You can helpexpand this article with text translated fromthe corresponding article in Thai.Click [show] for important translation instructions.
|
![]() Interactive map of One Bangkok | |
| Location | Northeast corner of Witthayu intersection (WhereWitthayu,Rama IV andSathon roads meet),Pathumwan,Bangkok |
|---|---|
| Status | Under construction, partially completed |
| Groundbreaking | June 2019 |
| Estimated completion | 2030-2031 |
| Use | Mixed use: offices, residential condominiums, hotels, retail |
| Website | https://www.onebangkok.com/ |
| Companies | |
| Architect | Skidmore, Owings & Merrill, A49,Kohn Pedersen Fox Associates, Lead8 |
| Structural engineer | Beca Group |
| Contractor | Thai Bauer & Seafco (foundation works); ThaiObayashi; Nantawan Co.Ltd;Italian-Thai Development; ThaiTakenaka; Pre-Built PCL; Visavapat Co.Ltd; Koranit Construction Co.Ltd; T.T.S. Engineering (2004) Co.Ltd. |
| Developer | Frasers Property, TCC Assets |
| Owner | Charoen Sirivadhanabhakdi |
| Technical details | |
| Cost | $USD3.9 Billion |
| Buildings | O4H4 (Signature Tower), O3, O2, O1B, O1AH1, H3C3A, C5, C3B, P5, H2A, H2B, R1, R2, R3, R4 |
| Size | 16.64 hectares |
| Leasable area | 1.83 million square metres |
One Bangkok is a US$3.9 billionmixed-use development[1] under construction inBangkok,Thailand. One Bangkok is being developed byFrasers Property, a subsidiary ofTCC Group, one of Thailand's largest conglomerates. It was expected to open in stages between 2024 and 2030[2] but due to delays has commenced opening in 18 March 2024 starting with the first office building and other elements expected to open during 2024 onwards.
The One Bangkok site occupies an area of 16.7 hectares (41 acres) overlookingLumphini Park at the corner of Witthayu intersection (WhereWitthayu,Rama IV andSathon roads meet) inPathum Wan district. The site was previouslySuan Lum Night Bazaar and encompasses the oldLumpinee Boxing Stadium and the oldArmed Forces Academies Preparatory School.
The development comprises five office towers, three hotels/service apartment towers, interconnected retail podiums,[3] art and cultural venues, with 8 hectares of plazas and landscaped green spaces. The project incorporated many sustainability design features such as a centralized energy and water management system, and the use of recycled waste building materials in construction. It is the first project in Thailand to target aLEED Platinum for neighborhood development.[4] The development is directly linked toLumphini station of theMRT Blue Line via an underground tunnel with the exit 1B.
One Bangkok is the first real estate project in Thailand to receive both Platinum certifications for WiredScore and SmartScore, marking the highest level of recognition from WiredScore for its commercial office towers.[5]
Among the prominent firms that have chosen to establish their offices at One Bangkok areBaker McKenzie Ltd., KGI Securities (Thailand) Public Company Limited,Estee Lauder Companies, A. Menarini (Thailand) Ltd., LINE MAN Wongnai, andBMW Group Thailand, among others.[5] andMicrosoft[6]
One Bangkok is planned as an integrated district that will accommodate a living and working population of 60,000, and up to 200,000 daily visitors.
The project includes five Grade-A office towers ranging between 40 and 92 storeys, three luxury hotels and service apartment towers and four retail precincts with a combined gross floor area of 1.83 million square meters. The retail precinct will accommodate 450 stores with 180,000 square meters of net lettable area.[7]
Two hotels are currently announced for One Bangkok: TheRitz-Carlton Bangkok, occupying the first 25 floors of one 50-storey tower,[8] andAndaz One Bangkok,[9] occupying the adjacent hotel tower. Both hotels are slated to open at the end of 2024.
The tallest building was originally planned within the complex to be the 92-storey Signature Tower, which at 436 metres (1,430 feet) in height would becomeBangkok's andThailand's tallest building upon completion.[10] As of 2024, construction of the superstructure works of the signature tower and one residential tower does not appear to have started, much of the rest of the development is now topped off or close to complete with the first office building opening to the public in March 2024.[11]
13°43′38″N100°32′50″E / 13.7272°N 100.5473°E /13.7272; 100.5473