MP 89CA and CC arriving atCité. | |
| Overview | |
| Termini | Porte de Clignancourt Bagneux-Lucie Aubrac |
| Connecting lines | |
| Stations | 29 |
| Service | |
| System | Paris Métro |
| Operator(s) | RATP |
| Rolling stock | MP 89CA (21 trains in operation as of 5 June 2023) MP 05 (11 trains in operation as of 10 February 2023) MP 14 (20 trains in operation as of 18 March 2025) |
| Ridership | 171,000,000 (avg. per year) 2nd/16 |
| History | |
| Opened | 1908 |
| Technical | |
| Line length | 13.9 km (8.6 mi) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in)standard gauge betweenroll ways |
| Electrification | 750VDC,guide bars on either side of the track |
| Conduction system | Automated (SAET) |
Line 4 (French pronunciation:[liɲᵊkatʁᵊ]) is one of the sixteen currently opened lines of theParis Métro, as well as one of its three fully automated lines. It connectsPorte de Clignancourt in the north of Paris, toBagneux-Lucie Aubrac in the eponymous southern suburban city, on a north-south axis across the French Capital. Held within the boundaries of the City of Paris for over a century – until its southern terminus was changed fromPorte d'Orléans toMairie de Montrouge in 2013 – the line was sometimes referred to as the Clignancourt – Orléans Line. At 13.9 km (8.6 mi) in length, it connects with all Paris Métro lines apart from the very short3bis and7bis branch lines, as well as with all 5RER train lines. It also serves three of the Paris Railway stations,Gare du Nord,Gare de l'Est, andGare Montparnasse. It is the second-busiest Métro line afterLine 1, carrying over 154 million passengers in 2004.
Line 4 was the first line to connect to the south side of theRiver Seine, through an underwater tunnel built between 1905 and 1907. Line 4 long ran the longest-servingMP 59 rubber trains, which usedrheostats to dissipate the braking power through resistance, making line 4 the hottest line in the system. Those trains were withdrawn from service on Line 4 during the course of 2011 and 2012 after 45 years (with some being in service for 50 years), yet remained another 12 years on in service on Line 11. On Line 4, they were replaced by theMP 89 CC stock transferred fromLine 1, right after its automation.
In 2013, Line 4 was extended for the first time since its initial construction, into the southern suburbs ofMontrouge. The line was further extended toBagneux–Lucie Aubrac in 2022, connecting to the futureGrand Paris Express.[1] The line has been retrofitted for full automation, with the first automated trains commencing service on 12 September 2022.[2]

Line 4, opened in 1908, was the last line of the original concession of theCompagnie du chemin de fer métropolitain de Paris and the first to cross theSeine underground (Line 5—nowLine 6 at this point—crossed the river on the Passy bridge, later renamed thePont de Bir-Hakeim in 1906). The route was the subject of lengthy discussions that delayed the start of construction of the tunnel. It was originally planned as a straight line under the Rue du Louvre, under the Seine in line with the street, under theInstitut de France, along the Rue de Rennes and then theBoulevard Raspail to the Porte d'Orleans.
But as a result of the delay in the extension of the Rue de Rennes as part ofHaussmann's plan towards the Seine—which was never carried out—and the outcry from the academicians who refused categorically the line passing under the Institut de France, the route was eventually changed to cross further east through thePlace du Châtelet and theÎle de la Cité.[3] The new route also has more coherence as a north–south route following the main traffic flows. A second modification of the route was also made: it was decided to make a temporary deviation via the major station ofGare Montparnasse to avoid a further delay in opening the line, which was eagerly awaited. This was made necessary by the delay in building the new Boulevard Raspail between Rue de Rennes and Boulevard du Montparnasse.[4] Once the Boulevard Raspail was completed, it was planned to take the shorter route and bypass the Gare Montparnasse. To the south of theVavin station the tunnel provides for the final route along the Boulevard Raspail. But the value in serving three major mainline stations by the line later led to the abandonment of this proposal.[5]
In 1905 construction was started by the company ofLéon Chagnaud—a former mason fromCreuse (adepartment with a tradition of supplying building workers in France)—and line 4 became the first to cross the Seine underground. The method used for crossing under the river is that of metalcaissons, twenty to forty meters in length mounted on the banks and sunken vertically in the river bed. The ends of the caissons were blocked and they were towed to their location before being ballasted with water and sunk in the riverbed. A chamber filled with pressurised air was built at the lower level of these caissons so that workers could excavate under the caissons. Each caisson gradually sank to its final position as the ground below it was removed. The northern stream of theSeine required three caissons, the southern stream two caissons.
The crossing of the Seine also involved the freezing of saturated ground between the station ofSaint-Michel and the Seine, under the line of theChemin de Fer de Paris à Orléans (nowRERline C) in 1908 and 1909. The installation of two refrigeration plants allowed the movement of brine cooled to −25 °C in dozens of tubes to stabilize the ground.[6]
The northern section was the first completed: it was opened on 21 April 1908 fromPorte de Clignancourt toChâtelet. The southern section was opened 30 in October 1909 fromPorte d'Orleans toRaspail. The two sections were connected on 9 January 1910. However, the line was closed to traffic a few days later in January 1910, when the level of the Seine broke its banks during theworst flood of the century. On the morning of 24 January 1910, a significant inflow of water at the Seine crossing interrupted services between Châtelet and Vavin, although services were restored later in the day. But the inflow increased and services were again halted in the afternoon. On 26 January Châtelet station and the crossing under the river was completely flooded and slowly rose in the tunnel. On the night of 27 and 28 January, flooding reachedRéaumur – Sébastopol and eventuallyGare de l'Est: The line at its minimum was reduced to operating between Clignancourt and Gare du Nord and between Vavin and Porte d'Orleans. The fall in the level of flooding during February allowed a gradual resumption of operations, but full service was not restored to 6 April after repair of extensive damage caused to the infrastructure.[7]
During the politically turbulent 1930s, Line 4 had its own drama: on 27 July 1934, a package left in a carriage was carried into the office of its chief supervisor, located on the platform of Montparnasse. The package exploded, killing the chief supervisor and another officer and wounding four passengers. The assassins were never found.[8]
During World War II the most violent bombing Paris suffered was on the night of 20 and 21 April 1944 when the rail freight yard of la Chapelle and the main truck workshop at Rue Championnet were hit. The roof of theSimplon station was hit by a bomb and it collapsed on the tracks and platforms. After repairs the line was brought back into service a few days later.[9]

The RATP was satisfied by experimentation withrubber tyres onLine 11 beginning in 1956. It therefore decided to equip lines 1 and 4 for rubber-tyre operations, which can increase line capacity by providing better acceleration and decelerations as a result of a much superior grip.
In the early 1960s these two lines were the two busiest on the network, with loads of 140% of capacity during the evening peak. However, as this change alone was insufficient to overcome this saturation, the length of stations was lengthened from 75 to 90 metres (246 ft 1 in to 295 ft 3 in), allowing the lengthening of train from five to six carriages. This work was carried out very quickly and, as early as October 1965, trains of six carriages traversed the line. On 3 October 1966, the first train composed ofMP 59electric multiple units operated on the line. The Line 4 trains were identical to those on Line 1, being composed of four motors and two trailers per train. The line's MP 59 fleet included 556 carriages: 376 powered carriages and 180 trailers. On 17 July 1967, the last steel-wheeled train left the line to strengthen the service of others with a hundred cars built before 1914 scrapped.[10] In February 1971, line 4 was the second network after line 11 to be equipped with semi-automatic operation, with a system known asGrecque ("Greek"). This allowed trains to run automatically once started by the driver and stop at the next station.[11]
Since its opening the only change of the route of the line took place in early October 1977 with the deviation of the line with the relocation of the station atLes Halles. During the excavation of the enormousLes Halles complex the station of Les Halles was relocated about ten metres further east to allow a shorter connection toChâtelet – Les Halles RER station. For this, three hundred and thirty meters of tunnel were built to join the old route. The changeover took place on three consecutive nights from 10 PM on Friday, 30 September 1977 to the beginning of services on Monday, 3 October. On the first night, the new track 2 was connected, on the second night, the new track 1 was built and on the last night it was connected.[12]
On 6 August 2005 at 4:42 pm, a fire on a train at Simplon due to the malfunction of acircuit breaker caused the evacuation of two MP 59 trains with 19 people mildly affected. The fire was extinguished by fire fighters at around 6:00 pm.[13]

Until 2013, Line 4 was one of a few lines (the others being semicircular lines 2 and 6, as well as the then new Line 14) that had never been extended beyond the "gates" of Paris. During the 1920s, a preliminary extension towards la Vache-Noire was planned but never carried out. Since that time, no other extension plan was brought up. In 2008, nearly a century after its opening, construction of a one-station extension towardsMairie de Montrouge began. The new station officially opened to passengers on 23 March 2013, allowing one to travel from Montrouge to Clignancourt in 30 minutes.[14] Mairie de Montrouge is a traditional two-tracked station.
In addition to the Montrouge extension, in 2011 there has been a much needed refreshing in rolling stock for Line 4, as the MP 59 trainsets were reaching the end of their useful lives. The automation of Line 1 and purchasing of new automated rolling stock (theMP 05) allowed the RATP to replace the MP 59 with theMP 89CC rolling stock fromLine 1. Testing of the MP 89 during overnight hours took place in 2010, with the first train (#01) to be transferred to Line 4 in April, 2011 and enter service on 23 May 2011. A second train (#44) entered service on 10 September 2011. The first MP 59 train that was retired was #6049, which was pulled from service in April, 2011.
As the MP 05 rolling stock began to debut on Line 1, the pace of transferring the MP 89CC stock from Line 1 to Line 4 increased to roughly 3 trains per month. Since January 2012, the RATP kept this rate of transfer (increasing the rate to 4 trains during November and December) despite only being able to remove 2 MP 59 trainsets from service each month. During the course of 2011, the following trains were transferred from Line 1 to Line 4: #s 14, 20, 29, 30, 31, 34, 38, and 40. Train #s 03 through 25, 27 through 42, 43, 44, 48, 49, 51, and 52 were transferred during the course of 2012. #45 was transferred on 3 January 2013, marking the 47th train to be moved to Line 4. Between February and March 2013, #s 02, 46, 47, and 50 were transferred. The final MP 89CC train was #26. The last MP 59 train to be pulled from service was #6021, which was withdrawn on 21 December 2012. Though many MP 59 trains operated on Line 4 for roughly 45 years, those trains that were brought over from Line 1 during the late 1990s have circulated throughout the Metro for about 50 years.[citation needed]

Following the opening of Mairie de Montrouge, plans were already in the works to further extend Line 4 another 1.8km southward. This extension consists of two stations:Barbara at the border between Montrouge and Bagneux (in Montrouge) andBagneux–Lucie Aubrac. Cosntruction began in 2014,[15] and service opened on 13 January 2022.[1] In 2025, Bagneux-Lucie Aubrac will provide a connection to the upcomingLine 15 ofGrand Paris Express.[16]
Following the implementation of full automation ofline 1, completed at the end of 2012, automation of line 4 was studied. Pierre Mongin, Chairman and CEO ofRATP, confirmed that automation would go ahead on 2 April 2013. He announced that it could be implemented from 2017 when the automaticMP 89 andMP 05 trains from line 14 could be transferred to line 4; line 14 would then receive the new 8-car MP 14 trains, to cope with the increase in passenger numbers expected from its extension as part of the Grand Paris project. The improvement in regularity and safety brought by automation would be increased, as on line 1, with the installation ofplatform screen doors[17] built byFaiveley Transport, manufacturer of platform screen doors for line 14.
Given the positive results of the full automation of line 1, on 10 July 2013, the STIF (now IDFM) authorised the launch of technical studies in 2013. The automation of line 4, which was estimated to cost €256 million, would be financed with €100 million from the STIF and the remainder by the RATP, the project owner.[18] It was announced that work would start in 2014 and be completed by 2022.[19][20] The financing agreement was adopted by the STIF in June 2014.[21]
Work finally began in 2016. The installation of the platform doors and the first tests of the system began in the second quarter of 2018. At that time, it was expected that the first driverless trains would be running in 2020 and the completion of automation was planned for 2022. The project was two years behind schedule: at the end of 2021, the first automatic trains were expected to run in the summer of 2022, with full automation completed by the end of 2023.[22]
The new centralised control station was put into service on 3 May 2020.[23]
The first four automatic trains began operating on 12 September 2022.[24] Other automatic sets were added gradually to make the line fully automatic. Operation has been possible with only automatic trains since 15 December 2023.[25] The automation of the line was inaugurated a month later on 19 January 2024.
Line 4 was once the busiest line in the Paris network, until Line 1 overtook it in 1997. From 1992 to 2004, traffic increased by 3.7%, which only places the line in ninth place in terms of growth on the network (excluding Line 14). This low growth is explained, for Line 4 itself or for the metro network as a whole, in part by significant declines in ridership when theRER B atSaint-Michel–Notre-Dame came into service in 1988, theRER D in 1995 and theRER E in 1999.
| Year | 1995[26] | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2002 | 2003 | 2004 | 2009 | 2010 | 2012 | 2014 | 2016 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Number of passengers(in millions)[27][28] | 122.5 | 133.5 | 130.9 | 135.7 | 135.1 | 131.9 | 139.8 | 134.9 | 138.1 | 154.1 | 172[29] | 173.9 | 174.4 | 163.6 | 157.9 | 152.2 | 158.5 | 79.7 | 106 | 138 | 151.8 | 161 |
The busiest stations served by the line are, in descending order (in annual traffic, all lines included): Gare du Nord (36.49 million passengers), Montparnasse - Bienvenüe (29.46 million), Gare de l'Est (15.66 million), Châtelet (12.84 million), Les Halles (12.63 million), Barbès - Rochechouart (9.14 million), Strasbourg - Saint-Denis (8.76 million). In 1998, daily traffic reached 463,974 passengers on average each working day, 361,313 on Saturdays and 209,955 on Sundays.[30] In 2003, annual traffic reached 137,939,350 passengers, with a daily traffic of 458,148 passengers on average each working day, 374,501 on Saturdays and 241,681 on Sundays.[31] In 2009, annual traffic was 172 million passengers, an increase of 24.5% in six years. Traffic on a normal working day reached 674,000 passengers in 2010,[32] 676,000 in 2011[33] and 740,000 in 2012.[18]
Phase 1 (2007–2013) of theSchéma directeur de la région Île-de-France ("Master Plan for theÎle-de-France region",SDRIF), adopted by resolution of the Regional Council of Ile-de-France on 25 September 2008, included a Northward extension to the "docks" ofSaint-Ouen (an urban redevelopment project next to theSeine) viaMairie de Saint-Ouen (where Line 4 would connect to Line 13's St. Denis branch and to Line 14).[34] However no detailed studies have yet been carried out, nor any funding set aside.
Around 1930, Line 4 was equipped with rolling stock known as "Sprague" M4 sets. They were not replaced until the line was converted to accommodate the rubber-tyred metro sets, after having operated more than 3 million km (1.9 million mi).
The replacement was carried out gradually between October 1966 and July 1967 byMP 59 sets. When theMP 89s arrived online 1 in 1997, the renovated MP 59s from line 1 were transferred to line 4, while the renovated MP 59s from line 4 were transferred toline 11. This resulted in the disappearance of the lastMP 55s from line 11 at the end of 1998 and the last on the system at the beginning of 1999. The other non-renovated MP 59s were retired. The MP 59 trains on line 4 were made up of six cars (MNABNM). The line's fleet consisted of 47 trains in 2010.
The automation of line 1 from 2011 being accompanied by new rolling stock, theMP 05, the MP 89s of this line were gradually assigned to line 4.[35] The first train (CC01) was put into commercial service on 23 May 2011. The old MP 59s were gradually reformed as the trains are transferred. At the beginning of February 2012, eleven MP 89 type trains were operating on line 4.[33]
On 21 December 2012, the last MP 59s were retired from the line,[36] after 45 years of operation on this line and 49 years since their entry into service on line 1.
In 2016, it was decided, according to the 2018–2023 timeline, that the MP 89 CC sets would be cascaded to line 6 and would be replaced by three different sets which would coexist on line 4: the MP 89 CA and the MP 05 coming from line 14, as well as 20 new MP 14s in the six-car version.[37] These projects were significantly delayed and, in 2021, no commercial circulation of the transferred vehicles had yet taken place.
Finally, on 12 September 2022, the first four automatic trains were put into service.[38] Since then, MP 89 CA, MP 05 and MP 14 have been running on the line, at the same time as the MP 89 CC. The last MP 89 CC left the line on 15 December 2023.[39]
The rolling stock of line 4 is maintained at theSaint-Ouen workshops, extending over an area of 34,000 square metres (370,000 sq ft) and opened in 1908. They are connected to the rear station of the terminus and located in this commune just north ofPorte de Clignancourt.

These workshops provide routine maintenance of trains but also heavy maintenance and overhaul ofMF 77 sets on lines7,8 and13 as well as auxiliary vehicles. They also specialise in overhauling the electronic equipment of all network equipment. In 2007, 60 staff were assigned to train maintenance, 220 to equipment maintenance.[40]
An inspection station located in the rear of theBagneux–Lucie Aubrac station allows light maintenance operations and first-level troubleshooting to be carried out. Before the extension of the line toMairie de Montrouge, this workshop was located on platform 2 towards Porte de Clignancourt atPorte d'Orléans station.
Heavy maintenance and regular overhaul (batteries, windings, paintwork) of the Line 4 sets, as with all the network's rubber-tyred equipment, takes place in the Fontenay workshops. They are located in the extension of the Line 1 tracks beyond theChâteau de Vincennes terminus. They are divided into two separate entities: a maintenance workshop for the Line 1 trains and an overhaul workshop for all the metro's rubber-tyred trains. The complex, which occupies a total area of approximately 39,000 square metres (420,000 sq ft), was modernised in the early 1960s for the arrival of the MP 59 sets; then the buildings were rebuilt for the arrival of the MP 89 sets during the 1990s. These workshops are also connected to the national rail network via theRER A tracks.[41] Three hundred and thirty employees were assigned to this workshop in 2007.[40]


Seven stations on the line have original thematic cultural decoration.[42] Most of them have been removed due to automation work.
Furthermore, two stations have an original structure: the metal structure ofCité andSaint-Michel was mounted on the roadway and sunk into the ground during their construction. The stations are accessed through an elliptical shaft, also made of metal. Cité station has the particularity of being lit by globes.
Line 4 servesGare du Nord,Gare de l'Est andGare Montparnasse. It passes through tourist districts and lively areas of the city, including (from north to south):
Although the line serves very touristy areas, it is considered by some of its users as an unpleasant line to travel. In addition to its entirely underground route, it is the slowest line on the network[45] and suffers from a certain discomfort (excessive heat, especially in summer[46]) as well as an overall impression of dirt and insecurity, particularly given its very high traffic. Finally, attacks on people are by far the most frequent on the network, whether it is theft, with or without violence, or threats and violence (excluding theft).[47]
According toFacebookgroupNew Urbanist Memes for Transit-Oriented Teens, Line 4 is considered "chaotic good" on theDungeons & Dragons (D&D)alignment system.[48][49]