Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Loop Trolley

From Wikipedia, the free encyclopedia
Streetcar service in St Louis, Missouri
Not to be confused with theLoop Service in Portland, Oregon.

Loop Trolley
Loop Trolley near Limit Avenue
Overview
StatusOperational (Seasonal)
OwnerLoop Trolley Transportation Development District
LocaleSt. Louis andUniversity City, Missouri
Termini
  • Missouri History Museum
  • University City Library
Connecting linesMetroLink (St. Louis)Red
atDelmar Loop
MetroLink (St. Louis)RedBlue
atForest Park–DeBaliviere
Stations10
Service
TypeHeritage streetcar
Operator(s)Metro Transit (2022–present)
Loop Trolley Company (2018–2021)
Ridership12,350 (2024)[1][2]
History
OpenedNovember 16, 2018 (2018-11-16)
SuspendedDecember 29, 2019
ReopenedAugust 4, 2022[3]
Technical
Line length2.2 mi (3.5 km)
CharacterAt-grade street running
Track gauge4 ft 8+12 in (1,435 mm)standard gauge
ElectrificationOverhead line600 V DC[4][5]
Route diagram

Missouri History Museum/
Forest Park
Forest Park–DeBaliviereRedBlueMetroLink (St. Louis)
Crossroads School
Delmar & DeBaliviere
Hamilton Avenue
Operations & Maintenance Facility
Delmar LoopRedDelmar Loop stationMetroBus (St. Louis)
The Pageant
City Limit
Leland Avenue
University City Library

Handicapped/disabled access All stations are accessible
This diagram:

TheLoop Trolley is a 2.2-mile (3.5 km), 10-stationheritage streetcar line in and near theDelmar Loop area ofgreater St. Louis, Missouri, United States. It opened for service in 2018, then shut down in 2019 after revenue fell far short of projections. Service resumed in 2022[3] under theMetro Transit division of theBi-State Development Agency,[6] which plans to run the trolley at least through the 2028 season.[7]

The tracks start inSt. Louis proper at theMissouri History Museum inForest Park. They run north on DeBaliviere Avenue, with stops atMetroLink'sForest Park–DeBaliviere station and in the neighborhoods ofDeBaliviere Place,Skinker/DeBaliviere, and theWest End.[8] They turn west onDelmar Boulevard to MetroLink'sDelmar Loop station and cross the border ofSt. Louis County intoUniversity City, where they enter theDelmar Loop district and terminate at theUniversity City Library just west of Kingsland Avenue.[8]

The line was built at a cost of $51 million (about $67.7 million in 2024[9]), more than half of which came from federal funds, by the Loop Trolley Transportation Development District, which owns the line and the three replica-historicstreetcars. Originally, the service was operated by a separatenon-profit entity called the Loop Trolley Company.[10][11]

Its annual operating expenses of $1.3 million were to be covered mostly by a one-cent sales tax collected by businesses along and near the line but also by fares and advertising.[10][4] But ridership fell far short of expectations, in part because the delayed arrival of its third streetcar limited operations to four days a week.[12]

The trolley ceased operation on December 29, 2019.[13][14] Federal officials subsequently said local governments would have to return millions of dollars of grant money if operation were not restarted.[15]

In February 2022, the Bi-State Development Board voted to take over the Loop Trolley, restart operation, and run it through June 2025.[16][17] Service resumed on August 4, 2022,[3] for a four-day-a-week, fare-freepilot program that ran through October 30,[18] when the line shut down for the winter.

The line operated similarly in 2023, 2024, and 2025: no-fare service Thursdays through Sundays between April and October.[19][20][21] In February 2025, the Bi-State board voted to continue this seasonal operation through 2028.[7]

History

[edit]
November 2015: Track construction under way onDelmar Boulevard
December 2018: A trolley stop on Delmar Boulevard, with map andticket vending machine

Before operation

[edit]
Further information:Streetcars in St. Louis

TheDelmar Loop was named for the streetcar turnaround that occupied two oblong blocks on the north side of Delmar east from Kingsland Avenue. This loop was used by two lines of theSt. Louis Public Service Company—the Olive-Delmar andCreve Coeur lines—and a private line west to what is now University City'sCity Hall. Streetcar service ended in St. Louis in 1966, but the Loop retained its name.

Around 1997,[22] the idea of bringing back streetcars found a champion inJoe Edwards, the owner ofBlueberry Hill,The Pageant, and other Loop businesses. Edwards eventually secured the purchase of twoPeter Witt-type streetcars that once operated inMilan, Italy. The two Peter Witt cars were cosmetically refurbished by theGomaco Trolley Company in 2005 and placed on long-term display along the route—one on Delmar by Commerce Bank, and the other at theMissouri History Museum—to publicize the proposed Loop Trolley line.[23] Originally, the two were slated to carry passengers if the project came to fruition, but plans to restore them to operating condition were deemed too expensive in 2015, in part because they had deteriorated during their years on outdoor display.[24]

In July 2010, theFederal Transit Administration's Urban Circulator Grant Program approved a grant of $25 million for the project.[25][26] Ultimately, the FTA provided about $34 million to the project.[15] Other funding came from theU.S. Department of Transportation's Congestion Mitigation and Air Quality Improvement Program and Surface Transportation Program, aTax increment financing, aNew Markets Tax Credit, the St. Louis County Transportation Fund,Great Rivers Greenway,Washington University, Loop Trolley Transportation Development District sales taxes, and donations.[27]

Construction began in March 2015 with a budget of $51 million[27] and anticipated annual ridership of 394,000 passengers.[28] The trackwork was half done by November 2015[29] and was completed in November 2016.[30] During construction, some shops and restaurants saw decreased foot traffic and sales. Some businesses moved; others closed permanently. One business owner called the Loop Trolley "a solution in need of a problem".[31][32][33]

In 2017, trolley officials projected that the first year of operation would see farebox revenue of $394,433 with all-day, seven-day service.[28]

The first of three streetcars being refurbished and modified for the line was delivered on February 16, 2017,[5] and the second on March 30, 2017.[34] On March 26, 2017, car No. 001 was towed along the line to check the tracks and clearances at station platforms, becoming the first streetcar to be moved along the Loop Trolley line, though not under its own power.[35][36]

In 2018, Loop Trolley officials said the first year's operating budget would be $1.3 million, of which $850,000 would come through the sales tax.[28]

The line's opening was delayed several times as completion of a third trolley car fell behind schedule. Eventually, Loop Trolley officials decided to operate a temporarily reduced schedule with two trolleys until the third was delivered.

In November 2018, the Loop Trolley Company announced that the line would open on November 15, 2018,[37] but snow delayed the opening one more day.[38]

Loop Trolley Company operation

[edit]

Service began on November 16, 2018.[39] The two replica-historicstreetcars initially ran four days a week: Thursdays, noon to 8 p.m.; Fridays and Saturdays, noon to 11 p.m.; and Sundays, noon to 8 p.m. Tickets cost $2 for a two-hour fare and $5 for an all-day fare. Cheaper tickets were available for passengers aged 5–12 or 65 or older, and for those with disabilities.[40] Service was expected to expand to more hours, and seven days a week after a third trolley arrived.[41][12]

A failure to obtain an operating permit from University City limited service during its first week to the portion between the Missouri History Museum terminus and theDelmar Loop MetroLink station.[39][42] Before granting approval, city officials insisted that the Loop Trolley Transportation Development District install temporary protective barriers around an electric line tower and submit a $300,000 bond that would pay to dismantle the tracks if the trolley endeavor failed. LTTDD officials complied, and received their operating permit on November 21.[43]

Trolleys began running along the entire line on November 23.[44][45] "The only trouble in evidence about 3 p.m. had nothing to do with the trolleys’ antique technology and everything to do with automated ticket machines that passengers struggled to learn," wrote theSt. Louis Post-Dispatch.[45]

In July 2019, officials announced that the Trolley had taken in just $22,283 in fare revenue in its first six months of operation, roughly one-tenth of their 2015 projection. They noted that the 2015 estimate had been based on seven-day operations with three trolleys.[28]

On October 17, 2019, a "winter schedule" curtailed operating hours so that trolleys stopped running at 6 p.m.[46]

On December 5, 2019, the operators of the Loop Trolley announced that the line would shut down on December 29 due to a lack of operating funds and low revenue. The sales tax raised about $860,000 in 2019,[47] in line with expectations.[28] But ridership was far lower than projected: the trolley sold 15,776 tickets in its first 11 months, far fewer than the amount needed to prevent a budget shortfall. Officials blamed the lack of ridership on the four-day schedule and the limited service caused by the lack of the third trolley.[48] No. 003 (ex-Seattle, ex-Melbourne), had still not been cleared to enter service when the line shut down.[49]

Operation suspended

[edit]

The trolley ceased operations on December 29, 2019.[14] TheBi-State Development Agency, a regional transit operator, immediately began seeking ways to restart operations.[13][14] Agency officials proposed to take over operations for four years with the aim of making the Loop Trolley self-sustaining by 2024. But on January 24, 2020, a Bi-State committee voted to reject the proposal; opponents said they doubted it would work.

At the committee meeting, Mokhtee Ahmad, the Federal Transit Administration's regional administrator, said that if no one restarted the Loop Trolley, his agency might sue to recover about $25 million that it had provided for construction. The money would be owed by the Loop Trolley Transportation Development District andEast-West Gateway Council of Governments, a regional planning organization. Ahmad also "implied that any litigation to recover federal money could hurt St. Louis’ applications for future federal grants,"St. Louis Public Radio wrote.[15]

Three months after service ceased, the Loop Trolley's website had not been updated to reflect the system's suspended status.[50]Joe Edwards, a Loop developer and chairman of the trolley taxing district, suggested in a newspaper interview and a letter to Ahmad that the arrival of the third trolley car combined with the revenue from the sales tax could enable the trolley to restart service in April.[51]

In August 2020, the website was changed to say: "To support regional efforts to eliminate COVID-19 during the ongoing pandemic, the Loop Trolley is currently out of service."[52] (The site continued to ascribe the suspension to the pandemic through July 24, 2022.[53])

On October 27, 2021, the East-West Gateway Council of Governments rejected a plan to use $1.26 million in federal money plus $540,000 from a sales tax along the route to restart Loop Trolley service.[54]

Renewed operation

[edit]

On February 25, 2022, the Bi-State Development Board voted to take over and restart operation of the Loop Trolley through June 2025.[16] Board members said restarting trolley operations was preferable to repaying millions of dollars in federal grants spent to build it.[16]

St. Louis MayorTishuara Jones, who had opposed the trolley restart but also preferred it to repaying the money, informed Ahmad of the decision in a February 25 letter. She acknowledged federal officials' request that service be restarted in June 2022, but said operation might be delayed to ensure safety.[17] Jones wrote that “the determining factor for a prudent opening date” would be up to theMissouri Department of Transportation.[47]

As of February 2022, the trolley operating fund included $881,321 collected via the local sales tax. Jones said the district estimated it would collect $773,787 in sales tax in 2022.[47] The trolley authority also resubmitted a request for a $1.26 million grant to the East-West Gateway Council of Governments; a decision was expected in August.[16]

Service resumed on August 4, 2022, operating Thursdays through Sundays and until only October 30, instead of year-round as it had in the past.[3] More than 8,000 rides were given during the nearly three-month operating season, according to Bi-State Development President and CEO Taulby Roach.[1]

In 2023, service ran from April 27[55] through October 29.[20] The six-month operating season saw more than 8,500 rides:[1] an absolute increase over 2022 but a decline in average monthly ridership, from about 2,500 to fewer than 1,400.[20] In November 2023, Roach said Bi-State was considering operating the trolley until 2026, one more year than the planned five.[1]

The 2024 season ran from April 25 to October 27, with service Thursdays through Sundays.[56] It gave an estimated 12,350 rides, about 44 percent more than the previous season. It also operated within its budget, Roach said in November 2024. He said Bi-State would work with the FTA and the Loop Trolley Transportation Development District "on an extension of this management contract so that we can continue to fulfill the obligation to the FTA and operate within reasonable expectations”.[57]

On February 28, 2025, the Bi-State board voted to keep running the Loop Trolley for 32 hours a week between April and October through 2028.[7]

The 2025 season runs from May 1 through October 26, with service from 11 a.m. to 7 p.m. Thursdays through Sundays.[21]

Rolling stock

[edit]

Loop Trolley service was provided by two faux-vintage streetcars acquired used fromPortland, Oregon. A third vintage streetcar fromSeattle[58] was expected to join the fleet in 2019.[59]

Interior of one of the ex-Portland cars

In December 2013, the Loop Trolley district acquired from Portland transit agencyTriMet twoGomaco-builtBrill-replica streetcars which were then in operation on thePortland Vintage Trolley service,[60] which use continued until mid-2014.[61] Those two cars were designed to look like 1903 streetcars but were actually built in 1991 (car 511) and 1992 (car 512), and feature steel frames under their wooden bodies and more-modern propulsion equipment (including rebuilt 1940strucks). For St. Louis, they were modified for wheelchair accessibility, to meetADA regulations, with the installation ofwheelchair lifts (one per side).[62] Gomaco was hired to carry out those and other modifications, and the work began at Gomaco'sIda Grove, Iowa, plant in August 2015.[24]

In January 2016, it was announced that the Loop Trolley district had purchased three ex-Melbourne, Australia,W2-type streetcars fromSeattle, which had operated on Seattle'sWaterfront Streetcar line until it shut down in 2005.[63] Only one of the three was planned for immediate refurbishment, modification and use due to funding limitations.[62] The necessary modifications included restoring doors on one side of the car, restoring steps to the doors (Seattle's line used high-platform stations which didn't necessitate steps), installing two wheelchair lifts, one on each side,[62] and replacement of the car'strolley poles with apantograph. The three cars were moved from Seattle in early June 2016.[58] Cars 482 and 518 were taken to St. Louis and put in indefinite storage for potential future restoration and use. Car 512 was taken to Gomaco in Iowa, which had been awarded a $676,750 contract to restore and modify the car.[64]

The operational fleet was to comprise three cars in 2019:[65] two ex-Portland Brill replica cars (Portland Nos. 511–512) and one ex-Seattle, ex-Melbourne car (Seattle No. 512).[58][64] Ex-Portland cars 511–512 were renumbered 002 and 001, respectively,[5] and ex-Seattle, ex-Melbourne car 512 was renumbered 003.[66] Car 001 is painted red and cream, Car 002 blue and cream, and Car 003 orange and cream.

When the line opened in 2018, Car 003 was still at Gomaco's Iowa plant, with its renovation and modification more than a year behind schedule, partly due to delays in getting parts from Germany.[65][12] Car 003 was delivered to the Loop Trolley's maintenance facility on January 29, 2019.[67]

As part of the effort to reduce operating costs, Bi-State decided to shrink the fleet from five to two cars. In 2024, Car 003 was returned to Gomaco along with Car 482 and Car 518.[68]

No.ImageTypeFormer No.Former operatorAcquiredStatusRefs.
1351Peter Witt streetcar1906Azienda Trasporti MilanesiAugust 2005Returned to Gomaco[69]
13521811Renumbered back to 1811 and acquired byMidwest Electric Railway[70]
482W2-type tramWaterfront StreetcarJune 2016Acquired by Gomaco[71][68]
518
001Replica Council Crest trolley512Portland Vintage TrolleyFebruary 16, 2017In operation[72]
002511March 30, 2017
003W2-type tram512Waterfront StreetcarJanuary 29, 2019Returned to Gomaco[67][68]

Maintenance facility

[edit]

The Loop Trolley's administrative headquarters and maintenance facility are located at 5875 Delmar Boulevard,[36] in a building that had been Delmar High School until 1980.[5]

See also

[edit]

References

[edit]
  1. ^abcdDavis, Elliott (November 26, 2023)."Bi-State may run Loop Trolley one year longer than planned".KTVI.Archived from the original on December 4, 2023. RetrievedDecember 3, 2023.
  2. ^"Loop Trolley ends season operating within budget and with 44 percent increase in ridership". November 11, 2024. RetrievedNovember 12, 2024.
  3. ^abcdSchlinkmann, Mark (August 4, 2022)."Loop Trolley starts anew in St. Louis; even its riders disagree on its worth".St. Louis Post-Dispatch.Archived from the original on August 6, 2022. RetrievedAugust 6, 2022.
  4. ^abLeahy, Joseph (March 21, 2017)."Upcoming street tests first of many for Loop Trolley's public debut".St. Louis Public Radio.Archived from the original on March 30, 2017. RetrievedMarch 29, 2017.
  5. ^abcd"Worldwide Review [regular news section]".Tramways & Urban Transit. UK:Light Rail Transit Association. April 2017. p. 152.ISSN 1460-8324.
  6. ^Schlinkmann, Mark (September 2022)."Loop Trolley to get $1.26 million after regional board approves federal grant".STLtoday.com.Archived from the original on September 12, 2022. RetrievedSeptember 12, 2022.
  7. ^abcLippmann, Rachel (February 28, 2025)."Bi-State to operate Loop Trolley for another three years".STLPR. RetrievedOctober 5, 2025.
  8. ^ab"Route Map". Loop Trolley TDD.Archived from the original on November 5, 2015. RetrievedDecember 7, 2015.
  9. ^1634–1699:McCusker, J. J. (1997).How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States: Addenda et Corrigenda(PDF).American Antiquarian Society. 1700–1799:McCusker, J. J. (1992).How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States(PDF).American Antiquarian Society. 1800–present:Federal Reserve Bank of Minneapolis."Consumer Price Index (estimate) 1800–". RetrievedFebruary 29, 2024.
  10. ^abThorsen, Leah (September 23, 2016)."Loop Trolley hours of operation set, but fares still unknown".St. Louis Post-Dispatch. Archived fromthe original on September 26, 2016. RetrievedMarch 29, 2017.
  11. ^Rizvic, Veneta (November 15, 2018)."Loop Trolley delayed; officials host dedication ceremony".St. Louis Business Journal.Archived from the original on December 4, 2023. RetrievedDecember 16, 2018.
  12. ^abcSchlinkmann, Mark (April 23, 2018)."When Loop Trolley finally opens, it will be on reduced-hours basis at first".St. Louis Post-Dispatch. Archived fromthe original on April 27, 2018. RetrievedAugust 6, 2022.
  13. ^abSchlinkmann, Mark (December 5, 2019)."Loop Trolley to shut down Dec. 29 as Bi-State weighs reviving it".stltoday.com (St. Louis Post-Dispatch).Archived from the original on December 7, 2019. RetrievedDecember 14, 2019.
  14. ^abcOlmos, Dori (December 29, 2019)."It's the Loop Trolley's last day".KSDK.Archived from the original on February 27, 2022. RetrievedDecember 31, 2019.
  15. ^abcPetrin, Kae M. (January 24, 2020)."Bi-State Development Will Not Revive Loop Trolley, Transit Agency CEO Says".St. Louis Public Radio (KWMU).Archived from the original on February 16, 2022. RetrievedAugust 6, 2022.
  16. ^abcdProducer, Dan Greenwald, Digital Content (February 18, 2022)."Bi-State Development Board votes to revive Loop Trolley".KMOV.Archived from the original on February 27, 2022. RetrievedFebruary 27, 2022.{{cite web}}: CS1 maint: multiple names: authors list (link)
  17. ^abProducer, Dan Greenwald, Digital Content."Letter from Jones says plans call for Loop Trolley to restart by June".KMOV. Archived fromthe original on February 26, 2022. RetrievedAugust 6, 2022.{{cite web}}: CS1 maint: multiple names: authors list (link)
  18. ^"Home". Loop Trolley. November 10, 2022. Archived fromthe original on November 10, 2022. RetrievedNovember 10, 2022.
  19. ^Schlinkmann, Mark (March 24, 2023)."The return of St. Louis' Loop Trolley is set for April 27".St. Louis Post-Dispatch.Archived from the original on March 26, 2023. RetrievedMarch 28, 2023.
  20. ^abcSchlinkmann, Mark (October 27, 2023)."Loop Trolley to shut down Sunday night until next spring".STLtoday.com.Archived from the original on December 4, 2023. RetrievedDecember 4, 2023.
  21. ^ab"STL Loop Trolley".STL Loop Trolley. Archived fromthe original on October 5, 2025. RetrievedOctober 5, 2025.
  22. ^"Loop trolley construction complete, but months of testing is ahead".KMOV. January 2, 2017.Archived from the original on October 5, 2018. RetrievedMarch 29, 2017.
  23. ^"Systems News [regular news section]".Tramways & Urban Transit. UK:Ian Allan Publishing/Light Rail Transit Association. October 2005. p. 412.ISSN 1460-8324.
  24. ^ab"Worldwide Review [regular news section]".Tramways & Urban Transit. UK:Light Rail Transit Association. November 2015. pp. 450–451.
  25. ^"U.S. Transportation Secretary Ray LaHood Announces $293 Million for New Transit Solutions, Economic Development Nationwide".Federal Transit Administration. July 8, 2010. Archived fromthe original on August 3, 2011. RetrievedJanuary 26, 2013.
  26. ^"Urban Circulator/Bus and Bus Livability Project Descriptions".Federal Transit Administration. July 8, 2010. Archived fromthe original on August 3, 2011. RetrievedJuly 20, 2010.
  27. ^ab"Loop Trolley FAQ".looptrolley.org. Loop Trolley Transportation Development District. 2015. Archived fromthe original on February 15, 2020. RetrievedDecember 1, 2021.
  28. ^abcdeSchlinkmann, Mark (July 3, 2019)."Loop Trolley ridership and fare revenue lag — it's raised just $22,283 in fares since Nov. 16".St. Louis Post-Dispatch. Archived fromthe original on July 3, 2019. RetrievedJuly 13, 2019.
  29. ^"Major track work completed in Delmar Loop prior to holiday shopping season". Loop Trolley. March 12, 2016. Archived fromthe original on March 12, 2016. RetrievedDecember 2, 2021.
  30. ^Westerman, Hannah (November 25, 2016)."U City Loop trolley construction completed and testing to start in December".KWMU.Archived from the original on December 1, 2018. RetrievedDecember 16, 2018.
  31. ^Strickland, Raymond (December 15, 2017)."Business owners remain skeptical of Loop Trolley, amid big donation".KSDK.Archived from the original on May 20, 2022. RetrievedJuly 13, 2019.
  32. ^Barker, Jacob (August 10, 2018)."Delmar Loop novelty retailer Phoenix Rising to close".St. Louis Post-Dispatch.Archived from the original on July 13, 2019. RetrievedJuly 13, 2019.
  33. ^Walker, Melody (November 1, 2018)."Delmar Loop Trolley takes toll on businesses after years of delays".KWMU.Archived from the original on July 13, 2019. RetrievedJuly 13, 2019.
  34. ^Regnier, Chris (March 30, 2017)."Second Loop Trolley car arrives in St. Louis".KTVI.Archived from the original on December 17, 2018. RetrievedDecember 16, 2018.
  35. ^Hoskins, Kelley (March 26, 2017)."Trolley cars make debut for testing in Delmar Loop".KTVI.Archived from the original on December 17, 2018. RetrievedDecember 16, 2018.
  36. ^abThorsen, Leah (March 24, 2017)."Loop Trolley testing to start early Sunday".St. Louis Post-Dispatch.Archived from the original on March 26, 2017. RetrievedMarch 29, 2017.
  37. ^Schlinkmann, Mark (November 12, 2018)."Loop Trolley to begin rolling Thursday morning".St. Louis Post-Dispatch.Archived from the original on November 13, 2018. RetrievedNovember 12, 2018.
  38. ^Schlinkmann, Mark (November 15, 2018)."Snow-go: Loop Trolley opening pushed back. Again".St. Louis Post-Dispatch. Archived fromthe original on November 22, 2018. RetrievedAugust 6, 2022.
  39. ^ab"Loop Trolley opens to public, is unable to operate in Delmar Loop".KMOV. November 16, 2018. Archived fromthe original on November 19, 2018. RetrievedAugust 6, 2022.
  40. ^"The Loop Trolley - Map & Schedule". November 25, 2018. Archived fromthe original on November 25, 2018. RetrievedDecember 1, 2021.
  41. ^Blume, Brett (November 15, 2018)."Loop Trolley Dedicated; Still Hasn't Made 1st Public Run".KMOX. Archived fromthe original on January 11, 2019. RetrievedAugust 6, 2022.
  42. ^Hunn, David (November 20, 2018)."Loop Trolley leaders scramble to get route fully opened".St. Louis Post-Dispatch.Archived from the original on November 24, 2018. RetrievedNovember 24, 2018.
  43. ^Schlinkmann, Mark (November 22, 2018)."The Loop Trolley will actually get to go to the Loop starting Friday".STLtoday.com (St. Louis Post-Dispatch). Archived fromthe original on December 2, 2021. RetrievedDecember 2, 2021.
  44. ^Nicholson, Marvin (November 23, 2018)."The Loop Trolley starts running in Delmar Loop Friday at noon".KMOV. Archived fromthe original on November 24, 2018. RetrievedAugust 6, 2022.
  45. ^abSuntrup, Jack (November 24, 2018) [online date November 23]."Loop Trolley finally hisses and honks its way into the Loop".St. Louis Post-Dispatch. pp. A1, A6. Archived fromthe original on November 26, 2018. RetrievedNovember 24, 2018.
  46. ^"The Loop Trolley - Map & Schedule". December 16, 2019. Archived fromthe original on December 16, 2019. RetrievedDecember 1, 2021.
  47. ^abcSchlinkmann, Mark (February 25, 2022)."St. Louis mayor says plans call for Loop Trolley to restart in summer".St. Louis Post-Dispatch. Archived fromthe original on February 26, 2022. RetrievedAugust 6, 2022.
  48. ^Kirn, Jacob (October 10, 2019)."The Loop Trolley is still attracting small crowds, running shortened schedule".St. Louis Business Journal.Archived from the original on August 6, 2020. RetrievedDecember 12, 2019.
  49. ^"Worldwide Review [regular news section]".Tramways & Urban Transit. UK: Light Rail Transit Association. February 2020. p. 74.
  50. ^"Home | Loop Trolley v3". March 13, 2020. Archived fromthe original on March 13, 2020. RetrievedDecember 1, 2021.
  51. ^Kohler, Jeremy (March 11, 2020)."Loop Trolley could be back on track in April, promoter Joe Edwards says".St. Louis Post-Dispatch. Archived fromthe original on March 11, 2020. RetrievedMarch 3, 2022.
  52. ^"Home | Loop Trolley". May 9, 2021. Archived fromthe original on May 9, 2021. RetrievedDecember 1, 2021.
  53. ^"HOME | STL Loop Trolley". July 24, 2022. Archived fromthe original on July 24, 2022. RetrievedSeptember 13, 2022.
  54. ^"Loop Trolley remains dead in its tracks after a regional planning agency rejects funding plan".St. Louis Public Radio. October 27, 2021.Archived from the original on February 18, 2022. RetrievedDecember 1, 2021.
  55. ^Clark, Patrick (April 27, 2023)."Beep! Beep! St. Louis Loop Trolley is back in operation".KTVI.Archived from the original on May 9, 2023. RetrievedMay 17, 2023.
  56. ^"Loop Trolley season begins next week".KMOV. April 19, 2024.Archived from the original on April 19, 2024. RetrievedJuly 4, 2024.
  57. ^Zotos, Alexis (November 2024)."Loop Trolley ends season operating within budget and with 44 percent increase in ridership".KMOV St. Louis. RetrievedJanuary 25, 2025.
  58. ^abc"Seattle trolleys arrive in St. Louis for Loop Trolley". Loop Trolley Transportation Development District. June 9, 2016. Archived fromthe original on August 18, 2016. RetrievedAugust 6, 2022.
  59. ^Verner, Brittney (November 23, 2018)."The Loop Trolley finally starts operating full route".KSDK.Archived from the original on September 23, 2020. RetrievedAugust 6, 2022.
  60. ^Bowen, Douglas John (December 13, 2013)."TriMet sells heritage trolleys to St. Louis".Railway Age.Archived from the original on December 16, 2018. RetrievedDecember 16, 2018.
  61. ^"Vintage Trolley Has Ceased Operation".Portland Vintage Trolley website. September 2014.Archived from the original on February 1, 2013. RetrievedDecember 16, 2018.
  62. ^abc"Worldwide Review [regular news section]".Tramways & Urban Transit. UK: Light Rail Transit Association. May 2016. p. 193.
  63. ^Green, Josh (January 14, 2016)."Seattle's old waterfront streetcars will live on - in different ways".KING-TV. Archived fromthe original on January 25, 2016. RetrievedAugust 10, 2016.
  64. ^ab"Worldwide Review [regular news section]".Tramways & Urban Transit. UK: Light Rail Transit Association. August 2016. p. 312.
  65. ^abMadden, Roche (November 16, 2018)."Long awaited Loop Trolley finally on the move".KPLR-TV.Archived from the original on November 17, 2018. RetrievedNovember 17, 2018.
  66. ^"Worldwide Review [regular news section]".Tramways & Urban Transit. UK: Light Rail Transit Association. September 2017. p. 353.
  67. ^abBaumer, Stephanie (January 29, 2019)."3rd Delmar Loop Trolley car delivered Tuesday".KMOV. Archived fromthe original on January 30, 2019. RetrievedAugust 6, 2022.
  68. ^abc"Living St. Louis | January 20, 2025".Nine PBS. RetrievedJanuary 24, 2025.
  69. ^"Gomaco Trolley Company: Reconditioned Peter Witt Trolley".www.gomacotrolley.com. RetrievedJanuary 24, 2025.
  70. ^"Historic Milan Trolley rolls into Mt. Pleasant".www.southeastiowaunion.com. RetrievedFebruary 7, 2025.
  71. ^"Seattle trolleys arrive in St. Louis for Loop Trolley".The Loop Trolley.
  72. ^"Gomaco Trolley Company: Gomaco Trolleys In St. Louis, Missouri".www.gomacotrolley.com. RetrievedJanuary 24, 2025.

External links

[edit]
Wikimedia Commons has media related toLoop Trolley (St. Louis).
Public transportation inGreater St. Louis
Public transit agencies
Local and express bus service
Demand response
Light rail
Streetcar
Infrastructure
Intercity rail
Intercity bus
Airports
Other
Italics denote lines or service which are planned or not operating
Lines
Infrastructure
Rolling Stock
Rail Yards and Shops
Major Transit Centers
Connecting services
Other Connections
Expansions
Operators
Italics denote lines or service which are planned or not operating
Bold denotes primary transfers or terminals
Statewide
St. Louis
Kansas City
North
Central
South
Regular service
Rebuilt lines
Tourism
Currently operatinglight rail andstreetcar systems in theUnited States
Arizona
Arkansas
California
Colorado
District of Columbia
Florida
Georgia
Illinois
Louisiana
Maryland
Massachusetts
Michigan
Minnesota
Missouri
New Jersey
New York
North Carolina
Ohio
Oklahoma
Oregon
Pennsylvania
Tennessee
Texas
Utah
Virginia
Washington
Wisconsin
Italics denote non-transit streetcar lines, operating only on limited dates and usually not year-round, for tourism or educational purposes.

Other transit in the United States:

Retrieved from "https://en.wikipedia.org/w/index.php?title=Loop_Trolley&oldid=1322922301"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp