An editor has determined thatsufficient sources exist to establish the subject'snotability. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Meitetsu Airport Line" – news ·newspapers ·books ·scholar ·JSTOR(May 2024) (Learn how and when to remove this message) |
| Meitetsu Airport Line | ||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A Meitetsu 2000 series EMU on the Meitetsu Airport Line | ||||||||||||||||||||||||||||||||||||||||
| Overview | ||||||||||||||||||||||||||||||||||||||||
| Native name | 名鉄空港線 | |||||||||||||||||||||||||||||||||||||||
| Owner | Meitetsu | |||||||||||||||||||||||||||||||||||||||
| Locale | Tokoname,Aichi | |||||||||||||||||||||||||||||||||||||||
| Termini | ||||||||||||||||||||||||||||||||||||||||
| Stations | 3 | |||||||||||||||||||||||||||||||||||||||
| Service | ||||||||||||||||||||||||||||||||||||||||
| Type | Commuter rail | |||||||||||||||||||||||||||||||||||||||
| Daily ridership | 8,695[1] (FY2008) | |||||||||||||||||||||||||||||||||||||||
| History | ||||||||||||||||||||||||||||||||||||||||
| Opened | 29 January 2005; 21 years ago (2005-01-29)[2] | |||||||||||||||||||||||||||||||||||||||
| Technical | ||||||||||||||||||||||||||||||||||||||||
| Line length | 4.2 km (2.6 mi) | |||||||||||||||||||||||||||||||||||||||
| Track gauge | 1,067 mm (3 ft 6 in) | |||||||||||||||||||||||||||||||||||||||
| Electrification | 1,500 VDC,overhead catenary | |||||||||||||||||||||||||||||||||||||||
| Operating speed | 120 km/h (75 mph) | |||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||
TheMeitetsu Airport Line (名鉄空港線,Meitetsu Kūkō-sen) is a railway line inAichi Prefecture, Japan, operated by the private railway operatorMeitetsu (Nagoya Railroad), connectingTokoname Station andCentral Japan International Airport Station inTokoname. The line opened, dual track and electrified, on 29 January 2005, and features a 1,076 m (3,530 ft) bridge over Ise Bay to the artificial island where the airport is situated. The line is operated as an extension of the Meitetsu Tokoname Line.
● L: Local (普通,futsū)
● S: Semi Express (準急,junkyū)
● E: Express (急行,kyūkō)
● R: Rapid Express (快速急行,kaisoku kyūkō)
● L: Limited Express (特急,tokkyū)
● MU: μSKY Limited Express (ミュースカイ,myū sukai)
All trains stop at stations marked "●" and pass stations marked "|". Some trains stop at "▲".
| No. | Station name | Japanese | Distance (km) | L | S | E | R | L | MU |
|---|---|---|---|---|---|---|---|---|---|
| Tokoname | 常滑 | 0.0 | ● | ● | ● | ● | ● | ▲ | |
| Rinkū Tokoname | りんくう常滑 | 1.6 | ● | ● | ● | | | | | | | |
| Central Japan International Airport | 中部国際空港 | 4.2 | ● | ● | ● | ● | ● | ● |