Niederaussem Power Station

Coordinates:50°59′44″N06°40′09″E / 50.99556°N 6.66917°E /50.99556; 6.66917
From Wikipedia, the free encyclopedia
Lignite-fired power plant in Germany
This article needs to beupdated. Please help update this article to reflect recent events or newly available information.(January 2021)
Niederaussem Power Station
Power Station Niederaussem in 2011
CountryGermany
LocationBergheim
Coordinates50°59′44″N06°40′09″E / 50.99556°N 6.66917°E /50.99556; 6.66917
Commission date1965
OwnerRWE Power
Operator
  • RWE Power
Thermal power station
Primary fuelLignite
Power generation
Units operational3
Nameplate capacity2,220MW
External links
CommonsRelated media on Commons
Map
The power station

Niederaussem Power Station is alignite-fired power station in theBergheimNiederaussem/Rhein Erft circle, owned byRWE. It consisted of nine units, which were built between 1963 and 2003. It is the largestlignitecoal power plant in operation in Germany, with total net capacity of 2,220 MW. The plant is estimated to have been one of the ten most carbon-polluting coal-fired power plants in the world in 2018, at 27.2 million tons ofcarbon dioxide, and its emissions intensity (kgCO2 perMWh of power produced) is estimated to be 45.1% higher relative to the average for all fossil-fueled plants in Germany.[1] According to the studyDirty Thirty, issued in 2007 by theWWF, Niederaussem Power Station is the second-worst power station in Europe in terms ofmercury emissions due to the use oflignite.[2] Niederaussem Power Station is also among the world'sleast carbon-efficient power stations, at 1.2 kilograms ofCO2 for every kilowatt-hour generated as of 2007.[3]

History

[edit]

Initial construction

[edit]
The plume clouds from the cooling towers break through the cloud layer.

In the autumn of 1960 the construction work for the blocks A and B (150 MW) began. The location was selected because of the possibility of an extension. The supply of brown coal was ensured by seams on a north-south course ("Garzweiler"). Before blocks A and B first produced power, the construction work for the first 300-megawatt power station block location in Niederaussem began. That block went online in the summer 1965. Between 1968 and 1971, three further blocks with improved technology were developed. With the building of the two 600 MW blocks, a large jump forward occurred. These blocks were synchronised to thegrid in 1974. At that time, the blocks at Niederaussem produced a total of 2,700 megawatts.

Mid-1990s

[edit]

In the middle of the 1990s, the output was again increased. In order to reach the limit values of the new environmental protection regulations, in 1986 the work for aflue-gas desulphurization plant began. That work was completed in 1988. The flue gases are fed into scrubbers and cleaned by a lime-water mixture. The cleaned and cooled exhaust is then warmed up to 75 °C (167 °F) again and carried by the chimneys to the outside air. During the flue gas purification,gypsum from the lime-water mixture, which is processed beside the power station in Auenheim by the company Pro mineral, is produced.

1997 to present

[edit]

With the construction of the new BoA block (Braunkohlekraftwerk mit optimierter Anlagentechnik), German forlignite power station with optimised system technology, a new chapter at the power station began; between 1997 and 2002 it was the most modern brown coal power station block of the world with a gross production of 1,012 megawatts (950 MW net) with a far higher efficiency (43%) than most other plants (as low as 31%). RWE invested1,200 million into the project. The new power block building has a height of 172 metres (564 feet) and is the tallest industrial building in the world.[4] The new unit'scooling tower was also the tallest in the world at 200 meters (656 feet)[5] when it was built, but is now the third-tallest, after those at thePingshan Power Station in China and theKalisindh Thermal Power Station in India. Thanks to these developments, Niederaussem became one of the largest and most moderncoal-fired power stations in the world. The official opening of the new block took place in summer 2002.

Since 21 July 2006,RWE has spent €40 million building afluidized bed drying unit with waste heat technology as a pilot project for the drying process of the raw brown coal. In addition, the free waste heat of the power station is used.

The older units at the plant are being decommissioned starting in the early 2010s.Units A and B were decommissioned at the end of 2012.In 2019, RWE cancelled a 1,200 MW upgrade.[6]Unit D was decommissioned on 31 December 2020, and unit C was decommissioned a year later on 31 December 2021.Units E and F were decommissioned on 31 March 2024.[7]

2006 fire

[edit]

On 9 June 2006 at 1:15, a fire caught hold in block H of the coaling station. The fire spread to two further coaling station blocks. Later, the flames seized nearly the entire area of the "old power station", and a large, black smoke cloud ascended, which spread many kilometers to the north-west. The power station's ownfire brigade could not control the fire and sounded the alarm. About 300 rescue forces from the entireLand responded. The damage to property went into the tens of millions.[citation needed] Even by the late evening of the next day, the fire was not completely extinguished. The spread of the fire was contained by recently-developed fire precautions in the other sectors of the power station so that only the coaling station was affected.

See also

[edit]

References

[edit]
  1. ^Grant, Don; Zelinka, David; Mitova, Stefania (2021)."Reducing CO2 emissions by targeting the world's hyper-polluting power plants".Environmental Research Letters.16 (9).doi:10.1088/1748-9326/ac13f1.ISSN 1748-9326.
  2. ^"HEAL Lignite Briefing"(PDF). Retrieved2019-07-14.
  3. ^"List of least carbon efficient power stations",Wikipedia, 2024-01-15, retrieved2025-01-18
  4. ^"Boilerhouse of Unit K of Niederaussem Power Plant, Bergheim - SkyscraperPage.com".skyscraperpage.com.
  5. ^Harte, R; Krätzig, W. B (1 January 2002). "Large-scale cooling towers as part of an efficient and cleaner energy generating technology".Thin-Walled Structures.40 (7):651–664.doi:10.1016/S0263-8231(02)00018-6.
  6. ^"RWE cancels plans for new coal plants, including Niederaussem".Reuters. 26 April 2019. Archived fromthe original on May 2, 2019.
  7. ^"RWE Power legt weitere fünf Kraftwerksblöcke endgültig still und setzt Kohleausstieg fort".

External links

[edit]
Wikimedia Commons has media related toNiederaussem Power Station.
Divisions and
subsidiaries
Current
Former


Joint ventures
and holdings
Current
Former
Places and
facilities
Germany
United
Kingdom
Other
People
Other
  • 1Sold2Decommissioned
Retrieved from "https://en.wikipedia.org/w/index.php?title=Niederaussem_Power_Station&oldid=1311888561"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp