Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Nandurbar railway station

From Wikipedia, the free encyclopedia
Railway Station in Maharashtra, India
icon
This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Nandurbar railway station" – news ·newspapers ·books ·scholar ·JSTOR
(April 2021) (Learn how and when to remove this message)

Nandurbar
General information
LocationNandurbar,Maharashtra 425412
India
Coordinates21°22′27″N74°14′40″E / 21.37408182°N 74.24453259°E /21.37408182; 74.24453259
SystemExpress train andPassenger train station
Owned byIndian Railways
Operated byWestern Railway zone
LineUdhna–Jalgaon line
Platforms4
Tracks7
Construction
Structure typeAt–grade
ParkingYes
Bicycle facilitiesYes
Other information
StatusActive
Station codeNDB
Fare zoneMumbai WR
History
Opened1899; 127 years ago (1899)
Electrified2002–03
Previous namesGreat Indian Peninsula Railway
Location
Nandurbar is located in Maharashtra
Nandurbar
Nandurbar
Location within Maharashtra
Show map of Maharashtra
Nandurbar is located in India
Nandurbar
Nandurbar
Nandurbar (India)
Show map of India

Nandurbar railway station serves the city ofNandurbar inNandurbar district in the Indian state ofMaharashtra.

History

[edit]

The Tapi Valley Railway was originally constructed by Killick Nixon Co. and taken over by 'the former B.B. and C.I. Railway, on 31 April 1942. Section from Udha to Vyara was constructed in 1898, from Vyara to Nandurbar in 1899 and from Nandurbar to Jalgaon in 1900. Track is laid with 75 lbs. R. rail on CST 9 sleepers with the density of N. plus 2. The entire line is ballasted with stone ballast. Maximum ruling; gradient on this section is 1 in 200 and the sharpest curve is of 1,910 feet radius. The terrain from where the line is passing is a flat one, it being taken generally parallel to the Tapi river. The entire line is broad gauge with single line up to Jalgaon. There are two important bridges on this line in the district, one near mile 157 on the Bori river and another near mile 186 on the Girna river. Length of the former is about 60' and that of the latter about 170'.[1]

It enters Jalgaon district from Dhulia district just after Betawad station at mile 147. The total route mileage under this section is about 46. Jalgaon station is not under Western Railway whose limit terminates at mile 189. From Jalgaon to Bhusawal it runs common with the Bombay–Bhusawal railway line.

Electrification

[edit]

Electrification of Nandurbar and Dondaicha railway track had completed in 2002–2003.[2]

References

[edit]
  1. ^History of Nandurbar Railway."History of Nandurbar and nearby Railway". Retrieved23 March 2015.
  2. ^Electrification of Nandurbar Rail Track."Electrification of Nandurbar and nearby Rail Track". Retrieved23 March 2015.

External links

[edit]


Stub icon

This article about a railway station in the Indian state ofMaharashtra is astub. You can help Wikipedia byadding missing information.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Nandurbar_railway_station&oldid=1237723347"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp