Pinopolis Dam

Coordinates:33°15′53″N80°06′02″W / 33.26464°N 80.10061°W /33.26464; -80.10061
From Wikipedia, the free encyclopedia
View of Lake Marion (upper left) and Lake Moultrie (bottom right)

Pinopolis Dam is a dam inBerkeley County, South Carolina.

The earthen and concrete dam was completed in 1941 bySantee Cooper, the state-owned electric and water utility also known as South Carolina Public Service Authority.[1] The dam is 138 feet (42 m) high and 11,500 feet (3,500 m) long at its crest.[2]

Broadly speaking, the dam impounds theCooper River and createsLake Moultrie. Specifically Lake Moultrie is fed directly fromLake Marion by a diversion canal built concurrently with the dam. This artificial rerouting of the Cooper River basin has effectively unified theSantee and Cooper River systems into a single hydrological drainage entity.

The overall New Deal-era Santee Cooper Power and Navigation Project improved navigation, providedhydroelectric power, and improved the general health, recreation, and economy of the area. The project was the largest land-clearing project in U.S. history up to that point, with over 12,500 workers clearing over 177,000 acres (720 km2) of swamp and forestland. 42 miles (68 km) of dams and dikes were constructed, including a 26-mile (42 km), 78-foot (24 m) tall earthen dike. The Pinopolis Dam included the hydroelectric station andnavigation lock, the highest single-lift lock in the world. In completing the largest earth-moving project in the nation's history, 42,000,000 cubic yards (32,000,000 m3) of earth were moved and 3.1 million cubic yards of concrete were poured.[3][4][citation needed]

The $48.2 million project (55 percent federal loan, 45 percent federal grant) first generated electricity on Feb. 17, 1942. As transmission lines were built, power flowed to customers in Berkeley, Georgetown and Horry counties, and ultimately to electric cooperatives serving customers in 46 counties.[3][citation needed]

The Pinopolis generating station was renamed Jefferies Hydroelectric Station in 1996 afterRichard Manning Jefferies, former Governor of South Carolina and executive of Santee Cooper. It produced 243 MWh electricity in 2019.[5][6][7]

The project also flooded theSantee Canal, the cemeteries and plantations of St John's Parish Berkeley,[8] and other historic resources.[1]

References

[edit]
  1. ^ab"Your Santee Cooper History".Santee Cooper. Archived fromthe original on 2001-06-16.
  2. ^"Cooper Dev - Pinopolis Dam, east South Carolina".Findlakes.com. Archived fromthe original on 2012-10-17.
  3. ^ab"Pinopolis Lock".Santee Cooper. Archived fromthe original on 2017-09-30.
  4. ^"Santee Cooper Project".Poe Family Papers. Clemson University Library Special Collections. Retrieved2022-09-27.
  5. ^"Download Data eGRID2019". U.S EPAEmissions & Generation Resource Integrated Database. 20 August 2020. Retrieved2021-08-03.
  6. ^Jackson, Susan."Renewable hydro generation and art deco architecture Great Depression's lasting legacy".Santee Cooper. Retrieved2021-08-03.
  7. ^"Jefferies Hydro Powerhouse Tour Brochure"(PDF).Santee Cooper. Archived fromthe original(PDF) on 2010-11-03.
  8. ^"South Carolina - Lost Places".

External links

[edit]

33°15′53″N80°06′02″W / 33.26464°N 80.10061°W /33.26464; -80.10061

Retrieved from "https://en.wikipedia.org/w/index.php?title=Pinopolis_Dam&oldid=1275534189"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp