TheNatal Government Railways Class I 2-6-2T of 1901 was a South African steam locomotive from the pre-Union era in theColony of Natal.
In 1894, the Natal Government made provision for the extension of the North Coast line fromVerulam to theTugela River. The Zululand Railway Company was contracted for the construction of the line in 1895. In 1901, the company acquired one2-6-2 side-tank locomotive as construction engine. Upon completion of the line in 1903, the locomotive was taken onto the roster of theNatal Government Railways and designatedClass I.[1][2]
Provision for the extension of the North Coast line from Verulam to the Tugela River was made by Act 34 of 1894 of theColony of Natal. On 19 December 1895, an agreement was reached with the Natal sugar magnateJames Liege Hulett, representing the Zululand Railway Company, for the construction of the new line.[1][2]
The government stipulated that the line was to be 3 feet 6 inchesCape gauge and laid with 45 pounds per yard (22 kilograms per metre) steel rail. The agreement further stipulated that, upon its completion, the line would be taken over as part of theNatal Government Railways (NGR) system.[1][2]
In 1901, the construction company acquired a single2-6-2T locomotive fromBaldwin Locomotive Works in theUnited States of America, for use as construction engine. The locomotive, which became the Zululand Railway no. 1, was designed and built to American specifications and narrow-gauge practice at the time and, as a result, conformed to NGR practice only in respect of itsJohnston link-and-pin couplers and brake gear.[1][2][3]
The cylinders were arranged outside thebar frame while theslide valves, arranged above the cylinders, were actuated byStephenson link motion through rocker shafts. Two sandboxes were mounted atop the boiler, fore and aft of the steam dome.[2]
The Tugela line was opened to traffic in 1903 and Zululand no. 1 was taken onto the NGR roster, where it was allocated no. 512.[1][2]
It was later renumbered to 501 and was allocated to the Construction Department of the NGR. When a classification system was introduced at some stage between 1904 and 1908, it was designated NGR Class I.[4]
When theUnion of South Africa was established on 31 May 1910, the three Colonial government railways (Cape Government Railways, NGR andCentral South African Railways) were united under a single administration to control and administer the railways, ports and harbours of the Union. Although the South African Railways and Harbours came into existence in 1910, the actual classification and renumbering of all the rolling stock of the three constituent railways were only implemented with effect from 1 January 1912.[5][6]
In 1912, the Construction Department locomotives in Natal were considered obsolete. The locomotive was excluded from the South African Railways classification and renumbering schedules, renumbered to 0501 and remained unclassified. It was scrapped in March 1916.[6][7]