NAIT/Blatchford Market station

Coordinates:53°34′01″N113°30′33″W / 53.5670°N 113.5092°W /53.5670; -113.5092
From Wikipedia, the free encyclopedia
Light rail station in Edmonton, Alberta, Canada

‹ ThetemplateInfobox station is beingconsidered for merging. ›
NAIT/Blatchford Market
General information
Coordinates53°34′01″N113°30′33″W / 53.5670°N 113.5092°W /53.5670; -113.5092
Owned byCity of Edmonton
PlatformsSide platforms
Tracks2
Construction
Structure typeSurface
Bicycle facilitiesYes
AccessibleYes
History
OpenedJanuary 20, 2024 (2024-01-20)
Services
Preceding stationEdmonton LRTFollowing station
TerminusMetro LineKingsway/​Royal Alex
Route map
Blatchford Gate
NAIT/Blatchford Market
Kingsway/​Royal Alex
Kingsway/Royal Alex Transit Centre
MacEwan
Churchill
Capital LineValley Line
Valley Line to
102 Street andMill Woods
Central
Capital Line
Bay/Enterprise Square
Capital Line
Corona
Capital Line
Government Centre
Government Centre Transit CentreCapital Line
University
University Transit CentreCapital Line
Health Sciences/Jubilee
Capital Line

Handicapped/disabled access All stations are accessible
This diagram:
Location
Map

NAIT/Blatchford Market station is anEdmonton LRT station inEdmonton,Alberta which serves as the northern terminus of theMetro Line.[1] The station is located north ofPrincess Elizabeth Avenue, on the west side of theNorthern Alberta Institute of Technology and Brigadier James Curry Jefferson Armoury. The station was built after a long-term comprehensive land use plan of theEdmonton City Centre Airport lands were finalized.[2][3][1]

NAIT station opened in 2015 at a temporary location until it was renamed and relocated approximately 200 metres northwest, to its permanent location on January 20, 2024.

History

[edit]
‹ ThetemplateInfobox station is beingconsidered for merging. ›
NAIT
General information
Coordinates53°33′58″N113°30′21″W / 53.5660°N 113.5058°W /53.5660; -113.5058
SystemFormer station
Owned byCity of Edmonton
PlatformsCentre platform
Tracks2
Construction
Structure typeSurface
Bicycle facilitiesYes
AccessibleYes
History
OpenedSeptember 6, 2015[4]
ClosedJanuary 20, 2024
Passengers
2019
(typical weekday)
2,931 board
2,864 alight
5,795 Total[5]
Location
Map

NAIT station

[edit]

Preliminary engineering of the line was completed July 2009 and construction of the phase from theMacEwan station to NAIT began in the summer of 2011. The station was supposed to open in 2014.[6] However, due to delays it opened on September 6, 2015.[4]

The station was closed for four months from April 28 to August 30, 2019 due to construction on theCapital Line which shares track with southern sections of the Metro Line.[7] Because of delays that the construction caused, Edmonton Transit operated five car trains on the Metro Line.[7] Since the NAIT station island platform was only three cars long, these larger trains were unable to fit alongside the platform, hence the temporary closure.

NAIT/Blatchford Market station

[edit]

NAIT/Blatchford Market station was constructed between 2020 and late 2023.[8] The original NAIT station closed on January 20, 2024, following the opening of NAIT/Blatchford Market station on the same day.[9]

Future

[edit]

In the future, the Metro Line will be extended by one station andBlatchford Gate will replace NAIT/Blatchford Market as the northern terminus of the line.

The two new stations are being constructed in response to the planned community ofBlatchford, which is being built on the land of the formerEdmonton City Centre Airport. The redevelopment of the old airport caused the original plan of two stations to be delayed, which resulted in the creation of a temporary station to service NAIT.[10]

Station layout

[edit]

NAIT/Blatchford Market station is an outdoors at-grade station. Unlike other stations on the high floor Edmonton LRT, NAIT/Blatchford Market station was built withside platforms instead of an island one.

Around the station

[edit]

Communities

[edit]

References

[edit]
  1. ^ab"North LRT to NAIT". City of Edmonton. Archived fromthe original on June 16, 2011. RetrievedFebruary 6, 2010.
  2. ^"North LRT Fact Sheet"(PDF). City of Edmonton. February 2012. Archived fromthe original(PDF) on June 1, 2012. RetrievedMay 30, 2012.
  3. ^"North LRT Stations". City of Edmonton. Archived fromthe original on June 16, 2011. RetrievedOctober 20, 2010.
  4. ^abRamsay, Caley (September 6, 2015)."After lengthy delay, Metro Line LRT opens to riders". Global News Edmonton. RetrievedSeptember 6, 2015.
  5. ^"2019 LRT Passenger Count Report"(PDF). City of Edmonton. April 2020. RetrievedFebruary 5, 2021.
  6. ^"Metro Line Delay FAQ"(PDF). City of Edmonton. October 8, 2014. Archived fromthe original(PDF) on October 13, 2014. RetrievedOctober 8, 2014.
  7. ^abHeidenreich, Phil (March 25, 2019)."City of Edmonton to suspend LRT services to NAIT campus for 4 months". Global News. RetrievedMarch 25, 2019.
  8. ^"Metro Line - Northwest Extension".City of Edmonton. RetrievedDecember 31, 2023.
  9. ^Siemens, Nicole (January 16, 2024)."New NAIT LRT station ahead of schedule, opening of other Blatchford stop remains unclear".Global News.Corus Entertainment. RetrievedJanuary 20, 2024.
  10. ^"Blatchford Edmonton".Blatchford. RetrievedDecember 31, 2023.
Edmonton LRT stations
Capital Line
Metro Line
Valley Line
Retrieved from "https://en.wikipedia.org/w/index.php?title=NAIT/Blatchford_Market_station&oldid=1311373808"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp