A taxi heads into the tunnel heading North (2011) | |
![]() Interactive map of Park Avenue Tunnel (Murray Hill Tunnel) | |
| Overview | |
|---|---|
| Location | Manhattan,New York |
| Coordinates | 40°44′56″N73°58′48″W / 40.74889°N 73.98000°W /40.74889; -73.98000 |
| Route | NorthboundPark Avenue |
| Start | East 33rd Street (entrance ramp) East 34th Street (entrance portal) |
| End | East 40th Street (exit ramp) East 39th Street (exit portal)(all traffic must continue to East 46th Street) |
| Operation | |
| Opened | 1834; 191 years ago (1834) |
| Owner | New York City |
| Operator | New York City Department of Transportation |
| Traffic | Cars(formerlytrains andstreet cars) |
| Technical | |
| Length | 5 blocks, approximately 0.25 miles (0.40 km) |
| No. oflanes | 1 |
| Operating speed | 35 mph (56.33 km/h) |
| Tunnel clearance | 8 feet 11 inches (2.72 m) |
| Width | 16 feet (4.88 m) |
ThePark Avenue Tunnel, also called theMurray Hill Tunnel, is a 1,600-foot-long (488 m) tunnel that passes under seven blocks ofPark Avenue inMurray Hill, in theNew York Cityborough ofManhattan. Traffic used to travel northbound from 33rd Street toward thePark Avenue Viaduct. The tunnel is under the jurisdiction of theNew York City Department of Transportation. It is designed to carry one lane of northbound car traffic fromEast 33rd Street toEast 40th Street. From 40th Street north, traffic must follow thePark Avenue Viaduct aroundGrand Central Terminal to46th Street. The vertical clearance is 8 ft 11 in (2.72 m).
TheIRT Lexington Avenue Line of theNew York City Subway, carrying the4, 5, 6, and <6> trains, runs parallel to the Park Avenue Tunnel in two tunnels below it.[1]
The tunnel once carried theNew York and Harlem Railroad and later, that company'sstreetcar line. It was then called the Murray Hill Tunnel. The tunnel was originally built as an open rock cut, completed in 1834,[2] after which the NY&H Railroad was opened as far asYorkville, to85th Street. The first trains to use the cut were horse-drawn. It carried steam trains from the beginning of the New York & Harlem steam service in 1837 until steam locomotives were prohibited south of 42nd St in 1858.[3]
In 1850, the cut was roofed over[4] using granite stringers from the original railroad bed south of14th Street, creating the present tunnel.[2] In 1870 an underground station for local horse-drawn streetcar service was added at 38th St along with stations at the portals at 34th St and 40th St.[5] After the completion ofGrand Central Depot in 1871 the tunnel was used exclusively by local streetcars. The streetcar line was electrified withunderground conduit power in 1898.[5]
In 1913, there was a plan to move the southern portal of the Park Avenue Tunnel one block north. This would have been accomplished by lowering 34th Street to the height of the existing tunnel.[6] Lloyd Collis of the Fourth Avenue Improvement Association said the plan would have minimal impact on surrounding buildings, such as the then-newVanderbilt Hotel, and would allow passengers at the33rd Street station to cross Park Avenue without having to detour to 32nd or 34th Street.[7] Several prominent businessmen and property owners includingJ. P. Morgan Jr. andCharles D. Wetmore opposed the plan.[8]
Some residents alleged the plan would damage nearby properties, while others objected that a flattened 34th Street would allow the construction of amoving walkway, "ruining" the residential character of the neighborhood.[9] The plans would have allowed a subway line to be built under 34th Street as well, though the Public Service Commission canceled a planned subway line under 34th Street in May 1913.[10] MayorWilliam Jay Gaynor vetoed the portal proposal the next month.[11]
In 1919 the ramp to thePark Avenue Viaduct around Grand Central Terminal was built directly above the northern streetcar ramp, which sloped upward from a portal north of 40th St to street level at 42nd St. In 1935, streetcar service was discontinued and the tunnel was converted for roadway use. At that time the north end was reconstructed with a steeper approach, reaching street level south of 40th St and allowing continuous car travel from the tunnel onto the viaduct. The tunnel reopened as a roadway in 1937.[5] Prior to August 3, 2008, the tunnel carried two-way traffic, onelane for each direction; on that date, it was made northbound-only to increase safety for pedestrians crossing Park Avenue at 33rd Street.[12]
In February 2017, the Park Avenue Tunnel was closed for a $24 million rehabilitation. It was scheduled to reopen in 2019 but remained closed until November 2023.[13]
In 2013, the tunnel was open to pedestrians for the first time in coordination with the annualSummer Streets event, which shuts down part of Park Avenue to vehicular traffic between 7 am and 1 pm for three Sundays every August. During the August 2013 event, the interior served as an art space containingRafael Lozano-Hemmer'sVoice Tunnel installation, in which visitors could record a short message that would be played back continuously from speakers along the tunnel walls.[14] In the 2014Summer Streets, the tunnel temporarily reopened to pedestrians, this time featuringDIVE, an installation by Jana Winderen that incorporates aquatic soundscapes.[15] Both art projects were commissioned by the New York City Department of Transportation.
Parts of the 1998 movieGodzilla were filmed in the tunnel. Toward the end of the film, Godzilla chases the film's main characters into the tunnel, but is later lured back into the open toward theBrooklyn Bridge.[citation needed]