Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Nehoiașu Hydro Power Plant

Coordinates:45°26′34″N26°18′20″E / 45.4427°N 26.3055°E /45.4427; 26.3055
From Wikipedia, the free encyclopedia
Dam in Surduc, Romania
Map
CountryRomania
LocationSurduc, Romania
Coordinates45°26′34″N26°18′20″E / 45.4427°N 26.3055°E /45.4427; 26.3055
Reservoir
CreatesNehoiaşu
Total capacity0.5 million cubic metres (410 acre⋅ft)
Surface area10 ha (25 acres)
Nehoiaşu Hydro Power Plant

Nehoiaşu Hydro Power Plant is a large power plant on theBâsca river situated inRomania. The project was started in 1998 and it was made up by the construction of adam with 8 mobile segments each 12 m (39 ft) high, which will be equipped with two vertical turbines, thehydropower plant having an installed capacity of 152MW. The power plant will generate 328GWh of electricity per year.

See also

[edit]

References

[edit]

External links

[edit]
High capacity power stations inRomania
(more than 100 MW installed capacity)
Thermal
Coal and oil
Natural gas
Hydroelectric
Nuclear
Wind farms
Solar parks


Stub icon

This article about a Romanian building or structure is astub. You can help Wikipedia byexpanding it.

Stub icon

This article about ahydroelectric power plant is astub. You can help Wikipedia byexpanding it.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Nehoiașu_Hydro_Power_Plant&oldid=1266529438"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp