Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

STS-106

From Wikipedia, the free encyclopedia
2000 American crewed spaceflight to the ISS

STS-106
Malenchenko outsideZarya during an EVA
NamesSpace Transportation System-106
Mission typeISS assembly
OperatorNASA
COSPAR ID2000-053AEdit this at Wikidata
SATCATno.26489Edit this on Wikidata
Mission duration11 days, 19 hours, 12 minutes, 15 seconds
Distance travelled7,900,000 km (4,900,000 mi)
Orbits completed185
Spacecraft properties
SpacecraftSpace Shuttle Atlantis
Launch mass115,259 kg (254,103 lb)
Landing mass100,369 kg (221,276 lb)
Payload mass10,219 kg (22,529 lb)
Crew
Crew size7
Members
EVAs1
EVA duration6 hours, 14 minutes
Start of mission
Launch date8 September 2000, 12:45:47 (2000-09-08UTC12:45:47Z) UTC
Launch siteKennedy,LC-39B
End of mission
Landing date20 September 2000, 07:56 (2000-09-20UTC07:57Z) UTC
Landing siteKennedy,SLF Runway 15
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Perigee altitude375 km (233 mi)
Apogee altitude386 km (240 mi)
Inclination51.6 degrees
Period92.2 minutes
Docking with ISS
Docking portUnity,PMA-2
Docking date10 September 2000, 05:51:25 UTC
Undocking date18 September 2000, 03:46:00 UTC
Time docked7 days, 21 hours, 54 minutes, 35 seconds

Left to right: Front row – Altman and Wilcutt; Back row – Morukov, Mastracchio, Lu, Burbank, Malenchenko.
← STS-101 (98)
STS-92 (100) →

STS-106 was a 2000Space Shuttle mission to theInternational Space Station (ISS) flown bySpace ShuttleAtlantis.

Crew

[edit]
PositionAstronaut
CommanderUnited StatesTerrence W. Wilcutt
Fourth and last spaceflight
PilotUnited StatesScott D. Altman
Second spaceflight
Mission Specialist 1United StatesEdward T. Lu
Second spaceflight
Mission Specialist 2
Flight Engineer
United StatesRichard A. Mastracchio
First spaceflight
Mission Specialist 3United StatesDaniel C. Burbank
First spaceflight
Mission Specialist 4RussiaYuri Malenchenko,RKA
Second spaceflight
Mission Specialist 5RussiaBoris Morukov,RKA
Only spaceflight

Spacewalks

[edit]
  • Lu and Malenchenko – EVA 1
  • EVA 1 Start: 11 September 2000 – 04:47 UTC
  • EVA 1 End: 11 September 2000 – 11:01 UTC
  • Duration: 6 hours, 14 minutes

Crew seat assignments

[edit]
Seat[1]LaunchLanding
Seats 1–4 are on the flight deck.
Seats 5–7 are on the mid-deck.
1Wilcutt
2Altman
3LuBurbank
4Mastracchio
5BurbankLu
6Malenchenko
7Morukov

Mission highlights

[edit]
ICC STS-106
Launch of the Space ShuttleAtlantis and the beginning of the STS-106 mission.
Illustration of the International Space Station during STS-106.
Crewmembers pose for the inflight crew portrait.
TheInternational Space Station as seen from STS-106. In view are the station'sUnity,Zarya, andZvezda modules, in addition to a docked Progress spacecraft.

Space Station assembly flight ISS-2A.2b utilized theSPACEHAB Double Module and the Integrated Cargo Carrier (ICC) to bring supplies to the station. The mission also included one spacewalk.

Veteran AstronautTerrence Wilcutt (Col., USMC) led the seven-man crew, commanding his second Shuttle flight and making his fourth trip into space. During the planned 11-day mission, Wilcutt and his crew mates spent a week inside the ISS unloading supplies from both a double SPACEHAB cargo module in the rear ofAtlantis's cargo bay and from a Russian Progress M-1 resupply craft docked to the aft end of theZvezda Service Module.Zvezda, which linked up to the ISS on 26 July, served as the early living quarters for the station and is the cornerstone of the Russian contribution to the ISS.

Mission STS-106 was added to the manifest after delays in launchingZvezda. The STS-101 flight was originally planned to carry cargo to the ISS and have three crew perform an EVA to connectZvezda to the ISS, but the delays caused the mission objectives of STS-101 to be split into 2A.2a (STS-101) and 2A.2b (STS-106). The three spacewalk crewmembers Lu, Williams, and Malenchenko followed their EVA onto STS-106.

The goal of the flight was to prepareZvezda for the arrival of the first residents, or Expedition, crew later in the fall of 2000 and the start of a permanent human presence on the new outpost. That crew, made up of Expedition Commander Bill Shepherd, Soyuz Commander Yuri Gidzenko and Flight Engineer Sergei Krikalev, launched on 31 October 2000 in a Soyuz capsule from the Baikonur Cosmodrome in Kazakhstan for a four-month "shakedown" mission aboard the ISS.

On flight day three, Dr.Ed Lu andYuri Malenchenko (Col., Russian Air Force), who were both making their second flights into space, conducted a 6-hour and 14 minute space walk. The spacewalk's objective focused on routing and connecting nine power, data and communications cables between the Zvezda module and the other Russian-built module,Zarya, as well as installing the six-foot-longmagnetometer. The magnetometer would serve as a three-dimensional compass designed to minimize Zvezda propellant usage by relaying information to the module's computers regarding its orientation relative to the Earth.

Lu and Malenchenko used tethers and handrails along the ISS to make their way to a point more than 100 feet (30 m) above the cargo bay, the farthest any tethered spacewalker has ventured outside the shuttle. They completed this with the assistance of their crewmates Burbank and Mastracchio who deftly maneuvered them around with the robotic arm. This spacewalk celebrates the sixth spacewalk in support of the station assembly and the 50th spacewalk in Space Shuttle history. Also this was the second joint U.S.-Russian space walk outside aSpace Shuttle, following on the work conducted by Astronaut Scott Parazynski and Cosmonaut Vladimir Titov outsideAtlantis while docked to theMir Space Station during theSTS-86 mission in October 1997. Lu, designated EV 1, wore the space suit marked by red stripes, while Malenchenko, EV 2, wore the pure white suit. This was Lu's first space walk, while Malenchenko had conducted a pair of space walks totaling 12 hours during his four-month stay aboard Mir in 1994.Dan Burbank (Lt. Cmdr, USCG), who was a spaceflight rookie, served as the space walk choreographer.

Mission SpecialistRick Mastracchio, also a spaceflight novice, was the prime robot arm operator for the mission, using the Canadian-built arm to move Lu and Malenchenko around the ISS as they conducted their assembly work. Mastracchio is backed up on arm operations by Pilot Scott Altman (Cmdr., USN), making his second flight into space.

The final member of the crew was Russian Cosmonaut Dr.Boris Morukov, making his first flight into space. Morukov was responsible for unloading supplies from the Progress vehicle during the docked phase of the flight.

On flight day four the crew entered the International Space Station through Pressurized Mating Adapter-2 (PMA-2) to begin the transfer operations of more than three tons of hardware and supplies.Atlantis' crew was the first to see the interior of the Russian Zvezda service module since it was launched from the Baikonur Cosmodrome in July. Additionally, a reboost was performed using the orbiter's Reaction Control System (RCS) to place the station in a higher orbit.

Transfer of supplies and maintenance tasks continued well into the fifth day, while orbiter consumables remained above the required levels allowing managers to extend the mission one additional day.

Activities on flight day five included the installation of three batteries insideZvezda. In order to reduce the weight for launch, Zvezda was launched with only five of its eight batteries in place.

Lu and Malenchenko spent much of flight day seven installing voltage and current stabilizers inZvezda. Components of the Elektron system, equipment sent into orbit to separate water into oxygen and hydrogen, were installed and would be activated after the first crew arrives.

The crew transferred more than 6,000 pounds of material – including six 100-pound bags of water, all of the food for the first resident crew, office supplies, onboard environmental supplies, a vacuum cleaner and a computer and monitor – to the interior of the station.

The astronauts spent a total of 5 days, 9 hours and 21 minutes inside the station before closing the hatch on the orbiting outpost. Wilcutt and Altman commanded a series of four altitude boosts to place the station in an orbit of approximately 241 by 233 statute miles, raising the average altitude by 14 miles (23 km). After spending 7 days, 21 hours and 54 minutes linked to the station,Atlantis undocked at 11:46 pm EDT as Wilcutt and Altman firedAtlantis' jets to move to a distance of about 450 feet for a double-loop flyaround.

Commander Terry Wilcutt guidedAtlantis to a landing at 2:56 am Central time, wrapping up a 4.9 million mile mission in which more than three tons of equipment were delivered to the international outpost. Wilcutt and his crewmates, Pilot Scott Altman and Mission Specialists Ed Lu, Rick Mastracchio, Dan Burbank, Yuri Malenchenko and Boris Morukov completed the 23rd consecutive landing of a shuttle at the Florida spaceport, and the 30th landing of a Shuttle at the Cape in the last 31 flights.

The first initial amateur radio station was flown on board the Space ShuttleAtlantis on STS-106. The crew transferred the ham radio gear into the space station for future use by the Expedition One crew.[2]

See also

[edit]

References

[edit]
  1. ^"Spaceflight mission report: STS-106".www.spacefacts.de. Retrieved25 April 2024.
  2. ^"ISS Reference – Ham Radio". Spaceflight.nasa.gov. 23 July 2012. Archived fromthe original on 3 March 2008. Retrieved2 November 2012.

External links

[edit]

Public Domain This article incorporatespublic domain material from websites or documents of theNational Aeronautics and Space Administration.

1998–2004
International Space Station Emblem
International Space Station Emblem
2005–2009
2010–2014
2015–2019
2020–2024
Since 2025
Future
Individuals
Vehicles
  • Ongoing spaceflights are inunderline
  • † - mission failed to reach ISS
Completed flights
Status
  • Retired
On display
Completed
(crews)
1970s
1980s
1990s
2000s
2010s
Cancelled
Orbiters
  • indicates failure missions.
January
February
March
April
May
June
July
August
September
October
November
December
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ).
Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).

Retrieved from "https://en.wikipedia.org/w/index.php?title=STS-106&oldid=1277316425"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp