Rashtreeya Vidyalaya Road is an elevated interchange metro station on the north–south corridor of theGreen Line and the east–west corridor of theYellow Line ofNamma Metro serving the 5th and 8th Block of Jayanagar area ofBangalore, India. It was opened to the public on 18 June 2017.[1]
TheYellow Line is operational from10August 2025 and has been officially inaugurated by Prime MinisterNarendra Modi[2][3][4][5][6] instead of May 2025[7][8][9] which was announced by theNamma Metro Managing Director, Maheshwar Rao, previously mentioned byKarnataka Deputy Chief Minister and Bengaluru Development MinisterD. K. Shivakumar and with four trainsets which will be ready for operations after arriving fromTitagarh Rail Systems in Kolkata.
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the terminal metro station (Rashtreeya Vidyalaya Road) along the 6.340 km (3.9 mi) km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km (11.7 mi)Yellow Line of Namma Metro. On 16 May 2017,HCC-URC CementationJV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[10] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
Rashtreeya Vidyalaya Road track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 2 Southbound | Towards →Silk Institute Next Station:Banashankari | |
| Platform 1 Northbound | Towards ←Madavara Next Station:Jayanagar | |
| Island platform |P1 & P3 doors will open on the left | ||
| Platform 3 Southbound | Towards →Delta Electronics Bommasandra Next Station:Ragigudda | |
| Platform 4 Northbound | Towards ← Train Terminates Here | |
| Side platform | Doors will open on the left | ||
| L2 | ||
Some of this metro station pictures are shown below:-
There are 3 Entry/Exit points – A, B and C. Commuters can use either of the points for their travel.