This article needs to beupdated. Please help update this article to reflect recent events or newly available information. Last update: 2015(April 2021) |
| Pune Monorail | |
|---|---|
| Overview | |
| Owner | N/A |
| Locale | Pune,Maharashtra |
| Transit type | straddle-beamMonorail |
| Number of lines | 2 (planned) |
| Number of stations | 18 (planned) |
| Daily ridership | 71,557 (Estd.) |
| Chief executive | N/A |
| Headquarters | N/A |
| Operation | |
| Began operation | N/A |
| Operator(s) | N/A |
| Number of vehicles | 15 |
| Train length | N/A |
| Headway | 3 minutes |
| Technical | |
| System length | 52 km |
| Track gauge | N/A |
| Electrification | 750 VDC |
| Average speed | 30 km/h (19 mph) |
| Top speed | 80 km/h (50 mph) |
Pune Monorail refers to several proposed monorail system for the city ofPune,India. As of 2024, none have come to fruition, with thePune Metro opening in 2022 instead.
ThePune Municipal Corporation decided to construct a monorail system to reduce road congestion and the number of private vehicles along the route. The monorail will be taken up by thePune Municipal Corporation.
There are 3 lines proposed to be built:[1]
The first monorail line will run along the proposed High Capacity Mass Transit Route (HCMTR) project. Length of this corridor will be 30 km[2]
Warje toKharadi, 22 km long route.
In 2024, a monorail was proposed for theThorat Udyan park inKothrud, Pune.[3] The project was suspended in 2024 before construction started.[4]