Madrid–Barcelona high-speed rail line

Coordinates:41°36′34″N0°13′15″E / 41.6094°N 0.2207°E /41.6094; 0.2207
From Wikipedia, the free encyclopedia
Railway line connecting Madrid and Barcelona, in Spain
This article is about theAVEhigh-speed rail line betweenMadrid andBarcelona. For the conventional railway line, seeMadrid–Barcelona railway.

Madrid–Barcelona (- Figueres) high-speed rail line
AVE Class 103 (Siemens Velaro) near Vinaixa
Overview
StatusOperational
OwnerAdif
LocaleSpain (Community of Madrid,Castilla–La Mancha,
Aragon,Catalonia)
Termini
Service
TypeHigh-speed rail
Operator(s)Renfe Operadora,SNCF (Ouigo),Trenitalia (Iryo)
Rolling stockAVE Class 103,100, and112
Ridership4.4 million (2019)[1]
History
Opened2008 (first section in 2003)
Technical
Line length620.9 km (385.8 mi) (as far as Barcelona)
748.9 km (465.3 mi) (as far as Figueres)
Number of tracksDouble track
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
Electrification25 kV 50 Hz
Operating speed
  • 300 km/h (190 mph)
  • 2011 to 2016:
  • 310 km/h (195 mph)[2]
Route map

km
0.0
Madrid AtochaRenfeOuigo España
24.7
Jarama (2,236 m)
64.4
Guadalajara–YebesRenfe
116.0
Las Inviernas
182.7
Ariza AV
221.1
CalatayudRenfe
Paracuelos (4,763 m)
272.9
294.9
Moncasí Junction
306.7
Zaragoza–DeliciasRenfeOuigo España
311.7
315.8
Canal Imperial
TardientaRenfe
HuescaRenfe
356.5
Bujaraloz
396.8
Ballobar
403.7
Cinca (870 m)
434.6
Les Torres de Sanui
442.1
Lleida PirineusRenfe
452.5
448.6
Artesa
452.5
456.6
Les Borges Blanques
488.9
L'Espluga de Francolí
509.3
L'Alcover
512.8
520.9
Camp de TarragonaRenfeOuigo España
534.7
Montornès
549.3
La Gornal
552.7
L'Arboç
565.9
Vilafranca del Penedès
579.6
Gelida
Martorell
Castellbisbal
Llobregat (Pallejà)
595.8
Sant Vicenç dels Horts
Llobregat (Sant Joan Despí)
610.4
Llobregat (Sant Boi)
Barcelona–Vilanova line
El Prat de Llobregat
Llobregat
to Can Tunis
Provença Tunnel,
Sants–La Sagrera
620.9
Barcelona SantsRenfeOuigo EspañaTGV inOui
Barcelona Sagrera
Montmeló
662.1
Llinarscrossover
678.1
Riells
703.5
Viloví d'Onyar
714.7
GironaRenfeTGV inOui
Vilademulscrossover
Barcelona–Cerbère railway
(conventional line)
748.9
Figueres–VilafantRenfeTGV inOui
752.4
International section
Spain
France
border
toPerpignan andTGV network
This diagram:

TheMadrid–Barcelona high-speed rail line is a 621-kilometre (385.9 mi)standard-gauge railway line inaugurated on 20 February 2008. Designed for speeds of 350 km/h (217.5 mph) and compatibility with neighbouring countries' rail systems, it connects the cities ofMadrid andBarcelona in 2 hours 30 minutes. In Barcelona the line is connected with thePerpignan–Barcelona high-speed rail line leading into France which connects it to the European high speed network.

Trains are operated by the national railwayRenfe under theAVE andAvlo brands, and by private competitorsOuigo España andIryo.

First stages

[edit]

In 2003 construction of the first phase of a new standard gauge line from Madrid to the French border (Madrid–Zaragoza–Lleida) was completed and on 11 October of that year commercial service began. This service also stopped at Guadalajara–Yebes andCalatayud. The service began running at only 200 km/h (124.3 mph). On 19 May 2006, after two years of operation, speed was increased to 250 km/h (155.3 mph) when the SpanishASFA signalling system was replaced with level 1 of the new EuropeanETCS/ERTMS system. On 16 October 2006 the trains on this line increased their operating speed to 280 km/h (174.0 mph).

On 18 December 2006 theAVE started operating toCamp de Tarragona, and on 7 May 2007 the service increased its speed to the maximum allowable for the line, 300 km/h (186.4 mph). This puts Tarragona at 30 minutes from Lleida. The extension to Barcelona was delayed various times due to technical problems; the Ministerio de Fomento having originally forecast the AVE's arrival in Barcelona by the end of 2007.[3]

Complete operation

[edit]
icon
This sectiondoes notcite anysources. Please helpimprove this section byadding citations to reliable sources. Unsourced material may be challenged andremoved.(November 2023) (Learn how and when to remove this message)

The complete line was opened February 2008. As of 2012, seventeen trains now run every day between the hours of 6 am and 9 pm, covering the distance between the two cities in just 2 hours 30 minutes for the direct trains, and in 3 hours and 10 minutes for those calling at all intermediate stations. Before the high-speed line was built, the journey between the two cities took more than six hours.

Madrid–Barcelona–Figueres line in red

Speed

[edit]
Maximum speed profile of the "Madrid–Barcelona–French Border" line, in 2015

It was originally forecast that, after reaching Barcelona in 2004, the line would run at 350 km/h (217.5 mph), the maximum capable speed of the new Siemens AVE trainsS103 which have replaced the Talgo Bombardier AVE S102, after the installation of level 2 of theETCS/ERTMS. But on the AVE's first day of operating at 300 km/h (186.4 mph) to Tarragona the Minister of Public Works, Magdalena Álvarez, stated that the maximum commercial operating speeds of the AVE on all lines would be 300 km/h (186.4 mph).[4]

On 11 December 2011, the speed was raised to 310 km/h (192.6 mph) on a 60 km (37.3 mi) section of the railway (between km 64.4, near Guadalajara, and km 124.4), with plans to further increase the speed to 320 km/h (198.8 mph) on a 24 km (14.9 mi) sub-section (from km 81.0 to km 105.24) and plans to rapidly extend the 310 km/h (192.6 mph) speed throughout the Spanish high-speed network.[5][2][6][7] Nevertheless, after almost 5 years of operation with S103 trains running at up to 310 km/h (192.6 mph) on this section, the speed was decreased back to 300 km/h (186.4 mph) on 17 August 2016.[2] The tests performed by ADIF had revealed that, at speeds exceeding 300 km/h (186.4 mph), the air which the trains were moving underneath was causing some stones of the ballast to rise, hitting the trains and causing damage of various kinds (the Spanish high-speed railways follow the French high-speed rail model of laying the rails on a bed of stones known as ballast, instead of laying the tracks on concrete plates, as is done for high-speed rail in Germany).[8] Due to this technical limitation and the substantial increase in costs and power necessary to break the 300 km/h (186.4 mph) barrier, the AVE in Spain abandoned prospects of operating at speeds over 300 km/h (186.4 mph) in the short or medium term.[8]

Usage

[edit]

It was forecast that the AVE would substantially replace air traffic on the Madrid – Barcelona route (in the same way that theEurostar has on theLondon–Paris/London–Brussels routes and France'sTGV has on theParis–Lyon route). Indeed, by the end of 2017, the line had already taken 63% of the traffic, taking most of it from aircraft.[9] A few years before the Madrid–Barcelona route was theworld's busiest passenger air route in 2007 with 971 scheduled flights per week (both directions).[10] Similarly more than 80% of travelers between Madrid and Seville use the AVE, with fewer than 20% traveling by air.[11]

Criticism

[edit]
icon
This sectiondoes notcite anysources. Please helpimprove this section byadding citations to reliable sources. Unsourced material may be challenged andremoved.(November 2023) (Learn how and when to remove this message)

There was criticism during the construction of the Madrid–Barcelona line. A critical report by the consulting firmKPMG, commissioned by ADIF (Administrador de Infraestructuras Ferroviarias) at the behest of the Ministry for Development (Ministerio de Fomento) on 23 June 2004, pointed to a lack of in-depth studies and over-hasty execution of works as the most important reasons for the problems that dogged construction of the AVE line. For example, during the construction of theAVE tunnel near Barcelona, a number of nearby buildings suffered damage from a sinkhole that appeared near a commuter rail station, damaging one of its platforms. The construction committee of Barcelona's famedSagrada Família church lobbied for a re-routing of the tunnel – it passes within metres of the massive church's foundations. It also passes equally near theUNESCO-recognizedCasa Milà also designed byAntoni Gaudí.

Until 2005 bothSiemens andTalgo/Bombardiertrain sets failed to meet scheduled speed targets, although in a test run during the homologation tests of the new S102 trains ofRenfe, a train-setTalgo 350 (AVE S-102) reached a speed of 365 km/h (226.8 mph) on the night of the 25/26 June 2006, and in July 2006 aSiemens Velaro train-set (AVE S-103) reached the highest top speed ever in Spain: 403.7 km/h (250.8 mph). At this time, it was a record for railed vehicles in Spain and aworld record forunmodified commercial service trainsets, as the earlierTGV andICE records were achieved with specially modified and shortened trainsets, and the 1996Shinkansen record of 443 km/h (275.3 mph) was using a test (non-commercial) trainset.

Planned services in 2012
At Paracuellos de la Ribera
Overview map of the high-speed connections from Barcelona towards France, with the year of opening

Extension to France

[edit]
Main article:Perpignan–Barcelona high-speed rail line

Barcelona to Figueres

[edit]

Originally planned to open in 2009, the extension of some Madrid–Barcelona routes toFigueres–Vilafant railway station viaGirona, opened on 9 January 2013.[12] This made possible upon the completion of the 131-kilometre (81.4 mi) Barcelona–Figueres section of thePerpignan–Barcelona high-speed rail line that connected for the first time the SpanishAVE high-speed network with the FrenchTGV high-speed network.[13] There have been delays in building a four-kilometre tunnel inGirona, the first phase of which was finished in September 2010,[14] and controversy over the route betweenSants andSagrera stations in Barcelona.[15] As of January 2013[update] there are eight trains a day running from Madrid, connecting at Figueres Vilafant with two TGV services to Paris.[16]

Figueres to Perpignan

[edit]

This is an internationalhigh-speed rail section between France and Spain. The section connects two cities on opposite sides of the border,Perpignan inOccitanie, France, andFigueres inCatalonia, Spain. It consists of a 44.4-kilometre (27.6 mi) railway which crosses the French–Spanish border via thePerthus Tunnel, an 8.3-kilometre (5.2 mi) tunnel bored under the Perthus Pass.[17] The section is open to high speed trains and freight. Construction was completed in February 2009, although services did not run until a station was built on the line at Figueres. As of March 2015, a daily TGV service connects Paris to Barcelona Sants via Perpignan-Figueres with 2 pairs of trips, plus other connections involving Lyon, Marseille, and Toulouse.[18]

See also

[edit]

References

[edit]

Notes

[edit]
  1. ^"AVE Barcelona-Madrid cumple 12 años acumulando más de 40 millones de viajeros".La Vanguardia (in Spanish). 20 February 2020. Retrieved5 January 2021.
  2. ^abc"Velocidades máximas de los trenes y de las líneas" (maximum speeds of the trains and of the lines), last updated on 10 December 2022, accessed on 27 April 2023.
  3. ^"La Vanguardia, 18 December 2006". Archived fromthe original on 28 November 2007. Retrieved17 July 2008.
  4. ^La Vanguardia, 7 May 2007
  5. ^"310 km/h: velocidad máxima de circulación en España" (310 km/h: maximum circulation speed in Spain),ViaLibre, 13 December 2011.
  6. ^"Renfe y Adif pondrán el AVE a 310 km/h en toda la red antes del verano de 2012" (Renfe and ADIF will set the AVE at 310 km/h in the whole network before the summer 2012),Cinco Dias (El Pais), 23 November 2011.
  7. ^"Madrid – Barcelona at 310 km/h with ETCS Level 2". Archived fromthe original on 28 July 2020. Retrieved31 October 2011.
  8. ^ab"El futuro del tren en Léon. El Ave necesita seis meses para llegar a 300 kilómetros por hora"[permanent dead link] (The future of train in Leon. The AVE needs 6 months to arrive at 300 km/h), 27 September 2015,leonoticias.
  9. ^Barcelona-Madrid high-speed line has had more than 85 million passengers 21 February 2018
  10. ^Air passenger transport in Europe in 2007
  11. ^Juan Carlos Martín and Gustavo Nombela, "Microeconomic impacts of investments in high speed trains in Spain",Annals of Regional Science, vol. 41, no. 3, September 2007
  12. ^Madrid-Barcelona-French Border line on theADIF website.
  13. ^"Spain completes Iberia's high-speed link to Europe".International Railway Journal. 8 January 2013. Retrieved30 December 2015.
  14. ^"Girona tunnelling makes progress".Railway Gazette. Retrieved23 September 2010.
  15. ^"Perpignan-Barcelona AVE to open in 2012 or .... 2020?".Today's railways Europe. No. 140. August 2007. p. 10.
  16. ^"Barcelona - Figueres high speed rail line to open on January 7".International Rail Journal. 10 December 2012. Retrieved18 January 2012.
  17. ^"Perpignan-Figueras High-speed Rail Line".Structurae. Retrieved30 January 2009.
  18. ^"Spain—closer than ever before".SNCF. Retrieved3 March 2015.

Further reading

[edit]

External links

[edit]
Wikimedia Commons has media related toMadrid–Barcelona high-speed rail line (Adif line 050).
Stations
Huesca branch
Lines in service
Lines under construction
Planned lines
Rolling stock
Services
Renfe
Africa
Morocco
Asia
China
Indonesia
Japan
Saudi Arabia
South Korea
Taiwan
Turkey
Uzbekistan
Europe
Belgium
Denmark
Finland
France
Germany
Greece
Italy
Netherlands
Norway
Poland
Russia
Spain
Sweden
United Kingdom
America
United States
Oceania
None
* An asterisk indicates overlap with conventional services.
High-speed
Mainline
Local
Mountain
Heritage
Proposed
Defunct

41°36′34″N0°13′15″E / 41.6094°N 0.2207°E /41.6094; 0.2207