Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Port Jefferson Branch

Route map:
From Wikipedia, the free encyclopedia
Long Island Rail Road branch

Port Jefferson Branch
DE30AC #407 entersStony Brook station, pulling an eastbound train towards Port Jefferson in 2022
Overview
StatusOperational
OwnerLong Island Rail Road
LocaleNassau andSuffolk Counties,New York,USA
Termini
Stations10
Service
TypeCommuter rail
SystemLong Island Rail Road
Services
Operator(s)Metropolitan Transportation Authority
Ridership11,934,009 (annual ridership, 2023)[1]
History
Opened1854–1873
Technical
Track gauge4 ft 8+12 in (1,435 mm)
ElectrificationThird rail750 V DC (west ofHuntington)
Route map
MapShow interactive map
9.3 mi
15 km
Jamaica
"E" train​​"J" train"Z" train
Zone 3
Zone 4
Hempstead intermediate stops
14.9 mi
24 km
Floral Park
16.2 mi
26.1 km
New Hyde Park
17.3 mi
27.8 km
Merillon Avenue
18.6 mi
29.9 km
Mineola
Zone 4
Zone 7
20.4 mi
32.8 km
Carle Place
21.4 mi
34.4 km
Westbury
24.8 mi
39.9 km
Hicksville
Landia(closed)
29.1 mi
46.8 km
Syosset
Zone 7
Zone 9
31.9 mi
51.3 km
Cold Spring Harbor
34.7 mi
55.8 km
Huntington
37.4 mi
60.2 km
Greenlawn
39.6 mi
63.7 km
Northport
Zone 9
Zone 10
43.4 mi
69.8 km
Kings Park
47.1 mi
75.8 km
Smithtown
49.9 mi
80.3 km
St. James
Flowerfield(closed)
53.1 mi
85.5 km
Stony Brook
Setauket(closed)
57.5 mi
92.5 km
Port Jefferson
Wading River
Extension
Wading River
Extension
Distances shown fromLong Island City
This diagram:
Show route diagram map

ThePort Jefferson Branch is arail line and service owned and operated by theLong Island Rail Road in theU.S. state ofNew York. The branch splits from theMain Line just east ofHicksville and runs northeast and east toPort Jefferson. Several stations on the Main Line west of Hicksville are served primarily by trains bound to/from the Port Jefferson branch, so LIRR maps and schedules for the public include that part of the Main Line in the "Port Jefferson Branch" service.

The Port Jefferson Branch is the busiest branch of the LIRR, with frequentelectric service toHuntington where electrification ends, and diesel service east of Huntington continuing to Port Jefferson. The MTA also refers to the line as the "Huntington/Port Jefferson Branch" or "Huntington Branch".

Service

[edit]

Port Jefferson Branch service (as distinct from the physical trackage called the Port Jefferson Branch) extends east fromFloral Park, where theHempstead Branch separates from the Main Line. The line west of Huntington is electrified and double tracked. Electrification extends east of Huntington, past a layup track used to store electric trains, to a point between the Park Avenue and Lake Road grade crossings. East of there, the line is single-track, with a double-ended freight siding atGreenlawn, an interlocked passing siding east ofNorthport, and further interlocked sidings atKings Park,Smithtown andStony Brook passenger stations, allowing trains traveling in opposite directions to pass each other.

Electric trains on the branch operate between Manhattan (Penn Station orGrand Central) and Huntington, providing local service on the branch. Trains to theRonkonkoma Branch provide supplemental service; these usually run express, stopping only at Mineola and/or Hicksville. Additional service to Mineola is provided byOyster Bay Branch trains, and a handful ofMontauk Branch trains also stop at Mineola and Hicksville on weekdays, though the vast majority ofMontauk Branch trains that run on the Main Line do not stop. Service on the non-electrified portion of the branch between Port Jefferson and Huntington is usually provided by diesel shuttles; transfers generally occur at Huntington between diesel shuttles and electric trains to/from city terminals. During rush hours, the branch sees extra service, including direct service between stations east of Huntington andHunterspoint Avenue,Long Island City, or Penn Station.

Stations on the electrified portion that have the heaviest traffic includeMineola (Main Line),Hicksville (Main Line), andHuntington. On the non-electrified portion, the heaviest traffic tends to be to the Stony Brook station whereStony Brook University is located.

History

[edit]

The line fromHicksville toSyosset was chartered in 1853 as theHicksville and Syosset Railroad and opened in 1854. The LIRR later planned to extend toCold Spring Harbor, butOliver Charlick, the LIRR's president, disagreed over the station's location, so Charlick abandoned the grade and relocated the extension south of Cold Spring, refusing to add a station stop near Cold Spring for years. Another argument atHuntington led to the line bypassing the town two miles (3 km) to the south, though a station was built. The line was extended from Syosset past Huntington toNorthport in 1868,[3] and in 1873 the 1870-charteredSmithtown and Port Jefferson Railroad opened from a mile south of Northport toPort Jefferson,[4] turning the old line into Northport into theNorthport Branch, the result of another argument between Charlick and Northport.[5] The extension required the construction of the Kings Park andSmithtown Trestles.[6][7]

The Woodville Road Bridge in Shoreham which once carried the Wading River Extension of the branch.

The Port Jefferson Branch was extended toWading River in 1895, and became known as the Wading River Branch. The line was once slated to continue eastward and rejoin the Main Line at eitherRiverhead orCalverton. From 1905 to 1928, Wading River was also the site of aLIRR demonstration farm. The other one was east ofMedford station on theMain Line.

The grade crossing with New York Avenue in Huntington was eliminated in 1909 as that road was lowered below grade.[8]: 53  In 1910 and 1911 work was undertaken to reduce grades and eliminate sharp curves along the line between Syosset and Huntington. The project eliminated grade crossings, shortened the line by 3,300 feet (1.0 km), and provided two million yards of excavated material that could be used for the reconstruction ofJamaica station.[9]: 21–22  In 1911, the line's second track was extended from Hicksville to Cold Spring.[10]: 22  In 1985, the second track was extended from just east of Syosset to just west of Huntington to alleviate a single-track bottleneck.

The line east of Port Jefferson was abandoned in 1938. Theright-of-way is now owned by theLong Island Power Authority and used for power lines. A parallelrail trail for bicycling, running, and walking opened in 2022.[11] The Port Jefferson Branch was electrified from Mineola to Huntington Station in 1970. The formerNorthport Branch was abandoned in 1985, and theKings Park Psychiatric Center spur (see below) was abandoned in 1988.

Kings Park Psychiatric Center Spur

[edit]
The former crossing of the Kings Park Psychiatric Center spur with NY 25A, now the beginning of the Kings Park Hike and Bike Trail,

TheKings Park Psychiatric run-off (KPPC) is anabandoned spur off the Port Jefferson Branch for theKings Park Psychiatric Center. This spur started just west ofKings Park station, ran north of the station house, crossed Indian Head Road (Suffolk CR 14) and then curved north to crossNew York State Route 25A, where it ran along the western edge of the hospital property, and ended at the Hospital's coal power plant.

Thisspur was first used in 1896 forcoal andpassenger use on Sundays.[8]: 78  The route was the second-largest spur in theLong Island Rail Road system when it was first completed. The route came to an end during the late 1980s.[12] Nowadays, this abandonedroute is aright-of-way for biking and is open to thepublic today. Only small fragments of rail remain, as it most of it was removed during the demise of the complex.[13]

Electrification

[edit]

On October 19, 1970,electrification was extended 16 miles (26 km) fromMineola toHuntington, the eastern limit of electrification on the branch. This was the first major LIRR electrification project since the electrification of the Babylon Branch in 1925 between Lynbrook and Babylon. The project was completed for $69 million, and received funding from a 1967 state transportation bond issue and theUnited States Department of Transportation. With the completion of electrification to Huntington, six trains would run from electric territory on the branch in the morning, and five would return in the evening, providing direct service to Brooklyn and Penn Station without a change at Jamaica.[14]

Since then, the LIRR has aspired to extend electrification beyond Huntington. In the 1980s, the railroad prepared to extend electrification to at leastNorthport, orSmithtown, although electrification of theRonkonkoma Branch on theMain Line was seen as a higher priority, in part because the Main Line's central location inSuffolk County would benefit a larger number of people.

In December 1983, the LIRR announced that it was taking steps in the electrification of the branch, with the first step being the addition of a second electrified track from Syosset to Huntington. The second built along the south side of the existing track.[15] The second track was expected to be open in 1986. In August 1983,Long Island Lighting Company started relocating its power line along the right-of-way between these points. The following month a contract to prepare the site and to construct the roadbed for the track was awarded for $9.5 million. In December 1983, grading and construction work was expected to begin that month, and track installation was scheduled to be completed by the end of 1985. As part of the project, the 800 feet (240 m) south platform was to be extended to accommodate 12-car trains. The design of the project to Northport was completed, and preliminary designs were expected to be completed by early 1984.[16]

On August 6, 1984, a groundbreaking ceremony was held at Kings Park station for the inauguration of a project to install high-level platforms at that station in preparation of the electrification of the line from Huntington to Smithtown. Kings Park would receive high-level platforms first, with Greenlawn, Northport, and Smithtown also slated to receive them. Work was to be completed in two phases. In the first phase, expected to be completed by the end of 1984, six-car high-level platforms would be installed. These platforms would be extended to accommodate twelve-car trains in the second phase, to be done by the middle of 1985.[17]

