Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Modinagar North RRTS station

From Wikipedia, the free encyclopedia
RapidX Delhi–Meerut RRTS station


Modinagar North
General information
LocationGT Road, near ICICI Bank Branch, Modinagar, Uttar Pradesh 201204
 India
Coordinates28°50′37″N77°35′00″E / 28.84373°N 77.58345°E /28.84373; 77.58345
System
Namo Bharat RRTS station
Owned byNCRTC
Operated byNCRTC
LineDelhi–Meerut RRTS
PlatformsSide platform
Platform-1 →Meerut South/Modipuram* (Future Service)
Platform-2 →New Ashok Nagar
* (To be further extended toSarai Kale Khan in the future)
Tracks2
Construction
Structure typeElevated,Double track
Platform levels2
ParkingCar parking Four-Wheeler Parking
AccessibleYesDisabled access
Other information
StatusOperational
History
Opened07 March 2024; 23 months ago (07 March 2024)
Electrified25 kV 50 Hz AC throughoverhead catenary
Services
Preceding stationNamo BharatFollowing station
Modinagar SouthDelhi–MeerutMeerut South
Terminus
Future Service
Modinagar SouthDelhi–Meerut
(Future Service)
Meerut South
Route map
Sarai Kale Khan
Baba Banda Singh Setu(Barapullah Flyover)
Barapullah Canal
Indian Railways
Jangpura
Jangpura Stabling Yard
Yamuna River
Mayur Vihar Flyover
Shahdara Canal
New Ashok Nagar
Ghazipur Canal
Anand Vihar
Sahibabad
Indian Railways
Ghaziabad
Guldhar
Duhai
Duhai Depot
Murad Nagar
Modinagar South
Modinagar North
Meerut South
Indian Railways
Shatabdi Nagar
Begumpul
Modipuram
Modipuram Depot
  1. ^Planned.
Location
Map

Modinagar North RRTS station[1] is an elevated RRTS station in theModinagar town ofGhaziabad district inUttar Pradesh, India. This serves as a RRTS station for higher-speed trains on theDelhi–Meerut Regional Rapid Transit System that can reach speeds of up to 180 km/h.[2]

After the trial run of Duhai - Meerut South RRTS stretch was commissioned successfully, this RRTS station was inaugurated by Prime MinisterNarendra Modi on March 6, 2024[3] viavideo conferencing fromKolkata, and began its operations along with the existing 17-km Sahibabad-Duhai stretch of theDelhi–Meerut RRTS from March 7, 2024.[4][5][6]

History

[edit]

TheNational Capital Region Transport Corporation (NCRTC) had invited tenders for the construction of the Modinagar North RRTS station along with the 21.5 km long Murad Nagar–Meerut South section of the 82.15 km Delhi-Meerut RRTS line.L&T Heavy Civil Infrastructure emerged as the lowest bidder for construction work. Under the agreement, companies started construction of Modinagar North RRTS station.[7][8][9]

Station layout

[edit]

The Modinagar North RRTS station has three levels - platform, concourse and street level. Modinagar North RRTS station will be 215 meters long and 26 meters wide. The rail tracks will be constructed at a height of 24 meters above the ground level.

Modinagar North track layout
P1
P2
Station with two tracks and two side platforms
GStreet levelExit/Entrance
L1MezzanineFare control, Station agent, Token vending machines, Crossover
L2Side platform | Doors will open on the leftDisabled access
Platform 1
Eastbound
Towards →Meerut South
Platform 2
Westbound
Towards ←New Ashok Nagar
Next Station:Modinagar South
Side platform | Doors will open on the leftDisabled access
L2

There are 2 Gate points – 1 and 2. Commuters can use either of the points for their travel:-

  • Gate 1 - Towards Meerut Side
  • Gate 2 - Towards Delhi Side

References

[edit]
  1. ^"DELHI-Ghaziabad-Meerut MAP".ncrtc.in. Retrieved1 May 2023.
  2. ^Staff Reporter (7 March 2024)."Hon'ble Prime Minister Inaugurates and Flags Off 17 Km Long Duhai to Modi Nagar North RRTS Stretch".Metro Rail News. Retrieved13 March 2024.
  3. ^"RRTS: PM likely to virtually open 17km stretch to Modinagar on March 6".Hindustan Times. 4 March 2024. Retrieved5 March 2024.
  4. ^"PM opens 17km RRTS stretch to Modinagar (north) virtually from Kolkata".Hindustan Times. 6 March 2024. Retrieved13 March 2024.
  5. ^"PM Modi inaugurates 17-km-long Duhai to Modi Nagar North RRTS section".The Indian Express. 6 March 2024. Retrieved13 March 2024.
  6. ^"Passenger operations begin on 34km RRTS section in Ghaziabad".Hindustan Times. 8 March 2024. Retrieved13 March 2024.
  7. ^"17km of RRTS line from Duhai to Modinagar to be ready for operations soon".Hindustan Times. 29 February 2024. Retrieved5 March 2024.
  8. ^"RRTS: Train Services Likely To Begin On 17km Stretch From Duhai to Modinagar Soon".TimesNow. 1 March 2024. Retrieved5 March 2024.
  9. ^"NCRTC completes 25-km viaduct of new section of Delhi-Meerut RRTS Corridor | Metro Rail Today".Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved6 January 2024.
  • Operational RRTS Line(s)
Operational
Under
Construction
Retrieved from "https://en.wikipedia.org/w/index.php?title=Modinagar_North_RRTS_station&oldid=1284400127"
Category:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp