Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Operation Scotland II

From Wikipedia, the free encyclopedia
Part of the Vietnam War (1968–1969)
Operation Scotland II
Part of theVietnam War
Date15 April 1968 – 28 February 1969
Location16°34′44″N106°45′11″E / 16.579°N 106.753°E /16.579; 106.753
ResultU.S. operational success
Belligerents
United StatesVietnamNorth Vietnam
Commanders and leaders
Units involved
308th Infantry Division
Casualties and losses
435 killedU.S.body count: 3,304 killed
Map
1959–1963:Guerrilla phase

1964–1965: Viet Cong offensive andAmerican intervention

1966 campaign

1967 campaign

1968–1969:Tet Offensive and aftermath

1969–1971:Vietnamization and
fighting in Cambodia

1972:Easter Offensive

1973–1974: Post-Paris Peace Accords

1975:Spring offensive


Air operations

Naval operations

Lists of allied operations

Operation Scotland II was aU.S. Marine Corps security operation that took place in northwestQuảng Trị Province from 15 April 1968 to 28 February 1969.

Background

[edit]

At 08:00 on 15 April, following the relief ofKhe Sanh Combat Base inOperation Pegasus the3rd Marine Division resumed responsibility for Khe Sanh Combat Base from the1st Cavalry Division and Operation Scotland II began with the Marines seeking out thePeople's Army of Vietnam (PAVN) forces on theKhe Sanh plateau and across the operational area which comprised the western third of Quảng Trị Province.[1]: 289 

Operation

[edit]

April 1968

[edit]

3rd Marine Division commander MGRathvon M. Tompkins sent the division deputy commander BGJacob E. Glick to Khe Sanh base to take control of the forces there comprising the1st Marine Regiment which was relieving the26th Marine Regiment, the1st Battalion, 9th Marines and the2nd Brigade, 1st Cavalry Division, this force was designatedTask Force Glick. The Task Force and Regimental command posts and2nd Battalion, 1st Marines were located at the base,1st Battalion, 1st Marines occupied Hills 558, 861, 881 South and950, the2nd Battalion, 3rd Marines provided security alongRoute 9 and the3rd Battalion, 4th Marines was deployed to secure Hill 689 (16°38′35″N106°41′20″E / 16.643°N 106.689°E /16.643; 106.689).[1]: 313 [2]

Map showing location of U.S. positions around Khe Sanh

On 16 April 1968, Company A1st Battalion, 9th Marines began a patrol southwest of Hill 689, when it was ambushed by PAVN soldiers in bunkers concealed in the thick vegetation. Two more companies from 1/9 Marines were dispatched to save them, but they became ensnarled in this confusing battle and were unable to disengage until the early morning of 17 April. Casualties amounted to 38 Marines and three Navy Corpsmen killed, three missing and 32 wounded. The battalion commander Lieutenant Colonel John Cahill was relieved of duty.[1]: 313–6 

On 19 April the PAVN ambushed a convoy of the1st Battalion, 11th Marines killing three Marines. Following this ambush 1st Marine Regiment commander Col.Stanley S. Hughes restricted traffic on Route 9 and formed a Provisional Mechanized Company combining an anti-tank company, two infantry platoons and elements of the3rd Tank Battalion to improve road security.[1]: 316 

At the end of April BGCarl W. Hoffman replaced Glick and the force was briefly designatedTask Force Hoffman but subsequentlyTask Force Hotel based on the radio callsign.[1]: 316 

May 1968

[edit]

On 14 May the PAVN ambushed a supply convoy 1 km north of Route 9, the 2/3 Marines was sent to relieve the convoy and pursued the PAVN into a bunker complex killing 74 PAVN for the loss of seven Marines.[1]: 317  On 17 May Company H, 2/1 Marines pursued several PAVN into a bunker complex killing 52 PAVN for the loss of six Marines. From 17 to 19 May, the 3/4 Marines patrolling the ridgeline between Hills 552 (16°38′13″N106°42′29″E / 16.637°N 106.708°E /16.637; 106.708) and 689 killed 84 PAVN and captured five.[1]: 318 [2]: 5–232 

At 04:00 on 19 May, a PAVN platoon attacked Company H 2/3 Marines position on Route 9 southeast of Khe Sanh killing three Marines for the loss of eight dead. Simultaneously Company I 3/4 Marines on Hill 552 was hit by PAVN mortar fire, at dawn the Marines attacked the PAVN position killing 42 and capturing four.[1]: 318  At 07:10 a platoon from Company F 2/1 Marines supported by two tanks on a road sweep operation from Khe Sanh base towards Route 9 was ambushed, the Marines attempted to assault the PAVN positions but were repulsed. The remainder of Company F was sent to reinforce the platoon but the Marines attack was again repulsed, Company G was then sent to reinforce Company F and napalm strikes were called in close to the Marine lines forcing the PAVN to retreat. Marine losses were eight dead while PAVN losses were 113 killed and three captured.[1]: 318  Given the increased PAVN activity around the base, in late MayIII Marine Amphibious Force (III MAF) ordered3rd Battalion, 9th Marines to reinforce the units in the area.[1]: 319 

On 24 May, Company G 2/3 Marines engaged a PAVN company in bunkers on a ridge overlooking Route 9, 4 km southeast of the base known as "Foxtrot Ridge" (16°37′11″N106°45′24″E / 16.6196°N 106.7568°E /16.6196; 106.7568).[2]: 5–188  Air and artillery strikes were called in on the bunkers but the Marine attack was repulsed so further gunship and artillery strikes were called in which allowed the Marines to capture the position by 20:15 for the loss of 15 Marines killed, while the PAVN had lost 58 dead. Company G was reinforced by Companies E and F and dug into positions 700m apart along the ridgeline. At 02:45 on 28 May Company F detected PAVN movement outside their perimeter and artillery strikes were called in. Three PAVN armed withSatchel charges then attacked a listening post killing themselves and three Marines, this action started a battalion sized attack on Company F's positions. The PAVN forced the 1st Platoon from its position and overran the company's 60 mm mortar position. At 03:30 Company F was hit by PAVN 130 mm artillery fire from across theVietnamese Demilitarized Zone (DMZ). At 04:15 anAC-47Spooky gunship and a flareship arrived over the battle and were engaged by PAVN antiaircraft fire. The PAVN made repeated attacks to try to overrun the Marine positions supported by continuousRPG-2 fire.[1]: 319  At 07:00 a napalm strike against PAVN reinforcements killed over 30 PAVN and started a wildfire that forced Company F from its fighting positions. Company F regained its positions as the fire died down and the PAVN began to disengage. At 11:50 Company E arrived to reinforce Company F and overran a PAVN RPG position. The Marines lost 13 dead while the PAVN lost 230 killed.[1]: 320 

In response to the renewed PAVN artillery fire, on 30 May, fourM107s and fourM110s were deployed to Khe Sanh base fromCamp Carroll and these engaged in a 48-hour artillery barrage namedOperation Drumfire II against suspected PAVN artillery positions in the Co Roc mountain range (16°33′40″N106°37′55″E / 16.561°N 106.632°E /16.561; 106.632), with little noticeable effect.[1]: 320 [2]: 5–112 

At 04:00 on 31 May the PAVN supported by artillery fire attacked Company E 2/3 Marines on Foxtrot Ridge but were beaten back. At 08:50 Company B 1/1 Marines was ambushed as it moved to support Company E, they were then reinforced by Company G 2/3 Marines and Company E 2/1 Marines who overran the PAVN positions. The Marines lost 32 dead while the PAVN lost 136 killed.[1]: 320 

June 1968

[edit]

From 2 to 19 JuneTask Force Hotel conductedOperation Robin in the "Vietnam Salient" 15 km south of Route 9 resulting in 65 Marines killed and 635 PAVN killed and 48 captured.[1]: 320–4 

From 19 JuneTask Force Hotel conductedOperation Charlie, the evacuation and destruction of the Khe Sanh Combat Base. Useful equipment was withdrawn or destroyed. At 03:25 on 1 July, the PAVN attacked a position held by 3rd Battalion, 4th Marines 3 km southeast of the base. The battle continued until late afternoon when the PAVN disengaged leaving over 200 dead, while the defending Marines lost two men. The PAVN kept up artillery and mortar fire on Marine positions around the base. At 20:00 on 5 July Khe Sanh Combat Base was officially closed and on 6 July Operation Charlie concluded. The 1/1 Marines remained around Hill 689 to recover the remains of seven Marines killed in the earlier fighting and another 11 Marines and 89 PAVN soldiers were killed, before the 1/1 Marines recovered the dead and withdrew from the area on 11 July.[1]: 324–6 

The abandonment of Khe Sanh base was part of a change in U.S. strategy following the replacement of GeneralWilliam Westmoreland asCOMUSMACV by GeneralCreighton Abrams and the increased availability of helicopters saw the Marines move away from being tied to defending large bases along the DMZ and refocussing on mobile operations to engage PAVN units and their logistics network.[1]: 324–6 

August–October 1968

[edit]
2/4 Marines offload from HMM-262 CH-46s near Lang Vei

August–September 1968 saw little activity in the Scotland II area as the PAVN concentrated their activity further east in theLancaster II andKentucky area of operations and poor weather limited activities. PAVN units observed in the area were engaged by fire on numerous occasions but with unclear results. On 17 September PAVN units were observed near the site of the abandoned Khe Sanh base and air and artillery strikes were ordered in with negligible results.[1]: 406–8 

On 5 OctoberTask Force Hotel commander BGFrank E. Garretson (who had assumed the command in August) commenced a new operation west of Khe Sanh, landing the 3/4 Marines and 2/4 Marines north and south of the abandonedLang Vei camp and then sweeping east along Route 9. The operation uncovered various PAVN supply caches and graves but saw only minor skirmishes with the PAVN. 2/4 Marines arrived atVandegrift Combat Base on 16 October and left the operation, while the 3/4 Marines, joined by 3/9 Marines on 24 October, continued to sweep the hills north of Route 9 until the end of October with limited results.[1]: 409–10 

In late October 2/9 Marines was landed in the Vietnam Salient and after sweeping it they moved north to patrol theĐa Krông valley, in mid-November it was joined by the 3/9 Marines and the two battalions conducted a systematic sweep of the valley and then moving further east and south of Vandegrift.[1]: 453–5 

November–December 1968

[edit]
Marine from 1/4 Marines distributes ammunition during an attack on Firebase Russell, 12 December 1968

By early NovemberTask Force Hotel controlled the following forces in the Scotland II operational area: 1/4 Marines defended and patrolled from Firebases Cates (16°40′24″N106°48′22″E / 16.6734°N 106.806°E /16.6734; 106.806) andShepherd and Hills 691 (16°40′23″N106°48′22″E / 16.673°N 106.806°E /16.673; 106.806) and 950;[2]: 5–95 [2]: 5–464 [2]: 5–234  3/4 Marines defended Firebase Gurkha (16°42′34″N106°42′45″E / 16.7094°N 106.7126°E /16.7094; 106.7126) and patrolled the Khe Xa Bai and Song Rao Quan Valleys;[2]: 5–206  and 2/4 Marines was deployed to Hill 1308 to constructFirebase Argonne approximately 10 km northwest ofKhe Sanh and 2 km east of the Laotian border. On 11 November following the completion of the construction of Firebase Argonne, 1/4 Marines rotated with 2/4 Marines who then closed Firebase Shepherd.[1]: 450 

On 21 November 3/4 Marines deployed by helicopter to reopenLanding Zone Mack and establishLanding Zone Sierra and Firebase Winchester (16°48′14″N106°47′15″E / 16.804°N 106.7876°E /16.804; 106.7876).[1]: 451 [2]: 5–551 

On 23 November Operation Lancaster II was terminated and the Lancaster area of operations was absorbed into the Scotland II and Kentucky operational areas.[1]: 448 

On 24 November Company E, 2/4 Marines was landed at Firebase Winchester and then moved 1 km east to establishFirebase Russell.[1]: 451 

On 28 November 1/9 Marines and 3/9 Marines launched Operation Dawson River to sweep the PAVN Base Area 101 and the Ba Long Valley uncovering numerous supply caches and graves but meeting limited resistance. The operation concluded on 25 December.[1]: 454–5 

On 3 December 1/4 Marines establishedFirebase Neville on Hill 1103, approximately 15 km north of Khe Sanh and just south of the DMZ and Battery G,3rd Battalion, 12th Marines deployed there. On 14 December Firebases Alpine, Argonne and Gurkha were closed.[1]: 451 

On 7 December 2/4 Marines was landed on ridgelines east of LZ Mack and 3 km north ofDong Ha Mountain. On 8 December as a patrol from Company E approached Hill 208 (16°51′14″N106°54′58″E / 16.854°N 106.916°E /16.854; 106.916) it was engaged by PAVN fire.[2]: 5–227  The Marines were reinforced and assaulted into the PAVN position where they were caught in a crossfire and at dusk they were forced to retreat leaving three dead Marines behind. The rest of the battalion was moved to surround the PAVN while it was bombarded throughout the night, but the PAVN escaped the cordon and the Marines only found the bodies of their own dead the next morning. On 11 December Company F was searching for PAVN mortar positions onMutter's Ridge along the southern DMZ when they became pinned down by entrenched PAVN; one of the company's platoon commanders was Lt.Robert Mueller. He earned aBronze Star for rescuing a fallen Marine under enemy fire as well as aPurple Heart after he was wounded in the leg by enemy fire.[3]

The Marines withdrew to evacuate their casualties and following air and artillery strikes resumed their assault on the PAVN positions. Company H moved in to attack the PAVN position from the north and also became heavily engaged but their fire eventually forced the PAVN to withdraw. Marine losses were 13 dead. On 12 December the Marines scoured the area but were denied permission to pursue the PAVN into the DMZ. Over the next two weeks 2/4 Marine searched the ridgeline but without engaging any more PAVN and on 26 December they were redeployed to theCửa Việt Base.[1]: 452–3 

January–February 1969

[edit]
1/4 Marines move to board a CH-46 at Vandegrift Combat Base

On 31 December 1968, the3rd Reconnaissance Battalion was landed west of the former Khe Sanh base to commence Operation Dawson River West. On 2 January 1969 the 9th Marines and the 2nd ARVN Regiment were also deployed on the Khe Sanh plateau supported by the newly established Fire Support Bases Geiger (16°40′26″N106°38′10″E / 16.674°N 106.636°E /16.674; 106.636) and Smith (16°37′12″N106°40′37″E / 16.62°N 106.677°E /16.62; 106.677);[2]: 5–195 [2]: 5–469  the three-week operation found no significant PAVN forces or supplies in the Khe Sanh area.[4]: 18–9 

The PAVN generally avoided contact throughout January as the Marines conducted sweeps across the Scotland II area to try to locate the PAVN and disrupt their logistical preparations. On 10 January a large bunker complex was discovered north of Firebase Neville indicating that the PAVN were preparing for operations in the area and on 1 February elements of the 3rd Reconnaissance Battalion and 2/4 Marines swept the southern half of the DMZ north of Neville discovering further caches but without gaining any useful intelligence on PAVN plans.[4]: 19–22 

In mid-January the 9th Marine Regiment beganOperation Dawson River South (later renamed Operation Dewey Canyon) against the Đa Krông andA Sầu valleys.[4]: 30 

In the early foggy morning of 25 February 1969 200 sappers from the PAVN 246th Regiment attacked Firebase Neville killing 12 Marines from Company H, 2/4 Marines and Battery G, 3/12 Marines and two Navy corpsmen for the loss of 36 PAVN dead. On the same morning the PAVN 27 Regiment attacked Firebase Russell 10 km east of Firebase Neville killing 29 Marines and Corpsmen for the loss of 25 PAVN. The PAVN remained deployed around Firebase Neville and continued to hit it with mortar fire for several more days despite air and artillery support, until swept from the area by Company G, 2/4 Marines.[4]: 22–3 

Aftermath

[edit]

Operation Scotland II concluded on 28 February 1969 with the subordinate units remaining in place.[4]: 23  In early April outgoing 3rd Marine Division commander MGRaymond G. Davis stated that "we totally control Quảng Trị Province."[4]: 52 

See also

[edit]

References

[edit]

Public Domain This article incorporatespublic domain material from websites or documents of theUnited States Marine Corps.

  1. ^abcdefghijklmnopqrstuvwxyzaaShulimson, Jack (1997).U.S. Marines in Vietnam, 1968, The Defining Year. History and Museums Division, Headquarters, U.S. Marine Corps.ISBN 0-16-049125-8.Public Domain This article incorporates text from this source, which is in thepublic domain.
  2. ^abcdefghijklKelley, Michael (2002).Where we were in Vietnam. Hellgate Press. pp. 5–234.ISBN 978-1555716257.
  3. ^Graff, Garrett (May 15, 2018)."The Untold Story of Robert Mueller's Time in Vietnam".Wired. RetrievedJune 3, 2018.
  4. ^abcdefSmith, Charles (1988).U.S. Marines in Vietnam: High Mobility and Standdown 1969. History and Museums Division, Headquarters, U.S. Marine Corps.ISBN 978-1494287627.Public Domain This article incorporates text from this source, which is in thepublic domain.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Operation_Scotland_II&oldid=1291538109"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp