Macombs Dam Park (/məˈkuːmz/mə-KOOMZ) is a park in theConcourse section ofthe Bronx, New York City. The park lay in the shadow of theold Yankee Stadium when it stood, betweenJerome Avenue and theMajor Deegan Expressway, near theHarlem River and theMacombs Dam Bridge. The park is administered and maintained by theNew York City Department of Parks and Recreation. The majority of Macombs Dam Park was not open to the public from August 2006, when construction began on the newYankee Stadium, to April 2012.[1]
The 28.425-acre (115,030 m2) park, prior to the stadium construction, featuredbaseball andsoftball diamonds,basketball courts, andfootball andsoccer fields.[2] Portions of the park are often used duringNew York Yankees home games to provideoverspill parking for vehicles in an area underserved by garages and other parking facilities.
Macombs Dam Park opened in 1899, when the Bronx was mostly farmland.[2] As was typical for urban planning at that time, a large, central greenspace was set aside to ensure that the developing neighborhood would be livable and sustainable. This same type of development had already been thriving around Manhattan'sCentral Park andBrooklyn'sProspect Park, among several other New York locations. Parks advocates contend that Macombs Dam Park is no less valuable than Central Park or Prospect Park, which are both in much wealthier neighborhoods. Macombs Dam Park is inNew York's 16th congressional district, the poorest in the United States.
Yankee Stadium opened in 1923 and theBronx County Courthouse, two blocks east onGrand Concourse, opened in 1934. Most of the neighborhood's apartment buildings opened in the 1920s and 1930s, including manyArt Deco landmarks that line the perimeter of what had been Macombs Dam Park.
This sectiondoes notcite anysources. Please helpimprove this section byadding citations to reliable sources. Unsourced material may be challenged andremoved.(April 2015) (Learn how and when to remove this message) |
Bronx officials[who?] had promised that replacement parks would be built before the stadium project began. When the $1.6 billion stadium was completed, residents had several new recreation areas, including ballfields on the Harlem River waterfront, about a half-mile from the formerMacombs Dam andMullaly Parks. Other recreation areas are on top of parking garages where the parks had been; these will be closed on game days, which make up 81 days of the 183 days between April and September, to accommodate fans' cars. The roofs of the garages, with artificial surface are counted as replacement parkland by New York City. Other replacement recreation areas are on the 9-acre (36,000 m2) site of the old Yankee Stadium. The above ground structure of the ballpark, built in 1923, was torn down, with the underground clubhouses remaining in use for the new parkland.
The new recreation areas cost at least $150 million, paid for entirely by New York City taxpayers. By contrast, renovating Macombs Dam and John Mullaly parks would have cost about $25 million. The city's parks department will retain ownership of the land under the Yankees' new stadium, but do not charge the Yankees rent or property taxes.
Residents and parks advocates had criticized the Yankees' changes to the neighborhood, which included cutting down 377 mature oak trees. They said state and federal laws designed to protect parkland from private development made this project unfair and possibly illegal. According to the city's Environmental Impact Statement for the Yankees' stadium project, several buildings surrounding Macombs Dam Park may become blighted when the project is completed. Opponents to the construction of the new Stadium were defeated and the Stadium officially opened on April 3, 2009, for anexhibition game against theChicago Cubs.
The entire park is an off-leash designated dog park. Certain areas, like the running track, are labeled as No Dogs Allowed.[3]
40°49′41″N73°55′46″W / 40.828091°N 73.929448°W /40.828091; -73.929448