This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Palestine Railways" – news ·newspapers ·books ·scholar ·JSTOR(January 2024) (Learn how and when to remove this message) |
Palestine Railways (Arabic: سكة حديد فلسطين (“Palestine Railways”); ContemporaryHebrew:מסילות ברזל פלשתינה (א"י) (“Palestine (Land of Israel) Railways”)[2] orרכבות ארץ-ישראל (“Land of Israel Railways”);[3] Present-day Hebrew:הרכבת המנדטורית (“Mandate Railways”)) was a government-owned railway company that ran all public railways in theLeague of Nations mandate territory ofPalestine from 1920 until 1948. Its main line linkedEl Kantara inEgypt withHaifa. Branches servedJaffa,Jerusalem,Acre and theJezreel Valley.

The Jaffa–Jerusalem railway, funded byChemin de Fer Ottoman de Jaffa à Jérusalem et Prolongements, was the first railway to be built in Palestine. Construction started on 31 March 1890 and the line opened on 26 September 1892.[4] It was built to1,000 mm (3 ft 3+3⁄8 in) with many tight curves and a ruling gradient of 2% (1 in 50).[4] The eastern part of the line, in the Judean hills betweenDayr Aban and Jerusalem, is particularly steep and winding. The "J&J"'s first locomotives were a fleet of five2-6-0 Mogul tender locomotives fromBaldwin in the USA, delivered in 1890 and 1892.[5] On a number of occasions the Baldwins' six-coupled driving wheels either spread the rails or became derailed on tight curves. As traffic increased the J&J obtained four 0-4-4-0Mallet articulated locomotives fromBorsig inGermany, delivered between 1904 and 1914.[5] The Mallets were intended to deliver greater tractive effort without spreading the rails, but they too suffered a number of derailments.[citation needed]
In 1915, duringWorld War I, theOttoman Army widened the track gauge betweenLydda and Jerusalem to1,050 mm (3 ft 5+11⁄32 in) to allow through running with theHejaz Railway and removed the track between Lydda andJaffa for military use elsewhere.[6]
In 1921, the British Government of Palestine seriously considered electrifying the line.Pinhas Rutenberg, the electricity concessionaire of Palestine, had been backed by High Commissioner Samuel in suggesting that the electrification of the line would not only be profitable but also crucial for the successful electrification of the country as a whole. However the Colonial Office backed off, fearing the heavy costs of this project[7]
This was a branch of theHejaz Railway between Haifa andDaraa in southern Syria where it joined the Hejaz main line. Construction began at Haifa in 1902 and was completed at Daraa in 1905.[8] The Jezreel Valley line, like the Hejaz main line, was built to1,050 mm (3 ft 5+11⁄32 in). Construction of a branch fromAfula on the Jezreel Valley line to Jerusalem had begun in 1908 and reachedNablus by the outbreak of the First World War in 1914.[9]
TheOttoman Empire needed to supply its forces holding the border ofPalestine against British and Empire forces inEgypt. The planned railway from Nablus through hilly country to Jerusalem could not be completed in time, so from 1915 the German railway engineerHeinrich August Meißner oversaw the building of a1,050 mm (3 ft 5+11⁄32 in) line westwards fromEl Mas'udiya toTulkarm.[6] From Tulkarm the terrain became much easier and a line was built northwards toHadera and southwards to Lydda where it joined the J&J and later became known as theEastern Railway. It used the widened J&J track (see above) as far asWadi Surar where it branched southwards towards the Ottoman front line. By October 1915 the line was operational as far south asBeersheba.[6] A branch was also built fromEt Tine just south of Wadi Surar toDeir Seneid, where it branched again toBeit Hanoun andHuj nearGaza.[6] The Ottomans also extended therailway to Beersheba into Sinai as far asKusseima.[citation needed]
TheEgyptian Expeditionary Force (EEF) of British and British Empire units was formed in March 1916. It began building thestandard gauge Sinai Military Railway fromEl Kantara on theSuez Canal across Sinai, reachingRomani by May 1916,[10]El Arish in January 1917[11] andRafah in March 1917.[12]
The SMR borrowed rolling stock and 70 locomotives fromEgyptian State Railways including 20Robert Stephenson & Co.0-6-0s, 20 Baldwin 2-6-0s and 15 Baldwin4-4-0s.[13] The SMR also acquired seven smallshunting locomotives: two 0-6-0STsaddle tanks built in 1900 and 1902 thatJ. Aird & Co.[13] had been using on a civil engineering project in Egypt (probably theAssiut Barrage), four 0-6-0ST's that had been built in 1917 for the Inland Waterways and Docks Department in Britain and one German 0-6-0WT that was part of the cargo of a merchant ship that theRoyal Navy captured in 1914.[14] The German locomotive had been built byHanomag inHanover in 1913[15] and all the saddle tanks had been built byManning Wardle inLeeds, England.[13]
The EEF captured Beersheba in October 1917 and Gaza in November.[16] EEF engineers extended the SMR to Deir Seneid by the end of November 1917 and a branch to Beersheba by May 1918.[16] From Deir Seneid, EEF engineers worked northwards converting the Ottoman tracks to standard gauge, reaching Lydda by February 1918,[17] converting the branch to Jerusalem by June[18] and continuing as far as Tulkarm on the Eastern Railway. From there they built the standard gauge line on a new route northwest to the coast and then northwards, reaching Haifa by the end of 1918.[19]
As the EEF advanced into Palestine it formed a new organisation, the Palestine Military Railway, to operate the various railways of various gauges that came under its control.Royal Engineers units restored Palestine's railways to working condition.[20] The PMR laid a number of temporary600 mm (1 ft 11+5⁄8 in)narrow gauge lines, including one between Lydda and Jaffa[12] on the J&J trackbed from which the Ottoman army had removed the1,000 mm (3 ft 3+3⁄8 in)metre gauge track in 1915. The PMR borrowed several3 ft 6 in (1,067 mm) locomotives to work the1,050 mm (3 ft 5+11⁄32 in)narrow gauge tracks, which were a very tight fit.[citation needed]
In April 1920 theSan Remo conference mandated theUnited Kingdom to administer Palestine: a decision endorsed by aLeague of Nations mandate in 1922. In October 1920 railway administration was duly transferred from the military PMR to a new company, Palestine Railways (PR), owned by the British Mandate government.[12][21] Throughout the military operations of the Ottoman and British Empires the Jaffa – Jerusalem railway had remained the property of the FrenchSociété du Chemin de Fer Ottoman de Jaffa à Jérusalem et Prolongements. The French sought £1.5 million from the British for the J&J but after arbitration accepted £565,000 paid in instalments.[21] The Lydda – Jaffa section was converted from 600mm gauge to standard gauge and reopened in September 1920.[18]
As PR's north-south main line had laid speedily for military purposes and its Jaffa – Jerusalem and Jezreel Valley lines were steeply graded, its trains were not very fast. Its highest speed limit was 50 miles per hour (80 km/h) and even its best trains achieved less than 30 miles per hour (48 km/h) overall between termini.[22]
From 1920 PR developed a daily Haifa – El Kantara mixed traffic service.[21]Wagons-Lits provided restaurant and sleeping cars three days per week until 1923, when this luxury service was increased to daily.[21]
Palestine lacked a deep-water seaport until 1933 when one was built at Haifa. Until then, cargo that Palestinian ports could not handle would pass throughPort Said in Egypt.[23] Egyptian State Railways carried the freight between Port Said and El Kantara and PR carried it between El Kantara East and Palestine.[23] No bridge was built across the Suez Canal until 1941, so freight was ferried across the canal between the ESR and PR stations on opposite banks at El Kantara. This would have included deliveries of locomotives and rolling stock to PR.[citation needed]
PR passenger traffic declined significantly in the 1920s and '30s. The competition from increasing numbers of private cars reduced first-class and then second-class passenger traffic, such that by 1934, 95% of remaining passengers were third-class.[24] The onset of theGreat Depression in 1929 badly affected tourist traffic, from which the PR never recovered.[24]
