| General information | |||||
|---|---|---|---|---|---|
| Location | Metheringham,North Kesteven,Lincolnshire England | ||||
| Coordinates | 53°08′20″N0°23′28″W / 53.139°N 0.391°W /53.139; -0.391 | ||||
| Grid reference | TF077614 | ||||
| Managed by | East Midlands Railway | ||||
| Platforms | 2 | ||||
| Other information | |||||
| Station code | MGM | ||||
| Classification | DfT category F2 | ||||
| History | |||||
| Original company | Great Northern and Great Eastern Joint Railway | ||||
| Pre-grouping | Great Northern and Great Eastern Joint Railway | ||||
| Post-grouping | London and North Eastern Railway | ||||
| Key dates | |||||
| 1 August 1882 | Opened asBlankney and Metheringham | ||||
| 11 September 1961 | Closed for passengers | ||||
| 15 June 1964 | closed for goods | ||||
| 6 October 1975 | Reopened asMetheringham | ||||
| Passengers | |||||
| 2019/20 | |||||
| 2020/21 | |||||
| 2021/22 | |||||
| 2022/23 | |||||
| 2023/24 | |||||
| |||||
| |||||
Metheringham railway station serves the village ofMetheringham inLincolnshire,England. It lies on thePeterborough–Lincoln line. It is owned byNetwork Rail and managed byEast Midlands Railway, which provides all its rail services.
The station opened to passengers on 1 July 1882 as Blankney and Metheringham. The line that the Station operated on, stretched from Yorkshire to Cambridgeshire and was built by the Great Northern and Great Eastern Railways. This line became known as the 'Joint Line'.
In the early 20th century, Lord Londesborough constructed a mile long coach road, known as Blankney Ride to take visitors discreetly and directly from the station to his home at Blankney Hall.
DuringWorld War II, the Blankney Signal Box was designated as an Emergency Signal Centre that would take over in the case that the Signal Centre at Lincoln would be knocked out.
On the 11th of September 1961, Blankney and Metheringham Train Station had closed. However, passenger trains continued to run on the lines. In 1976 Lincolnshire County Council paid the sum of £7,415 (around £66,887 today) to reopen the station as Metheringham Station, which it is still known by today. Within its first two years of operations, the station had approximately 30,000 passengers per year. In 2008, it was estimated the station had 100,000 passengers.
It was being refurbished in 2019. The signal box at the south end of the station is labelled "Blankney". It formerly operated the level crossing on theB1189 road, but it closed in 2014, with its functions passing to the Lincoln Signalling Control Centre.[1]


The station is unstaffed, and offers limited facilities. Both platforms have shelters and modernhelp points. There is a smallcar park andbicycle storage facility at the station. The full range of tickets for travel can be bought from theguard on the train at no extra cost as there are no retail facilities at the station. There is one Departure Board on Platform 1.[2]
All services at Metheringham are operated byEast Midlands Railway.
On weekdays and Saturdays, the station is generally served by an hourly service northbound toLincoln and southbound toPeterborough viaSleaford. Five trains per day are extended beyond Lincoln toDoncaster. The station is also served by a single daily service to and fromNewark North Gate.[3]
There is no Sunday service at the station.
| Preceding station | Following station | |||
|---|---|---|---|---|
| Lincoln | East Midlands Railway
| Ruskington | ||
| Historical railways | ||||
Line open, station closed | Great Northern and Great Eastern Joint Railway | Line open, station closed | ||