-up calls

[edit]

NASA began a tradition of playing music to astronauts during theGemini program, which was first used to wake up a flight crew duringApollo 15. Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[41][42]

Flight DaySongArtistPlayed for
Day 2"Back In The Saddle Again"Gene AutryFrederick W. Sturckow
Day 3"Made to Love"TobyMacNicole Stott
Day 4"Mi Tierra"Gloria EstefanJosé M. Hernández
Day 5"Indiana, Our Indiana"Indiana University BandKevin A. Ford
Day 6"What a Wonderful World"Louis ArmstrongChrister Fuglesang
Day 7"There is a God"33MilesPatrick G. Forrester
Day 8"What a Wonderful World"Louis ArmstrongDanny Olivas
Day 9"El Hijo del Pueblo"José Alfredo JiménezJosé M. Hernández
Day 10"Rocket"Andrew PetersonPatrick G. Forrester
Day 11"Only One"Jeremy KayJohn D. Olivas
Day 12"Beautiful Day"U2Timothy Kopra
Day 13"Sailing"Rod StewartChrister Fuglesang
Day 14"Good Day Sunshine"The BeatlesKevin A. Ford
Day 15"Big Boy Toys"Aaron TippinFrederick W. Sturckow

Media

[edit]
  • Discovery on the pad 6 August 2009
    Discovery on the pad 6 August 2009
  • Discovery poised for lift-off
    Discovery poised for lift-off
  • Launch from 180 miles away (long exposure)
    Launch from 180 miles away (long exposure)
  • STS-128 as seen from Bartram Springs in Jacksonville, FL
    STS-128 as seen fromBartram Springs in Jacksonville, FL
  • Long exposure picture of STS-128 launching
    Long exposure picture of STS-128 launching
  • Video of launch
  • Olivas(left) and Stott (right) during EVA 1.
    Olivas(left) and Stott (right) during EVA 1.
  • Leonardo is placed back in Discovery's payload bay.
    Leonardo is placed back inDiscovery's payload bay.

See also

[edit]

References

[edit]

Public Domain This article incorporatespublic domain material from websites or documents of theNational Aeronautics and Space Administration.

  1. ^abc"STS-128 Press Kit"(PDF).NASA.Archived(PDF) from the original on April 3, 2025. RetrievedAugust 19, 2009.
  2. ^Ryba, Jeanne (August 25, 2009)."Latest Shuttle News – Launch Team Targets Aug. 28 Launch".NASA.gov. Archived fromthe original on April 25, 2013. RetrievedAugust 26, 2009.
  3. ^abcdeMcDowell, Jonathan."Satellite Catalog".Jonathan's Space Page. RetrievedMay 24, 2013.
  4. ^abYembrick, John; Clem, Kyle, eds. (July 16, 2008)."NASA Assigns Crew for Equipment Delivery Mission to Space Station" (Press release).NASA. 08-176. Archived fromthe original on July 18, 2008. RetrievedAugust 5, 2009.
  5. ^abcBergin, Chris (August 24, 2009)."STS-128 Scrubbed due to unacceptable weather – 24‑hour turnaround".NASASpaceflight.Archived from the original on February 22, 2025. RetrievedAugust 26, 2009.
  6. ^abcHarwood, William (August 25, 2009)."Weather scrubs shuttle Discovery's late-night launch".Spaceflight Now. Archived fromthe original on February 24, 2025. RetrievedAugust 26, 2009.
  7. ^abcSimantov, Matthew (August 25, 2009)."Space shuttle Discovery launch attempt scrubbed due to weather".The Write Stuff.Orlando Sentinel. Archived fromthe original on August 28, 2009. RetrievedAugust 25, 2009.
  8. ^abHarwood, William (August 25, 2009)."Another scrub for space shuttle Discovery's launch".Spaceflight Now. Archived fromthe original on February 23, 2025. RetrievedAugust 26, 2009.
  9. ^abBergin, Chris (August 25, 2009)."SCRUB: Second STS-128 launch attempt scrubbed due to valve issue".NASASpaceflight.Archived from the original on February 14, 2025. RetrievedAugust 26, 2009.
  10. ^ab"NASA Calls Off Space Shuttle Launch Due to Bad Fuel Valve".Fox News.Associated Press. August 25, 2009.Archived from the original on August 28, 2009. RetrievedAugust 12, 2010.
  11. ^Curie, Michael; Cloutier-Lemasters, Nicole, eds. (March 3, 2009)."NASA Announces Change for Return of Station Crew Members" (Press release).NASA. M09-034. Archived fromthe original on December 30, 2011. RetrievedAugust 23, 2009.
  12. ^"Name and logo unveiled for Christer Fuglesang's mission to the ISS" (Press release).European Space Agency. August 3, 2009.Archived from the original on July 20, 2025. RetrievedAugust 23, 2009.
  13. ^"STS-128".Spacefacts.de.Archived from the original on May 27, 2025. RetrievedApril 25, 2024.
  14. ^Gebhardt, Chris (August 30, 2009)."Birthday girl docks with ISS – TriDAR test for new AR&D Docking System".NASASpaceflight.Archived from the original on July 6, 2025. RetrievedOctober 28, 2009.
  15. ^"Space Flight Systems Directorate Activities Report March 23 – April 3, 2009"(PDF).NASA. 2003. Archived fromthe original(PDF) on May 21, 2009. RetrievedAugust 10, 2009.
  16. ^Bergin, Chris (June 22, 2009)."Discovery handed special heatshield coating DTO on behalf of Orion".NASASpaceflight.Archived from the original on February 8, 2025. RetrievedAugust 5, 2009.
  17. ^Bergin, Chris (July 25, 2009)."STS-128: Discovery rolls to VAB on Sunday following ET-132 clearance".NASASpaceflight.Archived from the original on April 21, 2025. RetrievedAugust 5, 2009.
  18. ^Bergin, Chris (July 30, 2009)."Endeavour tracking KSC return on Friday – TPS cleared for entry".NASASpaceflight.Archived from the original on February 18, 2025. RetrievedAugust 5, 2009.
  19. ^Bergin, Chris (July 21, 2009)."STS-128: Completed ET-132 intertank pull tests show positive results".NASASpaceflight.Archived from the original on April 21, 2025. RetrievedAugust 5, 2009.
  20. ^Bergin, Chris (July 29, 2009)."Endeavour completes Late Inspections – Candidate found for ET-131 foam loss".NASASpaceflight.Archived from the original on March 26, 2025. RetrievedAugust 5, 2009.
  21. ^Bergin, Chris (August 2, 2009)."Understanding ET-131's rogue foam liberations leads to ET-132 confidence".NASASpaceflight.Archived from the original on March 22, 2025. RetrievedAugust 5, 2009.
  22. ^Bergin, Chris (July 13, 2009)."Bad weather scrubs fifth attempt for STS-127 – GUCP investigation results".NASASpaceflight.Archived from the original on July 7, 2025. RetrievedAugust 5, 2009.
  23. ^Ryba, Jeanne (August 5, 2009)."NASA – Archive".NASA. Archived fromthe original on October 16, 2009. RetrievedAugust 5, 2009.
  24. ^"Discovery astronauts in town for practice countdown".Spaceflight Now. August 5, 2009. Archived fromthe original on December 27, 2024. RetrievedAugust 12, 2009.
  25. ^Bergin, Chris (August 3, 2009)."Discovery completes dramatic rollout – Unique SRB repairs to take place at Pad".NASASpaceflight.Archived from the original on January 15, 2025. RetrievedAugust 5, 2009.
  26. ^abBergin, Chris (August 7, 2009)."Risk assessment debate for STS-128 tank – Rollback is a potential option".NASASpaceflight.Archived from the original on June 29, 2025. RetrievedAugust 12, 2009.
  27. ^Bergin, Chris (August 10, 2009)."STS-128: Managers head into FRR debate – Void in suspect IFR highlighted".NASASpaceflight.Archived from the original on July 13, 2025. RetrievedAugust 12, 2009.
  28. ^Harwood, William (August 7, 2009)."Engineers continue to assess shuttle fuel tank foam".Spaceflight Now. Archived fromthe original on December 27, 2024. RetrievedAugust 12, 2009.
  29. ^Harwood, William (August 18, 2009)."Discovery's fuel tank cleared for launch after foam debate".Spaceflight Now. Archived fromthe original on December 27, 2024. RetrievedAugust 19, 2009.
  30. ^abHarwood, William (August 26, 2009)."Discovery testing finds no problem with suspect valve".Spaceflight Now. Archived fromthe original on February 24, 2025. RetrievedAugust 27, 2009.
  31. ^abBergin, Chris (August 26, 2009)."STS-128: PV12 troubleshooting begins ahead of MMT launch decision".NASASpaceflight.Archived from the original on January 24, 2025. RetrievedAugust 27, 2009.
  32. ^abBergin, Chris (August 27, 2009)."STS-128 held a further 24 hours for PV12 data gathering".NASASpaceflight.Archived from the original on July 11, 2025. RetrievedAugust 27, 2009.
  33. ^Harwood, William (August 27, 2009)."Shuttle Discovery's launch pushed back to Friday night".Spaceflight Now. Archived fromthe original on June 17, 2025. RetrievedAugust 31, 2009.
  34. ^abHarwood, William (August 28, 2009)."Management team clears Discovery for launch".Spaceflight Now. Archived fromthe original on December 27, 2024. RetrievedAugust 31, 2009.
  35. ^"STS-128 MCC Status Report #01" (Press release).NASA. August 28, 2009. STS-128-01. Archived fromthe original on September 1, 2009. RetrievedAugust 31, 2009.
  36. ^Harwood, William (August 28, 2009)."Discovery en route to space station for delivery mission".Spaceflight Now. Archived fromthe original on August 24, 2024. RetrievedAugust 31, 2009.
  37. ^Bergin, Chris (August 28, 2009)."Discovery launches after smooth countdown".NASASpaceflight.Archived from the original on April 24, 2025. RetrievedAugust 31, 2009.
  38. ^abHarwood, William (August 21, 2009)."Update: Shuttle countdown on tap; weather 70 percent 'go' for Tuesday launch".CBS News.Archived from the original on January 23, 2025. RetrievedAugust 29, 2009.
  39. ^"STS-128 factsheet"(PDF).NASA. August 1, 2009. Archived fromthe original(PDF) on August 23, 2009. RetrievedJanuary 26, 2012.
  40. ^Ray, Justin (September 3, 2009)."Spaceflight Now STS-128 Mission Status Center".Spaceflight Now. Archived fromthe original on July 21, 2025. RetrievedSeptember 3, 2009.
  41. ^Fries, Colin (June 25, 2007)."Chronology of Wakeup Calls"(PDF).NASA. Archived fromthe original(PDF) on June 20, 2010. RetrievedAugust 13, 2007.
  42. ^"STS-128 Wakeup Calls".NASA. September 11, 2009. Archived fromthe original on November 23, 2009. RetrievedNovember 19, 2009.

External links

[edit]
Wikimedia Commons has media related toSTS-128.
Completed flights
Status
  • Retired
On display
Related
1998–2004
International Space Station Emblem
International Space Station Emblem
2005–2009
2010–2014
2015–2019
2020–2024
Since 2025
Future
Individuals
Vehicles
  • Ongoing spaceflights are inunderline
  • † - mission failed to reach ISS
Completed
(crews)
1970s
1980s
1990s
2000s
2010s
Cancelled
Orbiters
  • indicates failure missions.
Policy and history
History
(creation)
General
Human spaceflight
programs
Past
Current
Robotic programs
Past
Current
Individual featured
missions
(human and robotic)
Past
Currently
operating
Future
Communications
and navigation
NASA lists
NASA images
and artwork
Related
January
February
March
April
May
June
July
August
September
October
November
December
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ).
Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).

Retrieved from "https://en.wikipedia.org/w/index.php?title=STS-128&oldid=1305485112"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp