| Syama Prasad Mookerjee Port | |
|---|---|
Container shipMV Chana Bhum berthed at Berth No. 3 of Netaji Subhas Dock | |
![]() Interactive map of Syama Prasad Mookerjee Port | |
Native name | কলকাতা বন্দর |
| Location | |
| Country | India |
| Location | Kolkata, West Bengal, India |
| Coordinates | 22°32′46″N88°18′53″E / 22.54611°N 88.31472°E /22.54611; 88.31472 |
| UN/LOCODE | INCCU[11] |
| Details | |
| Opened | 1870; 155 years ago (1870) |
| Operated by | Syama Prasad Mukherjee Port Authority |
| Owned by | Syama Prasad Mukherjee Port Authority,Ministry of Ports, Shipping and Waterways,Government of India |
| Type ofharbour | Coastal breakwater, riverine, large seaport |
| Size | 4,500 acres (18 km2)[1] |
| No. ofberths | 34 (Kolkata)[2] 17 (Haldia)[3] |
| No. ofwharfs | 86 |
| Draft depth | Kolkata: 8.5 metres (28 ft) Haldia: 9.1 metres (30 ft) |
| Employees | 3,600[1] |
| Main trades | Automobiles, motorcycles and general industrial cargo including iron ore, granite, coal, fertilizers, petroleum products, and containers Major exports: Iron ore, leather, cotton textiles Major imports: Wheat, raw cotton, machinery, iron & steel |
| Stacking area | 134722 sqm |
| Water depth | 12.5 metres (41 ft)(KDS and HDC) |
| Statistics | |
| Vessel arrivals | 3263 (2023–24)[4][5] |
| Annual cargotonnage | 66.445 million tonnes(2023–24)[6][7] |
| Annualcontainer volume | 804,579TEUs(2024–25)[8] |
| Passenger traffic | 1,310(2023–24)[9] |
| Annualrevenue | ₹3,227.67 crore (US$380 million) (2023–24)[10] |
| Net income | ₹501.73 crore (US$59 million) (2023–24)[6][10] |
| Website www | |
ThePort of Kolkata, officiallySyama Prasad Mookerjee Port (SPMP orSMP, Kolkata), is the only riverine major port in India,[12] in the city ofKolkata, West Bengal, around 203 kilometres (126 mi) from the sea.[13] It is the oldest operating port in India[14] and was constructed by theBritish East India Company.[15] Kolkata is a freshwater port with no variation in salinity.[16] The port has two distinct dock systems – Kolkata Dock System andHaldia Dock Complex.
In the 19th century, the Kolkata Port was the premier port inBritish India. From 1838 to 1917, the British used this port to ship off over half a million Indians from all over India – mostly from theBhojpur andAwadh — and take them to places across the world, such as Latin America and Africa asindentured labourers. Afterindependence, the port's importance decreased because of factors including thePartition of Bengal (1947), reduction in the size of the porthinterland, and economic stagnation ineastern India.
It has a vast hinterland comprising the entire North East of India includingWest Bengal, Bihar,Jharkhand, Uttar Pradesh,Madhya Pradesh, Assam, North East Hill States and two landlocked neighbouring countries namely,Nepal andBhutan and also theAutonomous Region of Tibet (China). With the turn of the 21st century, the volume of throughput has again started increasing steadily. As of March 2018, the port is capable of processing annually 650,000 containers, mostly from Nepal, Bhutan, and India's northeastern states.[15]
In the early 16th century, Since the arrival of thePortuguese, who established the first European contact withBengal, customs duties collected from trading settlements upstream of theHooghly River heralded a change in the navigational system of theGanges. The prosperousSaptagram port at the confluence of the Saraswati andBhagirathi River was becoming increasingly impassable for ocean-going cargo ships. At this time, the Portuguese first used the present location of the port to anchor their ships, since they found the upper reaches of the Hooghly river, beyondKolkata, unsafe for navigation. By the end of the 16th century, large Portuguese ships were anchored inBetor. Betor was a place on the outskirts of Kolkata. From Saptagram (Santgao) the goods were ferried by small ships and loaded onto larger ships. In 1570 AD, the Portuguese shifted their trading post from Saptagram toHooghly, a few miles downstream. Soon Saptagram was replaced by Hooghly as the sea outlet of the region. Hooghly maintained its importance throughout the 17th century. A few decades later, after the Portuguese were driven out by theMughals in 1632 AD, theDutch and theEnglish established their trading posts here. But, the trade of Hooghly further downstream, especially as far asSutanuti andGobindpur, encouraged the expansion of smaller trading centers and settlements into larger scale activities.[17]
Kolkata was a small river port inhabited by weavers and artisans before it was developed as a center for maritime trade by theBritish East India Company. The port on the Hooghly shore acted as a catalyst in the transformation of thecity of Kolkata from a small weaving settlement to a major center ofmaritime trade inEast India.Job Charnock, an employee and administrator of theBritish East India Company, is believed to have founded a trading post at the site in 1690. Even before settling in Kolkata, the British knew that among the navigable areas of theHooghly River, the deepest water area is along the eastern bank fromGobindpur toGarden Reach and was easily navigable by large sea-going vessels. Since the area was situated on the river with jungle on three sides, it was considered safe from enemy invasion. From the mid-eighteenth century the growth of Kolkata's port was accelerated by the decline of the Mughal-era major ports of Hooghly on Hooghly River and Surat on the western coast.[17][18]

In the earlycolonial period, the main purpose of the port administration under the company's naval office, headed by a master attendant, was to provide pilotage services to ocean-going vessels. The Master Attendant also regularly conducted river surveys to report on the navigability of the river. The port's lack of docking facilities became a particular concern from the mid-eighteenth century, as ships were taken toBombay for repairs. In 1790, the first dock was built near Bankshall Ghat. Already in 1781, Colonel Watson was granted a site on the southern boundary of the harbor to build a floating dock. Watson set up a marine yard at Kiddirpor and also began construction of afloating dock in 1781, but was forced to abandon the project when legal disputes arose. Watson subsequently turned to shipyards and built a small number of ships before his retirement from the business. After Watson several steps were taken to establish shipbuilding factories in Kolkata, but none of them were comparable to the shipbuilding activities of Parsi Enterprises in Bombay.[17]
In the 1820s, several plans were made to build floating docks inKolkata andDiamond Harbour, but none of them materialised. When the disastrous cyclone of 1842 caused extensive damage to ships anchored in Kolkata harbour, the issue of dock construction came into discussion again. But modernization of the Port of Kolkata was overshadowed by a failed attempt to establish a new port (Port canning) onMatla River in the 1860s. Port canning scheme is formulated from an alternative thought of the entrepreneurs. From a business point of view, they believed that river silting problems would lead to the premature death of the Port of Kolkata, just as the Port of Saptagram on the Hooghly River had died three hundred years earlier. But Kolkata became a very important city for the British, so they abandoned the plan to establish a port on Matla River. To bring more efficiency to the management of the Port of Kolkata, the government was active in setting up the Port Trust, which provided a solid base for the British Empire's trade in India.[17]

After slavery was abolished in 1833, there was a high demand for labourers on sugar cane plantations in the British Empire. From 1838 to 1917, the British used this port to ship off over half a million Indians from all over India – mostly from theHindi Belt (especiallyBhojpur andAwadh) — and take them to places across the world, such asMauritius,Fiji, South Africa,Trinidad and Tobago,Guyana,Suriname, and otherCaribbean islands asindentured labourers. There are millions ofIndo-Mauritians,Indo-Fijians, andIndo-Caribbean people in the world today.[17]



As Kolkata grew in size and importance, merchants in the city demanded the setting up of a port trust in 1863. The disastrous cyclone of 1864 caused extensive damage to Kolkata port and the city of Kolkata. During this time ships anchored in Kolkata Harbor were damaged and destroyed. According to the then documents published by the British rulers, at that time the damage in the storm in the city of Kolkata alone exceeded 99 thousand rupees. Belvedere Estate, Judge's Court, European Lunatic Hospital, and many famous institutions of Calcutta were destroyed in the violence of nature. TheHooghly River was witnessing high tides up to a height of about 40 feet (12 m). After this incident there was a strong demand for the construction of a permanent dock. The colonial government formed a River Trust in 1866, but it soon failed, and administration was again taken up by the government. Finally, in 1870, the Calcutta Port Act (Act V of 1870) was passed, creating the offices of Calcutta Port Commissioners. At that time Calcutta port had only four jetties and one wharf for unloading cargo, which could berth 52 ships and had a total capacity of 48,000 tons. In 1871–72, the number of jetties had increased to 6, with a berth of 143 ships and a cargo capacity of 222,000 tons. The length of the wharf also increases significantly. Commodities such as crops, seeds and raw materials and mainly jute products were moved through this wharf. In the 1870s, rapidly increasing tea exports fromAssam and North Bengal necessitated the construction of a warehouse onStrand Bank Island.[17]

A wet dock was set up atKidderpore (Khidirpur) in 1892. This was the result of persistent demands by the merchant community of Kolkata. As cargo traffic at the port grew, so did the requirement of more kerosene, leading to the building of a petroleum wharf at Budge Budge in 1896. The Khidirpur Dock II was completed in 1902. During the twenty years before theWorld War I, a remarkable development was observed in the import-export sector through the Port of Kolkata.Coastal trade also developed significantly, particularly in the export of coal. After thepartition of Bengal in 1905, the government ofEastern Bengal and Assam developedPort of Chittagong as a rival to Kolkata, but it was not very fruitful. In 1925, the Garden Reach jetty was added to accommodate greater cargo traffic.[17]
Although hampered by the Great Depression during the period between the twoworld wars, the modernization of the Port of Kolkata also took place along with the development of modern industries. A new dock, named King George's Dock, was commissioned in 1928 (it was renamed Netaji Subhash Dock in 1973).[17][18] Though the port was conceived to be a commercial port and gateway ofeastern India, the port played a very important role in theSecond World War. It wasbombed[19] twice by theJapanese forces.[17]
The port facilities were devalued during theSecond World War, but the Port of Kolkata was revived by economic changes afterIndia's independence. TheFirst Five Year Plan called for the acquisition of new vessels such as dredgers,survey vessels,dock tugs, anchor vessels, light vessels and launches for Port of Kolkata along with other ports in India. TheHaldia Dock project was initiated in theThird Five Year Plan to ease the pressure on the Port of Kolkata. The Commissioners for the Port of Kolkata were responsible for the port till January 1975 when Major Port Trusts Act, 1963, came into force. The port is now run by a board of trustees having representatives from the Government, Trade Bodies, various Port Users, Labour Unions and some nominated members. TheFarakka Barrage was designed to divert 1,800 cubic meters per second (64,000 cu ft/s) of water from theGanges into theHooghly River to remove silt from Kolkata harbor without the need for regular mechanicaldredging. The barrage, about 2,304 meters (7,559 ft) long, began operations on 21 April 1975. After commissioning of the project it was found that the water flow diverted from the Farakka Barrage was not sufficient to satisfactorily desilt the river.[20] On 12 January 2020, the port was renamed to Syama Prasad Mookerjee Port by Prime MinisterNarendra Modi on the occasion of 150 years of operation of Kolkata Port atNetaji Indoor Stadium.[21]
The port is part of the21st Century Maritime Silk Road that runs from the Chinese coast via theSuez Canal to the Mediterranean, there to the Upper Adriatic region ofTrieste with its rail connections toCentral and Eastern Europe.[22][23][24]
The Kolkata Port Trust (KoPT) manages two separate dock agglomerations, the Kolkata Dock System (KDS) and the Haldia Dock Complex (HDC). These two dock systems are located on the banks of theHooghly River, giving the port the distinction of being India's only riverine major port.[25]
It is situated on the left bank of theHooghly River at about 203 km (126 mi) upstream from the sea. Thepilotage station is at Gasper/ Saugor roads, 145 Kilometres to the south of the KDS (around 58 km from the sea). The system consists of Khidirpur Dock (KPD), Netaji Subhash Dock (NSD), Budge Budge River Mooring (BB), Diamond Harbor Anchorage, Sagar Anchorage and Sandheads Anchorage. This dock system mainly servescontainer ships andbarges. Among the docks and moorings in the Kolkata dock system, Khidirpur dock has the lowest water depth, while the Budge Budge river mooring has the highest water depth. Apart from this, there are around 80 majorriverine jetties, and many minor jetties, and a large number of ship breaking berths.[26]
Vessels to enter Khidirpur Dock (KPD) and Netaji Subhash Dock (NSD) of the Kolkata Dock System first wait for tides at the anchorage at Nazirganj Flats, north ofGarden Reach. 5 ships can be anchored together in this anchorage. When the water level of the river reaches the level of the Kolkata Dock System (KDS) water level due to tidal action, the ships waiting at the anchorage enter Khidirpur Dock (KPD) and Netaji Subhash Dock (NSD) through lock-gates.[25][27]

Kidderpore Dock has a total of 18 berths, including 17 multipurpose berths and 1 berth for passenger ships including cargo; 6Buoys /Moorings and 3Dry Docks. Berths are identified by numbers, which can range from 1 to 29. The berths have uneven water depth, with a minimum of 7.4 metres (24 ft) at berth No. 29 and a maximum of 9.2 metres (30 ft) at berth No. 8.[28] Kidderpore Dock is divided into two parts, which are KDP-1 (West) and KDP-2 (East). Out of total 18 berths, KDP-1 consists of 10 berths and KDP-2 consists of 8 berths. These two parts – KDP-1 and KDP-2 – are separated by abascule bridge. The dock's quays have a combined length of 2,956 meters (9,698 ft), of which KDP-1 (West) is 1,728 meters (5,669 ft) and KDP-2 (East) is 1,228 meters (4,029 feet). The dock is connected to the shipping channel –Hooghly River, through alock gate. A section of the dock between the lock gate and KDP-1 is the "tidal basin"; dry docks are connected to this basin. Ships enter the dock through a lock gate. The lock barrel is 176.8 metres (580 ft) long and 24.4 m (80 ft) wide. The depth in front of the lock gate is about 2.9 metres (9 ft 6 in) to 3 metres (9.8 ft). Accordingly, vessels with a maximum length of 157 meters (515 feet) and a maximum width of 21.35 meters (70 feet) are able to enter the dock. Buoys/moorings installed within the docks provide support to the movement of ships. Kidderpore Dock has several bends, and no nightnavigation; as a result the ships operate only during the day.[25][27]
Netaji Subhas Dock (NSD) has a total of 10 berths, including 1 heavy lift berth, 4 dedicated container berths, 1 liquid cargo berth and 4 multipurpose berths; 2Buoys /Moorings and 2Dry Docks. Berths are identified by numbers, which can range from 1 to 14. The berths have uneven water depths, with a minimum of 7.1 meters (23 ft) at berth No. 1 and a maximum of 9 meters (30 ft) at berth No. 3.[29] The dock is connected to the shipping channel –Hooghly River, through alock gate. 2 Buoys/moorings within the docks provide support to the movement of ships.[25][27]
Container ships are mainly handled through this dock, and most of the containers of the Port of Kolkata are transported. There is acontainer terminal at the dock, which consists of a total of 5 berths – No. 3, No. 4, No. 5, No. 7 and No. 8 berth. The shortest berths in the terminal in terms of length is berth No. 4, which is 181 meters (594 ft) long and capable of handling ships up to 565 ft (172 m) long; And the longest is Berth No. 8, which is 225 meters (738 ft) long and capable of handling ships up to 507 ft (155 m) long.[29][27]
Budge Budge River Mooring or Budge Budge Petroleum Wharves is one of the earliest cargo handling facilities built on theHooghly River, which is still in operation today. It consists of 6 oil (petroleum)Wharves. Wharves are identified by numbers, which can range from 1 to 8 (except numbers 4 and 6). The water depth at the Wharves is uneven, with a maximum of 13.3 m (44 ft) at berth No. 1 and a minimum of 7.9 m (26 ft) at berth No. 8. The maximum size of vessel that can be accommodated is 620 feet (190 m) in length at the No. 1 and No. 8 Wharves.[30]

The Haldia Dock Complex is situated at around 60 kilometres (37 mi) away from the pilotage station. It is developed as a subsidiary port system of the Kolkata Dock System inKolkata. The maximum water depth in this Dock Complex is 12.5 meters (41 ft), which provides the ability to anchor ships up to 277 meters (909 ft) long. It is connected to the deep sea by the Western Channel, with an average depth of 8.4 meters (28 ft); therefore, the dock area is capable of anchoring ships up to 230 meters (750 ft) long.
The complex consists of a dock, oil and barge jetty and Haldia anchorage. The dock complex has a total of 14 berths and 3 oil jetties; Berths are inside docks with lock-gate and jetties are located on theHooghly River.[31] The berths of the impounded dock include – 6 dry bulk cargo berths, 3 liquid cargo berths, 3 multipurpose berths and 2 dedicated container berths.[31] Berths are identified by numbers, which can range from 2 to 13. The berths (impounded dock) have uneven water depth, with a minimum of 10 meters (33 ft) in berths No. 2 and No. 10, and a maximum of 12.5 meters (41 ft) in berths other than No. 2 and No. 10. The dock is connected to the Hooghly River, the shipping channel, through alock-gate.
The jetties on theHooghly River mainly transport liquid products —crude oil, POL products,naphtha,liquefied petroleum gas (LPG) and edible oil. These jetties are known as Haldia Oil Jetty, and are identified byRoman numerals. The water depth is 10 m (33 ft) at the first (HOJ-I) and second (HOJ-II) oil jetties, and 12.5 m (41 ft) at the third (HOJ-III) oil jetty. Recently, a fourth oil jetty, known as Outer Terminal 2, has been constructed between the Dock's Approach Jetty and the Second Oil Jetty (HOJ-II); the water depth at the jetty is 9 m (30 ft). Outer Terminal 1 (OT-1) is located upstream of the third oil jetty (HOJ-III) for the transportation of dry bulk cargo; the jetty has a water depth of 8.5 meters (28 ft) and is capable of anchoring vessels up to 8 metres (26 ft) in draft. Haldia Anchorage is used forlash vessels.
| Dock | Dry Dock Number | Size |
|---|---|---|
| Netaji Subhas Dock | 1 | 172.21 metres (565.0 ft) x 22.86 metres (75.0 ft) |
| 2 | 172.21 metres (565.0 ft) x 22.86 metres (75.0 ft) | |
| Kidderpore Dock | 1 | 160.02 metres (525.0 ft) x 19.5 metres (64 ft) |
| 2 | 142.95 metres (469.0 ft) x 19.5 metres (64 ft) | |
| 3 | 102.1 metres (335 ft) x 14.63 metres (48.0 ft) |
KoPT has the largestdry dock facility in India. These dry docks cater to the diverse repair and maintenance needs of the vessels calling on the Eastern Ports of India. In addition, shipbuilding facilities are also available in these dry docks. All the dry docks are inside the impounded dock system. There are five dry docks of which three are in Kidderpore Dock and two are in Netaji Subhas Dock.[13][32] Dry Dock No. 1, Dry Dock No. 2 and Dry Dock No. 3 of Kidderpore Dock have 184, 138 and 125 kill blocks respectively, and Dry Dock No. 1 and Dry Dock No. 2 of Netaji Subhash Dock have 170 and 175 kill blocks respectively;keel blocks hold the ship in place during repairs.[32]

There is a fully-fledged repair workshop including Diesel Engine Overhauling Unit, Structural Shop, Heavy and Light Machine Shop, Forging Shop, Electrical Shop and a Chain Testing/Repair Shop with 2500 KN capacity Tensile Compression Testing Machine to support various activities in the dry dock.[32] Electric Level LuffingCranes of 5 tonne and 7 tonne capacities are used at Dry Dock No. 1 and No. 2 of Kiddirpore Dock respectively, operating area radius of which area 20 m (66 ft) and 25.42 m (83.4 ft) respectively. 4 cranes are used at Netaji Subhash Dock, which includes 1 Electric Level Luffing Crane and 3 Electric Cranes. The Electric Level Luffing Crane has a capacity of 25 tons and a operating area radius of 15.25 m (50.0 ft); on the other hand, 2 of the electric cranes have a capacity of 3 and 6 tons and the other is of 3 ton capacity.[32]

The port has a 232 kilometers (144 mi) longshipping channel. Most ships navigating the Channel require a pilot, and the sharp bends andsubmerged Sandbars of the Channel require the assistance oftugboats for larger ships. The channel extends from the Sandheads area of theBay of Bengal to the Khidirpur Docks of the Kolkata Dock System in thecity of Kolkata; in the 87 km (54 mi) long stretch from the Sandheads to the Sagar Road, where vessels are managed through the Syama Prasad Mukherjee Port Authority's Vessel Traffic Management System. The depth of water in the channel is higher during monsoon than summer.[27]
Port of Kolkata has two entrances from the sea, one is the Eastern Channel and the other is the Western Channel. At present the eastern channel is used for ships bound forKolkata, while the western channel is used for navigation by ships bound forHaldia. The Eastern Channel is longer than the Western Channel (more than twice), so this channel has the most submerged Sandbars. Notable submerged Sandbars in the Eastern Channel are Sankrail Sandbar, Baj Baj Sandbar, Royapur Sandbar, Falta Sandbar, Nurpur Sandbar, Rangafala Sandbar, Korapara Sandbar, Bedford Sandbar (upper and lower) and Long Sandbar (upper and lower);[33][34] natural depth of water atFalta is 3 meters (9.8 ft). The Eastern Channel is divided into several smaller channels; smaller channels are mainly divided by submerged Sandbars.[34] The offshore portion of the Eastern Channel is known as the Gaspar Channel, which has a minimum natural depth of 7 meters (23 ft), and the portion of theHooghly River that extends from the Sagar Road to Diamond Harbor is divided into two smaller channels – the Bedford Channel and the Rangafala Channel. The Western Channel is divided into three main smaller channels, namely Eden Channel, Upper and Lower Jellingham Channel and Haldia Channel.[33][34] Balari Channel is situated upstream of Haldia Channel.[34] The Balari Channel was formerly navigable, serving as a link between the Eastern Channel and the Western Channel; but in the latter part of the last century it was declared unnavigable and abandoned by the port authority due to excessive siltation.[34]
The depth of the channel depends on the flow of water in theHooghly River. Channel depth is not equal at all locations due to the presence ofsubmerged Sandbars. The channel is 50 m (160 ft) deep at Sandheads and 9 m (30 ft) to 10 m (33 ft) deep at Sagar Road.[27] The minimum depth of the Eastern Channel up toKolkata is 3 m (9.8 ft). At high tide the depth of the channel is more than 8.5 m (28 ft); While ships with a maximum draft of 8.5 meters (28 ft) and a minimum draft of 5.4 meters (18 ft) are able tonavigate. The 110 kilometres (68 mi) long channel – Western Channel – up toHaldia has a minimum depth of 4.3 m (14 ft) and a minimum width of 345 m (1,132 ft). At high tide the depth of the Western Channel exceeds 9 m (30 ft); While vessels with a maximum draft of 9 meters (30 ft) and a minimum draft of 7.6 meters (25 ft) are able tonavigate.[35]
| Depth | Kolkata | Diamond Harbor | Sagar Road | Haldia | Sandheads | |
|---|---|---|---|---|---|---|
| Natural depth | Minimum | 3 metres (9.8 ft) | 5.3 metres (17 ft) | 6.4 metres (21 ft) | 5.5 metres (18 ft) | 50 metres (160 ft) |
| Depth during tides | Maximum | 8.5 metres (28 ft) | 9.5 metres (31 ft) | 10 metres (33 ft) | 9.1 metres (30 ft) | 50 metres (160 ft) |
| Average | 7.2 metres (24 ft) | 8.4 metres (28 ft) | 50 metres (160 ft) | |||

Due to the constraints of the river (likesilting,sandbars etc.) no seagoing vessel above 200GT is allowed to navigate without a qualifiedpilot of the Kolkata Port Trust. The total pilotage distance to KDS is 223 kilometres (139 mi), comprising 148 kilometres (92 mi) in river and 75 kilometres (47 mi) in sea, and for HDC is 121 kilometres (75 mi), comprising 46 kilometres (29 mi) in river and 75 kilometres (47 mi) in sea. The tides in the river create obstacles to the movement of ships to the port. At spring tides, tidal waves create pressure with height that makes it difficult for a ship to stay or anchor in the river. The tidal rise in the river varies from 4.2 kilometres (2.6 mi) to 6.5 kilometres (4.0 mi) duringspring tides. Ships are sheltered at the docks during high tides or spring tides. TheEastern Channel Light Vessel's position for navigation is 21°03'03.12" North Latitude and 88°11'30" East Longitude, and the Western Channel Light Vessel's position is 21°05'03.09" North Latitude and Longitude 87°50" '215.95" East Longitude.[37]
All vessels approaching Sandhead in the vicinity of the Eastern Channel Light Vessels communicate with the pilot station atSagar Island, designated "Sandheads Pilot" and "VTMS Control" on channels 16 and 68, and should not sail north of latitude 21°00'N without advice. For their journey from the Sandheads to the Sagar and pilot boarding points in Auckland, all vessels are provided with remotepilotage by VTMS guidance. Pilotage upstream of 21°39'02.93" N latitude is compulsory for all ships of 200 GRT and more.[37]
A pilot vessel/station is maintained at Sagar Road. The river pilot takes over the ship from Middleton Point in the channel and proceeds up the river. On arrival atKolkata (Garden Reach), the River Pilot hands over the handling of the vessel to a Harbor Pilot, who takes the vessel inside thelocks of KPD or NSD or to river mooring as required. From the lock, the vessel is guided to a designated berth by a dock pilot. The process is reversed to reach the sea from the dock. At Haldia, the pilot bringing the vessel from Upper Auckland hands over the vessel inside the lock to the dock pilot but for the oil jetties all vessels are moored at the jetty by the same pilot. Recommended draft changes for vessels navigating the channel occur between spring tides and low tides, and draft forecasts for inbound and outbound vessels are published by the Harbor Master (river) approximately four/six weeks in advance.[37]
All Automatic Tide Gauges in the channel are operated and maintained by the port. These tide gauges are located nearGarden Reach and Diamond Harbor on the east bank of the channel and Haldia on the west bank. For the round-the-clock recording of tidal data, which is used for the prediction of tides and preparation of tide tables bySurvey of India.[38]
A total of 500 (of which 140 are lighted)River Marks and Buoys are maintained by the KoPT. These are extremely useful in facilitating night navigation, pilotage and dredging. These lights are operated either by grid electricity, by battery or by dissolvedMarine Acetylene Gas. There is also 1 boat buoy, 30 lighted buoys and 72 unlit buoys marking the navigational channel from Sandheads to Kolkata. It has one of the longest navigational channels in the world.[38]
There are five unmanned light vessels, located south of the Sagarlighthouse. These unmannedlight-vessels help vessels navigating the channel safely from the sandheads to the Sagar. There are five unmanned light vessels on the south towards of the Sagar lighthouse are the U.G.L.F. located at 21°29′51″N and 88°06′36.5″E, L.G.L.F. located at 21°21'54" N and 088°09'34" E, Talent WK L.V. located at 21°21'54" N and 088°09'34" E, Eastern Channel L.V. located at 21°17'00" N and 088°11'25" E, and Western Channel L.V located at 21°05'002" N and 087°50'24.8" E.[27][38]
These are maintained at Akra, Moyapur, Hooghly Point, Balari, Gangra and Sagar for displaying rises of tide for the convenience of various vessels navigating, dredging and surveying in the River Hooghly. The semaphores used to display the tide level at these localities on a mast by the position of the meter and decimeter arms which were manually rotated with the rise and fall of every decimeter of tidal level. However these semaphores are no longer functional and instead, tidal levels are broadcast over VHF radio every half an hour from all the above stations except at Balari.[38]
In the wide estuary, position fixing with reference to shore objects to be viewed from the deck of a vessel, is very difficult. In 1983 KoPT introduced the Electronic Position Fixing System "Syledis" for position fixing of the vessels plying in the wide estuary of theHooghly river. The shore-based Syledis Position Fixing System was functioning round the clock with the help of the Syledis Stations located atHaldia,Raichak, Dadanpatra Bar and Frazergunj. The system was effectively used for the purpose of hydrographic survey and dredging. KoPT has now replaced the Syledis Position Fixing System by Differential GPS (Differential Global Position Fixing System). This latest state-of the art technology provides improved location accuracy of up to 10 cm.[38]
KDS Railway was set up to cater to the traffic needs for docks, warehouses in the vicinity and various public and private sidings located around the Kolkata docks system. It works as a terminal agent of Indian Railways and operationally underSealdah Division ofEastern Railway. KDS Rly has a working Agreement withEastern Railway and render services to the users on behalf of them. Though KDS railway initially had many interfaces withEastern Railway/South Eastern Railway and covered a wide range of area includingChitpur,Shalimar, andGarden Reach, at present its operation is truncated in the dock area only with the sole marshalling yard at East Dock Junction (EJC). The total track length of KDS railway is about 18 km (11 mi).[39]
It is connected withEastern Railway through theMajerhat railway station. Indian Railways bring traffic for KDS through full fledged goods trains (rakes) in the East Dock Junction (EJC), by their locomotives. Thereafter KDS railway, after necessary documentation and certain mechanical work, place the trains in the respective handling points (inside docks or private sidings), in full or installments as per operational feasibility. After completion of loading/unloading operation at Sheds/Docks/sidings etc, the rakes are hauled out and outward trains are formed at the marshalling yard (EJC). Again, after documentation, the outward rakes are dispatched by the locomotives provided byEastern Railway.[39]
HDC Railway was established to cater to the traffic demand for warehouses and sidings ofHaldia Dock Complex. HDC Railway consists of 115 kilometres (71 mi) track with 11.5 kilometres (7.1 mi) track and 2 yards. The freight trains are operated by 12 locomotives under the Railways, and have an annual freight capacity of 30 millionmetric tonnes. It is connected by fully electrified single line corridor at Gaurich withSouth Eastern Railway nearDurgachak Town railway station ofPanshkura-Haldia broad gauge railway section. This railway system has general marshalling yards and bulk handling yards.[40]
The Kolkata dock system (KDS) is connected to roads under theKolkata Municipal Corporation. Major congestion and traffic jams are seen on the narrow roads for vehicular movement in and out of the KDS. KDP and NSD are located about 10 km from the junction ofNational Highway 16 andNational Highway 19. The junction ofNational Highway 12 and Airport Road is about 25 km from the dock area. Diamond Harbor Road, Taratala Road and Garden Reach Road (Peripheral Road) are 4-lane, and have been strengthened and upgraded, but are often congested due to the simultaneous movement of local and cargo traffic.[25]
Haldia Dock Complex is directly connected toNational Highway 116 (Old, NH-41). This National Highway connects withNational Highway 16 (Old, NH-6) part ofGolden Quadrilateral atKolaghat, which making the dock complex accessible to other states of the country includingOdisha, Jharkhand.[41]
The Kolkata Dock System andHaldia Dock Complex are directly connected toNational Waterway 1, which provides the port with waterway connectivity toNorth India. This waterway transports goods directly from Port of Kolkata toVaranasi andSahebganj terminals. Besides, it is connected with the river ports of Bangladesh andNorth-Eastern Indian state ofAssam throughNational Waterway 97.[41]
In thefiscal year 2013–14, Port of Kolkata handled 41.386 million metric tons (45.620 million short tons) of cargo. This is significantly less than 53.143 million metric tons (58.580 million short tons) of cargo it handled in 2005–06. However, the number of vessels handled at Kolkata Port during 2013–2014 was the highest among allIndian Major Ports. KoPT handled 17.1% of the total number of vessels, which worked at Indian Major Ports in 2011–2012; significant improvement over 2011–12 which was 16%. During the fiscal year 2011–2012, 3183 vessels called at KoPT.[42]
The average turn around time per vessel was 4.18 days for Kolkata Dock System and 3.37 for Haldia Dock Complex.[43][44]
| Category | 2014–15 | 2013–14 | 2012–13 | 2011–12 | Unit |
|---|---|---|---|---|---|
| Containers (number) | 630,094 | 562,020 | 600,426 | 552,241 | TEUs |
| Import Cargo | 36.25 | 27.42 | 27.02 | 27.97 | millionmetric tonnes |
| Export Cargo | 10.05 | 13.96 | 12.91 | 15.28 | millionmetric tonnes |
| Passenger Traffic | 39,552 | 42,514 | 40,349 | 52,239 | |
| Number of Ships Handled | 3,230 | 3,225 | N/A | N/A |
| Category | 2014–15 | 2013–14 | 2012–13 | 2011–12 | 2010–11 |
|---|---|---|---|---|---|
| Operating Income | ₹18.68 billion (US$220 million) | ₹18.96 billion (US$220 million) | ₹14.02 billion (US$170 million) | ₹16.93 billion (US$200 million) | ₹16.07 billion (US$190 million) |
| Operating Expenditure | ₹19.36 billion (US$230 million) | ₹19.66 billion (US$230 million) | ₹17 billion (US$200 million) | ₹15.55 billion (US$180 million) | ₹14.63 billion (US$170 million) |
| Net Surplus | ₹−685 million (US$−8.1 million) | ₹−702 million (US$−8.3 million) | ₹−2.98 billion (US$−35 million) | ₹1.38 billion (US$16 million) | ₹1.44 billion (US$17 million) |