Bruce McIver, president of the LIRR at the time, estimated in 1986 that electrification of the branch would cost $320 million, including new rolling stock. He argued that the limited funds the railroad had set aside for electrification would be better spent on other improvements, such as signal andyard upgrades near Penn Station. Financial constraints acted as another obstacle to electrification to Northport.[18] McIver also did not want to electrify the branch in a piecemeal fashion and wanted to wait until the railroad had the funds to electrify from Huntington to Port Jefferson all at once. In anticipation of electrification, from late 1985 to early 1986, the LIRR built full-length high-level platforms at all stations between Huntington and Port Jefferson. Because electrification has not occurred, these 12-car platforms are unique in the LIRR's diesel territory; the high-level platforms along theMontauk,Greenport andOyster Bay diesel branches are all much shorter. Work to install centralized traffic control between Smithtown and Port Jefferson started in fall 1974 and was completed in March 1975. This project was intended to improve safety and to increase train speed. The change allowed bidirectional service in single-track territory with the use of passing sidings.[19]

On June 9, 1986, double-tracking of the line between Syosset and Huntington was completed, and seven additional trains (two diesels and five electric) were added to the schedule.[20] The second track sped some trips by up to 15 minutes, and increased operational flexibility. The $41 million project started in September 1983 and included the widening of bridges at West Rogues Path and Woodbury Road,[21] five rubberized grade crossings, and the installation of a six-car length platform on the new second track at Cold Spring Harbor. Construction for the project required off-peak service outages starting in June 1985,[22] and its completion was delayed from fall 1985 due to delays in property acquisition in Cold Spring Harbor.[23]

Instead of electrification, the LIRR ultimately pursueddual-mode locomotives that could switch between diesel power and electric power to serve Penn Station (where diesel emissions are banned). SenatorNorman Levy said that "The people who ride the line would have just about all the positive aspects of electrification with this proposal."[24] TheLIRR's dual-mode locomotives debuted in the late 1990s, providing two round trips during weekday rush hours between Penn Station and Port Jefferson, the first time a one-seat ride was available.[25]

Proposed electrification extension

[edit]

In 2015, multiple parties renewed calls for electrification of the branch. The LIRR estimated that electrification would cost up to $18 million per track mile, so electrification of the 23 miles from Huntington to Port Jefferson could cost approximately $414 million.[26][27][28] In its 20-Year Needs Assessment, the agency lists electrification eastward as a long-term goal.[29]

In September 2018, LIRR PresidentPhillip Eng said the LIRR is still exploring the possibility of electrifying the remaining section of track between Huntington and Port Jefferson.[30]

Grade crossing eliminations

[edit]

The Port Jefferson Branch and Main Line have been known to have some of the most hazardous grade crossings in the country.[31][32] On April 28, 1998, a bridge over Herricks Road opened, replacing a grade crossing which was once "labeled the most hazardous in the United States by theNational Transportation Safety Board." The grade-crossing elimination project was initiated after an incident on March 14, 1982, when a van with ten teenagers got struck at the four-lane wide rail crossing with the crossing gates down, killing nine of them. The project took five years and cost $85 million. Work continued for a year to widen the overpass to allow for a future third track.[33]

Other crossings eliminated along the branch include Mineola Boulevard in Mineola (1930), crossings within Hicksville when the station was elevated in the early 1960s, and Charlotte Avenue in Hicksville (1973). Ten years later in 2008, the four-lane wide Roslyn Road in Mineola was eliminated in the same fashion. Several hazardous crossings still exist west of Huntington east of DIVIDE interlocking, such as Robbins Lane and Jackson Avenue in Syosset. East of Huntington,Park Avenue in Huntington andMain Street in Port Jefferson are considered quite hazardous.

The Third Track project closed the seven remaining grade crossings on the Main Line, namely those in Westbury, Mineola, and New Hyde Park.[34][35] The first two crossings that underwent elimination would be Urban Avenue in Westbury and Covert Avenue in New Hyde Park. Construction to eliminate began from February–April 2019 with the closures of both roads. On the weekend of July 20–21, 2019, the trestle carrying the three tracks was installed at Urban Avenue. After construction of retaining walls, pedestrian walkway, and the repaving of the road, Urban Avenue was officially reopened on September 5, 2019. Covert Avenue underwent the installation of a three-track trestle on the weekend of August 24–25 and reopened on October 12, 2019. New Hyde Park underwent the installation of a three-track trestle on the weekend of July 11–12, 2020, and reopened in August 2020.[34][35]

By mid-2021, Main Street in Mineola, the pedestrian crossing at Mineola's station, and 12th Street in New Hyde Park were permanently closed to pedestrian and vehicular traffic, while Willis Avenue in Mineola and School Street in Westbury received trestles, with the roads crossing underneath. From May 2020 to November 2020, School Street underwent a grade crossing elimination and reopened less than two years after a violent accident occurred involving a pick-up truck and two trains. On October 24, 2020, the stretch of the line in New Hyde Park was officially grade-separated following the permanent closure of the 12th Street crossing. By late 2020, the only remaining grade crossings on the Main Line between Hicksville and Floral Park were located in Mineola. In November 2020, Willis Avenue's elimination project began that saw its Main Line and Oyster Bay Branch crossings eliminated with the road going underneath the tracks. Main Street and the pedestrian crossing were removed shortly thereafter.[34][35]

After the Third Track Project was completed, all Main Line grade crossings from Hicksville westward were eliminated, noise from horns was reduced to the benefit of residents along the tracks, and carbon emissions from idling vehicles was eliminated.[34][35] The elimination and reopening of Willis Avenue on September 3, 2021, officially marked the completion of the grade crossing elimination aspect of the Third Track Project, and the branch being fully grade-separated west of Hicksville.[34][35]

Infrastructure improvements

[edit]

New electric yard

[edit]

Lacking a yard to store its electric trains, the branch has storage space for just three 12-car electric trainsets (at the South Side track extension east of Huntington). As a result, electric trains mustdeadhead to Huntington for rush hour service from as far away asWest Side Yard inManhattan, about 37 miles (60 km) away. A new yard for electric trains would resolve this inefficiency and allow more frequent service on the branch.

In the early 2000s, the MTA performedenvironmental studies for over a dozen potential sites for a yard betweenHuntington andSmithtown.[36] Sites beyond Huntington would require extending the electrical infrastructure, which adds expense.

Communities near the sites opposed the MTA's efforts to advance work on a new yard, arguing that the MTA was too secretive and that the increased train service and train movements would hurt their communities and decrease their quality of life. One commenter asserted that a yard would turn the communities along the line into the MTA's "storage closet" forEast Side Access. Other opponents of the plan argued that the MTA should extend electrification to Port Jefferson and use its existing diesel rail yard.[37][38]

The MTA budgeted $8 million in its 2015–2019 Capital Program for environmental studies, design work, and land acquisition for a new electric yard. (Construction would be funded in a future Capital Program.)[39][40] As of 2019[update], the MTA was also considering other options, including extending electrification and/or a second track from Huntington to Port Jefferson.[41]

In February 2022, local leaders urged the MTA to consider a Superfund site near the Port Jefferson Station—the formerLawrence Aviation Industries site—for the electric storage yard, as well as extending electrification from Huntington to Port Jefferson. The MTA has not moved forward with this plan or any others.[42][43]


Third track between Floral Park and Hicksville

[edit]
The Post Avenue Bridge nearWestbury station, which was replaced in October 2017 to accommodate a third track
Construction of new platforms at theMineola station in 2021 to accommodate the third track

To accommodate a projected increase in Long Island Rail Road ridership following completion of theEast Side Access project toGrand Central Terminal, and to expand local and reverse-peak service, a third track was built on the Main Line betweenFloral Park andHicksville.[44][45] The construction project, also known as theLIRR Expansion Project, included purchasing properties in the track's right of way, eliminating grade crossings (in conjunction withNew York State Department of Transportation), relocating existing stations, and reconfiguringMineola Station. The project was stalled by fierce opposition from the villages ofFloral Park,New Hyde Park, andGarden City,[46][47][48] which advocated that construction and the resulting increased train service will reduce the quality of life in their neighborhoods. These villages did, however, support the station improvements and the elimination of grade crossings that the LIRR has planned in conjunction with the third track, and called for the LIRR to complete them in lieu of third track expansion, but theMTA has long insisted that a third track is a necessary component of LIRR's East Side Access expansion.[49] In March 2015, LIRR president Patrick Nowakowski declared that the LIRR would not proceed with the project without the support of the local communities.[50]

Small segments of the third track already existed: one segment betweenMerillon Avenue and Mineola, built in the vicinity of Herricks Road during the grade crossing elimination project that took place in 1998,[51] and another was built during a 2014–2018 renovation project at Hicksville station, which connected Track 1 at Hicksville station to the North Siding track located about 3,000 feet (910 m) west of the station. This short segment would eventually become the eastern end of the Third Track, and already allowed for a slight increase in peak-hour service upon its completion.[52][53] The MTA had also left provisions for a third track in construction of other infrastructure along the line, such as the Mineola Intermodal Center located adjacent to Mineola station, Mineola Boulevard Bridge, Roslyn Road Underpass inMineola, and the replacement Ellison Avenue Bridge over the Main Line inWestbury.[54][55][56][57]

In January 2016,GovernorAndrew Cuomo announced a transportation improvement plan which included several million dollars in funding to restart third track development.[58][59] Governor Cuomo said that unlike previous third track proposals, his plan would involve building the third track within existing LIRR right of way, which would reduce the number of existing homes and businesses affected by installation of the third track.[60] While previous proposals would have affected around 250 properties, 80 of which were homes, Governor Cuomo's proposal would only require taking small amounts of property from 50 properties in total, including around 20 homes.[60] This reduction in properties affected was accomplished by shifting the alignments of tracks in some areas to make room for the third track within the right-of-way and building a shorter third track than previous proposals, resulting in a 9.8-mile (15.8 km) three-track segment starting at Floral Park (the easternmost station shared by the Hempstead Branch and Main Line, where the Hempstead Branch and Main Line split from a 4-track corridor into two distinct pairs of tracks), instead of the previously planned 11.5-mile (18.5 km) segment starting fromQueens Village.[58][61] Despite the promise of mitigation efforts, several local politicians denounced the governor's plan within a day of its announcement; Floral Park's mayor toldThe New York Times that "we thought this was dead and buried",[58] while New Hyde Park's mayor pledged to "fight the governor vehemently on this" and a local state senator called the governor's plan "dead on arrival."[62]

In December 2017, the LIRR awarded a contract for the project to the consortium 3rd Track Constructors for $1.8 billion, with construction beginning in 2018 and completion estimated for 2022.[63][64][65] The first part of the contract included the reconstruction of the Carle Place, Mineola, and Floral Park stations; the construction or reconstruction of six railroad crossings and underpasses; and the construction of a parking structure at Mineola station. A groundbreaking ceremony for the Third Track project was held on September 5, 2018.[66][67] All eight grade crossings in the Third Track construction area were removed by February 2021.[68]: 7  The first phase of the third track opened on August 15, 2022,[69][70] and a second phase opened on August 30.[71] The entirety of the third track was complete by October 3, 2022.[72][73]

Stations

[edit]

West ofNew Hyde Park, trips go on to terminate atPenn Station,Hunterspoint Avenue,Grand Central, orJamaica.[74] Stations east ofPort Jefferson on the formerWading River Branch were abandoned on October 3, 1938.

Zone[75]LocationStationMiles (km)
fromLong Island City[2]
Date
opened
Date
closed
Connections / notes
4New Hyde ParkNew Hyde ParkDisabled access16.2 (26.1)c. 1837Bus transportNassau Inter-County Express:n24,n25/58
Originally named Hyde Park
Garden City ParkMerillon AvenueDisabled access17.3 (27.8)1837Originally named Clowesville, then Garden City
MineolaMineolaDisabled access18.6 (29.9)1837[76]Long Island Rail Road: Ronkonkoma Branch, Montauk Branch, Oyster Bay Branch
Bus transport Nassau Inter-County Express:n15,n22,n22X,n23,n24,n27,n40,n40x
Originally named Hempstead, then Branch or Hempstead Branch
7Carle PlaceCarle PlaceDisabled access20.4 (32.8)1842[77]Bus transport Nassau Inter-County Express:n22
Originally named Carll Place
WestburyWestburyDisabled access21.4 (34.4)1837[76]Bus transport Nassau Inter-County Express:n22,n35
New CasselNew Cassel18751876
HicksvilleHicksvilleDisabled access24.8 (39.9)1837[76]Long Island Rail Road: Ronkonkoma Branch
Bus transport Nassau Inter-County Express:n20H,n22,n24,n48,n49,n78,n79,n79x,n80
Syosset
Landia1952October 3, 1973
SyossetDisabled access29.1 (46.8)1854
Woodbury1875c. 1901Replaced by Cold Spring Harbor
9West HillsCold Spring HarborDisabled access31.9 (51.3)c. 1901
Huntington StationHuntingtonDisabled access34.7 (55.8)1868Bus transportSuffolk County Transit:1
Bus transportHuntington Area Rapid Transit:H10,H20
Terminus ofelectrification
GreenlawnGreenlawnDisabled access37.4 (60.2)c. 1868Bus transport Huntington Area Rapid Transit:H30
Originally named Centreport
East NorthportNorthportDisabled access39.6 (63.7)1873Bus transport Suffolk County Transit:7
Bus transport Huntington Area Rapid Transit:H40
Originally named New Northport, then Northport East
10Kings ParkKings ParkDisabled access43.4 (69.8)1872Bus transport Suffolk County Transit:56
Originally named St. Johnsland
SmithtownSmithtownDisabled access47.1 (75.8)1873Bus transport Suffolk County Transit:5,56
St. JamesSt. JamesDisabled access49.9 (80.3)1873
Flowerfield19101958
Stony BrookStony BrookDisabled access53.1 (85.5)1873Bus transport Suffolk County Transit:51
Bus transportSBU Transit: Outer Loop, Railroad Routes 1, Railroad Route 2
East SetauketSetauket1873June 27, 1980[78]
Port Jefferson StationPort JeffersonDisabled access57.5 (92.5)January 13, 1873[79]Bus transport Suffolk County Transit:51,53,55,62
Bus transport Port Jefferson Jitney
Miller PlaceMiller Place60.5 (97.4)18981938
Rocky PointRocky Point64.4 (103.6)June 27, 1895[80][81]1938Freight house still exists as a lumber yard
ShorehamShoreham65.7 (105.6)19001938
Wading RiverWading River68.7 (110.6)June 27, 1895[80][81]1938


Bibliography

[edit]

References

[edit]
  1. ^"2023 ANNUAL RIDERSHIP REPORT".mta.info. RetrievedJune 6, 2024.
  2. ^abLong Island Rail Road (May 14, 2012)."TIMETABLE No. 4"(PDF). p. V. RetrievedAugust 4, 2022.
  3. ^"PRR Chronology, 1868"(PDF). (93.8 KiB), June 2004 Edition
  4. ^"PRR Chronology, 1873"(PDF). (100 KiB), February 2005 Edition
  5. ^Ziel, Ron; Foster, George H. (1987).Steel Rails to the Sunrise. Mattituck: Amereon House. pp. 13–14.ISBN 0-8488-0368-X.
  6. ^Keller, David; Lynch, Steven (2005).Revisiting the Long Island Rail Road: 1925-1975. Images of Rail. Arcadia Publishing.ISBN 9780738538297.
  7. ^Seyfried, Vincent F. (1975)."Part Six The Golden Age 1881-1900".The Long Island Rail Road: A Comprehensive History. Long Island: Vincent F. Seyfried. Archived fromthe original on April 19, 2015.
  8. ^abMorrison, David D. (October 28, 2013).Long Island Rail Road: Port Jefferson Branch. Arcadia Publishing.ISBN 9781439644218.
  9. ^"The Long Island Railroad Twenty-Ninth Annual Report For The Year Ending December 31st, 1910".Report of ..., Trustee[S] of the Property of the Debtor, for the Year Ended ...1949-1953. Long Island Railroad Company. 1911.
  10. ^"The Long Island Railroad Thirtieth Annual Report For The Year Ending December 31st, 1911".Report of ..., Trustee[S] of the Property of the Debtor, for the Year Ended ...1949-1953. Long Island Railroad Company. 1912.
  11. ^Borruto, Ana (June 16, 2022)."The North Shore Rail Trail — linking Port Jeff to Wading River — is done after 50 years".Greater Long Island.
  12. ^Mileposts 43-44 Kings Park (Bob Emery Map; September 1957; TrainsAreFun.com)
  13. ^Kings Park State Hospital Spur (Train Web)
  14. ^"Start New Timetable On Electrified Section".New York Daily News. October 19, 1970. RetrievedMarch 19, 2023 – via Newspapers.com.
  15. ^"Letters to the Long Island Editor; L.I.R.R.'s Plans For Electrification".The New York Times. September 2, 1984.ISSN 0362-4331. RetrievedFebruary 27, 2019.
  16. ^Goldman, Ari L. (December 4, 1983)."Amount of L.I.R.R. Fare Rise Weighed".The New York Times.ISSN 0362-4331. RetrievedFebruary 27, 2019.
  17. ^Hanrahan, Michael (August 7, 1984)."Kings Park station work begins".New York Daily News. RetrievedMarch 19, 2023 – via Newspapers.com.
  18. ^McQuiston, John T. (November 24, 1985)."Pulling the Plug on Electrification".The New York Times.ISSN 0362-4331. RetrievedJanuary 5, 2016.
  19. ^Stadler, Derek (August 16, 2016).""Port Jefferson Blues": The Smithtown Commuter Saga".Derek Stadler. Archived fromthe original on October 7, 2021. RetrievedMay 6, 2018.
  20. ^"Port Jefferson Branch Timetable Effective June 9, 1986".Flickr. Long Island Rail Road. February 27, 2019. RetrievedFebruary 27, 2019.
  21. ^"LIRR adds 7 new trains Monday".New York Daily News. June 5, 1986. p. 340. RetrievedFebruary 27, 2019.
  22. ^"LIRR halts trains for track work".New York Daily News. June 11, 1985. RetrievedMarch 19, 2023 – via Newspapers.com.
  23. ^Bleyer, Bill (June 7, 1986)."7 Trains Added to Line".Newsday. p. 17. RetrievedMarch 19, 2023 – via Newspapers.com.
  24. ^McQuiston, John T. (February 23, 1986)."L.I.R.R. Electrification: New Plans, New Delays".The New York Times.ISSN 0362-4331. RetrievedJanuary 5, 2016.
  25. ^Lambert, Bruce (May 31, 1997)."The 4:49 to Port Jefferson: A Spoardic Promise of Modernity".The New York Times.ISSN 0362-4331. RetrievedJanuary 5, 2016.
  26. ^Castillo, Alfonoso A. (February 15, 2015)."Port Jefferson backs electrification of LIRR line". Newsday. RetrievedJanuary 6, 2016.
  27. ^Schwartz, David M.; Brand, Rick (March 4, 2015)."Suffolk planning panel calls for LIRR electrification". Newsday. RetrievedJanuary 6, 2016.
  28. ^Murdocco, Rich (March 9, 2015)."Now Is Not the Time to Electrify More LIRR Tracks".Long Island Press. RetrievedMay 3, 2015.
  29. ^"MTA 2015-2034 20-Year Capital Needs Assessment"(PDF).mta.info. Metropolitan Transportation Authority. p. 70. RetrievedJanuary 5, 2016.
  30. ^Castillo, Alfonso A. (September 26, 2018)."LIRR to power up a seldom-used rail link to alleviate service disruptions". Newsday. RetrievedSeptember 26, 2018.
  31. ^Horvath, Adam Z. (June 3, 1991)."Six Deadly Crossings: But revised cost stops railroad project in its tracks".Newsday. p. 3. RetrievedJune 20, 2024 – via Newspapers.com.
  32. ^Buettner, Russ; Fitzsimmons, Emma G. (February 12, 2015)."In New York Area, Points Where Train and Tragedy Are Likely to Intersect".The New York Times. RetrievedJune 20, 2024.
  33. ^Draffen, Duayne (April 28, 1998)."16 Years After Death of 9 Teen-Agers, Rail Bridge Opens".The New York Times.ISSN 0362-4331. RetrievedMay 8, 2015.
  34. ^abcdeCastillo, Alfonso A. (June 23, 2018)."LIRR Expansion to kick off with 10 major projects".Newsday. RetrievedApril 21, 2019.
  35. ^abcde"Governor Cuomo Announces Groundbreaking of Historic Long Island Rail Road Third Track".Governor Andrew M. Cuomo. September 5, 2018. RetrievedApril 21, 2019.
  36. ^"Planned Service Changes"(PDF). Archived fromthe original(PDF) on December 19, 2005.
  37. ^John Rather (August 27, 2000)."L.I.R.R. Expansion: The Other Shoe Drops".The New York Times.ISSN 0362-4331. RetrievedJanuary 5, 2016.
  38. ^John Rather (November 30, 2003)."The Proposed L.I.R.R. Yard Draws Fire".New York Times.ISSN 0362-4331. RetrievedJanuary 5, 2016.
  39. ^"Planned Service Changes". Archived fromthe original on April 11, 2008.
  40. ^"MTA 2015-2019 Capital Program, pages 24, 97 and 208"(PDF). RetrievedJanuary 5, 2016.
  41. ^"Long Island Rail Road Committee Meeting - March 2019"(PDF).mta.info.Metropolitan Transportation Authority. March 25, 2019. p. 46. RetrievedMarch 25, 2019.
  42. ^"Port Jefferson Station Superfund site sale eyed to recoup back taxes, electrify LIRR branch". December 29, 2021.
  43. ^"Suffolk County Leaders: Lawrence Aviation presents real potential for LIRR electrification". February 11, 2022.
  44. ^"MTA - Planning Studies".Metropolitan Transportation Authority. Archived fromthe original on March 6, 2014.
  45. ^"Main Line Corridor Improvements Project Presentation"(PDF).Metropolitan Transportation Authority. Archived fromthe original(PDF) on January 25, 2016. RetrievedJanuary 7, 2016.
  46. ^Stephanie Mariel Petrellese (November 11, 2005)."Floral Park Mayor To Address LIRR Expansion". The Garden City News. Archived fromthe original on March 22, 2006. RetrievedDecember 23, 2006.
  47. ^Carisa Keane (June 24, 2005)."Residents: MTA/LIRR Needs to Get on Right Track". New Hyde Park Illustrated News. Archived fromthe original on September 27, 2007. RetrievedDecember 23, 2006.
  48. ^Stephanie Mariel Petrellese (December 15, 2006)."Village Meets With LIRR On "Third Track" Project". The Garden City News. Archived fromthe original on January 12, 2007. RetrievedDecember 23, 2006.
  49. ^Nardiello, Carolyn (September 16, 2008)."Third-Track Plan Isn't Dead, L.I.R.R. Insists".The New York Times.ISSN 0362-4331. RetrievedJuly 31, 2012.
  50. ^Castillo, Alfonso A. (March 3, 2015)."3rd track plan conditional on community support, LIRR chief says".Newsday. Archived fromthe original on March 10, 2016. RetrievedOctober 20, 2015.
  51. ^Robert Gearty (April 22, 1998)."END'S NEAR FOR A KILLER LIRR X'ING".New York Daily News. Archived fromthe original on March 7, 2016. RetrievedNovember 2, 2015.
  52. ^"Governor Cuomo Announces Final Design for Revitalized Hicksville Station".Metropolitan Transportation Authority. February 24, 2015. RetrievedNovember 2, 2015.
  53. ^Nunez, Jenifer (February 24, 2015)."LIRR finalizes Hicksville Station design; includes East Side Access work". RT&S. RetrievedJanuary 7, 2016.
  54. ^"$24.3 MILLION LIRR ROAD CROSSING ELIMINATION PROJECT IN MINEOLA COMPLETED". New York State Department of Transportation. December 31, 2008. RetrievedNovember 4, 2015.
  55. ^"National Steel Bridge Alliance 2009 Bridge Prize Competition"(PDF). RetrievedNovember 4, 2015.
  56. ^"Application for Transportation Investment Generating Economic Recovery (TIGER) Funds Ellison Avenue Bridge Reconstruction, page 3"(PDF).Metropolitan Transportation Authority. RetrievedNovember 2, 2015.
  57. ^"40,000 Customers Facing Delays This Weekend, Oct. 24-25, as LIRR Installs a New Bridge in Westbury".Metropolitan Transportation Authority. October 22, 2015. RetrievedNovember 2, 2015.
  58. ^abcFitzsimmons, Emma G. (January 5, 2016)."Cuomo Revives Long-Stalled Plan to Add Track to L.I.R.R.".The New York Times.ISSN 0362-4331. RetrievedJanuary 7, 2016.
  59. ^Third Main Line Track project web site
  60. ^abMadore, James T. (January 5, 2016)."Andrew Cuomo tells Long Island Association he'll push LIRR third track, LI Sound tunnel".Newsday. Archived fromthe original on January 6, 2016. RetrievedJanuary 7, 2016.
  61. ^"LIRR Main Line Expansion Will Ease Commuting and Attract Businesses and Jobs" (Press release).Metropolitan Transportation Authority. January 5, 2016. Archived fromthe original on January 19, 2016. RetrievedJanuary 7, 2016.
  62. ^Manskar, Noah (January 7, 2016)."Cuomo revives LIRR third track plans". The Island Now. Archived fromthe original on January 10, 2016. RetrievedJanuary 8, 2016.
  63. ^Berger, Paul (December 13, 2017)."MTA Awards $1.8 Billion Contract to Expand Long Island Rail Road".The Wall Street Journal. RetrievedJanuary 25, 2018.
  64. ^Castillo, Alfonso A. (December 13, 2017)."MTA approves $1.9B contract to design, build LIRR 3rd track".Newsday. Archived fromthe original on January 26, 2018. RetrievedJanuary 25, 2018.
  65. ^Klar, Rebecca (December 20, 2017)."MTA approves $1.8B contract for third track project". The Island Now. RetrievedJanuary 25, 2018.
  66. ^"LIRR Third Track Project Moving Forward Despite Concerns Of Residents".CBS New York. September 5, 2018. RetrievedSeptember 6, 2018.
  67. ^Rivoli, Dan (September 5, 2018)."Cuomo continues infrastructure tour with Long Island Rail Road groundbreaking".New York Daily News. RetrievedSeptember 6, 2018.
  68. ^"Capital Program Oversight Committee Meeting May 2021".Metropolitan Transportation Authority. May 26, 2021. RetrievedMay 26, 2021.
  69. ^"LIRR unveils 1st section of new express lane track".Yahoo! Sports. August 15, 2022. RetrievedAugust 15, 2022.
  70. ^"First section of LIRR's Third Track expansion debuts Monday morning".News 12 - The Bronx. August 14, 2022. RetrievedAugust 15, 2022.
  71. ^"MTA Announces Opening of Second Section of LIRR Main Line Third Track".City Life Org. August 30, 2022. RetrievedAugust 31, 2022.
  72. ^Duggan, Kevin (October 3, 2022)."'Third' time's the charm: MTA finishes $2.5 billion LIRR Third Track project".amNewYork. RetrievedOctober 15, 2022.
  73. ^Vantuono, William C. (October 4, 2022)."LIRR Completes Third Track Project".Railway Age. RetrievedOctober 15, 2022.
  74. ^"LIRR Port Jefferson Branch Timetable". New York: Metropolitan Transportation Authority. May 23, 2023.
  75. ^"New Fares — Effective April 21, 2019".Metropolitan Transportation Authority. RetrievedApril 27, 2020.
  76. ^abcBrooklyn Advocate,Long Island Rail Road, February 1837
  77. ^"Long Island Railroad Company".Brooklyn Daily Eagle.Brooklyn, NY. May 28, 1842. p. 3.
  78. ^"Setauket Station Closing".Newsday. June 27, 1980. RetrievedMarch 19, 2023 – via Newspapers.com.
  79. ^"Port Jefferson".The Brooklyn Daily Eagle. January 13, 1873. p. 4. RetrievedApril 2, 2021 – via Newspapers.com.Open access icon
  80. ^ab"Wading River Branch Inspected".The Brooklyn Daily Eagle. May 25, 1895. p. 7. RetrievedApril 2, 2021 – via Newspapers.com.Open access icon
  81. ^abAllen 1895, p. 236.

External links

[edit]
Template:Attached KML/Port Jefferson Branch
KML is not from Wikidata
Main routes

Branch
services
Freight
operations
Operator
Freight-only branches
Defunct
branches
Acquired
railroads
Other
Retrieved from "https://en.wikipedia.org/w/index.php?title=Port_Jefferson_Branch&oldid=1315601224"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp