| Robin Hood Line | |||
|---|---|---|---|
East Midlands Railway Service toWorksop atNottingham | |||
| Overview | |||
| Status | Operational | ||
| Owner | Network Rail | ||
| Locale | Nottinghamshire Derbyshire East Midlands | ||
| Termini |
| ||
| Stations | 13 | ||
| Service | |||
| Type | Heavy rail | ||
| System | National Rail | ||
| Operator(s) | East Midlands Railway | ||
| Rolling stock | Class 158Express Sprinter Class 170Turbostar | ||
| History | |||
| Opened | 1848[1] | ||
| Closed | 1960s | ||
| Reopened | 1993–1998 | ||
| Technical | |||
| Number of tracks | MostlyDouble Track, with aSingle track section between Bulwell and Kirkby-in-Ashfield. | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in)standard gauge | ||
| |||
TheRobin Hood Line is a railway line running fromNottingham toWorksop,Nottinghamshire, in England. The stations between Shirebrook and Whitwell (inclusive) are in the county ofDerbyshire.
Passenger services are operated byEast Midlands Railway. The line in its present form opened to passengers in stages between 1993 and 1998. Following theBeeching cuts of the 1960s, the line had been freight-only. The cuts had left Mansfield as one of the largest towns in Britain without a railway station.
The majority of the current Robin Hood Line re-uses the formerMidland Railway (MR) route fromNottingham toWorksop. However, due to rationalisation leading to track removal in order to save the costs of maintaining the tunnel north ofAnnesley, the through route was severed in the 1970s.[2]
Northwards from Nottingham, the freight-only line remained intact as far asNewstead, where it had served the now closed Newstead Colliery.[2]
Southwards from Worksop, the line followed the old MR route as far asSutton-in-Ashfield. Between Sutton-in-Ashfield andKirkby-in-Ashfield, the line was diverted in 1972 to take the formerGreat Northern Railway (GNR) route through the area.[3]This allowedBritish Rail to sell land right in the centre of Kirkby-in-Ashfield whilst keeping a freight route through the town. After crossing the town on the GNR route, the line re-joined the old MR route to Pye Bridge, nearIronville but the connection between Kirkby-in-Ashfield and Newstead was closed and the tunnel filled in.[2]
When plans for the Robin Hood Line were drawn up, it was vital in the interest of keeping costs down to make as much use of the existing infrastructure as possible so, rather than trying to buy back the land to rebuild the line through the centre of Kirkby-in-Ashfield, the existing GNR diversion was kept and a new partly single track stretch of railway built to re-create the missing link between Kirkby-in-Ashfield and Newstead.[2]
North of Newstead, at Annesley, both theGreat Central Railway (GCR) and the Midland Railway had driven tunnels through the picturesqueRobin Hood Hills but, since both lines closed, both tunnels had been filled in.[3] The GCR's tunnel had been at a lower level than the MR's and so was much longer but it had previously been shared with the GNR and the elevation was a good match for the route through Kirkby. In the end it proved cheaper to re-excavate the MR's tunnel, which was found to be in excellent condition[2] and build the new connection on a gradient between the two levels.[4]
The new service fromNottingham toNewstead opened in 1993, althoughBulwell station opened only in 1994. It was extended toMansfield Woodhouse in 1995, withKirkby-in-Ashfield station opening in 1996. The through passenger route from Nottingham toWorksop opened in 1998.[1]
In 2004 the section betweenBulwell andHucknall wassingled to allow space for the newNottingham Express Transit tramway, which follows the route as far north as Hucknall and opened in March 2004.[5]
As of March 2020, the Robin Hood Line operates a Monday to Saturday service between 05:40 and 22:20. During the day, trains run at hourly intervals between Nottingham and Worksop, the full journey taking 67 minutes.[6]
A Sunday service began on 7 December 2008, with ten trains running between Nottingham and Mansfield Woodhouse between 09:15 and 22:30. Four of those continued to Worksop.[7]The Sunday service was funded byDerbyshire County Council andNottinghamshire County Council. An understanding was made with theDepartment for Transport that, if the patronage reached an agreed threshold after two years, it would consider taking over the service and incorporate it within theEast Midlands Trains franchise. However, this service was not a commercial success north ofMansfield Woodhouse, and Nottinghamshire County Council decided to reduce its funding and prioritise running a reduced Sunday service from 22 May 2011. The service runs eight times each Sunday between Nottingham and Mansfield Woodhouse and return.[6]
Just north of Shirebrook station is a junction with a freight branch line that was used for coal traffic to High Marnham power station viaWarsop,Edwinstowe andOllerton. Following closure of the power station the line is disused but has been kept open and fully maintained as a test track for driver training.[8]In mid-2009Nottinghamshire County Council commissioned a feasibility study to consider a plan to extend the Robin Hood Line along this route by extending the current hourly service betweenNottingham andMansfield Woodhouse to Ollerton, calling at Shirebrook, Warsop and Edwinstowe (forCenter Parcs Sherwood Forest holiday resort). Nottinghamshire CC have remained keen on the idea, and met with the rail minister Claire Perry in March 2016 to press for the scheme to be adopted. The new line would be about 6 miles (9.7 km) long, but as much of it is used for driver training, only about 2 miles (3.2 km) of new track would be required, and the infrastructure is still in good condition.[9]A report produced for Nottinghamshire CC in February 2016 suggested that the likely costs of reinstatement, including the rebuilding of the three stations, would be between £18.9M and £24.5M, with signalling accounting for more than half of that figure.[10] Operating costs were estimated to be some £1.6M per year, with revenue from fares expected to be a little over half of that, and the rest to be found from subsidies.[11] A condition of the awarding of a new East Midlands franchise for operating the line in 2019 was that the operator was required to produce a business case for the extension to Ollerton.[12]
There are also plans to reinstate passenger trains over the freight-only line fromKirkby-in-Ashfield to the closedPye Bridge railway station on theErewash Valley line. The line, which has been named the Maid Marian line, has been championed by Ashfield District Council, as it would greatly improve access to the proposed Toton HS2 station for residents in the area. In February 2020, they commissioned a public consultation on the idea,[13] and in November 2020 submitted a bid for the second round of the government'sRestoring Your Railway fund, to cover the cost of a feasibility study. The project was one of fifteen schemes which were successful in obtaining such funding.[14]