You can helpexpand this article with text translated fromthe corresponding article in Spanish. (February 2023)Click [show] for important translation instructions.
Machine translation, likeDeepL orGoogle Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
Youmust providecopyright attribution in theedit summary accompanying your translation by providing aninterlanguage link to the source of your translation. A model attribution edit summary isContent in this edit is translated from the existing Spanish Wikipedia article at [[:es:Metro de Madrid]]; see its history for attribution.
You may also add the template{{Translated|es|Metro de Madrid}} to thetalk page.
TheMadrid Metro (Spanish:Metro de Madrid) is arapid transit system serving the city ofMadrid, capital of Spain. The system is the 14th longest rapid transit system in the world, with a total length of 293 km (182 mi). Its growth between 1995 and 2007 put it among the fastest-growing networks in the world at the time. However, theEuropean debt crisis greatly slowed expansion plans, with many projects being postponed and canceled. Unlike normal Spanish road and rail traffic, whichdrive on the right, Madrid Metro trains useleft-hand running on all lines because traffic in Madrid drove on the left until 1924, five years after the system started operating.
Trains are in circulation every day from 6:00 am until 1:30 am,[5] though during the weekends, this schedule was to be extended by one more hour in the morning in 2020. Furthermore, the regional government intended to keep stations opened around the clock during these days from 2023 onwards.[6][7] It had only stayed open 24 hours during the 2017World Pride and during the2021 Madrid snowstorm.[8]
Alight rail system feeding the metro opened in 2007 calledMetro Ligero ("light metro").[9] TheCercanías system works in conjunction with the metro, with a majority of its stations providing access to the underground network.
The closed Chamberí station on line 1Metro de Madrid Diesel motors used for generating electricity before the Spanish Civil War, at exhibition inPacífico Power Plant
On 19 September 1916, a royal decree approved the 4-line plan for the creation of the metro of Madrid. The engineers who created the plan - Mendoza, González Echarte, and Otamendi - then began the process of raising 8 millionpesetas to begin the first phase of the project, the construction of Line 1 fromSol toCuatro Caminos. Carlos Mendoza made contact with Enrique Ocharán, the director ofBanco de Vizcaya, who offered 4 million pesetas on the condition that the public pledged an additional 4 million.
Mengemor published a brochure to persuade people to make donations. The men were able to raise 2.5 million pesetas of the 4 million they needed. KingAlfonso XIII intervened and invested 1.45 million pesetas of his own money.[11]
The first phase of construction was finished in 1919. It was constructed in a narrow section and the stations had 60 m (200 ft) platforms. The enlargement of this line and the construction of two others followed shortly after 1919.[12] The Madrid metro was inaugurated on 17 October 1919 by King Alfonso XIII.[13][14][15][16] At the time of inauguration, the metro had just one line, which ran for 3.48 kilometres (2.16 mi) betweenPuerta del Sol andCuatro Caminos, with eight stops.[13]
The king, the royal family, and others took part in the first official metro ride which went from Cuatro Caminos toRíos Rosas and took 40 seconds. There they stopped for one minute, before traveling to theChamberí station which took 45 seconds. The trip went all the way to the end point, Sol. The king and his family then rode the metro back to Cuatro Caminos from Sol, this time without stopping. The journey took 7 minutes and 46 seconds.[14]
After the journey, a lunch was served on the Cuatro Caminos platform, and the engineers were congratulated for creating a "miracle."[14]
Two days later, on 19 October 1919, the Madrid metro was opened to the public. On its first day, 390 trains ran, 56,220 passengers rode the metro, and the company earned 8,433 pesetas from ticket fares.[17]
During November and December 1919, the metro had an average of 43,537 passengers a day and earned an average of 6,530 pesetas a day from ticket sales. Due to their success, the company decided to expand more, and created 12,000 new shares to sell to the public to raise more funds to fund further expansion.[17]
1920–1921: expansion of Line 1 and construction of Line 2
The Company then began to gather materials necessary to expand theLine 1 fromSol with the new stationsProgreso,Antón Martín and finallyAtocha. The latter was then and is now an important train station for mainline rail.
On 31 July 1920 the company submitted it proposal to extend Line 1 fromAtocha toPuente de Vallecas. In 1921 the company declared its interest in beginning the line fromSol toVentas, with the first phase of the project being built fromSol toGoya, alongCalle Alcalá.
Work began on 27 March 1921 to expand the Line 1 from Atocha to Vallecas, and to begin construction on a line from Sol to Goya.[18]
On 26 December 1921 the Sol-Atocha section of the Line 1 was inaugurated, adding three new metro stops to the line: Progreso, Antón Martín, and Atocha. The king and queen, DonAlfonso XIII and DoñaVictoria, attended the inauguration.[19]
In 1924, traffic in Madrid switched from driving on the left to driving on the right, but the lines of the Madrid Metro kept operating on the left hand side.[20] In 1936, the network had three lines and abranch line betweenÓpera and the old Estación del Norte (nowPríncipe Pío). All these stations served as air raid shelters during theSpanish Civil War. After the Civil war, the public works to extend the network went on little by little. In 1944, afourth line was constructed, absorbing the branch of Line 2 betweenGoya andDiego de León in 1958, a branch that had been intended to be part ofLine 4 since its construction but was operated as a branch ofLine 2 until construction works had finished.
In the 1960s, a suburban railway was constructed betweenPlaza de España andCarabanchel, linked to lines 2 (atNoviciado station with a long transfer) and 3. Afifth metro line was constructed as well with narrow sections, but 90 m platforms. Shortly after opening the first section of Line 5, the platforms of Line 1 were enlarged from 60 to 90 m, permanently closingChamberí station since it was too close toIglesia (less than 500 m). Chamberí has been closed ever since and was recently[when?] reopened as a museum.[21]
In the early 1970s, the network was greatly expanded to cope with the influx of population andurban sprawl from Madrid's economic boom. New lines were planned with larger 115 m long platforms. Lines 4 and 5 were enlarged as well. In 1979, bad management led to a crisis. Projects that had already started were finished during the 1980s and all remaining ones were abandoned. After all those projects, 100 km (62 mi) of rail track was completed by 1983[22] and the suburban railway had also disappeared since it had been extended toAlonso Martínez and subsequently converted to the newLine 10.
Typical Madrid metro entrance, designed byAntonio Palacios, atTribunal station
Work on a major expansion of the metro began in 1995, with 172 km (107 mi) of new line and 132 new stations opened by 2011, built in 4 phases.[23] The average construction pace throughout that era (more than 10 km (6 mi) of new line per year) was among the fastest in the world at that time and was equalled or surpassed by only very few metros in theglobal north (one notable example beingSeoul Metro) either then or since.
This included the extension of lines 1, 4 and 7 and the construction of a newLine 11 towards the outlying areas of Madrid. Lines 8 and 10 were joined into a longer Line 10 and a newLine 8 was constructed to expand the underground network towards the airport. The enlargedLine 9 was the first to leave the outskirts of Madrid to arrive inRivas-Vaciamadrid andArganda del Rey, two satellite towns located in the southeast of Madrid. Control of the network was transferred to a public enterprise, Metro de Madrid S.A.
In the early 2000s, a huge project installed approximately 50 km (31 mi) of new metro tunnels. This construction included a direct connection between downtown Madrid (Nuevos Ministerios) and theairport, a further extension of Line 8, and adding service to the outskirts with a 40 km loop calledMetroSur serving Madrid's southern suburbs.
MetroSur, one of the largest ever civil engineering projects in Europe, opened on 11 April 2003. It included 41 km (25 mi) of tunnel and 28 new stations, with a new interchange station on Line 10, connecting it to the city centre and stations linking to the local train network. Its construction began in June 2000 and the whole loop was completed in less than three years. It connectsGetafe,Móstoles,Alcorcón,Fuenlabrada, andLeganés, five towns located in the south of Madrid. As the metro line is part of a project to develop the area, some stations lay in sparsely populated places or were even surrounded by fields at the time of opening.
Most of the efforts ofMadrid regional government in 2000s were channeled towards the enlargement of the Metro network. In the 2003–2007 term, PresidentEsperanza Aguirre funded a multibillion-euro project, which added new lines, and joined or extended almost all of the existing metro lines. The project included the addition of 90 km (56 mi) of railway and the construction of 80 new stations. It brought stations to many districts that had never previously had Metro service (Villaverde,Manoteras,Carabanchel Alto,La Elipa,Pinar de Chamartín) and to the eastern and northern outskirts as well (Coslada,San Fernando de Henares,Alcobendas,San Sebastián de los Reyes). For the first time in Madrid, three interurban light rails (Metro Ligero or ML) lines were built to the western outskirts (Pozuelo de Alarcón, Boadilla del Monte) – mL2 and mL3 – and to the new northern districts of Sanchinarro and Las Tablas – mL1. As a last minute addition, a project on line 8 connected it to the new T4 terminal ofMadrid-Barajas Airport.
TheGreat Recession and subsequent European debt crisis, which affected Spain particularly hard, brought metro expansion to a halt asausterity measures all but dried up available funding.
Lago station in the oldLine S (nowLine 10) is one of the few surface stations in the Metro network.Alonso Martínez station inLine 4: old stations are often compact, and usually not too deep undergroundGetafe Central inLine 12, with a Cercanías transfer: new stations are built deliberately ample, with several cross-visible levels and elevators for disabled people.Estrella station inLine 9, in the old style.
The age of many Madrid Metro stations is evident by their design: Older stations on the narrow lines are often quite compact, similar to stations of theParis Metro. They were decorated with tilings in different colour schemes depending on the station similar to the scheme architectAlfred Grenander implemented atBerlin U-Bahn around the same time. In recent years, most of these stations have been refurbished with single-coloured plates matching those in the newest ones, alongside other improvements such as modernized signalling technology and elevators. The stations built between the late 70s and the early 90s are slightly more spacious, with most of them having cream-coloured walls.
On the other hand, the most recent stations are built with space in mind, and have natural-like lighting and ample entryways.[24] The colour scheme varies between stations, using single-colored plates and covering the whole station in light colors. Recently built transfer stations have white walls, but this is not the norm.
Most stations are built with twoside platforms, but a handful of them (the busiest transfers) have a centralisland platform in addition to the side platforms theoretically dedicated to exits. This system was originally used on theBarcelona Metro and is called theSpanish solution. The 12 stations with this setup are:
Two stations havecross-platform interchange arrangement with two island platforms, which allows extremely fast transfers between lines. Both of these stations are on Line, with cross-platform interchanges atPríncipe Pío (with) andCasa de Campo (with). On both occasions, Line 10 uses the outside tracks, so passengers unboarding there leave through the "right" side of the train instead of the usual left side.
In addition, 10 stations are built with just one island platform instead of the usual side platforms. These stations are:
Another system is where there is one island platform with one side platform. This system is used in two stations on lines 2 and 4 as termini, and three stations on Lines 7, 9, and 10 where it is required for passengers to change to smaller trains to continue their journeys, normally to towns outside Madrid likeAlcobendas orCoslada. This is done so the island platform can be used for passengers to change easily between trains. In the latter three stations, the island platform is equipped with fare gates for tickets to be validated for travel between fare zones. These stations are:
Map of electrification voltages used in the metro and Metro Ligero: brown indicates 600V, green indicates 1,500V, pink indicates 750V
Since 1999 Metro de Madrid has used a patented system for its installations: a solid rail hung from the ceiling of the tunnels, instead of the usual copper or aluminium wire hung from overhead gantries at regular intervals. This type ofoverhead line is rigid, making it more robust and less prone to failures. Installations outside tunnels are rare, as they require many more support structures compared to traditional wire based overhead lines, making them more expensive to install. This system of rigid overhead power supply is also used in other metro systems. Similar installations exist in some mainline rail tunnels where space is limited, e.g.Leipzig City Tunnel or the lower level ofBerlin Hauptbahnhof,
The Metro conventional network has 242 stations on 12 lines plus one branch line, totalling 294 kilometres (183 mi),[25] of which approximately 96% of stations are underground.[n. 2] The only surface parts are betweenEmpalme and west ofEugenia de Montijo (); betweenLago and north ofCasa de Campo (); and between south ofPuerta de Arganda andArganda del Rey (), for a total of 8 aboveground stations. Additionally, some 30 km (19 mi) ofMetro Ligero (light rail) lines across serve the various regions of the metropolitan area which have been deemed not populated enough to justify the extraordinary spending of new Metro lines. Combined, they have 38 stops, of which 4 also connect to the conventional Metro system. Most of the ML track length is on surface, usually running on platforms separated from normal road traffic. However, ML1 line has some underground stretches and stations.
Traditionally, the Madrid metro was restricted to the city proper, but today nearly one third of its track length runs outside the border of the Madrid municipality. Today, the Metro network is divided in six regions:[26]
MetroMadrid (zone A): the core network inside the Madrid city borders, with over two-thirds of the overall length. Also includes light rail line 1.[26]
At most of the borders between the regions, one has to switch trains even when staying in the same line, because the train frequency is higher in the core MetroMadrid than in the outer regions.
Madrid also has an extensive commuter train (Cercanías) network operated byRenfe, the national rail line, which is intermodal with the metro network. In fact, 22Cercanías stations have connections to the Metro network, which is indicated on the official map by the Cercanías logo. Many of the new lines since 1999 have been built to link to or end at Cercanías stations, like theML2 line, which ends at the Aravaca station providing a fast entry into Madrid though the C-7 or C-10 commuter lines and arriving in only one step to the bus and Metro hubPríncipe Pío ().
Line R is a shuttle service (R stands for "ramal" = "branch").[26]
Old stations are not accessible to people with disabilities but since 1995 all new stations must be accessible by law. Thus, both new stations and renewed old ones have elevators for people on wheelchairs, huge signs for the visually impaired, etc.
All narrow loading gauge lines except line 5 had originally 60m platforms. Line 1 was the first to have theirs extended to 90m, while line 3 had to wait until the 2000s: prior to its recent extension to the southern district of Villaverde, it was completely closed for nearly a year and thoroughly renewed, and was the first to receive the all-newConstrucciones y Auxiliar de Ferrocarriles Series 3000 trains.
Configurations: M – engine (Motor), R – passive (Remolque), S – cabless engine (motor Sin cabina). Dots/dashes mean crossable/complete basic unit separation, while their absence implies a walkable aisle throughout the joined units.
Alstom Citadis 302 tramways have one motor "car", one suspended, one with bogie but without motors, one suspended, one motor.
The four ML (Ligero) lines are1,435 mm (4 ft 8+1⁄2 in)standard gauge. All other lines use1,445 mm (4 ft 8+7⁄8 in) gauge, the only railway using a specificItalian gauge outside Italy.
Traditionally, the trains operating in the Madrid Metro have been built and supplied by the Spanish companyConstrucciones y Auxiliar de Ferrocarriles (CAF). This was particularly true underFrancisco Franco's dictatorship, due to the politic ofautarky his administration initially pursued. However, despite CAF still working for the Metro, in recent years the ItalianAnsaldoBreda has also provided trains for the wide-profile lines.
Every rolling unit in the Madrid Metro has a unique ID that singles it out in the whole network. Those IDs are grouped by the rolling unit model (the "series") and thus is used to categorize the trains, as they bear no user-visible statement of the model specified by the manufacturer. An ID is made up of:
A letter indicating the type of rolling unit: M for a car with both engines and driver's cabin (SpanishMotor), R for an engineless car, with or without drivers cabin (SpanishRemolque) and S for a cabinless car with engines (Spanishmotor Sin cabina).
A dash separating the two components
A three or four digit number indicating the unit's series and the position within it. Usually, the series is indicated by the thousands and hundreds (i.e.5281 indicates a series 5000, subseries 200 train).
A series 2000-B "bubble" metro train on line atCasa de Campo station.
CAF series 2000: This series has two separate sub-series usually called A and B. The first batch, while reliable and practical, was extremely "box-like" in its looks. They are nicknamed 'Pandas', after a car by Seat with the same name and similar boxy design. In contrast, the B sub-series train sets can be told apart by its sleeker, rounder forms, which has granted them the nickname of "bubble" (burbuja) for their round driver cabin window. Series 2000A are currently the more numerous in the network: 530 cars[n. 3] were built and delivered between 1985 and 1993,[27] having serviced every narrow profile line. They are also among the oldest stock in operation in the Madrid Metro. The most reliable ones are being refurbished and painted with new, lighter colors like the ones used in Series 3000. Series 2000B were delivered in lesser numbers (about 126 cars) between 1997 and 1998,[28] with the inclusion ofair conditioning and station announcements through pre-recorded voice messages and LED displays. They are currently used in line 5, with no plans for retirement.
A series 3000 train arriving atAvenida de Guadalajara station on line.
CAF series 3000: The newest of the narrow line trainsets, series 3000 were commissioned for the reopening of line 3 after its complete renewal in the early 2000s. Their constituent subunits can be completely joined throughcrossable articulations, making it possible to go from the head to the tail without actually exiting the train. This has earned them the nickname of "boa", a term usually applied in Spain to double-length buses with such joints. They are currently servicing lines 2, R, 3, 4 and 5. Series 3000 trains look rather like a narrowed version of series 8000, while the interior uses mainly yellow and light blue tones.
A series 5000 train atPlaza Elíptica station on Line 6, the circular line.
CAF series 5000: Currently servicing line 9 and occasionally line 6, this model has had a long history: the first trainsets were delivered in 1974[29] for the newly opened, first wide-profile line 7, while the latest subseries, 5500, of which 24 trainsets of 6 cars each were built, entered service in 1993.[30] They were the last to use the old, square "box-like" design from CAF, which was already becoming unpopular for its exaggerate priming of effectiveness versus aesthetics. The first iteration featured a wood lookalike coating for the inner walls and a novel seat distribution in two-seat rows perpendicular to the train walls, making them look not unlike older regional trains. Subseries 5100–5200 returned to the traditional seating along the train walls, but still included another feature from the first iteration, automatic opening of all the gates in the train. The final subseries, 5500, has a distinct, darker color scheme and returns to the usual on-demand opening of train gates with a button on each one. Being the oldest rolling stock in operation in the wide profile lines, many cars were retired or sold to theBuenos Aires Underground for operation onLine B to make up for shortfalls on the line following extensions.
A series 6000 train inLa Poveda station on line
CAF series 6000: This model, of which 29 trainsets were built and delivered in 1998,[31] was the first by CAF to feature a new, sleeker and rounder design. As it was to serve TFM, the stretch of line 9 connecting Madrid to Arganda del Rey (the first extension of the Metro network outside Madrid proper), its interior resembles the regionalCercanías trains more closely than any other Metro trains: compact seats in couples set perpendicularly to the train walls, more places to grasp in case of a sudden brake/acceleration, etc. They were also the first to include luminous panels stating their destination, as the line they service was effectively split in two stretches, and travellers had to switch trains at Puerta de Arganda. Finally, they primed the "boa train" layout, but the walkable aisle only spanned two cars, while a trainset would usually carry 4 or 6. These trains are equipped with automatic train protection (ATP) and automatic train operation (ATO).[32] Series 6000 is currently doing service on line 9b (TFM). In 2013, 73 of the 108 cars ordered were sold to Buenos Aires for operation on Line B of the metro system; the sale totalled €32.6 million for the retirement of Japanese-built units, with a further 13 cars ordered at a later date.[33][34][35][36][37][38][39] These trains have been widely criticised in Argentina, and been called the worst purchase in the history of the Buenos Aires Underground.[40]
A series 7000 train imBatán station on line
Ansaldobreda series 7000 & 9000: The first purchase to a manufacturer other than CAF, and to a non-Spanish dealer, 37 series 7000 trainsets service the extremely busy line 10. They were the first in the network to feature a full "boa" layout, allowing commuters to traverse the whole six cars. They are extremely functional, with ample 1.3m doors and a sleek, unobtrusive design for a total capacity of 1,260 people per trainset (180 seated). This model also features two TV screens in each car, but they are left unused, both regularly or in emergencies. Series 9000 trains are similar to their previous incarnation, but include better accessibility for disabled people and more safety measures, such as visual and auditive warnings for the train gates and more effective emergency brakes, they also brought small aesthetic changes like the removal of the wood effect from the ceiling and the change of the red top stripe of the doors to a blue color. Series 7000 currently service the main part of line 10 from Puerta del Sur to Tres Olivos and occasionally on line 9; while series 9000 comprise the main fleet of line 7 and 12, occasionally on line 10, and on line 9 to cover for the sold 6000s.
A series 8000 train waiting on line atPinar del Rey station
CAF series 8000: Originally designed for the MetroSur line 12, 45 trainsets were built and delivered by CAF in 2002.[41] Each one is composed of three cars or four cars joined in the "boa" layout, with the three car version servicing line 12 and the four car version servicing line 8 as-is, while line 9 & line 10 services use two such trainsets to form a MRM-MRM configuration for a maximum of 1,070 passengers (144 seated). The interior distribution is rather like that of series 7000, with a bigger clear area (i.e. without seating) in the first car for people carrying luggage to/from the airport and disabled people in wheelchairs. Like the narrower series 3000 trainsets, itsbogies are insonorized and feature a hybrid rubber-pneumatic suspension system. Series 8000 primed the introduction ofregenerative braking in the Madrid Metro. The system reverses the normal circuit of the electric motors when braking, thus making the decelerationreturn power to the network. Also, they feature the now-standard informative panels and gate activity warnings in the interior. A second batch was ordered for line 11 to replace the series 3000 operating on the line since the extension of the line to La Fortuna in 2010. The original batch currently services lines 12 and 8, while also providing rush hour support to lines 9 and 10 while the second batch currently services line 11.
A series 8400 train on line
CAF series 8400: Derived from the recent series 8000 trains, the 8400 series are the newest train type to enter service on the Madrid Metro on line 6 since 2010 to complement the older series 5000 serving on that line. It currently services line 6.
Alstom Citadis 302: The vehicles serving thelight rail lines arelow-floorarticulated trams in a five-section "boa" configuration, which allows for a maximum of about 200 passengers per tram (60 seated). They can reach a top speed of 100 km/h (65 mph), but in practice, they are limited to 70 km/h (45 mph) in most track stretches, and even less in urban sprawls. The tram features a bell-like proximity warning that is activated when the train approaches a station or a level crossing with pedestrians, which has given rise to complaints from people living near the tracks because of the noise generated. Safety features also include door activity warnings for passengers and emergency brakes comparatively more effective than in any other train dedicated to Metro service, as the trams, though remaining in their own lanes separated from other traffic, can cross roads and populated areas.
Currently, Metro Ligero has four lines, although one of them is located outside the city of Madrid in its entirety:
Metro Ligero 1/Line ML-1: Pinar de Chamartín – Las Tablas: 5,4 km and 9 stations, 5 of which are underground.
Metro Ligero 2/Line ML-2: Colonia Jardín – Estación de Aravaca: 8,7 km and 13 stations, 3 of which are underground.
Metro Ligero 3/Line ML-3: Colonia Jardín – Puerta de Boadilla: 13,7 km and 16 stations, 1 of them is underground – and is shared with ML-2.
Metro Ligero 4/Line ML4:Tranvía de Parla: 8,3 km and 15 stations.
This sectionneeds expansion. You can help byadding to it.(June 2008)
Until the early 1990s and the transfer of the Metro system to theAutonomous Community of Madrid, the rate of investment in the network by the central government was extremely low,[n. 4] and thus very old trains were used way beyond their intended lifespans. Particularly loathed was the case of line 5, which was serviced by the nearly 40-year-old series 300 and 1000 from CAF. It was not uncommon that a child would ride to school on the same train his/her parents took decades earlier. Some renewals, along with the purchases of series 2000A and 5000, were started by thesocialist regional government ofJoaquín Leguina, but in 1995 thePeople's Party took over the government with the promise to widely extend and improve the Metro service. New lines were built and old ones refurbished: line 5 service was disturbed for several years as some stations at a time were closed and refitted, while line 3 was closed for two consecutive summers in order to expand its platforms to 90 m. Then, new rolling stock was also requested: 1998 saw the arrival of the first CAF series 2000B, retiring the infamous series 1000. Initially, the better-preserved series 300 were refitted and painted in the new blue-white colour scheme (from the old red corporate image), but they were also retired with the arrival of more series 2000B and, finally, series 3000.
The Regional Transportation Consortium sells monthly and yearly passes worth unlimited trips within the zone covered on every transportation method ascribed to itTicket machines used on the Madrid Metro.
The Madrid Metro network is split into the six "functional" zones mentioned above. Each one has a "single" ticket (Billete Sencillo), valid for one trip within the zone, and a 10-trip ticket for a comparatively lower price. When crossing zone boundaries, one has to buy a new ticket for the zone being entered. There is also a "combined" ticket, which provides for a single trip between any two points of the network except theAirport stations, which have an additional supplement of €3. All in all, it is possible to go from the airport to any other point of the network for up to €5.00.[42] All tickets are issued on theTarjeta Transporte Público.
Also, theConsorcio Regional de Transportes (Regional Transportation Consortium) has a division of its own, with geographic zones named A through C2. This body sells monthly and annual passes for unlimited trips within their zone of validity, and also a range of Tourist Passes for 1, 3, 5 or 7 days. All of them are accepted at the Metro stations within their zones, and passengers using a CRT pass do not have to pay the airport supplement.
Name
Valid for
Expires after
Price
Metro Sencillo
MetroMadrid (including ML1), MetroNorte, MetroEste or MetroSur
The metro is operated by its own company, under the Department of Public Works, City Planning, and Transportation of theautonomous community of Madrid. The passage between Puerta de Arganda (Line 9) and Arganda del Rey (Line 9) is operated byTransportes Ferroviarios de Madrid (TFM), while the second and third lines ofMetro Ligero are operated byMetro Ligero Oeste (MLO). All of Madrid's rapid transit systems are members of theConsorcio Regional de Transportes, which sells monthly passes for unlimited use of the metro, bus and commuter train networks within the area covered by the pass.
Some underground stations are large enough to hold public events, such as the three-day fitness festival in May 2011, which attracted 2,600 visitors.Ópera station contains a 200-square-metre archaeological museum.[44]
Various metro stations show contemporary art. The exhibition100 años de Metro (100 years of Metro) has received more than 27,000 visitors.[45] At Expometro within theRetiro station, multiple exhibitions of modern art have been on display, such as the exhibition by Pablo Sycet, Rafael Arellano, Tono Carbajo, Christian Domec and Julio Juste calledThe Dream of Madrid, 1986,[46] or "The Passengers" byDaniel Garbade (2000).[47] Both platforms of the station exhibit murals byAntonio Mingote. The Goya station shows works byFrancisco Goya (1746–1828) on two murals on the platforms of line 2.[48]
As part of its Accessibility PlanMetro Madrid confirmed that they are going to install lifts at several stations throughout the Metro network to allow easier access for people of reduced mobility.[50] Phase 1 of this plan (between 2016 and 2020) envisaged that 17 additional stations would be equipped with lifts,[51] although by 2020 only 11 of those stations were upgraded, plus one more that was not part of the original plan (Sevilla).[52] Phase 2 (2021–2028) is expected to bring step-free access to a further 24 stations,[53] in addition to the 6 that had not received their upgrades in time for Phase 1.[54]
In addition, in line with local policy, all newly-built stations must be fully step-free from the start. As a result, the relatively new lines, and are already fully step-free at all its stations. Line is likewise entirely wheelchair-accessible since the line's major upgrade in 2003–2006.[55]
As of 2018[update], there are more than 530 lifts on the network.[56]
A provisional network diagram of the Madrid Metro that includes the currently planned extensions of lines, and.
As of January 2024[update], there are four projects confirmed by the operator that will expand the Madrid Metro network, three of which are under construction.
The largest project is the extension of line towards the Valdebebas neighbourhood in the northeast of the city.[57][58][59][60] The extension is expected to be completed by 2030[57] and will open in three stages:
Stage 1: the southern section (Plaza Elíptica–Conde de Casal) is already under construction; it will extend the line from its present terminus at Plaza Elíptica by five additional stations: Comillas, Madrid Río (both brand-new stations with no interchange),Palos de la Frontera (interchange with line),Atocha (intechange withRenfe services to destinations throughout Spain,Madrid'sCercanías services, and Metro line), and Conde De Casal (interchange with line).[57] This extension will coincide with the construction of a major bus station at Conde De Casal, giving the line an additional interchange with inter-city bus services. This section is expected to open in 2024.
Stage 2: the central section (Conde de Casal–Mar de Cristal) will extend the line towards Mar de Cristal station (interchange with lines and), with intermediate stations atVinateros (interchange with line),La Elipa (interchange with line),Pueblo Nuevo (interchange with lines and) andArturo Soria (interchange with line).Metro Madrid also includes the possibility of constructing more intermediate stations along this section, although makes no mention of where exactly those would be located.[57]
Stage 3: the northern section (Mar de Cristal–Valdebebas Norte) will take the line to its final northern terminus in the new neighbourhood of Valdebebas, with three new stations: Cuidad de la Justicia (adjacent to the existing Valdebebas station on theCercanías network, with which it will form an interchange),Airport Terminal 4 (interchange with line, theCercanías, and flights fromBarajas Airport), and Valdebebas Norte (located west of Terminal 4 of the airport).[57]
The southern terminus of the line is also to be extended at some point during this project, by one stop atCuatro Vientos where it will interchange with line.[57]
The project has earned line its nickname "The Diagonal", as it will run across the whole city from the southwest to the northeast.Metro Madrid claims that this extension will aid in the decentralisation of the city, given that the line will mostly run away from the city centre (except near Atocha). As such, it is expected to relieve the busy lines and (with the former currently handling most out-of-centre traffic, and the latter also running mostly southwest–northeast).[57]
The empty trackbed at Chamartín station, constructed during the station's renovation project, in preparation for line's extension to the area before it was replaced by the current plan.
This project replaces an earlier proposal which would have instead extended the line along a semi-circular route towardsAvenida de la Ilustración, via Atocha,Ascao, Arturo Soria andChamartín.[61][62] This plan was eventually scrapped in 2020, but not before extra empty platforms were built at Chamartín to accommodate a future extension there. At the southern terminus, some proposals envisaged that the line would instead head south toSan Nicasio inLeganés, to connect with line, before the current scheme to Cuatro Vientos was adopted.[63]
Line is due to be extended one stop beyond its southern terminus atVillaverde Alto towardsEl Casar inGetafe. At El Casar, it will form an interchange with line, giving the latter a second direct Metro connection to the centre of Madrid[64](beside the existing connection atPuerta del Sur with line). The extension is in the process of being constructed, and is scheduled to become operational towards the end of 2024.[65]
Another short extension project currently under construction is on line. This line will similarly be extended one stop at its north-eastern end, beyondAlameda de Osuna towardsAirport Terminals 1-2-3 station, where it will connect with line and provide a second direct link into the city centre forMadrid Barajas Airport.[66][57] Its planned opening date is some time around 2028.
The TFM section of line will benefit from an additional station built on its existing route, betweenPuerta de Arganda andRivas Urbanizaciones stations. It is projected to open in 2029 and will serve the new communities of Los Ahijones and Los Berrocales once those are built.[67]
Many pending expansion projects were stalled by the economic fallout of the2008 financial crisis. During the 2010s, improving the existing network was considered a higher priority than extending it, with major projects such as the aforementionedimproved accessibility plan being put into place. Nonetheless, as both the number of trips in the Metro and the number of inhabitants of theComunidad de Madrid have seen steady increases in recent years,[68] there has been a growing political consensus that further extensions are necessary, especially in regards to supporting the single central circular line in a system of mostly radial lines.
In the context of theMadrid Nuevo Norte project, several official proposals envisage the construction of a new short metro line fromChamartín station, with three new stations located in the new development.Metro Madrid announced that this could be a standalone line with fully driverless trains,[69] though a map on the official website for the project suggested that the line could operate as a branch line or extension of the current line.[70][71]
In November 2024,Metro Madrid announced that they had ordered 80 new trainsets from Spanish manufacturerCAF, with a total cost of about €950 million.[72] 40 of these trains will be of the broad loading gauge type; these are to be used on line and will be fully driverless – a first for the Madrid Metro.[73] The other half of the order consists of narrower trainsets, which will be semi-automatic and will carry a driver; these sets are destined for line.[72] Both series of trains are expected to enter service on their respective lines from early 2027 and will replace some of the oldest units currently in service, most notably the aging 2000 and 5000 series.[72][73] Meanwhile, the relatively new 8000 series trains presently used on line will be redeployed on other wide-loading-gauge lines, including supporting the extension of line which is due to open around the same time.[73]
On 2 August 2024,Metro Madrid announced that they plan to haveplatform screen doors installed at all stations on line.[74] The works are scheduled to begin in June 2025, coinciding with the major track renewal works that had already been planned for the line that year. This project is considered to be the first major step towards the eventual goal of fully driverless operations on the line.[73][75]
^The number is 276 if stations are counted individually. If transfers are counted by just adding up the number of stops in each line (as most documents and reports do), the number is 328. The source states 302 because it uses this system and because 26 stations of the second and third lines ofMetro Ligero thatMetro Ligero Oeste S.A. operates are not included in their corporate reports, although they are part of the network.
^There are 8 out of 231 stations that are not underground, which amounts to just 4% of the total, though the aboveground route length may be longer.
^Trainset sizes vary between lines: 90m lines use six cars per train, while 60m lines use only four. Thus the actual number of trains varies between 88 and 132.
^A similar case happens as of 2008[update] with theCercanías commuter network, as theSpanish government is focused on the expansion of the nationwideAVE high-speed network.
^Applicable for MetroMadrid, €1.50 for up to 5 stations, €0.10 extra per station, up to €2.00.
^"Andén Cero".Metro de Madrid (in Spanish). Retrieved30 October 2019.
^MARÍA JESÚS HERNÁNDEZ (2009)."90 años en Metro".El Mundo (Spain) (in Spanish). Retrieved19 February 2023.se alcanzaron los 100 kilómetros al abrirse el tramo Plaza Castilla-Herrera Oria (1983)
^"Madrid Metro".www.metromadrid.es. Retrieved5 August 2023.Metro de Madrid has in recent years implemented the most ambitious Expansion Programme in its entire history and the largest known worldwide, in four successive plans (1995–1999, 1999–2003, 2003–2007 and 2007–2011), taking on the rail integration tasks for the planning, design, construction, implementation and operation of a total of 172 new kilometres of network, 132 stations and 7 depots, and the design and commissioning of 795 new cars.