As PR's finances deteriorated, in 1934 the United Kingdom government appointed a committee of investigation led by SirFelix Pole, former chairman of Britain'sGreat Western Railway.[24] Pole also had the specific task of advising to improve stations and the railway route to improve links between Jaffa, Tel-Aviv and Haifa.[25] The other members of Pole's committee were C. M. Jenkin-Jones of Britain'sLondon and North Eastern Railway and the accountant Sir Laurence Halsey, who was a partner inPrice Waterhouse.[25] Jenkin-Jones' specific task was to advise how to develop traffic facilities, traffic organisation and what rates to charge.[25] Halsey was to advise on the accounting system and the establishment of an adequate renewals fund.[25]
In the 1934–35 financial year Palestine Railways suffered a net deficit of £87,940.[25] Later in 1935 Pole's committee published its report,[24] which really was three related reports from the three committee members.[25] Each member's recommendations called for considerable investment.[25] Pole criticised the way the railway was operated around the key central junction at Lydda.[24] It identified serious under-investment, reporting that Jaffa and Tel Aviv stations were"inadequate and unsuitable" and"traffic congestion [was] considerable" around Lydda.[24] Passengers between Haifa and Tel Aviv or Jaffa had to change at Lydda, which was both inadequate for passengers and a source of congestion atLydda station.[citation needed]
Pole therefore recommended building two new link lines from Tel Aviv to by-pass Lydda: a northerly one toMagdiel on the Haifa main line to create a direct Haifa – Tel Aviv – Jaffa route[24] and a southerly one throughRishon LeZion and over the El Kantara main line atRehoboth to a junction with the Jerusalem line atNiana.[26]
In July 1935 in theUK House of Commons theLiberal MPBarnett Janner askedMalcolm MacDonald,Secretary of State for the Colonies:
"whether he is aware of the discontent with the present services provided by the Palestine railways; and whether he can now give an assurance that, as a consequence of the recent official inquiry into this matter, remedial action will be set on foot during the current year?"[25]
MacDonald replied:
"Until a few years ago the financial position of Palestine restricted expenditure on the maintenance and improvement of the railways, but additional revenue is now available and considerable sums have already been spent and are about to be spent for this purpose. Any further action which may be found to be necessary arising out of recent expert enquiries will be taken as soon as possible."[25]
Despite MacDonald's promise PR never received the necessary capital and neither of Pole's proposed lines was ever built by Palestine Railways. The only extension that Pole recommended and PR did build was a short extension for freight from Jaffa station to the harbour.[26] Jaffa harbour was so constrained by hazardous rocks that only small vessels dared to enter it; ocean-going cargo ships would lie off-shore and transfer their freight to or from the docks bylighters. Pole's recommendation to rebuild the harbour was not implemented, so as a result PR's new freight line received little use.[26]

For standard gauge use overseas the British Government requisitioned manyLondon and North Western Railway"Coal Engine"0-6-0s and 50London and South Western Railway395 Class 0-6-0s. The British Government sent 42 LNWR and 36 LSWR locomotives to the PMR[27]
In 1918 the PMR ordered 50 new locomotives. British factories were fully occupied so the order was placed with Baldwin in the USA.[28] They were4-6-0s of a simple wartime design, widely used elsewhere including onrailways in Belgium.[28] The first ten were delivered to Palestine in April 1919.[29] They had 5 ft 2 in (1,570 mm) driving wheels suitable for mixed traffic use.[30]
The PMR suffered at least one serious accident. In about 1918 the older of the Manning Wardle saddle tanks that the PMR had acquired from J. Aird & Co. was shunting at Jerusalem when the weight of its train became too much for it to hold on the gradient.[14] The train ran away downhill towards Bittir and collided with an LSWR 395 Class that was climbing towards Jerusalem.[14] The resulting collision"practically demolished" the saddle tank.[14]
The LNWR 0-6-0s were old, worn out and performed very badly in Palestine, so PR retired all of them for scrap by 1922.[28] The LSWR 0-6-0s performed better,[27] so PR kept most of them in service until 1928[28] and retained the last nine as shunting locomotives until 1936.[31]
The four Manning Wardle saddle tanks from the Inland Waterways and Docks Department were identical so PR designated them class M.[14] These were satisfactory asshunting locomotives and PR kept them in service for many years.[14] The J. Aird & Co. Manning Wardles were dissimilar and the PMR had already lost the older one in 1918 in a collision on the Jerusalem branch with an LSWR 395 class (see above).[14] PR disposed of the Hanomag well tank and the former Aird 1902 Manning Wardle for scrap in 1928.[30]
TheBaldwin 4-6-0 locomotives were successful on most of Palestine's standard gauge network but could not haul adequate loads on the steep gradients from Jaffavia Lydda to Jerusalem. In 1922 PR obtained six engines fromKitson and Company inLeeds,England, specifically designed to be powerful enough for the Jerusalem service. They were2-8-4Ttank locomotives designated class K. They had 4 ft 0 in (1,220 mm) driving wheels,[30] a diameter suitable for low-speed freight work and also for mountain gradients. The track gauge on the tight curves on the Jerusalem branch was widened from1,435 mm (4 ft 8+1⁄2 in) to as much as 4 ft 9.75 in (1,467 mm)[32] but unfortunately even with this adjustment the heavy eight-coupled class K was unsuitable and suffered a number of derailments.[citation needed]
PR designated theBaldwin 4-6-0s class H. In 1926 six were shipped toArmstrong Whitworth and Company inNewcastle upon Tyne, England who rebuilt them as4-6-2T tank locomotives, designated class H2.[33] In 1933 PR opened its own railway workshops in Haifa.[34] In 1937, with the help of some parts supplied byNasmyth, Wilson and Company inSalford, England, the Qishon works converted five class H 4-6-0s to4-6-4T tank locomotives,[35][36] designated class H3.[citation needed]
In 1928 PR bought one vertical-boilered0-4-0T shunting locomotive[37] and two vertical-boilered steam-poweredrailcars for local services fromSentinel-Cammell inShrewsbury, England.[33] Each railcar unit had two coach bodies articulated over three bogies. The shunter was capable of only light duties and by the end of theSecond World War PR had stored it out of use.[37] PR found the railcar format inflexible, as if passenger numbers exceeded the capacity of a railcar it was not practical to couple up an extra coach.[38] In 1945 PR removed the Sentinel engines and converted the railcars to ordinary coaching stock.[39]
After 1928 PR retained a few 395 class 0-6-0s for shunting, but they were approaching 50 years old so in 1934 PR obtained three purpose-built 0-6-0T shunting locomotives from Nasmyth, Wilson to start replacing them.[37] These were designated class N and PR took delivery of seven more in the period 1935–38.[37]

H class 4-6-0s hauled the Haifa – El Kantara service until 1935, when theNorth British Locomotive Company inGlasgow,Scotland supplied six more powerful 4-6-0s that PR designatedclass P.[37] These had a tractive effort of 28,470 lbf (126.6 kN): 16% more than the 24,479 lbf (108.9 kN) of classes H, H2 and H3.[30] Class P also had5 ft6+3⁄4 in (1,695 mm) driving wheels:[30] a mixed-traffic diameter by British standards but larger than those of the H series and therefore more suitable for higher speed traffic.[citation needed]
PR suffered frequent locomotive failures. In 1934 its locomotives averaged 7,860 miles (12,650 km) between failures, whereas the figure for locomotives in Great Britain for the same year was 88,229 miles (141,991 km).[40] Staff error caused 17% of failures but far more were caused by poor water, which PR's General Manager reported was"the most pressing of all the railway problems".[40] PR sought to alleviate this by buildingwater softening plants at the main watering points on its network, frequently chemically testing the water and eventually fitting all locomotives with blowing down apparatus with which the driver could purge sludge from the boiler.[41]

PR had fuelled its locomotives withWelsh coal[31] but in June 1940Italy declared war on the Allies and France surrendered to Germany and Italy, leaving the Mediterranean extremely dangerous for British merchant shipping. Early in 1942 PR belatedly began to convert its locomotives to burn oil,[42] but it did not complete the conversion programme until 1943.[31]
In 1941 Britain started to supply two types of2-8-0 Consolidation freight locomotive to its Middle East Command. One was theROD 2-8-0 class that had been designed in 1911 as theGreat Central RailwayClass 8K and that theUK's War Department (WD) had adopted as a standard design to be mass-produced for military traffic in the First World War. The other was theLondon, Midland and Scottish RailwayStanier 8F that had been designed in 1935 and that the WD now adopted as a standard design to be mass-produced for military use in the Second World War.[citation needed]
As Allied forces concentrated on defending Egypt and the Suez Canal from Italian and German attack the first shipments of 2-8-0s were delivered to Egypt,[43] but in March 1942 both types started to arrive in Palestine and by June 1942 24 ROD locomotives were working on PR and the Haifa – Beirut – Tripoli (HBT) line.[44] In 1944-45 the ROD locomotives were transferred out of Palestine and replaced by LMS locomotives[44] that had been in service on theTrans-Iranian Railway.[45] Other LMS locomotives were overhauled in Palestine in 1944 before being deployed either elsewhere in the Middle East or to the part of Italy now under Allied control.[46]
In the second half of 1942 the USA started to supply locomotives to the British Middle East Command. By December 1942, 27[44]USATC S200 Class2-8-2 Mikados were working the PR and HBT main lines and two[44]USATC S100 Class 0-6-0Tswitchers were supplementing PR's shunting fleet.[citation needed]
,By June 1943 12Whitcomb 65-DE-14[47] 650 HPdiesel-electric locomotives from the US were working on the HBT and by 12 December more were working on the PR.[44] The latter were an effective replacement for PR's Baldwins on the steeply graded Jerusalem line[48] but within a few months all had been transferred to double the diesel fleet on the HBT.[44] Whitcomb diesels were the HBT's principal motive power until the middle of 1944,[48] when they were replaced with ROD 2-8-0s[44] and transferred to Italy.[49]

In 1936–39 Palestinian Arabs opposed to Jewish mass immigrationrevolted against British rule. Railways were a particular target for sabotage.[50] The British builtblockhouses to protect bridges and regular military patrols of railway lines.[51] Patrols were initially on foot, then in armoured freight vans propelled by locomotives with armoured cabs, and finally with dozens of rail-mountedarmoured cars built at Qishon works.[52] After one was blown up by a mine, killing a soldier, the front of each armoured car was fitted with a long bar propelling apony truck intended to detonate any mine safely without injuring any of the armoured car's occupants.[53] British soldiers made Arab hostages ride on the pony truck so that any mine would be likely to kill them.[53][54]
Security measures failed to stop attacks on the railway. One attack damaged a Sentinel railcar.[53] In October 1937 a more serious attack damaged a passenger train and prompted a further decline in passenger numbers.[53] In 1938 sabotage derailed 44 trains, damaged 33 rail-mounted armoured cars, destroyed 27 stations and other buildings, damaged 21 bridges andculverts and destroyed telephone and signalling equipment and water supplies.[53] A member of the Survey of Palestine recalled that"nearly all the stations on the railway had been burnt".[54] For more than one period night running became so dangerous that it was suspended.[55] In September 1938 first the Jerusalem line and then El Kantara line were closed by extensive sabotage.[55] After the latter was reopened in October, Haifa – El Kantara trains were run only three days per week compared with the previous daily service.[56] The worst year was 1938, in which 13 railway workers were killed and 123 injured.[56]


During theSecond World War traffic on PR increased dramatically from 1940 to 1945.[57] The PR main line was a supply route for theNorth African Campaign that lasted from the Italian attack on Egypt in 1940 until the German surrender inTunisia in May 1943. In April – May 1941 theItalian air force and GermanLuftwaffe usedVichy French air bases in themandated territories of Syria and Lebanon as staging posts to supportRashid Ali'scoup d'état against Iraq's pro-British government. British and Empire forces landed in southern Iraq and overthrew the coup in the briefAnglo-Iraqi War of May 1941. Then in June and July 1941 PR served as a supply route for the British Empireinvasion of Vichy Syria and Lebanon.
PR suffered relatively few enemy air attacks.[58] In 1941 Haifa suffered several air raids, one of which left an unexploded bomb within a few yards of the line.[58] The last significant air attack on the railway was late in 1942, damaging the rail link to Haifa port.[58] The attacks killed one railway worker and wounded ten more.[58]
In June 1941Australian Army Engineers started building a line alongside theSuez Canal southwards from PR's terminus at El Kantara.[59] In July 1941 they connected the new line with Egyptian State Railways (ESR) by aswing bridge at El Ferdan across the canal.[59] In August 1941 PR started operating a through service between Haifa andCairo.[59] Construction of the line beside the canal continued until July 1942 when it reachedEl Shatt.[59] ESR then took over operation of the completed route.[59]
South African Army engineers built the first section of a new Haifa –Beirut –Tripoli (HBT) railway, branching off the 1050 mm gauge Haifa – Acre line and running along the rocky coast and through two tunnels to Beirut.[57] For its construction the HBT initially used 1050 mm gauge track throughout the Haifa – Beirut section for through running of traffic carrying railway construction materials.[60] The South Africans were transferred to other duties and the Haifa – Beirut section was completed by the New Zealand Railway Group.[60] The New Zealand Railway Group also operated the 1050 mm gaugeJezreel Valley railway between Haifa and Daraa on the Syrian border,[61] the Daraa – Damascus section of the 1050 mm gauge Hejaz Railway main line[61] and 60 miles (97 km) of branch lines including the 1050 mm line betweenAfula on the Jezreel Valley railway,Nablus, and Tulkarm on the main line between Haifa and Lydda.[61] The Afula – Mas'udiya service ended in 1932, and the Tulkarm – Mas'udiya – Nablus service in 1938, except for a 5 km dual gauge section between Tulkarm and the ballast quarries atNur Shams.[34][62]
By August 1942, the Haifa – Beirut section was complete, the track was converted to standard gauge,[60] and the stretch between Haifa and Acre, which was shared with the Jezreel Valley railway, todual gauge.[63] The new railway line started carrying through military traffic between Egypt, Palestine and Lebanon.[60] By then Australian Royal Engineers were already building the Beirut – Tripoli section, which they completed in December 1942.[60] PR operated the HBT between Haifa andAz-Zeeb[60] just south of the Lebanese border and the British militaryMiddle East Command operated the HBT between Az-Zeeb and Tripoli.[citation needed]
Completion of the Ferdan bridge and HBT hugely enhanced PR's strategic role. PR's annual freight traffic grew from 858,995 tons in 1940-41 to 2,194,848 tons in 1943-44.[64] The huge growth in the number of trains increased the potential for accidents. There were three head-on collisions and in 1942 six H class 4-6-0s were written off in accidents. The war effort both increased wear on equipment and reduced resources for maintenance. In November 1944 a downpour derailed an El Kantara – Haifa train, killing seven people and injuring 40.[58]





Most ROD and S200 locomotives were withdrawn from Palestine before the end of the Second World War and the remaining few soon followed,[44] but PR took 24 LMS 8F's[65] and the two S100s[66] into its locomotive fleet.
In 1945Zionist paramilitary organisations formed an alliance, theJewish Resistance Movement, which launched a war against British administration in which members of thePalmach,Irgun andLehi organisations sabotaged the PR network at 153 places throughout Palestine. Terrorists robbed a train delivering wages to railway staff.[67] In 1946 a terrorist bomb demolished the main part of the Haifa East station building.[68] In theNight of the Bridges of 16–17 June that year,Palmach saboteurs destroyed 11 road and rail links with neighbouring countries including PR's1,435 mm (4 ft 8+1⁄2 in)standard gauge links with Egypt and Lebanon and its1,050 mm (3 ft 5+11⁄32 in) gauge link with Syria.[69]
On 22 April 1947, terrorists blew up an El Kantara – Haifa train nearRehovot, killing five British soldiers and a number of civilians.[70] As security deteriorated, theft from the railway increased.[71] British security forces failed to intervene to protect the railway and in some cases took part in looting its assets.[72] In January 1948 the General Manager, Arthur Kirby, vainly pleaded with SirHenry Gurney, Chief Secretary of the Mandate Government, for adequate armed protection for the railway and its 6,000 staff, otherwise they would cease to do their duty and"I cannot guarantee to keep the railways operating".[73] In February Kirby noted:[citation needed]
...locomotives wrecked by mines have been repaired time and time again so that most of them, though blown up several times, are still working after 28 years of service – and working efficiently... We have no fewer than 50 personnel of the train crews absent from duty, some in hospital, suffering from the effects of having been interfered with while trying to perform their duty. Men have been killed while performing their duties. Running trains are subject to attack and the principal marshalling depot is constantly being fired over by snipers... [but] so long as the present Railway Management exists, it will endeavour to maintain the railways and ports as fully as possible without fear or favour and irrespective of politics.[74]
On 31 March 1948 another train was blown up by a terrorist mine nearBinyamina south of Haifa, killing 40 civilians and wounding 60.[75][76] By April 1948 Kirby described snipers' and saboteurs' killing of railway staff as"incessant".[72] In 1948 terrorists attacked PR's head office, Khoury House in Haifa, and the resulting fire badly damaged the accounts department.[1] PR's telephone and telegraph network was destroyed[77] and Jewish terrorists stole Kirby's car at gunpoint.[78]
Kirby instructed his staff:
The intention of the Management is that the Railways will be kept in operation and handed over on 15th May as a going concern. The severe loss of Khoury House, Headquarters, and the secession of Arab staff in Haifa will not interfere with this intention... All staff reporting for duty will be allocated to the best advantage, irrespective of the Branch in which they have been hitherto employed...[79]
Privately Kirby wrote to Gurney:
I have been expected to carry on the railways and ports under almost impossible conditions; I have taken upon myself risks and responsibilities that have seldom, if ever befallen the General Manager of a Colonial Railway; I have achieved more than could have been hoped for....[80]

By the time the British withdrew from the Mandate in May 1948, railway operations had effectively ceased.[81] For the remainder of 1948 railway services in the new State of Israel were confined to the area around Haifa, running southwards on the main line as far asHadera and northwards toKiryat Motzkin and laterNahariya.[82]
In the centre of the country, the populations ofRamla on the Jaffa – Jerusalem line and Lydda where this line joined the Haifa – El Kantara main line had large Arab majorities, who blocked Israelis from using railways or roads through this key area. One of the few train movements here after the British withdrawal was in July 1948 when Israeli forces launchedOperation Danny toexpel the Arab populations of Lydda and Ramla. When the Arab defenders blockaded the railway to help defend Lydda, an Israeli force reportedly used S100 0-6-0T number 21 as a battering ram to breach the fortifications.[66] Although Operation Danny succeeded in forcing at least 50,000 Arab residents to leave Lydda and Ramla, the military situation between Ramla and Jerusalem still prevented the restoration of regular trains on that line until March 1950.[83]
In the south of the country the rail link with Sinai and Egypt was fought over. Israelis ambushed an Egyptian troop train nearRafah, derailing it and inflicting many casualties.[82]
Israeli forces secured nearly all of the Haifa – Ashkelon section of the Haifa – El Kantara main line. However, a short stretch of theEastern Railway throughTulkarm was held byJordanian forces and the1949 Armistice Agreements made this front line part ofthe Armistice Line between Israeli- and Jordanian-controlled territory. In August 1948, Israel bypassed Tulkarm with a short stretch of new track just west of what was to become the Armistice Line.[84]
The Armistice Line between Israel and Syria left the Haifa –Samakh section of the 1050mm gaugeJezreel Valley line in Israeli-controlled territory. Israel Railways continued using parts of this route on an irregular basis until the early 1950s at which point the entire line was abandoned as it was the only narrow gauge line left in the Israeli network. In 2011–2016 the section between Haifa andBeit She'an was rebuilt in standard gauge along roughly the same route as the Ottoman era one, although the rest of the route along the Jordan River from Beit She'an to Samakh remains dismantled and has not been reopened.[citation needed]
The 1935 Pole committee's proposals were eventually realized, in modified form, decades after Palestine Railways' demise. In the early 1950sIsrael Railways finally connected Tel Aviv to Haifa using two northern routes: First through a link to the Eastern Railway via theBnei Brak railway station and later through a newcoastal railway toHadera where it linked up with the existing line to Haifa. These links however served the newTel Aviv Central Station and were only connected to the Jaffa-Lydda-Jerusalem railway through theEastern Railway, essentially the same indirect route used by Palestine Railways, until 1993 when the Ayalon Railway was constructed through the center of Tel Aviv. The railway junction in Niana, now calledNa'an, was built, but rather than serving a line to Rehovot and Rishon LeZion, it served a rebuiltRailway to Beersheba. In 2013, Israel Railways opened a new rail line to Ashdod via the southern Tel Aviv suburbs of Rishon LeZion andYavne, followed by an extension of theLod-Ashkelon railway to Beersheba viaSderot,Netivot andOfakim two years later, finally creating a southbound rail route that bypasses Lydda (now called Lod).[citation needed]

The former Palestine Railways are currently in three parts:
The HBT Railway is mostly dismantled except for the short section between Haifa andNahariya (nearby Az-Zeeb). This section has also been double tracked by Israel Railways. As the area north of Nahariya the HBT railway passes through is now a national park, Israel Railway's tenative plans for a new railway to Lebanon foresee a new railway to the east of the HBT railway, branching off theAcre-Karmiel railway atAhihud.[citation needed]
Israel dismantled much of the railway in Sinai in the period between theSix-Day War and theYom Kippur War, re-using most of the materials to build theBar Lev Line fortifications along the Suez Canal. In the 21st century, starting from Egypt in the south,Egyptian National Railways opened theEl Ferdanswing bridge on 14 November 2001, replacing a bridge destroyed in the Six-Day War in 1967. From El Ferdan, work then started on slowly rebuilding the former route toEl Arish, with the possibility of renewing the rest of the route toGaza. The project includes a branch line toPort Said Container Terminal. In December 2008Google Earth showed progress with stations as far asBir el-'Abd while some remnants of the old trackbed towards El Arish and Rafah are still visible. Later in the first decade of the 2000s, the rebuilt line in the Sinai became neglected, disused and overrun by sandstorms in many locations. In July 2012, the Egyptian transportation ministry declared its intention to restore the line to Bir el-'Abd. However, this was not carried out and a few years later the construction of theNew Suez Canal had since completely disconnected the Sinai from the rest of Egypt’s rail network until a new rail bridge is built somewhere across the canal.[citation needed]