Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

New England Central Railroad

This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia

Railroad company

Not to be confused withCentral New England Railroad orCentral New England Railway.
New England Central Railroad
A blue and yellow diesel locomotive parked on railroad tracks, in front of a building
A NECRGP38 at White River Junction, Vermont
Overview
Parent companyGenesee and Wyoming
HeadquartersSt. Albans, Vermont
Reporting markNECR
LocaleNew England
Dates of operation1995–present
PredecessorCentral Vermont Railway
Technical
Track gauge4 ft 8+12 in (1,435 mm)standard gauge
Length345 miles (555 km)
Other
WebsiteOfficial website
Route map

US/Canada border
St. Albans
Essex Junction
Burlington
Northern Subdivision
Granite Division
Montpelier Junction
WACR
Conn River Subdivision
White River Junction
Lebanon
Claremont
Bellows Falls
Brattleboro
East Northfield
Connecticut River Line
B&S (PAS)
Millers Falls
Palmer
Willimantic
P&W
P&W
Northeast Corridor
Central Pier
New London
P&W
Northeast Corridor

TheNew England Central Railroad (reporting markNECR) is aregional railroad in theNew England region of the United States. It began operations in 1995, as the successor of theCentral Vermont Railway (CV). The company was originally a subsidiary of holding companyRailTex before being purchased byRailAmerica in 2000. In 2012, the company was purchased byGenesee & Wyoming, its current owner.

The New England Central Railroad main line runs fromNew London, Connecticut, toAlburgh, Vermont, at the Canada–US border, a distance of 366 miles (589 km).[1] As of 2024, it has a total track length 345 miles (555 km).[2] Primary sources of traffic include lumber, metals, chemicals, and crushed stone.

History

[edit]

Background and CN divestment

[edit]
Four green and yellow locomotives pulling a train.
A Central Vermont Railway train in 1994

TheCentral Vermont Railway (CV) had long been owned and operated by Canadian railroads, first theGrand Trunk Railway and from 1927 theCanadian National Railway (CN); CN was in turn owned by the government of Canada. The Central Vermont's owners kept it a separate company, complete with its own fleet of green and yellow painted locomotives.[3]

Operations on the line entered a general decline in the 1980s in tandem with falling freight volumes, which persisted despite the introduction of modern locomotives by CN in the early 1990s.[3] In 1992, the Canadian government began the process of privatizing CN; as part of privatization, branches and less lucrative lines were identified for divestment, including the Central Vermont. CN announced it wished to sell the Central Vermont in 1993, and in October 1994 shortline railroad holding companyRailTex Corp. offered to buy the CV via a new subsidiary named the New England Central Railroad (NECR).[4][5] The transaction was completed in early 1995.[6]

Formation and early years (1995–2000)

[edit]

The Central Vermont Railway transitioned to the New England Central Railroad starting on February 3, 1995, with the transition completed three days later on February 6.[3] The new railroad was marked by improved service compared to the old Central Vermont, as well as more flexible crew arrangements, both of which led to a resurgence of the line. Within a year of NECR's takeover of the line, declining traffic flow was reversed, with the railroad handling more than 30,000 carloads annually within two years of commencing operations,[1] in contrast to the old CV, which had suffered through years of declining traffic and the loss of profitability.[7] The company's rapid success led to it being named 1995's Short Line Railroad of the Year by industry trade journalRailway Age.[8]

NECR's motive power initially consisted of formerGulf, Mobile and Ohio RailroadEMD GP38s, although by the late 1990s, leased locomotives, largely formerConrailEMD SD40-2s, entered service.[6]

Shortly after NECR's founding, the state of Connecticut and the company worked to develop more business at the Port of New London, where the State Pier had recently collapsed. The railroad was commended by a local newspaper for "an aggressive effort to bring rail and shipping business through New London."[9] The pier was rebuilt and opened in 1998, with NECR's tracks directly serving the port.[10][11] The port's operator leased four acres from the railroad for cargo storage.[10]

RailAmerica ownership (2000–2012)

[edit]

In 2000, RailTex was acquired byRailAmerica, which was subsequently bought in 2007 byFortress Investments. Neither change in ownership affected the NECR to any great extent.[12]

On November 9, 2010, the railroad began construction on a project to raise speeds on trackage within Vermont to 59 miles per hour (95 km/h), with speeds on the route south ofWhite River Junction being increased to 79 miles per hour (127 km/h) for passenger service. The upgrades were part of a project to decrease running times forAmtrak'sVermonter, which operates over the route. Construction was funded by a $70 million grant from the federal government, part of theAmerican Recovery and Reinvestment Act.[13]

The NECR main line was heavily damaged in several locations byHurricane Irene during August 2011. A six mile segment in Vermont was taken out of service entirely by storm damage, with downed trees and flooding affecting other segments as well. Rail service returned to all customers by September 13, with full repairs completed later in the month.[14][15]

Genesee & Wyoming ownership (2012–present)

[edit]
A pair of orange and black diesel locomotives parked on a siding, with train cars behind them.
A NECR train parked inBrattleboro, Vermont

The 45 railroads formerly owned byRailAmerica, which had previously taken overRailTex lines, were transferred to Connecticut-based shortline holding companyGenesee & Wyoming in December 2012. This change of ownership caused a shuffle of locomotives around their rail system, and the original NECR yellow-and-blue paint scheme is slowly being replaced by the Genesee & Wyoming scheme.[3] Genesee & Wyoming subsequently purchased theProvidence and Worcester Railroad, which interchanges freight with the New England Central, in 2016.[3]

NECR purchased the shortlineClaremont-Concord Railroad in 2015, adding the latter's line in Claremont and its freight rights on a state-owned line inLebanon, New Hampshire.[16]

Operations

[edit]

System

[edit]

New England Central's main line connects theLong Island Sound port ofNew London, Connecticut, to the Canadian border inEast Alburgh, Vermont. The company's line connectsSt. Albans,Essex Junction,Montpelier,White River Junction, andBrattleboro within Vermont. Branches connect Essex Junction toBurlington and White River Junction toLebanon, New Hampshire, and a third branch exists inClaremont, New Hampshire (formerly the Claremont-Concord Railroad). Within Massachusetts, the NECR mainline passes throughMillers Falls and the important junction atPalmer. In Connecticut, the line servesStafford Springs,Willimantic, andNorwich before terminating at thePort of New London.[3]

Train operations

[edit]

From the Canadian border, several mainline trains move traffic along the system. Trains 323 (northbound) and 324 (southbound) operate between St. Albans (connecting with Canadian National trains from Montreal) and Brattleboro, making stops to pick up or drop cars at junctions as needed. Train 611 hauls mainline traffic between Brattleboro and Palmer. South of Palmer, train 608 operates south to Willimantic and back, while train 610 covers the line between Willimantic and New London.[3] Local trains are based in St. Albans, White River Junction, and Palmer, serving customers in those areas or performing switching at NECR yards.[3]

Besides the CN interchange in St. Albans, NECR interchanges withVermont Railway (plusCanadian Pacific Railway through ahaulage agreement) and its subsidiariesGreen Mountain Railroad andWashington County Railroad in Vermont and New Hampshire, withCSX Transportation and theMassachusetts Central Railroad in Palmer, withPan Am Southern in Brattleboro and Millers Falls, and with the Providence and Worcester Railroad in Willimantic and New London.[3]

Traffic

[edit]
NECR 1750, an EMD SD9 in NECR colors at St. Albans, Vermont on April 27, 2019

The railroad's traffic consists largely of general freight, including lumber products, metals, chemicals and stone products,[17][18] although COFC (container on flat car) andTOFC (trailer on flat car) business is also operated from the Canada–US border to Boston, in partnership with theProvidence and Worcester Railroad.[19] The NECR hauled around 37,000 carloads in 2008.[17]

Facilities

[edit]

NECR maintains significant operations at several locations along their line. Its main office is located inSt. Albans, Vermont, along with the main office for theConnecticut Southern Railroad (CSOR), with which NECR shares many management functions.[18] St. Albans is also the location of the main shop and dispatch office. Vermont's largest rail yard is the St. Albans yard, which handles upwards of 40,000 cars each year. Other significant operations are atWhite River Junction andBrattleboro, both of which are the location of offices and smaller yards.[20] Palmer, Massachusetts, serves as the main yard and office for operations south of the Vermont line.[1]

Locomotives

[edit]
Three blue and gray locomotives in a small rail yard.
Several NECR SD40 locomotives, still wearingConrail colors in 2007

The New England Central Railroad started operations with 12 GP38 locomotives, and exclusively operatedElectro-Motive Diesel products from its founding until 2023. These were supplemented by a trio of SD40s acquired from Conrail during the 1990s. After RailAmerica took ownership of the NECR, a number ofGP40-2L locomotives (the L indicating a wideCanadian safety cab) were added to the fleet, plus twoSD9s ofDuluth, Missabe and Iron Range Railway heritage.[3]

When RailAmerica was placed under new ownership in 2007, more locomotives were transferred to NECR, including GP40-2s and six-axleSD40-2s. Additional SD40-2 andSD45 style locomotives from other railroads joined NECR's fleet by 2012. NECR also obtained aSD40T-2 (colloquially known as a tunnel motor) ofSouthern Pacific Railroad vintage in 2013.[3] In 2023, NECR acquired 7 formerCSXC40-8Ws, making them the firstGeneral Electric locomotives on their roster.[21] As a Genesee & Wyoming subsidiary since 2012, NECR has sometimes shared locomotives with nearby G&W subsidiariesConnecticut Southern Railroad andProvidence and Worcester Railroad (the latter purchased by G&W in 2016).[3]

Passenger services

[edit]

Since 1995,Amtrak has operated its dailyVermonter service between Washington, D.C., andSt. Albans, Vermont, using the NECR. Until 2014, the NECR was used north ofPalmer, Massachusetts, and since 2014, north ofNorthfield, Massachusetts.[3][22] With state and federal funding, Amtrak and the New England Central Railroad completed repairs and upgrades to much of the NECR mainline in Vermont in 2012, allowing theVermonter to reach a maximum speed of 79 miles per hour (127 km/h).[23] TheCentral Corridor Rail Line is a proposed passenger train service betweenNew London andBrattleboro via the NECR main line.[24]

Wikimedia Commons has media related toNew England Central Railroad.

References

[edit]
  1. ^abcSolomon, Brian; Mike Confalone (2007).Rails across New England 1989–1999: Volume 2-Connecticut, Massachusetts & Rhode Island. Railroad Explorer.ISBN 978-0-9725320-5-1.
  2. ^"New England Central Railroad – A Genesee & Wyoming Company". RetrievedMay 8, 2025.
  3. ^abcdefghijklmSolomon, Brian (June 2020). "A Quarter Century of New England Central".Trains. pp. 38–45.
  4. ^"CN Plans to Sell Central Vermont RR".Toledo Blade. October 27, 1993. RetrievedDecember 28, 2021.
  5. ^"Central Vermont to Sell Rail".The Day. October 11, 1994. RetrievedDecember 28, 2021.
  6. ^abConfalone, Mike; Joe Posik (2005).Rails across New England 1989–1999: Volume 1-Maine, New Hampshire & Vermont. Railroad Explorer.ISBN 0-9725320-1-3.
  7. ^"The Central Vermont Railway". Picturing the Past. Archived fromthe original on July 20, 2011. RetrievedFebruary 16, 2010.
  8. ^"Awards". RailAmerica. Archived fromthe original on February 15, 2012. RetrievedFebruary 15, 2010.
  9. ^"Good news for New London".The Day. June 11, 1996. p. A10. RetrievedJanuary 7, 2023.
  10. ^abKaplan, Karen (May 9, 1999)."Revival of State Pier has been a boon for city".The Day. pp. G1, G3. RetrievedJanuary 7, 2023.
  11. ^Benson, Judy (July 23, 1996)."Montreal firm wins bid to run State Pier".The Day. pp. A1, A5. RetrievedJanuary 7, 2023.
  12. ^Frailey, Fred W. (June 2010). "RailAmerica Restarts Its Engines".Trains. Kalmbach Publishing.
  13. ^"Vermont, Amtrak formally kick off high speed work". Trains Magazine. November 9, 2010. RetrievedNovember 11, 2010.
  14. ^"New England Central returns to normal after Hurricane Irene". RailAmerica News. September 30, 2011. Archived fromthe original on October 18, 2011. RetrievedNovember 10, 2011.
  15. ^Progressive Railroading Staff (September 13, 2022)."Rail News - New England Central closer to restoring hurricane-damaged network".Progressive Railroading. RetrievedOctober 24, 2022.
  16. ^"G&W to buy Claremont Concord Railroad".Trains. August 10, 2015. RetrievedNovember 25, 2022.
  17. ^ab"RailAmerica's Empire".Trains Magazine. Kalmbach Publishing. June 2010.
  18. ^ab"New England Central Railroad". Canadian National Railway. Archived fromthe original on July 16, 2011. RetrievedFebruary 16, 2010.
  19. ^"New England Central Railroad (NECR)". RailAmerica. Archived fromthe original on October 22, 2010. RetrievedFebruary 16, 2010.
  20. ^"New England Central Railroad". Vermont Rail Action Network. Archived fromthe original on January 24, 2010. RetrievedFebruary 17, 2010.
  21. ^"Genesee & Wyoming to buy 69 locomotives from Wabtec pre-owned program".Trains. June 29, 2023. RetrievedAugust 15, 2024.
  22. ^"Amtrak Vermonter makes first Knowledge Corridor run in Springfield, Northampton and Greenfield". masslive.com. 2014. RetrievedJanuary 3, 2015.
  23. ^"Amtrak completes Vermonter rail line upgrade".Railway Technology. October 7, 2012. RetrievedJanuary 8, 2023.
  24. ^"Our View: Rail would boost economy".Norwich Bulletin. October 8, 2010. Archived fromthe original on January 31, 2013. RetrievedNovember 6, 2010.

External links

[edit]
Preceded byShort Line Railroad of the Year
1995
Succeeded by
North American railroads
Other operations
Former operations
Regional railroads of North America
Current
Former
Freight carriers
Passenger carriers
Heritage railroads
International
National
Retrieved from "https://en.wikipedia.org/w/index.php?title=New_England_Central_Railroad&oldid=1315303350"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp