Longyan–Longchuan high-speed railway | |
---|---|
Overview | |
Native name | 龙龙高速铁路 |
Status | Partly in operation |
Termini | |
Stations | 7 |
Service | |
Operator(s) | China Railway Nanchang Group &China Railway Guangzhou Group |
History | |
Opened |
|
Technical | |
Line length | 290 km (180 mi)[1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed |
|
TheLongyan–Longchuan high-speed railway is ahigh-speed railway in China. The railway will be 290 kilometres (180 mi) long when completed, and will have a design speed of 250 kilometres per hour (160 mph).[1] The section from Meizhou West to Longchuan West will be operated at 350 kilometres per hour (220 mph).
Construction officially began on 30 June 2020.[2]
The section from Gutianhuizhi to Wuping opened on 26 December 2023,[1] and section from Meizhou West to Longchuan West opened on 14 September 2024.[3]
Station Name | Chinese | China Railway transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Gutianhuizhi | 古田会址 | Ganzhou–Ruijin–Longyan railway | ||||||||
Shanghang | 上杭 | |||||||||
Wuping | 武平 | |||||||||
Jiaoling | 蕉岭 | |||||||||
Yanyang West | 雁洋西 | |||||||||
Meizhou | 梅州 | Zhangping–Longchuan railway | ||||||||
Meizhou West | 梅州西 | Meizhou–Chaoshan high-speed railway | ||||||||
Xingning South | 兴宁南 | |||||||||
Wuhua | 五华 | |||||||||
Longchuan West | 龙川西 | Ganzhou–Shenzhen high-speed railway | ||||||||
![]() | This People's Republic of China rail-related article is astub. You can help Wikipedia byexpanding it. |