Parts of this article (those related to Deadlinks, Update infobox, No recent production numbers) need to beupdated. Please help update this article to reflect recent events or newly available information.(December 2019) |
| Nellis Solar Power Plant | |
|---|---|
Nellis Solar Power Plant, was the second largestphotovoltaic power plant in North America when built | |
| Country | United States |
| Location | Nellis Air Force Base,Nevada |
| Coordinates | 36°15′30″N115°03′10″W / 36.25833°N 115.05278°W /36.25833; -115.05278 |
| Commission date | December 17, 2007 |
| Owner | MEMC |
| Solar farm | |
| Type | Flat-panel PV |
| Site area | 140 acres (0.6 km2) |
| Power generation | |
| Units operational | 72,416 |
| Nameplate capacity | 14.2MW |
| Annual net output | 32GWh |
| External links | |
| Commons | Related media on Commons |
![]() | |
TheNellis Solar Power Plant is a 14-megawatt (MW)photovoltaic power station located withinNellis Air Force Base. The power plant was inaugurated in a ceremony on December 17, 2007, with Nevada GovernorJim Gibbons activating its full operation.[1][2][3]
The peak power generation capacity of the plant is 15 MWAC.[1] This means the ratio of average to peak output, orcapacity factor, of this plant is around 22%.
Construction began on April 23, 2007,[1] and operation of the first 5 MW began on October 12, 2007.[4][5]
Under the terms of thePower Purchase Agreement, MMA Renewable Ventures, who own the panels, is leasing the land at no cost and Nellis is agreeing to buy the power for 20 years at about 2.2 cents/kW·h, instead of the 9 cents they are paying to Nevada Power, saving the Air Force $1 million each year. None of the $100 million cost came from the Air Force, but instead MMA "funds, owns and operates the solar energy system and sells the electricity generated to the energy customer through a predictable, long term contract."[6]
The partners were able to build the plant, recover costs and produce electricity at a savings, because of the fairly complex financing structure arranged among MMA, its investors, Nevada Power, and Nellis — in addition to the value of solar tax incentives.[7]
The plant was expected to produce 30 GWh per year but actually produced about 32 GWh the first year, 8% more than expected,[8] saving the Air Force $1.2 million in the first year of operation.[9]
Gaining the most resilience benefit from a solar installation requires adding aBattery energy storage system to retain power when the solar array is not producing and ideally aMicrogrid to allow independent operation from the electric grid during a power outage.[10] For this reason, Nellis announced a battery storage and microgrid project in 2022 to complement its solar array.[11]
Nellis consists of 5,821 tilted axes, T20single axis trackers made by Sunpower, and uses 72,416solar panels, each 200 watts,[12] and 54 Xantrex (Schneider Electric) GT 250inverters,[13] each rated 250 kW. The maximum output is therefore inverter limited to 13.5 megawatts (AC). At full output, the inverters are 96% efficient. Approximately 10% of the panels are mounted on north–south-oriented horizontal single-axis trackers. About one-third of the solar panels were made bySuntech Power, the lead supplier.[14]

In 1999, Nevada passed arenewable portfolio standard (RPS) as part of their 1997 Electric Restructuring Legislation (AB 366). It required any electric providers in the state to acquire actual renewable electric generation or purchase renewable energy credits so that each utility had 1 percent of total consumption in renewables. However, on June 8, 2001, Nevada GovernorKenny Guinn signed SB 372, at the time the country's most aggressive renewable portfolio standard. The law requires that 15 percent of all electricity generated in Nevada be derived from new renewables by the year 2013.[15]
The 2001, revision to the RPS keeps in place Nevada's commitment to expand solar energy resources by requiring that at least 5 percent of the renewable energy projects must generate electricity from solar energy.[15]
In June 2005, the Nevada legislature passed a bill during a special legislative session that modified the Nevada RPS (Assembly Bill 03). The bill extends the deadline and raised the requirements of the RPS to 20 percent of sales by 2015.[15]
A separate plant called Nellis Solar PV II,[16] located to the south of the base, generates another 15 megawatts of power. It began construction on March 24, 2015,[17] and was completed in February 2016.[18]

PresidentBarack Obama visited the facility and addressed an audience of more than 450 people on May 27, 2009.[19][20]
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2007 | 1,497 | 859 | 398 | 2,755 | |||||||||
| 2008 | 535 | 1,284 | 3,143 | 3,923 | 3,995 | 5,120 | 3,630 | 3,386 | 3,338 | 2,382 | 1,136 | 627 | 32,500 |
| 2009 | 614 | 1,073 | 3,155 | 3,651 | 4,230 | 3,106 | 3,672 | 4,258 | 3,525 | 2,323 | 1,571 | 821 | 32,000 |
| 2010 | 443 | 819 | 2,023 | 2,585 | 3,662 | 4,322 | 3,339 | 4,211 | 3,925 | 2,377 | 2,264 | 1,330 | 31,301 |
| 2011 | 1,447 | 1,940 | 2,432 | 3,392 | 3,745 | 4,286 | 3,135 | 3,681 | 2,632 | 2,535 | 1,553 | 1,347 | 32,125 |
| 2012 | 842 | 1,099 | 1,587 | 2,450 | 3,593 | 3,710 | 3,288 | 3,228 | 3,672 | 3,566 | 2,889 | 2,236 | 32,159 |
| 2013 | 1,796 | 2,200 | 2,706 | 3,141 | 3,381 | 3,441 | 2,664 | 2,658 | 2,616 | 3,040 | 2,069 | 2,046 | 31,758 |
| 2014 | 1,527 | 1,597 | 2,302 | 2,426 | 2,870 | 3,291 | 2,882 | 3,134 | 3,244 | 3,287 | 2,793 | 1,849 | 31,202 |
| 2015 | 1,521 | 2,134 | 2,767 | 3,130 | 2,867 | 3,159 | 2,925 | 2,876 | 2,652 | 2,341 | 2,228 | 1,829 | 30,428 |
| 2016 | 648 | 3,789 | 1,218 | 1,284 | 1,644 | 1,655 | 1,863 | 1,818 | 1,774 | 1,472 | 1,416 | 1,139 | 19,725 |
| 2017 | 1,413 | 1,453 | 2,537 | 2,790 | 3,123 | 3,206 | 2,697 | 2,768 | 2,484 | 2,442 | 1,678 | 1,615 | 28,213 |
| 2018 | 1,276 | 1,637 | 2,097 | 2,618 | 2,768 | 3,242 | 2,762 | 2,792 | 2,686 | 2,106 | 1,646 | 1,274 | 26,910 |
| 2019 | 1,395 | 1,527 | 2,112 | 2,499 | 2,649 | 2,917 | 2,946 | 2,869 | 2,452 | 2,380 | 1,624 | 1,097 | 27,897 |
| 2020 | 1,423 | 1,797 | 1,919 | 2,263 | 2,535 | 2,719 | 2,825 | 2,536 | 2,212 | 2,004 | 1,489 | 1,230 | 24,959 |
| 2021 | 1,009 | 1,289 | 1,631 | 1,970 | 2,176 | 1,993 | 1,916 | 2,008 | 1,774 | 1,398 | 1,140 | 869 | 19,180 |
| 2022 | 1,164 | 1,408 | 1,713 | 2,005 | 2,289 | 2,175 | 1,987 | 1,825 | 1,773 | 1,595 | 1,169 | 866 | 19,975 |
| Total | 423,097 | ||||||||||||