Revesby | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Southbound view of the station entrance, building and platform, December 2012 | ||||||||||||||||||||||||
| General information | ||||||||||||||||||||||||
| Location | Blamey Street,Revesby | |||||||||||||||||||||||
| Coordinates | 33°57′09″S151°00′53″E / 33.95243889°S 151.0148194°E /-33.95243889; 151.0148194 | |||||||||||||||||||||||
| Elevation | 17 metres (56 ft) | |||||||||||||||||||||||
| Owned by | Transport Asset Manager of New South Wales | |||||||||||||||||||||||
| Operated by | Sydney Trains | |||||||||||||||||||||||
| Line | East Hills | |||||||||||||||||||||||
| Distance | 20.96 kilometres (13.02 mi) fromCentral | |||||||||||||||||||||||
| Platforms | 4 (2 island) | |||||||||||||||||||||||
| Tracks | 4 | |||||||||||||||||||||||
| Connections | ||||||||||||||||||||||||
| Construction | ||||||||||||||||||||||||
| Structure type | Ground | |||||||||||||||||||||||
| Accessible | Yes | |||||||||||||||||||||||
| Other information | ||||||||||||||||||||||||
| Status |
Staffed: 6am to 10pm
| |||||||||||||||||||||||
| Station code | RSY | |||||||||||||||||||||||
| Website | Transport for NSW | |||||||||||||||||||||||
| History | ||||||||||||||||||||||||
| Opened | 21 December 1931 | |||||||||||||||||||||||
| Rebuilt | April 2013 | |||||||||||||||||||||||
| Electrified | Yes | |||||||||||||||||||||||
| Passengers | ||||||||||||||||||||||||
| 2023[2] |
| |||||||||||||||||||||||
| Services | ||||||||||||||||||||||||
| ||||||||||||||||||||||||
| ||||||||||||||||||||||||
Revesby railway station is a heritage-listed railway station located on theEast Hills line, serving theSydney suburb ofRevesby. It is served bySydney Trains'T8 Airport & South Line services.

Revesby station opened on 21 December 1931 when theline was extended fromKingsgrove toEast Hills. In 1956 acrossing loop was opened.[3][4]
On 9 December 1985, the line from Revesby to East Hills was duplicated with a new track laid to the north of the existing one.[5] The line from Kingsgrove to Revesby was duplicated around the same time.[6]
TheRail Clearways Program saw the station's role change significantly, with plans to considerably boost capacity of the East Hills line by creating two centre turnbacks at the station to replace a side turnback at East Hills, and quadruplicating the line from Kingsgrove to Revesby.
In 2006, construction commenced on a second island platform and a replacement footbridge. Platform 3 opened in December 2008, as the main platform to the west. The existing Platform 2 became a centre turnback with only a few services initially using the facility.[7] In October 2009, a new timetable was introduced, and Revesby replaced East Hills as the major intermediate terminus.
In April 2013, as part of the quadruplication of the line from Kingsgrove to Revesby, Platform 4 opened.[8]
| Platform | Line | Stopping pattern | Notes |
| 1 | services toCentral & theCity Circle via theAirport 13 weekday morning peak services to Central & the City Circle viaSydenham | limited all stations services to City Circle via Airport | |
|---|---|---|---|
| 2 | terminating services to & fromCentral & theCity Circle via theAirport | [9] | |
| 3 | terminating services to & fromCentral & theCity Circle via theAirport and late night Macarthur via Glenfield services | [9] | |
| 4 | services toMacarthur 8 weekday evening peak services toCampbelltown | [9] |
U-Go Mobility operates five bus routes via Revesby station, undercontract toTransport for NSW:
Revesby station is served by oneNightRide route:
