TheOswestry, Ellesmere and Whitchurch Railway was a railway company that constructed a line fromWhitchurch viaEllesmere toOswestry. Most of the line was inShropshire but part entered Flintshire, nowWrexham County Borough. It was seen as a link from the local railways around Newtown to theLondon and North Western Railway, breaking the local monopoly of theGreat Western Railway. It opened as a single line in 1863 and 1864. Throughout the construction period it was short of money, and was paid for by the contractor, who took shares. Sporadically through its life it became a useful part of a through route for mineral trains, but it never developed greatly.

The railway was amalgamated on 25 July 1864 with three other railways, theOswestry and Newtown Railway, theLlanidloes and Newtown Railway and theNewtown and Machynlleth Railway, to formCambrian Railways. Cambrian Railways was in turn amalgamated into the Great Western Railway on 1 January 1922.

It was the scene of a serious derailment of an excursion train atWelshampton in 1897.

The line closed in 1965.

Origin

[edit]
The Oswestry, Ellesmere and Whitchurch Railway network in 1864

In the early 1850s trunk railway schemes affiliated to theLondon and North Western Railway and to theGreat Western Railway were promoted, to cross the Welsh hinterland, which as yet was without railways. None of the schemes was implemented and as a result a number of local proposals arose, to build short lines of only local significance. Thus by 1860 theLlanidloes and Newtown Railway, theOswestry and Newtown Railway, and theNewtown and Machynlleth Railway were built or in course of building.

These railways needed access to the developing English network, and the Oswestry and Newtown Railway provided that by connecting with theShrewsbury and Chester Railway, which was supported by the Great Western Railway, atOswestry. The relationship with the GWR was sometimes rocky, however.[1]: 153 

On 2 September 1858 the London and North Western Railway opened a single-track route fromCrewe toWhitchurch andShrewsbury. This suggested to the Welsh companies the possibility of an alternative to the GWR-dominated connection, if a line could be built to join the LNWR route. A public meeting was held inEllesmere on 1 October 1860. It was said that not only would a line between Whitchurch and Oswestry serve local districts, but it would link the Newtown group of railways with Crewe,Manchester and the industrial northwest of England. Moreover the line could even form the basis of a line through toMilford Haven, connecting the northwest with an Atlantic port as an alternative toLiverpool.[2]: 49–56 [1]: 153 [3]

Soon a provisional committee met to manage the engineering design and parliamentary process for the line. Intelligence was received that the Great Western Railway was planning branch extensions in the area and the committee planning the line to Whitchurch wanted to get the scheme under way before the GWR decided to interfere. On 9 January 1861 T & J Savin and Ward were appointed contractors and agreed to meet parliamentary expenses, provided the promoters acquired the necessary land and provided the initial cash for construction. The lack of money for preliminary expenses set the scene for the future.[2]: 49–56  Still some interested parties were proposing extensions of the scheme to serve other areas locally, and potential investors were confused by the multiplicity of schemes that seemed to be competing for their approval.Extraction of coal was developing rapidly in districts nearRuabon andFfrith, nearBrymbo, and branches from the future line that could serve those locations too were being proposed.[2]: 49–56 

Authorisation

[edit]

The Oswestry, Ellesmere and Whitchurch Railway Bill went to the 1861 session of Parliament; it was supported by the LNWR and strenuously opposed by the GWR. Fierce argument raged in the committee stages over the advantages of other rival schemes, but it was theOswestry, Ellesmere and Whitchurch Railway Act 1861 (24 & 25 Vict. c. ccxxiii) that was passed on 1 August 1861; a GWR alternative was rejected. However the act stipulated that work was only to start on the Ellesmere to Whitchurch section: the continuation from Ellesmere to Oswestry was to be suspended until 1 September 1862, under a clause inserted by the Lords, which hoped for a reconciliation with the GWR to see if a scheme could be developed to link Ellesmere, Oswestry, Ruabon and Shrewsbury. Share capital of £150,000 was authorised. £18,000 had already been expended on the parliamentary battle.[2]: 49–56 [1]: 153 [3][4]

Bettisfield station in 1962

The OE&WR communicated with the GWR on 31 October 1861 offering cooperation in building junctions atWhittington, where their lines crossed, as a move towards the parliamentary desire for full cooperation, but the GWR rebuffed the move. Construction work started on 4 September, but when Savin and Company asked for £10,000 to reimburse their outlay on parliamentary expenses, the cost of buying land and carrying out preliminary works, the OE&WR had no money to meet this debt. The company had to ask the Oswestry and Newtown Railway to make the payment, taking OE&WR shares in exchange. The process was repeated only a month later when Savin was due more money.[2]: 49–56 

Once again mineowners and others in theWrexham andMold areas agitated for a branch connecting to the line, and the OE&WR company obtained powers for a line fromBettisfield toWem in theOswestry, Ellesmere and Whitchurch Railway (Extension) Act 1862 (25 & 26 Vict. c. ccxviii) on 7 August 1862, but this was never built.[2]: 49–56 

Construction

[edit]

Within six months of the start of work on the Ellesmere to Whitchurch line, most of the track had been laid. The route lay acrossWhixall Moss (or Fenn's Moss), a three-mile (5 km) extent of bog. It was impossible to drain the moss to get a firm track foundation. While the average depth was estimated to be only about 12 feet (3.7 m), a surveyor lost a 35-foot (11 m) rod trying to find the bottom in one place. The line was built on a foundation formed of a raft of faggots.[2]: 49–56 

Captain Henry Tyler inspected the line for theBoard of Trade and approved it for the operation of passenger trains in May 1863; it was single-track line on a double-track formation. Goods train operation was started on 20 April 1863, and passenger trains followed on 4 May 1863; the line was worked by the LNWR.[1]: 153 [3][5][2]: 49–56 

The former Ellesmere station in 1997

Work started on the7+12-mile (12 km) section west from Ellesmere to Oswestry on 4 September 1862, three days after the date permitted in the original Act. The construction was straightforward and was completed on 27 July 1864.[2]: 49–56 [5]

At firstWhittington was the only intermediate station betweenEllesmere andOswestry (above and a little distance fromthe GWR station).Frankton, serving the twin border villages ofEnglish Frankton andWelsh Frankton, was added in 1866 or 1867. Ellesmere was the only intermediate station with apassing loop. Permanent station buildings were not built atFenn's Bank and Frankton until the early 1880s.[2]: 49–56 

Into the Cambrian Railways

[edit]

The OE&WR realised that its small size and dependence on other railways made it vulnerable, and it negotiated with other lines for amalgamation. After a number of false starts, agreement was reached that the four Whitchurch–Machynlleth lines would amalgamate to form theCambrian Railways Company, and this was authorised on 25 July 1864, two days earlier than completion of the line's construction.[1]: 153 [3]

Wrexham and Ellesmere Railway

[edit]
Main article:Wrexham and Ellesmere Railway

Wrexham was an important focus of coal and iron extraction. TheLondon and North Western Railway was increasing its interests in the area, and wanted a link to its system from Wrexham. This could most conveniently be achieved by a link to Ellesmere on the OE&WR, and this was authorised by Parliament on 31 July 1885 as theWrexham and Ellesmere Railway. It opened on 2 November 1895. There was a triangular junction at Ellesmere, but the Oswestry-facing curve was not much used until after 1911, when iron ore flows to and from South Wales were important for a few years. The southern end of the Wrexham line and the junctions at Ellesmere closed in 1962.[6]

Welshampton derailment

[edit]

A serious derailment took place atWelshampton on 11 June 1897; twelve people died as a result. ASunday school excursion was returning fromBarmouth toRoyton inLancashire; it was a long and heavy train, pulled by two locomotives with tenders. A little east of Welshampton at about 35 mph (55 km/h) the tender of the second enginederailed, destroying the track as it ran, and most of the following coaches derailed too. Lt ColH.A. Yorke conducted aBoard of Trade inquiry. In his report he said,

I walked over the line... and found that the majority of the oldsleepers were so much decayed or split that they afforded but little hold to thespikes... I saw a number of loose spikes with their head projecting 1 inch to1+12 inches above thechairs, and there was unmistakeable evidence that a considerable amount of movement, both vertical and lateral, of the chairs and spikes, occurs during the passage of trains.

A railway employee had stated that a four-wheel brake and third-class coach (referred to as a "van") was rough-riding but Yorke made it clear that he discounted the relevance of this: "My opinion [is] that the van had nothing to do with the derailment".

It has been suggested that the original displacement of the road, was caused by theLancashire and Yorkshire van, and that this was the first to leave the rails, pulling the tender and carriages after it. But the probabilities seem to me to be all the other way if thepermanent-way was strong enough to withstand the rocking motion of the two engines (each with its tender weighing70+34 tons) it is hardly conceivable that it would be disturbed by a relatively light vehicle of 10 tons weight... The lateral strain produced by the rear tender alone must necessarily have been far greater than that caused by the four wheeled vehicle...

But most careful consideration of all the circumstances confirms me in the belief, that this most serious accident was certainly caused due to the dislocation of the permanent way produced by the high speed and the consequent oscillation of the two heavy engines and tenders of the train, that the second tender was probably the first vehicle to leave the rails and that the derailment would have occurred even if the van had not been present... From what I have said above it is evident that the condition of the road demands the immediate attention of theCambrian company.[7]

Closure

[edit]

AfterWorld War II use of the railways in rural locations fell off rapidly as people turned to road transport for goods and personal transportation. The entire route between Whitchurch, Oswestry and Buttington was closed on 18 January 1965, except that the Ellesmere to Whitchurch goods service continued for a few weeks, closing on 27 March 1965.[1]: 165 [2]: 172 

Station list

[edit]
Oswestry, Ellesmere
& Whitchurch Railway
Whitchurch
Fenn's Bank
Bettisfield
Welshampton
Ellesmere
Frankton
Whittington High Level
Tinkers Green Halt
OswestryCambrian Heritage Railways
Weston Wharf

Nature reserve

[edit]

The central section of the line is now part of theFenn's, Whixall and Bettisfield Mosses National Nature Reserve.

References

[edit]
  1. ^abcdefBaughan, Peter E. (1991). David St. John Thomas; Allan Patmore (eds.).North and Mid Wales. A Regional History of the Railways of Great Britain. Vol. XI (2nd ed.). Newton Abbot, England: David & Charles.ISBN 0-946537-59-3.
  2. ^abcdefghijkChristiansen, Rex (1971).The Cambrian Railways. Vol. 1: 1852-1888. Illustrated by R. W. Miller. Newton Abbot: David and Charles.ISBN 0-7153-5236-9.
  3. ^abcdStanley C Jenkins and Martin Loader,The Great Western Railway: volume 5: Shrewsbury to Pwllheli, Amberley Publishing, Stroud, 2015, Kindle edition
  4. ^Donald J Grant,Directory of the Railway Companies of Great Britain, Matador Publishers, Kibworth Beauchamp, 2017,ISBN 978 1785893 537, page 432
  5. ^abLeslie Oppitz,Shropshire and Staffordshire Railways Remembered, Countryside Books, Newbury, 1993,ISBN 1 85306 264 2, pages 11 to 13
  6. ^Stanley C Jenkins and John M Strange,The Wrexham and Ellesmere Railway, The Oakwood Press, Usk, 2004,ISBN 0 85361 617 5, pages 14, 29, 30, 47
  7. ^H A Yorke, Board of Trade, Report on the Accident that Occurred near Welshampton on the Cambrian Railways on 11 June 1897.
Historic Welsh railway companies
Great Western
Railway
London and North
Western Railway
Joint lines
Independent lines
Industrial railways
Retrieved from "https://en.wikipedia.org/w/index.php?title=Oswestry,_Ellesmere_and_Whitchurch_Railway&oldid=1287334694"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp