Madhupur–Giridih–Koderma line

From Wikipedia, the free encyclopedia
Railway route in India

Madhupur–Giridih–Koderma line
Giridih, an important railway station on Madhupur–Giridih–Koderma line
Overview
StatusOperational
OwnerIndian Railways
LocaleJharkhand, India
Termini
Stations21 operational
Service
TypeElectrified
SystemBroad gauge
ServicesKoderma–Madhupur line
Operator(s)Eastern Railway
East Central Railway
History
Opened1871, 2012, 2015, 2019
Technical
Line length138 km (86 mi)
Number of tracks1
Track gauge5 ft 6 in (1,676 mm)broad gauge
ElectrificationYes
Operating speed110 km/h
Route map
Madhupur–Giridih–Koderma line
km
Up arrow
138
Madhupur
Left arrow
132
Sugapahari
130
Sugapahari Halt
125
Jagadishpur
121
Krishna Ballabh Sahay Halt
111
0
Maheshmunda
11
Giridih
16
CPC Siding Giridih
104
0
New Giridih
Jhajha–New Giridih line (planned)
Usri River
12
Bengabad
25
Chakai
32
Batia
45
Sono
Up arrow
70
Jhajha
Down arrow
Dhanbad–New Giridih line (planned)
Dhirabar River
12
Koimara
25
Fatehpur
32
Tundi
45
Maharajganj
Khudia River
59
Govindpur
Up arrow
70
Pradhankhanta
Down arrow
96
0
Salaia
Parasnath–New Giridih line (planned)
7
Lakhiatanr
14
Kumhartola
24
Madhuban
31
Chainpur Halt
Up arrow
38
Parasnath
Down arrow
93
Jitpur
86
Kawar
79
Jorasankh Halt
72
Jamua
62
Duriatanr Halt
55
Rema
49
Dhanwar
41
Rakesh Bagh Halt
33
Nawadih
28
Nawal Sahi Halt
20
Maheshpur Halt
10
Koderma Town
Up arrow
0
Koderma
Down arrow
km

Madhupur–Giridih–Koderma line is a 138 km (86 mi)-long single5 ft 6 in (1,676 mm)broad gauge track fromMadhupur town inDeoghar district toKoderma town inKoderma district viaGiridih town inGiridih district ofJharkhand state. It is an extended route of Madhupur–Giridih railway line. The Koderma–Maheshmunda section falls underDhanbad Division ofEast Central Railway and Giridih–Madhupur section underAsansol Division ofEastern Railway. The construction of 110 km (68 mi) rail line from Koderma to Maheshmunda was done under supervision of Dhanbad Division of East Central Railway.[1]

History

[edit]

Giridih railway station was built as a railway siding in 1871 by the British government in India (prior to the India's independence in 1947) mainly for transport of mineral reserve from the region. The contract for the railway siding was awarded in 1865 and the construction was completed in 1871.[2] The siding is owned byCentral Coalfields Limited.[3]

A 110 km (68 mi) track fromKoderma to Maheshmunda was constructed. This extended the Madhupur–Giridih railway line to Koderma, effectively making it a Madhupur–Giridih–Koderma line. A new railway station was built inGiridih named asNew Giridih railway station (NGRH) which leaves out the already existingGiridih railway station (GRD) on this route, also making Maheshmunda a junction station. On 16 February 2019,Eastern Railway in its press-release announced a passenger train service w.e.f. 25 February 2019 fromKoderma toMadhupur viaNew Giridih. Onward journey duration is of 4 hours and 5 minutes while the return journey duration is 4 hours and 25 minutes. Eastern Railway also announced another passenger train service w.e.f. 25 February 2019 from Koderma to Maheshmunda Junction through the same press-release. Onward journey duration is of 3 hours while the return journey duration is 3 hours and 10 minutes.[4]

Electrification

[edit]

Madhupur–Giridih–Koderma line was completely electrified in October 2020.

Further extension

[edit]

There are plans from the Railway ministry to connectParasnath withNew Giridih via Madhuban, for the convenience of theJain pilgrims visitingShikharji.[5] construction of which was sanctioned and the project included in the Union Budget 2018-19 at a cost of ₹902.86 Crores on a 50:50 cost sharing basis between the Government of Jharkhand and Indian Railways. The foundation stone for construction was laid in 2019. The 49-km long railway line will have two crossing stations and a couple of halts. During the financial year 2022-23, Indian Railways had allotted ₹50 Crores for the above project for early starting of the project. In a land acquisition application submitted to DLAO/Giridih by DyCE/Con/HZME office, ₹78.27 Crores were demanded for Raiyati land of 26 villages and payment for land acquisition is yet awaited for deposition of fund from Government of Jharkhand.[6]

There are other proposals as well to connectNew Giridih withDhanbad via Tundi and Govindpur,[7] and withJhajha via Bengabad, Chakai and Sono. The first phase of the Jhajha–New Giridih rail line involves 20-km long Jhajha–Batia section, the foundation for which was laid in 2019 and which will be constructed at a cost of Rs 496 crore.

A final location survey for 7.54 km-longMadhupur bypass line was sanctioned in February 2020 after construction of which trains fromJasidih can run up toGiridih andKoderma without loco reversal atMadhupur. A delay of more than 30 minutes for an engine change atMadhupur will thus be avoided. The estimated cost of the linking project is Rs 281 crore.

Description

[edit]

Following is the list of stations that are onMadhupurKoderma route viaNew Giridih.[8]

List of stations
S.No.StationStation Code
1MadhupurMDP
2Sugapahari TP-6/3SGPA
3Sugapahari Halt TP-7/11SAPT
4JagadishpurJGD
5Krishna Ballav Sahay HaltKBSH
6Maheshmunda JunctionMMD
7New GiridihNGRH
8SalaiyaSLIA
9KawarKWAR
10Jorasankh HaltJASH
11JamuaJAUA
12Duriyatanr HaltDUTR
13RemaREMA
14Raj DhanwarDNWR
15Rakesh Bagh HaltRHBH
16NawadihNWDH
17Nawasahi HaltNWSI
19Maheshpur A Cabin HaltMHSA
20Koderma TownKQRT
21Koderma JunctionKQR

Trains

[edit]

Single passenger train run five times a day betweenMadhupur JunctionGiridih. The train service on Madhupur–Giridih rail route started in 1871. The passenger trains are run byEastern Railway zone. The trains run five times daily except Thursdays and four times on Thursday.[9] Following are the trains arriving and departing fromGiridih.[10][11]

Passenger Trains
Sl.No.TRAIN NO.TRAIN NAME
153511Madhupur–Giridih Passenger
253512Giridih–Madhupur Passenger
353513Madhupur–Giridih Passenger
453514Giridih–Madhupur Passenger
553515Madhupur–Giridih Passenger
653516Giridih–Madhupur Passenger
753517Madhupur–Giridih Passenger
853518Giridih–Madhupur Passenger
953519Madhupur–Giridih Passenger
1053520Giridih–Madhupur Passenger

After the construction ofKoderma–Maheshmunda section in 2019, new passenger trains were started on this route which are run byEast Central Railway. Following are the trains running on this route viaNew Giridih.

Passenger trains
Sl.No.TRAIN NO.TRAIN NAME
153365Maheshmunda–Koderma Passenger
253366Koderma–Maheshmunda Passenger
353369Madhupur–Koderma Passenger
453370Koderma–Madhupur Passenger

A new express train connectingNew Giridih toRanchi was announced by Koderma MPAnnapurna Devi on 6 April 2023 andIndian Railways released an official notification for the same on 23 August 2023. The inaugural run of New Giridih–Ranchi Intercity Express was flagged off by Koderma MPAnnapurna Devi on 12 September 2023 and regular service commenced from 13 September 2023.[12] As of now it is the only long distance express train running on this rail line, connecting the city ofGiridih with the state capitalRanchi, and also the only train running with aVistadome coach in the state ofJharkhand.[13][14]

See also

[edit]

References

[edit]
  1. ^"Railways conduct trial run on newly built track on Dhanbad Division".The Times of India. 27 March 2010.Archived from the original on 3 January 2013. Retrieved27 March 2010.
  2. ^Akhtar, Shahnawaz (20 August 2009)."Ignored, Giridih station cries for care – Pilgrim spot fetches Rs 25cr for railways, but denied express trains".The Telegraph (Calcutta). Calcutta, India. Archived fromthe original on 3 February 2013. Retrieved31 March 2012.
  3. ^"Colliery Sidings East Railway". Official Website of the Eastern Railway. Archived fromthe original on 26 May 2012. Retrieved1 April 2012.
  4. ^Railway, Eastern (16 February 2019)."pic.twitter.com/fol9xNXCuk".@EasternRailway. Retrieved17 February 2019.
  5. ^"Giridih lauds Didi's budget – 'Madhuban link a blessing'".The Telegraph. Calcutta. 5 July 2009. Archived fromthe original on 24 September 2015. Retrieved31 March 2012.
  6. ^"Jharkhand govt's fund denial halts rail movement to Jains' 'Mecca-Medina'". Retrieved8 September 2023.
  7. ^"मोदी सरकार ने खींचा धनबाद-गिरिडीह के बीच रेल लाइन का खाका".Dainik Jagran (in Hindi). Retrieved23 February 2019.
  8. ^"List of Stations on Asansol Division". Official Website of Eastern Railway, Govt of India. Retrieved7 April 2012.
  9. ^Akhtar, Shahnawaz (19 May 2008)."Coal mafia chokes trains".The Telegraph. Calcutta. Archived fromthe original on 3 February 2013. Retrieved31 March 2012.
  10. ^"Trains to Giridih". India Rail Info. Retrieved31 March 2012.
  11. ^"Trains from Giridih". India Rail Info. Retrieved31 March 2012.
  12. ^"Ranchi-New Giridih Intercity From Sep 12".The Times of India. Retrieved8 September 2023.
  13. ^"Jharkhand gets first intercity express with vista dome coach". The Week. Retrieved12 September 2023.
  14. ^"Jharkhand's first Vistadome-equipped Intercity Express ready for debut ride! Know arrival, departure time and full route". Financial Express. Retrieved11 September 2023.

External links

[edit]
Railways in Eastern India
National network/
trunk lines
Other lines/sections
Interstate
Bihar
Jharkhand
Odisha
West Bengal
Suburban
rail transport
Monorail
Defunct lines
Revived/
under revival
Inactive
Zones & Divisions
Eastern
East Central
East Coast
North Eastern
Northeast Frontier
South Eastern
Production units/
workshops
Transit points
with Bangladesh
Active
Defunct
Indian railheads
near India–Nepal border
Railway companies
See also