Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

London Rail

From Wikipedia, the free encyclopedia
Directorate of Transport for London

London Rail
Formation1999
TypeDirectorate ofTransport for London
PurposeOverseeingregional rail operations
Region served
Greater London, UK
Parent organisation
Transport for London
This article needs to beupdated. The reason given is:all references are from before 2015. Please help update this article to reflect recent events or newly available information.(September 2022)
Atopological map of the London Rail services, showing all lines and stations. TheLondon Overground,DLR,Tramlink, andElizabeth line are shown, as well as theLondon Underground system, to show how London Rail's services integrate with each other.

London Rail was a directorate ofTransport for London (TfL), involved in the relationship with theNational Rail network withinGreater London, UK which managed TfL's non-London Underground train services.

Rail for London, established in 2006, provides rail passenger transport services in London.[1]

Operations

[edit]

London Rail managed theLondon Overground (LO),London Trams, theDocklands Light Railway (DLR), and theElizabeth line. As part of an internal restructure within TfL, it recently[when?] merged with the (previously separate)London Underground directorate, bringing all of Greater London local transport services on rails under one division.

The London Overground was established in 2007 when TfL took over the control of the former National RailSilverlink franchise in 2007. It has since taken on more services through a former London Underground line and over otherNetwork Rail lines. London Rail lets a concession to operate the Overground. Operation is contracted toArriva Rail London (owned byArriva UK Trains) until 2024.

London Trams is responsible only for the Croydon Tram known asTramlink. Tramlink was set up in 2000 by aprivate finance initiative. It was bought by TfL in 2008 and is operated on its behalf byFirstGroup. London Trams has been working on proposals for other tram schemes in west and central London, however as of 2011 all are unfunded or cancelled.

The Docklands Light Railway was established in 1987 and has seen significant expansion since. Its operation has been contracted out as a concession to a joint venture betweenKeolis andAmey since 2014.[2] There are also other concessionaires who have built and managed extensions.[3]

The Elizabeth Line (formerly known as Crossrail) also operates as a concession from London Rail.[4] It already operates the Shenfield Metro services, taking over fromAbellio Greater Anglia on 31 May 2015, as well as the ex-Heathrow Connect route since 20 May 2018.[5]

National Rail in Greater London

[edit]

TheNational Rail network within Greater London carries large numbers of commuters into London and also provides many local services, especially withinSouth London.

Under theGreater London Authority Act 1999 Transport for London was given powers to consult with the train operators and as such London Rail is therefore more of an enabler than an operator, and has developed partnerships with theDepartment for Transport (who are responsible for rail strategy),Network Rail (who own the infrastructure) and the varioustrain operating companies (who operate the services) in order to further its aims.

A pilot project was launched in 2003 to promote the various services provided by train operating companies in South London under one umbrella brand,Overground Network. The scheme included station upgrades, signage and publicity, but promotion of the brand had ceased by 2007.

London Rail also influences rail freight and freight depots in Greater London.[6] In August 2007, London Rail published its 'Rail Freight Strategy' report.[7]

Both formerMayors of LondonKen Livingstone andBoris Johnson have expressed the desire to gain control of all local rail services in Greater London in the future and make them part of theLondon Overground. London Overground has already taken overLea Valley Lines services from Liverpool Street to Enfield Town, Cheshunt and Chingford andRomford to Upminster Line services on 31 May 2015.[8]

References

[edit]
  1. ^tfl
  2. ^"French firm wins 7-year Docklands Light Rail franchise".BBC News. 4 July 2014.
  3. ^"DLR management | Transport for London". Archived fromthe original on 30 September 2012. Retrieved1 October 2012.
  4. ^"Crossrail moves forward with major train and depot contract", Crossrail, 1 December 2010
  5. ^"TfL to operate Heathrow Connect services ahead of Elizabeth line opening".tfl.gov.uk.
  6. ^London Freight
  7. ^London RailArchived 5 June 2011 at theWayback Machine Rail Freight Strategy report
  8. ^"London Rail Authority". alwaystouchout.com. 7 September 2006. Archived fromthe original on 4 April 2004. Retrieved16 December 2007.
Portal:
Companies and
organisations
Transport for
London
(TfL)
London Underground
London Rail
London Buses
Other
Bus operators
River operators
Train operators
Other
Airports
Within London
Outside London
Major stations
Central area
Other
Roads
Motorways
Ring roads
Charging
Ticketing
Other
Former BR sectors
Network
Services
Railway lines
Other topics
Future plans
Planned and proposed stations
Planned and proposed routes
Rolling stock
Current
Former
Operations
History
Current franchises
Former franchises
Retrieved from "https://en.wikipedia.org/w/index.php?title=London_Rail&oldid=1318040084"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp