A reuse test small-scale first stage of Miura 5 inEl Arenosillo | |
| Function | partiallyreusablelaunch vehicle tolow Earth orbit |
|---|---|
| Manufacturer | PLD Space |
| Country of origin | Spain |
| Size | |
| Height | 35.7 m (117 ft)[1] |
| Diameter | 2.0 m (6 ft 7 in)[1] |
| Mass |
|
| Stages | 2–3 |
| Capacity | |
| Payload toLow Earth orbit (LEO) | |
| Mass | 1,080 kg (2,380 lb)[1] |
| Payload toSSO | |
| Mass | 540 kg (1,190 lb)[1] |
| Associated rockets | |
| Comparable | Maia,Shavit 2,Prime,Electron |
| Launch history | |
| Status | Under development |
| Launch sites | Guiana Space Centre (planned) Etlaq Spaceport (planned)[2] |
| First flight | Q1 2026 (planned)[3] |
| First stage | |
| Height | 26.3 m (86 ft)[4] |
| Diameter | 2.0 m (6 ft 7 in) |
| Powered by | 5TEPREL-C |
| Maximum thrust | 950 kN (210,000 lbf) |
| Burn time | 182 s.[1] |
| Propellant | LOX /RP-1 |
| Second stage | |
| Height | 12.1 m (40 ft) |
| Powered by | 1TEPREL-C vacuum |
| Maximum thrust | 50 kN (11,000 lbf) |
| Burn time | 420 s.[1] |
| Propellant | LOX /RP-1 |
| Kick stage (optional) | |
Miura 5 is a two-stage European orbitalrecoverable launch vehicle currently under development by the Spanish companyPLD Space. In a standard two-stage configuration, it will have a length of 34 m, be capable of inserting 1000 kg of payload into alow Earth orbit (LEO), featuring an optional kick stage that can circularize the orbits of satellites.[5]
Development of the Miura 5 has been sponsored by theEuropean Space Agency (ESA) via the agency'sFuture Launchers Preparatory Programme (FLPP); additional support has come from the French space agencyCNES and the Spanish agencyNational Institute for Aerospace Technology (INTA). Work commenced during the mid-2010s under the nameArion 2, the present name was adopted following a redesign that doubled the lift capacity of the launcher during 2018. On 11 April 2019, PLD Space carried out a successful drop and recovery test of the first stage of a Miura 5 demonstrator. As of February 2025, the first test flight of Miura 5 is expected to take place sometime in early 2026.[6]

The Miura 5 has been designed to reuse the majority of the technology developed for the precedingMiura 1. However, many of these technologies will be refined substantially to incorporate lessons learnt with the earlier rocket.[7][8] New design elements include the propellant tanks and engine; it remains a liquid fuel rocket.[9] Many elements of the Miura 5, including the propulsion system, structures, and avionics development, will be designed and produced in-house.[10][11]
The Miura 5 is to be propelled by a singleTEPREL-Cturbopump engine, unlike its predecessor, which used apressurized tank cycle instead.[12]
A key feature of the Miura 5 is its reusable first stage. The recovery process shall employ a combination of engine thrust andparachutes.[13] While furnished with a larger parachute arrangement to account for the larger scale of the Miura 5, the various subsystems controlling the recovery are identical those used on the Miura 1.[10] The launcher's reuse capabilities have reportedly been scaled as to permit each rocket to be launched a maximum of three times.[14]
The Miura 5 was originally envisioned to have a lift capacity of 150 kilograms; in comparison toVega,Arianespace’s smallest launcher, it was to be capable of carrying roughly one-tenth of the payload.[13] It is specifically intended for the launching ofsmall satellites intolow Earth orbit (LEO).[13] However, mid-way through the design process, the Miura 5's lift capacity was doubled in response to formal recommendations produced by the ESA in 2018.[5] It will be typically operated as a two stage launcher, although provisions will be made for individual rockets to be expandable to three stages when a greater lift capacity or altitude is required.[15]
During October 2016, theEuropean Space Agency (ESA) announced the selection of the Spanish aerospace start-upPLD Space as the main contractor of the LPSR ("Liquid Propulsion Stage Recovery") program, one part of the agency'sFuture Launchers Preparatory Programme (FLPP).[10] The company was allocated an initial contribution of €750,000 towards the early development of a reusable first stage of a future space launch system; the long-term objective is to provide the reusable first stage for what later became the Miura 5. Various options for recovery were examined, primarily involving the use ofparachutes; other methods, such as the use of controlledparagliders orballutes, were also explored at this stage. Some early testing of the system was performed using the smallerMiura 1 rocket.[16][10]
Early on in its development, the launch vehicle was referred to asArion 2; however, following the completion of a ten-month review conducted by the ESA and the decision to redesign the launcher to facilitate launches up to 300 kilograms to a 500-kilometer orbit, it was decided to adopt the nameMiura 5.[5][17]
On 11 April 2019, with the assistance of theSpanish Army, PLD Space performed a successful drop and recovery test of the first stage of a Miura 5 demonstrator atEl Arenosillo Test Center.[18] This demonstration stage, which had a reduced 1.5 m diameter instead of 1.8 m, was dropped by aBoeing CH-47 Chinook helicopter from a height of 5 km. It slowed its rate of descent using a total of three parachutes before performing a water landing, at which point it had been descending at a rate of roughly ten meters per second. The demonstrator was recovered by divers and brought back toMazagón by atugboat to be thoroughly examined.[19][20]
During July 2019, it was announced that PLD Space had reached an agreement with the French space agencyCNES to study the launch of Miura 5 at theGuiana Space Centre (CSG) inFrench Guiana.[21] Under a separate arrangement, the Spanish agencyNational Institute for Aerospace Technology (INTA) has also worked with PLD Space in securing a launch site at theEl Hierro Launch Centre, which has been claimed by the company to be the optimal choice from a technical perspective.[22] PLD Space has also publicly commented on the possibility of conducting launches from the plannedspaceport inAzores, but the status of this proposal is presently uncertain.[4] Company officials have estimated that the construction of a suitable ground facilities for launching will cost roughly €15 million.[23]
During 2021, in light of the successful drop testing of the first stage, the ESA awarded a new contract to PLD Space to continue with development of the Miura 5.[10] During mid 2023, an agreement was signed with CNES for the future maiden launch of the Miura 5 to be conducted at Guiana.[23][7]
As of December 2023, the first test flight of Miura 5 is expected to take place sometime in early 2026.[3] The initial model, which is planned to be used for the first two flights, will be entirely expendable. It will be superseded by an improved model of the Miura 5 that uses the recoverable first stage, which is intended to perform the planned commercial launches.[10]