| Probolinggo–Banyuwangi Toll Road | |
|---|---|
| Jalan Tol Probolinggo–Banyuwangi | |
| Probowangi Toll Road | |
| Route information | |
| Part of | |
| Maintained by PT Jasa Marga Probolinggo Banyuwangi (JPB) | |
| Length | 163.83 km (101.80 mi) |
| Status | Under construction |
| Major junctions | |
| Northwest end | Probolinggo |
| Major intersections | |
| Southeast end | Port of Ketapang |
| Location | |
| Country | Indonesia |
| Provinces | East Java |
| Major cities | |
| Highway system | |
Probolinggo–Banyuwangi Toll Road (Probowangi Toll Road) is acontrolled-accesstoll road inEast Java. The toll road will connectProbolinggo Regency,Situbondo Regency andBanyuwangi Regency. The toll road will be integrated withPort of Ketapang to allow crossing from Java toBali. The toll road is the final phase ofTrans-Java Toll Road withPort of Merak on the western end. It is currently under route planning phase, but the construction of the first phase of this toll road was expected to be operational around 2024.[1]
The groundbreaking for the first section of the toll road was done on 6 February 2023 by theMinister of Public Works and Housing,Basuki Hadimuljono with expectations that the first phase will be operating in 2024.[2]
The toll road is divided into 6 sections: