Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

List of tallest buildings in Charlotte

From Wikipedia, the free encyclopedia

Skyline of Charlotte(Use cursor to identify buildings)
Skyline of Charlotte in 2018
Map all coordinates usingOpenStreetMap
  • Download coordinates asKML

Charlotte, the largest city in theU.S. state ofNorth Carolina, is the site of 69 completedhigh-rise buildings over 200 feet (61 m), 8 of which stand taller than 500 feet (152 m).[1][2][3][4] The tallest building in the city is theBank of America Corporate Center, which rises 871 feet (265 m) inUptown Charlotte and was completed in 1992. It is also the tallest building in North Carolina and the54th-tallest building in the United States.[5][6] The second-tallest skyscraper in the city is550 South Tryon, which rises 786 feet (240 m) and was completed in 2010.[7] TheTruist Center, completed in 2002 and rising 659 feet (201 m), is the 3rd-tallest building in Charlotte.[8] Nine of the 10 tallest buildings in North Carolina are located in Charlotte.[9]

The history of skyscrapers in the city began with the construction of theIndependence Building in 1909. This building, which rose 186 feet (57 m) and 14 floors,[10] is often regarded as the first skyscraper in Charlotte.[11] Despite having been added to theNational Register of Historic Places in 1978, it was demolished in 1981 to allow for the construction ofOne Independence Center.[10] Charlotte's first building taller than 492 feet (150 m) wasOne South at The Plaza, completed in 1974.[12] The projectQueensbridge Collective will be composed of two skyscrapers, the first buildings outsideUptown to rise above 492 feet (150 m).[13][5][7][8][14][15][16][17] The residential tower broke ground May 24, 2023, and is expected to be completed at the end of 2025.[18] The office tower was changed to be a mixed use building with 400,000 square feet (37,000 m2) of office space across the top 19 floors and 304 apartments across the lower floors.[19][20][21][22][23][24][25][26][27][28] Overall, theCouncil on Tall Buildings and Urban Habitat ranks Charlotte's skyline (based on buildings over 492 feet (150 m) tall existing or under construction) 4th in theSoutheastern United States (afterMiami,Atlanta andSunny Isles Beach), 6th in theSouthern United States (after Miami,Houston,Dallas, Atlanta and Sunny Isles Beach), and 19th in the United States.[29][a]

Tallest buildings

[edit]

As of February 2026[update], there are 69high-rise buildings in Charlotte that stand at least 200 feet (61 m) tall, based on standard height measurement. This height includesspires and architectural details but does not include antennamasts.[b][1][2][3] This list includes only buildings that have been completed and not justTopped out.

RankNameImageHeight
ft (m)
FloorsYearCoordinatesNotes
1Bank of America Corporate Center871 (265.5)[5]60[5]1992[5]35°13′38.3″N80°50′31.6″W / 35.227306°N 80.842111°W /35.227306; -80.842111 (Bank of America Corporate Center)It is the456th-tallest building in the world, the54th-tallest in the United States, thetallest building in North Carolina, the tallest building betweenPhiladelphia andAtlanta, the tallest building constructed in Charlotte in the 1990s, and the tallest office building in theCarolinas.[5][48] However, with 1,212,176 square feet (112,614.8 m2) of space it is only the 2nd-largest office building in Charlotte by leasable square feet; the largest is550 South Tryon.[49]
2550 South Tryon786 (239.7)[7]48[7]2010[7]35°13′26″N80°50′54.7″W / 35.22389°N 80.848528°W /35.22389; -80.848528 (Duke Energy Center)550 South Tryon is the 851st-tallest in the world, the 97th-tallest in the United States, and the 2nd-tallest in North Carolina.[7][50] With 1,370,214 square feet (127,297.0 m2) of space it is the largest office building in Charlotte by leasable square feet.[49]
3Truist Center659 (200.8)[8]47[8]2002[8]35°13′39.2″N80°50′26.9″W / 35.227556°N 80.840806°W /35.227556; -80.840806 (Hearst Tower)Truist Center is the 3rd-tallest in North Carolina. It has 970,002 square feet (90,116.1 m2) of space, which makes it the 5th-largest office building in Charlotte by leasable square feet.[49]
4Bank of America Tower632 (192.6)[51]33[51]2019[51]Bank of America Tower is the 4th-tallest in North Carolina. With 841,164 square feet (78,146.7 m2) of space, it is the 8th-largest office building in Charlotte by leasable square feet.[49]
5Duke Energy Plaza629 (191.7)[14]40[14]2022[14]It has 1,000,000 square feet (93,000 m2) of space, which makes it the 3rd-largest office building in Charlotte by leasable square feet.[49]
6301 South College588 (179.2)[52]42[52]1988[52]35°13′25.9″N80°50′40.3″W / 35.223861°N 80.844528°W /35.223861; -80.844528 (One Wells Fargo Center)301 South College is the 6th-tallest in North Carolina. It has 994,033 square feet (92,348.7 m2) of space, which makes it the 4th-largest office building in Charlotte by leasable square feet.[49]
7The Vue576 (175.5)[15]50[15]2010[15]35°13′51.6″N80°50′41.3″W / 35.231000°N 80.844806°W /35.231000; -80.844806 (The Vue)The Vue is the 7th-tallest in North Carolina and it is the tallest residential building in the Carolinas.[53]
8One South at The Plaza503 (153.3)[16]40[16]1974[16]35°13′35.8″N80°50′35.8″W / 35.226611°N 80.843278°W /35.226611; -80.843278 (Bank of America Plaza)One South at The Plaza is the 9th-tallest in North Carolina.[12][54] With 891,136 square feet (82,789.2 m2) of space, it is the 7th-largest office building in Charlotte by leasable square feet.[49]
91 Bank of America Center484 (147.5)[55]32[55]2010[55]35°13′35.3″N80°50′26.4″W / 35.226472°N 80.840667°W /35.226472; -80.840667 (1 Bank of America Center)1 Bank of America Center is the 10th-tallest in North Carolina.[55] With 746,152 square feet (69,319.8 m2) of space, it is the 9th-largest office building in Charlotte by leasable square feet.[49]
10300 South Tryon[c]463 (141)[56]25[56]2017[56]35°13′33.6″N80°50′46.3″W / 35.226000°N 80.846194°W /35.226000; -80.846194 (300 South Tryon)11th-tallest in North Carolina.[56][57] With 638,000 square feet (59,300 m2) of space it is the 14th-largest office building in Charlotte by leasable square feet.[49]
11121 West Trade462 (140.8)[58]32[58]1990[58]35°13′38.6″N80°50′38.6″W / 35.227389°N 80.844056°W /35.227389; -80.844056 (121 West Trade)12th-tallest in North Carolina.[58]
12Three Wells Fargo Center450 (137.2)[59]32[59]2000[59]35°13′28″N80°50′46.7″W / 35.22444°N 80.846306°W /35.22444; -80.846306 (Three Wells Fargo Center)14th-tallest in North Carolina.[59] It contains 931,046 square feet (86,497.0 m2) of space, which makes it the 6th-largest office building in Charlotte by leasable square feet.[49]
13Museum Tower447 (136.3)[60]42[60]2017[60]35°13′29.1″N80°50′55″W / 35.224750°N 80.84861°W /35.224750; -80.84861 (Museum Tower)15th-tallest in North Carolina.[d][60] It has 394 units built on top of the Mint Museum Uptown. It has resort-style amenities on the 43rd floor, with a saltwater pool, a lounge and a game room.[61]
201 North Tryon447 (136.3)[62]30[62]1997[62]35°13′43″N80°50′30.5″W / 35.22861°N 80.841806°W /35.22861; -80.841806 (Fifth Third Center)15th-tallest in North Carolina.[e][62][63] The tower was developed by Trammel Crow Co. for Bank of America.[64] It is the 12th-largest office building in Charlotte by leasable square feet.[49]
15Two Wells Fargo Center433 (132)[65]32[65]1971[65]35°13′30.9″N80°50′42.8″W / 35.225250°N 80.845222°W /35.225250; -80.845222 (Two Wells Fargo Center)18th-tallest in North Carolina. With 758,508 square feet (70,467.7 m2) of space it is the 9th-largest office building in Charlotte by leasable square feet.[49]
16Avenue425 (129.5)[66]36[66]2007[66]35°13′44.7″N80°50′32.3″W / 35.229083°N 80.842306°W /35.229083; -80.842306 (Avenue)19th-tallest in North Carolina.[66] It is a 387-unit condo building on .8 acres developed by Novare Group Inc.[67]
17400 South Tryon420 (128)[68]32[68]1974[68]35°13′29.8″N80°50′49.6″W / 35.224944°N 80.847111°W /35.224944; -80.847111 (400 South Tryon)It is the 21th-tallest in North Carolina.[68] In April 2025 the building was put up for public auction. The only bid was for $36 million, from the lender, listed as 400 South Tryon LP. At the time of the auction the building was 23% occupied.[69][70]
18Carillon Tower394 (120.1)[71]24[71]1991[71]35°13′42.6″N80°50′43.2″W / 35.228500°N 80.845333°W /35.228500; -80.845333 (Carillon Tower)23rd-tallest in North Carolina.[71] It is the 19th-largest office building in Charlotte by leasable square feet.[49]
19Charlotte Plaza388 (118.3)[72]27[72]1982[72]35°13′29.6″N80°50′35.9″W / 35.224889°N 80.843306°W /35.224889; -80.843306 (Charlotte Plaza)25th-tallest in North Carolina.[72][73] In November 2024 the building was listed for sale, with 60% occupancy. Also, the building is in special loan negotiations with the lender.[74]
20The Ellis384 (117)[75]33[75]2021[75]549 apartment units with 19,000 square feet (1,800 m2) of retail.[76] It is one of the tallest residential towers in Charlotte,[77] and the 14th-largest apartment complex in the Charlotte area.[78]
21Ally Charlotte Center378 (115.2)[79]26[79]2021[79]Construction started in December 2016 and the building delivered on May 3, 2021.[80][81][82][83] With 725,000 square feet (67,400 m2) of space it is the 11th-largest office building in Charlotte by leasable square feet.[49]
22FNB Tower Charlotte371 (113)[84]29[84]2021[84]Anchored byFNB Corporation, with 156,000 square feet (14,500 m2) of office space, 196 luxury apartments, and 2,300 square feet (210 m2) of retail space. It broke ground in December 2018.[85] The building opened on July 21, 2021.[86]
23Lowe's Global Technology Center357 (108.8)[87]23[87]2021[87]It sits across the street from the Design Center of the Carolinas and is anchored byLowe's. Construction started August 2019.[25] It is the tallest building outside Uptown.[13]
24 Radius Dilworth Overlook345 (105.1)[88]26[89]2025[90]The complex is composed of 2 apartment towers with a combined total of 626 units with 6,000 square feet (560 m2) of ground level retail.[91] It is the 7th-largest apartment community in the Charlotte area.[78] It is also the tallest building in Dilworth[90]
Oro Ballantyne345 (105.1)26[92]2025[90]It is a 26-story apartment tower that will have 365 units that is split between the high-rise and mid-rise buildings located inBallantyne Corporate Park as part of The Bowl, which is a part of the Ballantyne Reimagined project.[92][93]
26Catalyst338 (103)[94]27[94]2009[94]35°13′33.5″N80°50′53.1″W / 35.225972°N 80.848083°W /35.225972; -80.848083 (Catalyst)With 462 apartments it is the 23rd-largest apartment complex in the Charlotte area.[78][95]
Ascent Uptown338 (103)[96]33[96]2017[96]35°13′38.7″N80°50′48.9″W / 35.227417°N 80.846917°W /35.227417; -80.846917 (Ascent Uptown)It contains 300 units, with 20,000 square feet (1,900 m2) of amenities on the top 2 floors[97]
28Honeywell Tower331 (101)[98]23[98]2021[98]The building contains 373,921 square feet (34,738.4 m2) of leasable space, which makes it the 27th-largest office building in Charlotte.[49]
29525 North Tryon330 (100.6)[99]19[99]1999[99]35°13′51.9″N80°50′17.3″W / 35.231083°N 80.838139°W /35.231083; -80.838139 (525 North Tryon)With 425,298 square feet (39,511.5 m2) of space it is the 24th-largest office building in Charlotte by leasable square feet.[49][100][101]
30TradeMark325 (99.1)[102]28[102]2007[102]35°13′44.4″N80°50′44.5″W / 35.229000°N 80.845694°W /35.229000; -80.845694 (TradeMark)[103]
31First Citizens Plaza320 (97.5)[104]23[104]1987[104]35°13′36.7″N80°50′39.3″W / 35.226861°N 80.844250°W /35.226861; -80.844250 (First Citizens Plaza)In April 2023 the property was returned to the lender after the owner defaulted on the loan. At that time the building was 43% occupied.[105][106]
32Kingston South End318 (96.9)[107]24[108]2024[108]It is a 24-story residential tower with 324 apartments and 15,000 square feet (1,400 m2) of ground floor retail.[108][109][110]
600 South Tryon318 (96.9)[111]24[112]2025[113]It is the 4th office tower that is a part of the Legacy Union project.[112] The 24-story tower contains 415,000 square feet (38,600 m2), which makes it the 25th largest office building in Charlotte by square footage.[112][49]
Linea318 (96.9)[114]24[115]2025[116]It is an apartment tower with 370 units along with 18,700 square feet (1,740 m2) of ground-floor retail and restaurant space. It is being built next to the completedThe Line where Sycamore Brewing relocated.[117]
35The Arlington310 (94.5)[118]24[118]2002[118]35°13′1.8″N80°51′9.1″W / 35.217167°N 80.852528°W /35.217167; -80.852528 (The Arlington)It was the tallest building outside ofUptown Charlotte untilLowe's Global Technology Center was completed in 2021.[90][119][87]
Skye310 (94.5)[120]22[120]2013[120]35°13′21.3″N80°50′27.7″W / 35.222583°N 80.841028°W /35.222583; -80.841028 (Skye)It is a 172-room Hyatt Place hotel and contains 69 condos with a 8,000 square feet (740 m2) restaurant on the 20th floor.[121][122]
37110 East305 (92.9)[123]23[123]2024[123]It is a 370,000 square feet (34,000 m2) office tower with 7,000 square feet (650 m2) of street level retail.[124] This square footage makes it the 28th largest office building in Charlotte and the largest building in South End.[49]
38One Independence Center301 (91.8)[125]22[125]1983[125]35°13′39.9″N80°50′34.1″W / 35.227750°N 80.842806°W /35.227750; -80.842806 (101 Independence Center)It contains 565,694 square feet (52,554.7 m2) of space it is the 18th largest office building in Charlotte by leasable square feet.[49]
39200 South College300 (91.5)[126]22[126]1974[126]35°13′31.4″N80°50′37.1″W / 35.225389°N 80.843639°W /35.225389; -80.843639 (BB&T Center)The building contains 567,865 square feet (52,756.4 m2) it is the 7th largest office building in Charlotte by leasable square feet.[49][126][127]
AC Hotel/Residence Inn Charlotte EpiCentre300 (91.5[128]22[128]2018[128]Construction started in 2015 and it delivered in the spring 2018. With 300 rooms it the 11th largest hotel in Charlotte by number of rooms.[129][130]
41200 South Tryon299 (91.1)[131]18[131]1961[131]35°13′35.3″N80°50′40.9″W / 35.226472°N 80.844694°W /35.226472; -80.844694 (200 South Tryon)Tallest building constructed in Charlotte in the 1960s.[131][132]
42The Westin Charlotte293 (89.3)[133]25[133]2003[133]35°13′18.7″N80°50′50.1″W / 35.221861°N 80.847250°W /35.221861; -80.847250 (The Westin Charlotte)It contains 700 rooms, making it the largest hotel in Charlotte by number of rooms.[129]
550 South293 (89.3)[134]20[134]2009[134]35°13′14.2″N80°50′38.9″W / 35.220611°N 80.844139°W /35.220611; -80.844139 (NASCAR Plaza)[134][135]
44The Hilton Charlotte Center City[f]292 (89)[136]22[136]1990[136]35°13′26.1″N80°50′37.6″W / 35.223917°N 80.843778°W /35.223917; -80.843778 (The Hilton Charlotte Center City)With 400 rooms it is the 5th largest hotel in Charlotte by number of rooms.[129][137][138]
45650 S Tryon291 (88.6)[139]18[139]2020[139]Second office tower planned on the Legacy Union development site. Construction completed mid November 2020.[140]
46112 Tryon Plaza280 (85.3)[141]22[141]1927[141]35°13′37.3″N80°50′37.5″W / 35.227028°N 80.843750°W /35.227028; -80.843750 (112 Tryon Plaza)Tallest building constructed in Charlotte in the 1920s.[141][142]
JW Marriott Charlotte280 (85.3)[143]22[143]2021[143]Construction started in December 2018. With 381 rooms it is the 7th largest hotel in Charlotte by number of rooms.[129] The hotel opened August 17, 2021.[144]
48Bell Uptown Charlotte[f]278 (84.9)[145]22[145]2014[145]35°13′36.2″N80°50′56″W / 35.226722°N 80.84889°W /35.226722; -80.84889 (Element Uptown)22-story 352-unit apartment tower across the street from Romare Bearden Park, developed by Childress Klein. It was sold to Bell Partners in June 2022 for $165 million.[146][147]
49The Howard R. Levine Center for Education270 (82.2)[148]14[149]2025[150]It will be the Wake Forest University School of Medicine Charlotte campus main education tower containing medical school classrooms.[148][151]
50The Ascher Uptown Apartments North Tower264 (80.5)[152]24[152]2015[152]35°13′56.4″N80°50′14.8″W / 35.232333°N 80.837444°W /35.232333; -80.837444 (SkyHouse Uptown North Tower)One of 2 twin residential towers that combined feature 672 apartments, which makes it the 5th largest apartment complex in the Charlotte area.[153][154][78]
The Ascher Uptown Apartments South Tower264 (80.5)

[155]

24[155]2017[155]35°13′54.4″N80°50′17.6″W / 35.231778°N 80.838222°W /35.231778; -80.838222 (SkyHouse Uptown South Tower)One of 2 twin residential towers that combined feature 672 apartments, which makes it the 5th largest apartment complex in the Charlotte area.[153][156][78]
52Regions 615260 (79.1)[157]19[157]2017[157]35°13′17.5″N80°50′53.3″W / 35.221528°N 80.848139°W /35.221528; -80.848139 (615 South College)It contains 375,865 square feet (34,919 m2) of leasable space. Regions Financial anchors the building.[158] The building also contains 300MUFG Union Bank employees.[159]
53Charlotte Marriott City Center252 (76.8)[160]19[160]1984[160]35°13′40.6″N80°50′36.9″W / 35.227944°N 80.843583°W /35.227944; -80.843583 (Charlotte Marriott City Center)It contains 446 rooms, which makes it the 2nd largest hotel in Charlotte by number of rooms.[129][161]
Omni Charlotte Hotel[f]252 (76.8)[162]19[162]1977[162]35°13′35.3″N80°50′33.5″W / 35.226472°N 80.842639°W /35.226472; -80.842639 (Omni Charlotte Hotel)With 373 rooms it is the 8th largest hotel in Charlotte by number of rooms.[129][27][163]
55129 West Trade250 (76.2)[164]17[164]1958[164]Tallest building constructed in Charlotte in the 1950s.[164]
56Le Méridien Charlotte[f]238 (72.5)[165]18[165]1973[165]35°13′2.4″N80°50′18.7″W / 35.217333°N 80.838528°W /35.217333; -80.838528 (Le Méridien Charlotte)The hotel was previously part of the Blake Hotel, which had 605 rooms. In early 2015 the former hotel completed a $20 million renovation to become The Sheraton and Le Méridien. Le Méridien is the 11th largest hotel in Charlotte by number of rooms.[129][166][167][168][169]
Sonesta Charlotte Executive Park238 (72.5)[170]18[170]1983[170]The hotel is owned by Hospitality Properties Trust, purchased in 2017 for $44 million. With 300 rooms it is the 11th largest hotel in Charlotte by number of rooms.[171][129] In 2014 a $10 million renovation was finished.[172]
58The Francis Apartments230 (70.1)[173]19[173]2018[173]$150 million mixed used development by Crescent Communities and CNM Enterprises inUptown Charlotte. It contains 459 apartments, a 38,000 square feet (3,530 m2) and 23,000 square feet (2,137 m2) of additional retail space.[174]
59Kimpton Tryon Park226 (69)[175]18[175]2017[175]35°13′34.4″N80°50′47.6″W / 35.226222°N 80.846556°W /35.226222; -80.846556 (Kimpton Tryon Park Charlotte)With 217 rooms it is the 25th largest hotel in Charlotte by number of rooms.[129][176][177][178]
Bond on Mint226 (68.8)[179]17[180]2025It is a 17-story apartment building located at the corner of Mint St and Morehead St in South End with 393 units.[180]
61Ritz-Carlton Charlotte225 (69.1)[181]17[181]2009[181]150 room hotel built by Bank of America for $500 million combined cost for1 Bank of America Center and the hotel. The bank has an agreement with the hotel to cover their losses in order to keep the hotel open.[182][183] Also, bank employees will receive discounted rates.[184]
Johnston Building225 (69.1)[185]17[185]1924[185]In December 2024 Charlotte City Council approved a redevelopment of the entire building to become a 245-room hotel.[186]
63Uptown 550223 (68)[187]21[187]2019[187]21 story apartment tower that along with a 6-story building contains 421 apartments.[188]
64Charlotte-Mecklenburg Government Center214 (65.2)[189]14[189]1988[189]
65440 South Church212 (64.7)[190]16[190]2009[190]The building contains 365,000 square feet (33,900 m2), Ally Financial anchored the building from 2009[191] to moving intoAlly Charlotte Center in 2021.[192]
Towerview at Ballantyne212 (64.7)[193]16[193]2021[193]Announced in October 2019 by Northwood Ravin asBallantyne Corporate Park's first apartment tower. The 16-story building with an attached low-rise building have 212 apartments. The building was part of the early stages of Ballantyne Reimagined.[194]
The Line212 (64.6)[195]16[195]2022[196]A 16-story building developed by Portman.[28][197] Foundry Commercial became the first tenant of the building starting on May 16, 2022.[196]
68Capitol Towers North200 (60.9)[198]10[198]2017[198]Developed by Charlotte-based Lincoln Harris, located in South Park on a 6 acres (2.4 ha) site behind Piedmont Town Center. The towers were built as speculative buildings, with no tenants signed on prior to construction.[199][200]
Capitol Towers South200 (60.9)[201]10[201]2015[201]Developed by Charlotte-based Lincoln Harris, located in South Park on a 6 acres (2.4 ha) site behind Piedmont Town Center. The towers were built as speculative buildings, with no tenants signed on prior to construction.[199][200]

Tallest under construction

[edit]

As of February 2026[update], there are 3 buildings that are under construction, or under demolition, or in site prep in Charlotte that are planned to rise at least 200 feet (61 m).[g][2][3]

NameImageHeight
ft (m)
FloorsYearNotes
1111 South Tryon540 (164.5)[202]43[20]2027[203]Mixed-use tower with 400,000 square feet (37,000 m2) of office space across the top 19 floors and 304 apartments across the lower floors. It is the second phase of Queensbridge Collective.[204][205][19][18][20] Upon completion it will be the 26th largest office building in Charlotte and the largest in South End.[49]
Queensbridge Collective Vivian516 (157.2)[206]42[207]2026[208]The tower will be 42 stories it includes 409 apartments and 25,000 square feet (2,300 m2) of retail.[206][205][209] It broke ground on May 24, 2023.[18] Once completed it will be the second tallest residential tower in North Carolina.[206][210] The building topped out February 6, 2025.[211] It will deliver in the third quarter 2025.[204]
Metropolitan Tower357 (108.8)27[212]2027[213]Northwood Ravin is planning to build a 27-story[212] 283-unit apartment tower at the corner of Metropolitan Avenue and South Kings Drive. In 2020 Northwood purchased the 1.3 acres (0.53 ha) site for $2.25 million fromJ.P. Morgan Chase & Co.[214] The rezoning was approved in April 2021 originally for 330 apartments.[215] It will broke ground in early 2024.[212]

Tallest approved

[edit]

These buildings have either been approved, issued permits, or awaiting construction[216][217][218]

NameHeight
ft (m)
FloorsYearNotes
ANOVA265 (80.772)20[219]2028[219]The building is a 20-story apartment building being built at The Pearl with 382 units, with 19 units reserved for low-income residents. In 2021 Atrium promised that affordable housing would be a part of the district. The Construction will begin in the first half of 2026 and deliver in 2028.[220][219]
900 South McDowell238 (72.5)18[221]Northwood Ravin is developing an 18 story 328 unit apartment building at 900 South McDowell, right next toThe Pearl. The developer purchased the 1.3 acre property for $11.25 million in June 2025 from Duncan-Parnell. The building should break ground in 2026.[221]
Southern Land Company Residential Tower397 (121)30[222]2026It is a mixed-use tower with 300 luxury apartments that will be built on the former site of Tyber Creek Pub. It is being developed by Southern Land Company on a 1 acre (0.40 ha) parcel at the corner of Tremont Ave and South Blvd which combines lots 1919, 1923 and 1933 South Blvd. The historic building at 1923 South Blvd., which was part of the land purchased by Southern Land Company, was relocated to 1829 Cleveland Ave.[223][224] Tyber Creek closed on March 18, 2024.[225]
Carson & Tryon Office Building411 (125.2)[226]31[227]2025It is a 31-story mixed use tower with 565,000 square feet (52,500 m2) of office space, 200 room hotel, 10,000 square feet (930 m2) of retail, and 200 residential units.[228][227][229] The 3 acres (1.2 ha) site is currently occupied by an Enterprise Rent-A-Car location at the corner of Carson and Tryon at 1102 S Tryon St. The developers Crescent Communities and Nuveen Real Estate paid $37 million for the four parcels from different owners that make up the site.[230][231] Crescent Communities applied for building permits with Mecklenburg County on October 14, 2024, although a ground breaking date has not been set.[232] Charlotte's largest law firm Moore & Van Allen will anchor the building. The firm currently occupies 152,000 square feet (14,100 m2) at Bank of America Corporate Center. It is unclear how much space the firm will occupy in the new building.[233]
Carson & Tryon Hotel265 (80.7)20[222]2025200 room hotel that is a part of the development Carson & Tryon. The development also includes a 31-story mixed use tower with 565,000 square feet (52,500 m2) of office space, 10,000 square feet (930 m2) of retail, and 200 residential units.[228][227][229] The 3 acres (1.2 ha) site is currently occupied by an Enterprise Rent-A-Car location at the corner of Carson and Tryon at 1102 S Tryon St. The developers Crescent Communities and Nuveen Real Estate paid $37 million for the four parcels from different owners that make up the site[230][231] Construction will start in 2023[209] and complete in 2025.[227]
1728 South Blvd.265 (80.7)20[234]2025Office Tower that will be a joint venture between White Point Partners, MRP Realty and Barings with 400,000 square feet (37,000 m2) of office space, ground floor retail, and a rooftop terrace. The building will be nearAscent South End. It will be built on the lot that Walgreens once occupied and the store will be built on the ground floor once complete. Construction will begin in 2023.[234]
VeLa Uptown368 (112.1)32[235]2026379 luxury apartments which are being developed at 200 E. Seventh St., former site of the Levine Museum of the New South. The .7 acres (0.28 ha) site at the corner of East Seventh and North College was purchased on March 13, 2022, for $10.75 million. It will also include 4,000 square feet (370 m2) of retail and 20,000 square feet (1,900 m2) of resident amenity space. The project cost is $170 million. Construction will begin in 2025 and complete in the 4th quarter of 2026.[236][235][237]
205 E Bland St265 (80.7)20[238]2026Cousins Properties is planning a 200,000 square feet (19,000 m2) office building on a .9 acres (0.36 ha) parking lot. The building will also include ground-floor retail and onsite parking.[238] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lot 1401 S. Tryon St. and 200 E. Bland St.[238][239]
2915 Griffith265 (79.2)20[240]2026325,000 square feet (30,200 m2) building on a 1.7 acres (0.69 ha) lot located directly next to Suffolk Punch and across from Lynx Blue Line's New Bern Station in South End, construction will start in the second quarter of 2022 and finish in 2024.[241][242]
Camden Exchange398 (121.3)30[243]2026Apartment tower with 315 units, 10,000 square feet (930 m2) of ground floor retail, and 10,000 square feet (930 m2) of office space occupied by Catalyst. It is being developed by Catalyst Capital Partners and Stiles Corp and it will be built on the former site of Price's Chicken Coop located at 1600 and 1604 Camden Road. It will break ground in late 2024.[237][209][244]
Intercontinental Hotel at Belk Place451 (137.4)34[245]2026It will contain 244 room luxury hotel,[245] which will make it the 22nd largest hotel in Charlotte by number of rooms.[129] Construction started in February 2018, on hold due to theCOVID-19 pandemic's effect on the Charlotte hotel business[246] Will become the tallest hotel in the Southern United States outside of Atlanta upon completion.[247][248] The hotel developer, Salter Brothers, announced in June 2023 the project is back on track. Construction will start in summer 2024 and complete in mid-2026.[245]
1427 South Blvd411 (125.2)31[249]2027[250]Washington, D.C. developer Akridge and Virginia-based property management company Kettler are developing a 31-story 450 unit apartment building on a .9 acres (0.36 ha) lot. The building will also include ground level retail, a resort style pool, fitness center, and co-working space. The companies purchased the lot on December 20, 2022, for $13.5 million. It is currently occupied by businesses Modern Man, Savvy Seconds Consignment, Fresh Nails, Lucky Fish and Destined To Make It.[249] It will break ground in 2024.[250]
Brooklyn Village Phase 1 Office Tower 1318 (96.9)24[251]2026It is a 24-story office tower that is being built as a part of the Brooklyn village development phase 1. This is 1 of 2 office towers totaling 531,600 square feet (49,390 m2). It will be built upon a 5.75-acre lot that was previously occupied by Bob Walton Plaza at 700 E. Brooklyn Village Ave.[251] The land sold in July 2023 for $10.3 million. In September 2023 the demolition of Bob Walton Plaza began and construction will complete in late 2026.[252][253]
Brooklyn Village Phase 1 Office Tower 2212 (65)16[251]2026It is a 16-story office tower being built as a part of the Brooklyn village development phase 1. This is the second of 2 office towers totaling 531,600 square feet (49,390 m2). It will be built upon a 5.75-acre lot currently occupied by Bob Walton Plaza at 700 E. Brooklyn Village Ave, which will be made up of 6 parcels.[251] The land sold in July 2023 for $10.3 million. In September 2023 the demolition of Bob Walton Plaza began and construction will complete in late 2026.[252][253]
401 South College2027Animal investment firm and Millennium Venture Capital in December 2022 purchased the building for $24 million. The site is 2.3 acres. However, Charlotte Regional Visitors authority swapped a 1.9-acre parcel at 501 South Caldwell St for a .7-acre parcel on the site at the corner of College Street and Martin Luther King Jr. Blvd. A 1.6-acre site remains available for the development, which will be divided into two parcels. On one of the parcels will be a high-rise multifamily tower with 350 to 400 units. Construction is expected to start in late 2025.[254][255]
South End Station Building 1212 (64.7)16[222]Cousins Properties is planning a 2 building 700,000 square feet (65,000 m2) mixed use complex at 200 E Bland; where All American Pub, Hot Taco and Slate are currently located. The complex will include a potential 300 multifamily units, retail and office space.[239][222] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lots 1401 S. Tryon St. and 205 E. Bland St.[238][239][256]
South End Station Building 2212 (64.7)16[222]Cousins Properties is planning a 2 building 700,000 square feet (65,000 m2) mixed use complex at 200 E Bland; where All American Pub, Hot Taco and Slate are currently located. The complex will include a potential 300 multifamily units, retail and office space.[239][222] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lots 1401 S. Tryon St. and 205 E. Bland St.[238][239][256]
Tremont Alley Office Building251 (76.5)19[257]Cousins is building a 350,000 square feet (33,000 m2) office tower on West Tremont across from the Common Market. The building will also contain 18,000 square feet (1,700 m2) of ground floor retail and the building will sit on podium parking. It will occupy a 2.4-acre lot that was purchased in December 2020 for $18.7 million that was composed of 3 parcels 242 Tremont Ave., 306 Tremont Ave., and 305 Dogget St.. The lot is currently vacant, the previous industrial building have been demolished.[257][256]
Tremont Alley Apartment Building251 (76.5)19[257]Cousins is building a 305-unit residential tower on West Tremont across from the Common Market. The building will also contain 18,000 square feet (1,700 m2) of ground floor retail and the building will sit on podium parking. It will occupy a 2.4-acre lot that was purchased in December 2020 for $18.7 million that was composed of 3 parcels 242 Tremont Ave., 306 Tremont Ave., and 305 Dogget St. The lot is currently vacant, the previous industrial building has been demolished.[257][256]
1426 S Tryon St.265 (80.7)20[258]Highwoods Properties Inc. in May 2022 purchased the lot across the street from the Railyard for $27 million. Currently occupying the site is a low-rise building containing an ABC store. A mixed-use building with 300,000 square feet (28,000 m2) of office space and 250 apartments is planned.[258]
1435 South Tryon318 (96.9)24[259]Cousins Properties is planning a 24 story mixed tower on the site of a surface parking lot. It will have office space and a multifamily component. The land was part of a 2.2 acre $20 million purchase in November 2020 that also included 200 East Bland. The development of 1435 South Tryon and 200 East Bland will break ground in a year or two.[259]
1175 Pearl Park Way275 (83.82)[260]Pappas Properties is a planning a three building development in midtown that is the final phase of a multi phase development in the area. The three building includes a 275-foot apartment tower with 425 units, 150-room hotel, 100,000 square feet (9,300 m2) of office space, 35,000 square feet (3,300 m2) of retail on a 2.2-acre lot.[260]

Timeline of tallest buildings

[edit]
The Bank of America Corporate Center has been the tallest building in Charlotte since 1991.

Since 1909, the year the first high-rise in the city was constructed,[11] the title of the tallest building in Charlotte has been held by eight high-rises.

Original nameYears as tallestHeight
ft (m)
FloorsReference(s)
Independence Building[h]1909–1924 (15 years)185 (56.3)14[10]
Johnston Building[i]1924–1926 (2 years)225 (68.58)17[185]
112 Tryon Plaza1926–1961 (35 years)280 (85.3)22[141]
200 South Tryon1961–1971 (10 years)299 (91.1)18[131]
Two Wells Fargo Center1971–1974 (3 years)433 (132)32[65]
One South at The Plaza1974–1988 (14 years)503 (153)40[16]
301 South College1988–1991 (3 years)588 (179.2)42[52]
Bank of America Corporate Center1991–present (35 years)871 (265.5)60[5]

See also

[edit]
Portals:

Notes

[edit]
  1. ^New York has 293 buildings over 492 feet (150 m) existing or under construction,[30] Chicago has 128,[31] Miami has 56,[32] Houston has 39,[33] Los Angeles has 32,[34] San Francisco has 28,[35] Boston has 20,[36] Seattle has 20,[37] Dallas has 19,[38] Atlanta has 16,[39] Las Vegas has 15,[40] Philadelphia has 14,[41] Jersey City has 12,[42] Sunny Isles Beach has 11,[43] Pittsburgh has 10,[44] Minneapolis has 9,[45] Denver has 8,[46] Detroit has 8,[47] and Charlotte has 8.[29]
  2. ^If two or more buildings are of the same height, they are listed in order of floor count, then alphabetically. The "Year" column indicates the year in which a building was originally completed.
  3. ^Height estimated by theCTBUH.
  4. ^Along with the Fifth Third Center.
  5. ^Along with the Museum Tower.
  6. ^abcdHeight estimated by Emporis.
  7. ^Any buildings that have been topped out but are not completed are also included.
  8. ^Demolished in 1981.
  9. ^Original height unknown. 17 floors since 1929.

References

[edit]
General
Specific
  1. ^ab"Charlotte (completed)".The Skyscraper Center.CTBUH. RetrievedJuly 22, 2017.
  2. ^abc"High-rise buildings in Charlotte". Emporis. Archived from the original on July 31, 2017. RetrievedJuly 18, 2017.
  3. ^abc"Skyscrapers in Charlotte". Emporis. Archived from the original on July 30, 2017. RetrievedJuly 30, 2017.
  4. ^"Charlotte Skyscraper Diagram". Skycraper Page. RetrievedDecember 9, 2023.
  5. ^abcdefg"Bank of America Corporate Center".The Skyscraper Center.CTBUH. RetrievedJuly 13, 2017.
  6. ^"Bank of America Corporate Center". Emporis. Archived from the original on February 19, 2007. RetrievedJuly 13, 2017.
  7. ^abcdef"Duke Energy Center".The Skyscraper Center.CTBUH. RetrievedJuly 14, 2017.
  8. ^abcde"Hearst Tower".The Skyscraper Center.CTBUH. RetrievedJuly 14, 2017.
  9. ^"North Carolina Skyscraper Diagram (completed)". Skyscraper Source Media. RetrievedNovember 20, 2017.
  10. ^abc"Independence Building". Emporis. Archived from the original on May 14, 2015. RetrievedJuly 18, 2017.
  11. ^ab"Charlotte High Rise Buildings". Charlotte-Mecklenburg Historic Landmarks Commission. RetrievedJuly 18, 2017.
  12. ^ab"Bank of America Plaza".The Skyscraper Center.CTBUH. RetrievedJuly 14, 2017.
  13. ^abSoloff, Katie Peralta (October 7, 2021)."6 biggest developments underway shaping South End".Axios Charlotte. RetrievedOctober 7, 2021.
  14. ^abcd"Charlotte Metro Tower".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  15. ^abcd"The Vue".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  16. ^abcde"Bank of America Plaza".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  17. ^Franco, Elise (September 13, 2022)."Riverside reveals changes to Queensbridge Collective project near uptown Charlotte, South End (RENDERINGS)".Charlotte Business Journal. RetrievedMarch 23, 2023.
  18. ^abcFranco, Elise (May 25, 2023)."Riverside's Queensbridge Collective to be 'another jewel' in Charlotte's crown (PHOTOS)".Charlotte Business Journal. RetrievedMay 25, 2023.
  19. ^abFranco, Elise (December 8, 2025)."Riverside boosts Queensbridge office space as another high-profile tenant signs lease".Charlotte Business Journal. RetrievedDecember 8, 2025.
  20. ^abcFranco, Elise (September 5, 2025)."Queensbridge Collective ready to start next phase as anchor tenant inked for second tower".Charlotte Business Journal. RetrievedSeptember 5, 2025.
  21. ^Sands, Alexandria (January 2, 2025)."7 Charlotte developments to deliver in 2025".Axios Charlotte. RetrievedJanuary 2, 2025.
  22. ^Franco, Elise (May 16, 2023)."Construction set to start on first phase of Riverside's $700 million mixed-use development (RENDERINGS)".Charlotte Business Journal. RetrievedMay 16, 2023.
  23. ^Fahey, Ashley (May 17, 2021)."Duke Energy to exit current HQ building in uptown after company's new tower delivers".Charlotte Business Journal. RetrievedMay 17, 2021.
  24. ^Cope, Cassie (December 26, 2018)."Construction begins on 29-story uptown bank tower. It will have more than offices".Charlotte Observer. RetrievedJune 11, 2021.
  25. ^abCrane, Brianna (June 27, 2019)."View Renderings: Lowe's chooses South End for new tech hub, moving into stunning 23-story tower".Axios Charlotte. RetrievedMarch 19, 2021.
  26. ^"Honeywell HQ to anchor latest office tower at Legacy Union in uptown".Charlotte Business Journal. bizjournals. RetrievedFebruary 23, 2020.
  27. ^abThomas, Jennifer (June 18, 2020)."When JW Marriott Charlotte expects to open in uptown after hitting construction milestone".Charlotte Business Journal. RetrievedMay 30, 2021.
  28. ^abSealey, Clayton (November 26, 2019)."Guide: The Growing Skyline in Charlotte's South End".Charlotte Magazine. RetrievedFebruary 23, 2020.
  29. ^ab"Charlotte United States".Council on Tall Buildings and Urban Habitat. RetrievedMarch 23, 2023.
  30. ^"New York City (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  31. ^"Chicago (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  32. ^"Miami (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  33. ^"Houston (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  34. ^"Los Angeles (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  35. ^"San Francisco (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  36. ^"Boston (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  37. ^"Seattle (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  38. ^"Dallas (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  39. ^"Atlanta (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  40. ^"Las Vegas (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  41. ^"Philadelphia (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  42. ^"Jersey City (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  43. ^"Sunny Isles Beach (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  44. ^"Pittsburgh (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  45. ^"Minneapolis (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  46. ^"Denver (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  47. ^"Detroit (completed / under construction / topped out 150m+)".The Skyscraper Center.CTBUH. RetrievedJuly 18, 2017.
  48. ^"Bank of America Corporate Center". Skyscraper Source Media. RetrievedJuly 13, 2017.
  49. ^abcdefghijklmnopqrstuSharipo, Amy (July 27, 2025)."Charlotte's largest office buildings".Charlotte Business Journal. RetrievedDecember 26, 2025.
  50. ^"Duke Energy Center". Skyscraper Source Media. RetrievedJuly 14, 2017.
  51. ^abc"Bank of America Tower".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  52. ^abcd"One Wells Fargo Center".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  53. ^"The Vue". Skyscraper Source Media. RetrievedJuly 14, 2017.
  54. ^"Bank of America Plaza". Skyscraper Source Media. RetrievedJuly 14, 2017.
  55. ^abcd"1 Bank of America Center".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  56. ^abcd"300 S Tryon". Council on Tall Buildings and Urban Habitat. RetrievedSeptember 24, 2021.
  57. ^"300 South Tryon". Skyscraper Source Media. RetrievedNovember 20, 2017.
  58. ^abcd"121 West Trade".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  59. ^abcd"Three Wells Fargo Center".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  60. ^abcd"Mint Museum Apartments Tower". Skyscraper Source Media. RetrievedNovember 29, 2022.
  61. ^Williams-Tracy, Laura (October 20, 2017)."Uptown's Museum Tower is taking it to a higher level".Charlotte Business Journal. RetrievedJanuary 1, 2024.
  62. ^abcd"Fifth Third Center".Council on Tall Buildings and Urban Habitat. RetrievedNovember 29, 2022.
  63. ^"Fifth Third Center". Skyscraper Source Media. RetrievedJuly 14, 2017.
  64. ^"What's In A Name",The Charlotte Observer, December 1, 1997.
  65. ^abcd"Two Wells Fargo Center".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  66. ^abcd"Avenue".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  67. ^"Novare breaks ground on 27-story tower".Charlotte Business Journal. August 29, 2007. RetrievedJanuary 3, 2024.
  68. ^abcd"400 South Tryon".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  69. ^Franco, Elise (April 2, 2025)."Uptown office tower garners $36M bid at public auction".Charlotte Business Journal. RetrievedApril 7, 2025.
  70. ^Franco, Elise (April 25, 2025)."Lenders take back uptown tower after $36M foreclosure bid is finalized".Charlotte Business Journal. RetrievedMay 5, 2025.
  71. ^abcd"Carillon Tower".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  72. ^abcd"Charlotte Plaza".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  73. ^"Charlotte Plaza". Skyscraper Source Media. RetrievedJuly 15, 2017.
  74. ^Franco, Elise (March 29, 2024)."CBRE lists Charlotte Plaza uptown office tower for sale".Charlotte Business Journal. RetrievedDecember 23, 2024.
  75. ^abc"The Ellis".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  76. ^Sealey, Clayton (June 23, 2021)."Charlotte's newest residential tower is complete, with hundreds of ready-to-lease units".Charlotte Observer. RetrievedJune 24, 2021.
  77. ^"Hoar Construction Completes 33-Story Ellis Apartment High-Rise in Uptown Charlotte".ReBusiness Online. June 28, 2021. RetrievedJune 28, 2021.
  78. ^abcdeSharipo, Amy (August 18, 2023)."Charlotte's largest apartment communities".Charlotte Business Journal. RetrievedDecember 23, 2023.
  79. ^abc"Ally Charlotte Center".Council on Tall Buildings and Urban Habitat. RetrievedDecember 1, 2022.
  80. ^Chemtob, Danielle (May 3, 2021)."Construction on the latest bank tower in the Charlotte skyline is now complete".Charlotte Observer. RetrievedMay 5, 2021.
  81. ^Thomas, Jason (September 21, 2017)."Uptown will be getting a new bank tower — Ally Charlotte Center".Agenda. Charlotte Agenda. RetrievedDecember 12, 2017.
  82. ^Portillo, Ely."Busy uptown intersection is closing for December to make way for a new office tower".Charlotte Observer. Ely Portillio. RetrievedDecember 12, 2017.
  83. ^Fahey, Ashley."Uptown office tower tops out, on track to deliver in 2021".Charlotte Business Journal. bizjournals. RetrievedFebruary 23, 2020.
  84. ^abc"FNB Tower".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  85. ^Cope, Cassie (December 26, 2018)."Construction begins on 29-story uptown bank tower. It will have more than offices".Charlotte Observer. RetrievedJune 11, 2021.
  86. ^Kuznitz, Allison (July 21, 2021)."The newest addition to the Charlotte skyline just opened near Bank of America Stadium".Charlotte Observer. RetrievedJuly 22, 2021.
  87. ^abcd"Design Center Tower".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  88. ^"Radius Dilworth". Emporis. Archived from the original on May 17, 2022. RetrievedApril 25, 2022.
  89. ^Chemtob, Danielle."A 26-story apartment tower is planned near Dilworth. Here's what it will include".Charlotte Observer. RetrievedMay 18, 2021.
  90. ^abcdFranco, Elise (November 18, 2024)."Major Dilworth development hits milestone; tower project up next".Charlotte Business Journal. RetrievedNovember 18, 2024.
  91. ^Peralta, Katie; Mahoney, Ashley."26-story tower with skyline views breaks ground soon in Dilworth".Axios Charlotte. RetrievedSeptember 24, 2021.
  92. ^abRago, Gordon (May 18, 2022)."See renderings of the Bowl at Ballantyne, a 20-acre project bringing a 'main street' feel".Charlotte Observer. RetrievedMay 19, 2022.
  93. ^Huguley, Collin (May 17, 2022)."RENDERINGS: Northwood Investors gives new peek at OMB-anchored The Bowl at Ballantyne".Charlotte Business Journal. RetrievedAugust 7, 2023.
  94. ^abc"Catalyst".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  95. ^"Catalyst". Skyscraper Source Media. RetrievedJuly 15, 2017.
  96. ^abc"Ascent Uptown". Skyscraper Source Media. RetrievedDecember 1, 2022.
  97. ^Fahey, Ashely (June 28, 2017)."A look inside uptown Charlotte's newest luxury apartment high-rise (PHOTOS)".Charlotte Business Journal. RetrievedOctober 5, 2022.
  98. ^abc"Honeywell Tower".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  99. ^abc"525 North Tryon".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  100. ^Fahey, Ashley (November 18, 2016)."525 North Tryon updates part of changing corridor around it".Charlotte Business Journal. RetrievedJanuary 7, 2024.
  101. ^"525 North Tryon". Skyscraper Source Media. RetrievedJuly 15, 2017.
  102. ^abc"333 West Trade Street".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  103. ^"TradeMark". Skyscraper Source Media. RetrievedJuly 15, 2017.
  104. ^abc"First Citizens Plaza".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  105. ^Fahey, Ashley (April 24, 2023)."Real estate firm Dilweg hands First Citizens Bank Plaza back to lender after WeWork defaults on lease".Charlotte Business Journal. RetrievedJanuary 6, 2024.
  106. ^"First Citizens Building". Skyscraper Source Media. RetrievedJuly 15, 2017.
  107. ^"1714 South Boulevard". Emporis. Archived from the original on October 7, 2021. RetrievedOctober 7, 2021.
  108. ^abcFranco, Elise (July 29, 2024)."White Point Partners, Greystar near delivery on high-rise luxury apartments in South End".Charlotte Business Journal. RetrievedJuly 29, 2024.
  109. ^Huguley, Collin (June 29, 2021)."White Point Partners, Greystar reveal new details on high-rise project in South End".Charlotte Business Journal. RetrievedJune 29, 2021.
  110. ^"Greystar, White Point Break Ground on Ascent South End".Cision PR Wire. March 3, 2022. RetrievedMarch 9, 2022.
  111. ^"600 South Tryon". Emporis. Archived from the original on July 13, 2022. RetrievedJuly 13, 2022.
  112. ^abcRago, Gordon (July 12, 2022)."First look at latest addition to Charlotte skyline, a 24-story uptown office tower".Charlotte Observer. RetrievedJuly 12, 2022.
  113. ^Franco, Elise (January 13, 2025)."New uptown tower inks three big office leases".Charlotte Business Journal. RetrievedJanuary 13, 2025.
  114. ^"2161 Hawkins Street". Emporis. Archived from the original on May 11, 2022. RetrievedMay 11, 2022.
  115. ^Fahey, Ashley (May 18, 2021)."Portman Residential planning high-rise apartment tower at South End site near the Rail Trail".Charlotte Business Journal. RetrievedMay 18, 2021.
  116. ^Franco, Elise (July 7, 2025)."Early look at new South End tower's leasing prospects".Charlotte Business Journal. RetrievedApril 18, 2025.
  117. ^Franco, Elise (September 8, 2022)."Portman to start construction next month on South End apartment tower".Charlotte Business Journal. RetrievedSeptember 8, 2022.
  118. ^abc"The Arlington".Council on Tall Buildings and Urban Habitat. RetrievedDecember 1, 2022.
  119. ^"The Arlington". Skyscraper Source Media. RetrievedJuly 15, 2017.
  120. ^abc"Skye Building".Council on Tall Buildings and Urban Habitat. RetrievedDecember 21, 2022.
  121. ^Stabley, Susan (February 7, 2013)."Skye Condominiums developer plans countersuit over loan commission claim".Charlotte Business Journal. RetrievedJanuary 9, 2024.
  122. ^"SKYE Condominiums". Skyscraper Source Media. RetrievedJuly 15, 2017.
  123. ^abc"110 East".Council on Tall Buildings and Urban Habitat. RetrievedOctober 28, 2025.
  124. ^Fahey, Ashley (March 2, 2020)."RENDERINGS: Here's what South End's next office tower will look like".Charlotte Business Journal. RetrievedMarch 3, 2020.
  125. ^abc"101 Independence Center".Council on Tall Buildings and Urban Habitat. RetrievedNovember 29, 2022.
  126. ^abcd"BB&T Center".Council on Tall Buildings and Urban Habitat. RetrievedNovember 29, 2022.
  127. ^"BB&T Building". Skyscraper Source Media. RetrievedJuly 15, 2017.
  128. ^abc"AC Hotel/Residence Inn Charlotte City Center".Council on Tall Buildings and Urban Habitat. RetrievedDecember 1, 2022.
  129. ^abcdefghijShapiro, Amy (January 19, 2024)."Charlotte's largest hotels".Charlotte Business Journal. RetrievedDecember 30, 2024.
  130. ^"AC Hotel/Residence Inn Charlotte EpiCentre". Emporis. Archived from the original on February 24, 2018. RetrievedJuly 17, 2017.
  131. ^abcde"200 South Tryon Street".Council on Tall Buildings and Urban Habitat. RetrievedNovember 29, 2022.
  132. ^"200 South Tryon". Skyscraper Source Media. RetrievedJuly 15, 2017.
  133. ^abc"The Westin Charlotte".Council on Tall Buildings and Urban Habitat. RetrievedNovember 29, 2022.
  134. ^abcd"NASCAR Plaza".Council on Tall Buildings and Urban Habitat. RetrievedNovember 29, 2022.
  135. ^"NASCAR Plaza". Skyscraper Source Media. RetrievedJuly 15, 2017.
  136. ^abc"Hilton Charlotte Center City". Emporis. Archived from the original on June 30, 2021. RetrievedOctober 7, 2021.
  137. ^"Hilton Charlotte & Towers". Emporis. Archived from the original on July 17, 2018. RetrievedJuly 16, 2017.
  138. ^"The Hilton Charlotte Center City". Skyscraper Source Media. RetrievedJuly 16, 2017.
  139. ^abc"Two Legacy Union".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  140. ^Fahey, Ashley (December 10, 2020)."Developers, contractors get creative on Covid-19 challenges for construction".Charlotte Business Journal. RetrievedMay 27, 2021.
  141. ^abcde"112 Tryon Plaza".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  142. ^"112 Tryon Plaza". Skyscraper Source Media. RetrievedJuly 16, 2017.
  143. ^abc"JW Marriott Charlotte".Council on Tall Buildings and Urban Habitat. RetrievedDecember 1, 2022.
  144. ^Thomas, Jennifer (July 26, 2021)."Luxury hotel JW Marriott set to open in uptown Charlotte".Charlotte Business Journal. RetrievedJuly 27, 2021.
  145. ^abc"Element Uptown". Emporis. Archived from the original on July 17, 2018. RetrievedSeptember 24, 2021.
  146. ^Huguley, Collin (June 29, 2022)."Uptown Charlotte apartment complex fetches $165M in recent sale".Charlotte Business Journal. RetrievedOctober 16, 2022.
  147. ^"Element Uptown". Emporis. Archived from the original on July 17, 2018. RetrievedJuly 16, 2017.
  148. ^abHudson, Caroline; O'Connell, Liz (August 24, 2021)."Atrium Health, development firm outline plans for future innovation district at med school site".Charlotte Business Journal. RetrievedOctober 16, 2022.
  149. ^Franco, Elise (May 28, 2024)."Atrium Health's innovation district, medical school in Charlotte is 'on time and on track'".Charlotte Business Journal. RetrievedJune 14, 2024.
  150. ^Franco, Elise (June 14, 2024)."MIDTOWN'S FUTURE SHAPING UP".Charlotte Business Journal. RetrievedJune 14, 2024.
  151. ^Wilson, Jen (December 14, 2021)."Howard Levine Foundation donates $25M to support Atrium's innovation district building".Charlotte Business Journal. RetrievedOctober 16, 2022.
  152. ^abc"SkyHouse Uptown North Tower".Council on Tall Buildings and Urban Habitat. RetrievedDecember 1, 2022.
  153. ^abFahey, Ashley (June 19, 2017)."Grand opening for second SkyHouse tower set this week".Charlotte Business Journal. RetrievedOctober 16, 2022.
  154. ^"SkyHouse Uptown North Tower".The Skyscraper Center.CTBUH. RetrievedJuly 16, 2017.
  155. ^abc"SkyHouse Uptown South Tower".Council on Tall Buildings and Urban Habitat. RetrievedDecember 1, 2022.
  156. ^"SkyHouse Uptown South Tower".The Skyscraper Center.CTBUH. RetrievedJuly 16, 2017.
  157. ^abc"615 South College".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  158. ^Fahey, Ashely (September 13, 2016)."Regions Bank to occupy 63,806 square feet at 615 South College".Charlotte Business Journal. RetrievedOctober 5, 2022.
  159. ^Hudson, Caroline (June 30, 2019)."International financial group opens uptown office with plans to add 300 jobs".Charlotte Business Journal. RetrievedOctober 5, 2022.
  160. ^abc"Charlotte Marriott City Center". Emporis. Archived from the original on July 17, 2018. RetrievedSeptember 24, 2021.
  161. ^"Charlotte Marriott City Center". Emporis. Archived from the original on July 17, 2018. RetrievedJuly 16, 2017.
  162. ^abc"Omni Charlotte Hotel". Emporis. Archived from the original on July 17, 2018. RetrievedSeptember 24, 2021.
  163. ^"Omni Charlotte Hotel". Emporis. Archived from the original on July 17, 2018. RetrievedJuly 17, 2017.
  164. ^abcd"129 West Trade Street".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  165. ^abc"Le Meridien Charlotte". Emporis. Archived from the original on October 20, 2017. RetrievedOctober 7, 2021.
  166. ^Thomas, Jennifer (November 10, 2022)."Behind the scenes of Le Méridien's multimillion-dollar transformation (PHOTOS)".Charlotte Business Journal. RetrievedJanuary 5, 2015.
  167. ^Boye, Will (November 10, 2022)."Charlotte's Blake Hotel to undergo $20M renovation, conversion".Charlotte Business Journal. RetrievedJuly 17, 2013.
  168. ^"Le Méridien Charlotte". Emporis. Archived from the original on October 20, 2017. RetrievedJuly 17, 2017.
  169. ^"The Blake Hotel". Skyscraper Source Media. RetrievedJuly 14, 2017.
  170. ^abc"Crowne Plaza Executive Park". Emporis. Archived from the original on February 27, 2021. RetrievedMay 5, 2022.
  171. ^Fahey, Ashley (September 20, 2017)."Crowne Plaza Charlotte sells for $44M".Charlotte Business Journal. RetrievedMay 5, 2022.
  172. ^Thomas, Jennifer (November 11, 2014)."Here's a look at Crowne Plaza Charlotte's $10M renovation (PHOTOS)".Charlotte Business Journal.
  173. ^abc"Novel Stonewall Station".Council on Tall Buildings and Urban Habitat. RetrievedNovember 28, 2022.
  174. ^Thomas, Jennifer (October 25, 2019)."Novel project put Stonewall in play — with more to come".Charlotte Business Journal. RetrievedOctober 16, 2022.
  175. ^abc"Klimpton Hotel".Council on Tall Buildings and Urban Habitat. RetrievedJanuary 10, 2023.
  176. ^"Klimpton Hotel".The Skyscraper Center.CTBUH. RetrievedNovember 20, 2017.
  177. ^"Kimpton Tryon Park". Emporis. Archived from the original on August 10, 2017. RetrievedNovember 20, 2017.
  178. ^Portillo, Ely (June 13, 2017)."Charlotte's newest luxury hotel opens soon, with a new name".The Charlotte Observer. RetrievedNovember 20, 2017.
  179. ^"Mint & Morehead". Emporis. Archived from the original on May 23, 2022. RetrievedMay 17, 2022.
  180. ^abFranco, Elise (April 21, 2022)."UPDATE: Texas developer bringing multifamily tower to high-profile site near Bank of America Stadium (RENDERINGS)".Charlotte Business Journal. RetrievedMay 3, 2022.
  181. ^abc"The Ritz Carloton Charlotte". Emporis. Archived from the original on May 14, 2015. RetrievedFebruary 23, 2022.
  182. ^Rothacker, Rick (June 1, 2010). "Reflections of Grandeur".The Charlotte Observer.
  183. ^Rothacker, Rick (June 21, 2007). "Ritz deal leaves hotel bill to BofA".The Charlotte Observer.
  184. ^Rothacker, Rick (June 22, 2007). "BofA to pay hotel bill".The Charlotte Observer.
  185. ^abcd"Midtown Plaza".Council on Tall Buildings and Urban Habitat. RetrievedDecember 1, 2022.
  186. ^Franco, Elise (December 11, 2024)."Redevelopment of historic uptown office building gets go-ahead".Charlotte Business Journal. RetrievedDecember 11, 2024.
  187. ^abc"Uptown 550 on Stonewall". Council on Tall Buildings and Urban Habitat. RetrievedDecember 20, 2023.
  188. ^"Finalist: Apartment or Condominium Development".Charlotte Business Journal. RetrievedOctober 16, 2022.
  189. ^abc"Charlotte-Mecklenburg Government Center". Skyscraper Page. RetrievedDecember 9, 2023.
  190. ^abc"Ally Center Charlotte". Emporis. Archived from the original on July 17, 2018. RetrievedFebruary 23, 2022.
  191. ^Boye, Will (October 14, 2009)."Charlotte office projects land tenants".Charlotte Business Journal. RetrievedJanuary 1, 2024.
  192. ^Hudson, Caroline (April 22, 2021)."ALLY'S BIG MOVE Fast-growing online bank joins major rivals on Tryon Street with opening of new hub".Charlotte Business Journal.
  193. ^abc"Towerview at Ballantyne". Emporis. Archived from the original on November 21, 2021. RetrievedFebruary 23, 2022.
  194. ^Fahey, Ashley (October 1, 2019)."FIRST LOOK: Northwood Ravin's first Ballantyne Corporate Park apartments to include 16-story tower".Charlotte Business Journal. RetrievedOctober 15, 2022.
  195. ^ab"The Line". Emporis. Archived from the original on July 20, 2021. RetrievedMarch 9, 2022.
  196. ^abFranco, Elise (April 22, 2022)."Foundry Commercial relocating its Charlotte office from uptown to new South End tower".Charlotte Business Journal. RetrievedApril 26, 2022.
  197. ^Portillo, Ely (March 6, 2018)."Creative office building near prominent South End brewery goes on sale".Charlotte Observer. RetrievedDecember 8, 2020.
  198. ^abc"Capitol Towers North". Emporis. Archived from the original on December 15, 2021. RetrievedMay 5, 2022.
  199. ^abBoye, Will (December 19, 2014)."Lincoln Harris expects Capitol Towers building to deliver in July".Charlotte Business Journal.
  200. ^ablast=Frazier |first=Eric|title="Construction starts on SouthPark office towers",The Charlotte Observer, May 30, 2014.
  201. ^abc"Capitol Towers South". Emporis. Archived from the original on December 15, 2021. RetrievedMay 5, 2022.
  202. ^Sands, Alexandria (September 7, 2025)."Moore & Van Allen relocating HQ to South End skyscraper".Axios Charlotte. RetrievedSeptember 7, 2025.
  203. ^"1111 South Tryon Street".Council on Tall Buildings and Urban Habitat. RetrievedOctober 28, 2025.
  204. ^abKalinoski, Gail (February 12, 2025)."Charlotte Tower Tops Out".Multi-housing News. RetrievedJune 13, 2025.
  205. ^abHuguley, Colin (March 10, 2022)."RENDERINGS: Developer reveals new details about massive project on edge of uptown and South End".Charlotte Business Journal. RetrievedSeptember 13, 2022.
  206. ^abcWilson, Jen (July 29, 2024)."Local coffee company becomes first retail tenant named for Queensbridge Collective".Charlotte Business Journal. RetrievedJuly 29, 2024.
  207. ^"Queensbridge Collective".Council on Tall Buildings and Urban Habitat. RetrievedJune 14, 2024.
  208. ^Sands, Alexandria (December 8, 2023)."Queensbridge Collective signs EY, adds two floors of office to meet rising demand".Axios Charlotte. RetrievedDecember 9, 2023.
  209. ^abcSoloff, Katie Peralta (December 21, 2022)."The most anticipated Charlotte developments set to break ground in 2023".Axios Charlotte. RetrievedDecember 21, 2022.
  210. ^Franco, Elise (November 17, 2023)."Woodfield Development delivers apartments at Farmington project near Harrisburg".Charlotte Business Journal. RetrievedNovember 17, 2023.
  211. ^Franco, Elise (February 12, 2025)."High-profile project at cusp of South End, uptown hits development milestone".Charlotte Business Journal. RetrievedFebruary 12, 2025.
  212. ^abcSoloff, Katie Peralta (December 10, 2023)."High-end apartment tower breaks ground soon in midtown".Axios Charlotte. RetrievedDecember 10, 2023.
  213. ^Franco, Elise (October 25, 2024)."Vertical construction starting soon on high-rise building in midtown".Charlotte Business Journal. RetrievedFebruary 12, 2025.
  214. ^Franco, Elise (October 5, 2023)."Northwood Ravin filings show work starting on an apartment tower in Charlotte's midtown neighborhood".Charlotte Business Journal. RetrievedOctober 5, 2023.
  215. ^Wilson, Jen (April 19, 2021)."CBJ Morning Buzz: Midtown multifamily tower among projects on city's agenda; Pipeline company again underestimates gas spill in region".Charlotte Business Journal. RetrievedOctober 5, 2023.
  216. ^"GUIDE: The Growing Skyline in Charlotte's South End".Charlotte Magazine. November 26, 2019. RetrievedFebruary 23, 2020.
  217. ^"How Shorenstein is mapping out its $500M real estate pipeline in Charlotte".Charlotte Business Journal. bizjournals. RetrievedFebruary 7, 2020.
  218. ^Soloff, Katie Peralta (December 21, 2022)."The most anticipated Charlotte developments set to break ground in 2023".Axios Charlotte. RetrievedJanuary 3, 2023.
  219. ^abcCrouch, Michelle (December 19, 2025)."A plan for apartments at The Pearl".Charlotte Ledger. RetrievedDecember 19, 2025.
  220. ^Crouch, Michelle (December 23, 2025)."Four years after promises, a plan for apartments at The Pearl".NC Health News. RetrievedDecember 26, 2025.
  221. ^abFranco, Elise (January 26, 2026)."Northwood Ravin to develop midtown tower on $11.25M site near The Pearl".Charlotte Business Journal. RetrievedJanuary 26, 2026.
  222. ^abcdefSealey, Clayton (February 9, 2022)."Special report: South End's booming skyline".Charlotte Ledger. RetrievedJanuary 2, 2023.
  223. ^Thomas, Jennifer (October 18, 2023)."Historic Leeper-Wyatt building set for Dilworth move, eyed as sister restaurant to Leluia Hall".Charlotte Business Journal. RetrievedOctober 18, 2023.
  224. ^Jordan, Chase (October 18, 2023)."Charlotte historic site dodges wrecking ball as city approves rescue plans for landmark".Charlotte Observer. RetrievedOctober 18, 2023.
  225. ^Thomas, Jennifer (January 18, 2024)."What's next as Tyber Creek Pub gears up for final St. Patrick's Day at South End home".Charlotte Business Journal. RetrievedJanuary 18, 2024.
  226. ^"Carson South End". Emporis. Archived from the original on May 14, 2022. RetrievedApril 26, 2022.
  227. ^abcdRago, Gordon."Charlotte skyline to change again with a 31-story, $600 million tower in South End".Charlotte Observer. McClatchy. RetrievedFebruary 23, 2022.
  228. ^abFranco, Elise (November 28, 2022)."Crescent Communities, Nuveen Real Estate release new details on Carson & Tryon project in South End".Charlotte Business Journal. RetrievedNovember 28, 2022.
  229. ^ab"Carson & Tryon".Crescent Communities. RetrievedNovember 4, 2022.
  230. ^abSoloff, Katie Peralta (February 26, 2022)."Enterprise site development aims to connect South End with Uptown".Axios Charlotte. Axios. RetrievedFebruary 28, 2022.
  231. ^abFranco, Elise (June 22, 2022)."The Spectrum Cos. to manage leasing of planned South End development".Charlotte Business Journal. RetrievedNovember 1, 2022.
  232. ^Franco, Elise (October 21, 2024)."Crescent Communities files permits for long-awaited South End office development".Charlotte Business Journal. RetrievedOctober 21, 2024.
  233. ^Franco, Elise (October 21, 2024)."Law firm Moore & Van Allen to leave uptown, anchor major South End development".Charlotte Business Journal. RetrievedOctober 21, 2024.
  234. ^abO'Connell, Liz (February 2, 2022)."Joint venture plans South End office tower to start construction in 2023".Charlotte Business Journal. bizjournals. RetrievedFebruary 3, 2022.
  235. ^abFranco, Elise (October 19, 2022)."VeLa Development Partners lays out plans for $170M apartment tower uptown".Charlotte Business Journal. bizjournals. RetrievedOctober 19, 2022.
  236. ^Sands, Alexandria (December 16, 2024)."8 most anticipated Charlotte developments of 2025".Axios Charlotte. RetrievedDecember 17, 2024.
  237. ^abSoloff, Katie Peralta (December 19, 2023)."Most anticipated developments set to break ground in Charlotte in 2024".Axios Charlotte. RetrievedDecember 19, 2023.
  238. ^abcdeFranco, Elise (January 26, 2023)."Atlanta-based Cousins Properties to develop South End office tower at site of parking lot".Charlotte Business Journal. RetrievedJanuary 26, 2023.
  239. ^abcdeFahey, Ashley (December 2, 2020)."RailYard acquisition shatters office market record in $201M buy".Charlotte Business Journal. RetrievedJanuary 26, 2023.
  240. ^Fahey, Ashley (June 15, 2021)."Stream Realty Partners, The Durban Group plan mixed-use tower adjacent to The Suffolk Punch in South End".Charlotte Business Journal. RetrievedJune 15, 2021.
  241. ^Lu, Yiwen (June 16, 2021)."New mixed-use tower planned next to popular South End brewery. Here's what we know".Charlotte Observer. RetrievedJune 16, 2021.
  242. ^"Development Report Center City Charlotte"(PDF).Center City Partners. August 1, 2022. RetrievedOctober 21, 2022.
  243. ^Huguley, Colin (November 16, 2021)."Catalyst Capital Partners, Stiles to develop mixed-use tower in South End".Charlotte Business Journal. RetrievedNovember 16, 2021.
  244. ^Rago, Gordon."Price's Chicken Coop land sold for close to $4M. Here's what's next for the site".Charlotte Observer. McClatchy. RetrievedSeptember 2, 2022.
  245. ^abcSpanberg, Erik (June 8, 2023)."Australian developer Salter Brothers puts stalled InterContinental Hotel plan back in motion, eyes mid-2026 opening".Charlotte Business Journal. RetrievedJune 8, 2023.
  246. ^Thomas, Jason (December 7, 2017)."2 new luxury hotels set to begin construction".Agenda. Charlotte Agenda. RetrievedDecember 12, 2017.
  247. ^Spanberg, Erik."Construction of InterContinental Hotel atop historic theater in uptown on hold".Charlotte Business Journal. bizjournals. RetrievedApril 25, 2021.
  248. ^Soloff, Katie Peralta (March 13, 2021)."Charlotte hotels could be in trouble".Axios Charlotte. RetrievedJuly 6, 2021.
  249. ^abFranco, Elise (January 30, 2023)."Akridge, Kettler to add 865 apartments in South End".Charlotte Business Journal. RetrievedJanuary 30, 2023.
  250. ^ab"1427 SOUTH BLVD".Akridge. RetrievedOctober 11, 2023.
  251. ^abcdFranco, Elise (October 12, 2022)."Brooklyn Village mixed-use project is on track to break ground in early 2023".Charlotte Business Journal. RetrievedOctober 19, 2022.
  252. ^abFranco, Elise (July 31, 2023)."BK Partners to start construction on Brooklyn Village redevelopment this fall".Charlotte Business Journal. RetrievedAugust 1, 2023.
  253. ^abBergeron, Josh (September 6, 2023)."Brooklyn Village project will demolish first-of-its-kind Black-developed building".Charlotte Observer. RetrievedSeptember 6, 2023.
  254. ^Franco, Elise (February 7, 2025)."Plan unveiled for major uptown redevelopment at former Duke Energy site".Charlotte Business Journal. RetrievedFebruary 7, 2025.
  255. ^Franco, Elise (December 16, 2022)."Duke Energy completes sale of two uptown properties slated for redevelopment".Charlotte Business Journal. RetrievedFebruary 7, 2025.
  256. ^abcdFranco, Elise (June 1, 2023)."Atlanta-based Cousins targets South End site it owns for high-rise office tower, apartment building".Charlotte Business Journal. RetrievedJune 1, 2023.
  257. ^abcdRago, Gordon (May 26, 2023)."First look at latest towers coming to South End, planned for near Common Market".Charlotte Observer. RetrievedMay 26, 2023.
  258. ^abPurtell, David (May 10, 2022)."Highwoods Properties plots $230M expansion in Charlotte with deals for Legacy Union tower, South End site".Charlotte Business Journal. RetrievedAugust 28, 2023.
  259. ^abFranco, Elise (January 30, 2026)."Big projects on pause CBJ review shows how market shifts stalled high-profile developments across the city's core — and what happens next".Charlotte Business Journal. RetrievedJanuary 30, 2026.
  260. ^abFranco, Elise (March 19, 2024)."Charlotte developer Pappas Properties wins nod for final phase of major midtown project".Charlotte Business Journal. RetrievedMarch 19, 2024.

External links

[edit]
Main
Seal of Charlotte, North Carolina
History
Government
Colleges and
universities
Attractions
Sports teams
Media
Economy
Transportation
Healthcare
Lists of tallest buildings in the United States
Northeast
New England
New Jersey
New York
Pennsylvania
Midwest
Indiana
Michigan
Minnesota
Missouri
Ohio
Other
South
Florida
Louisiana
North Carolina
Tennessee
Texas
Virginia
Other
West
California
Mountain
Northwest
Other
Current
See also
Retrieved from "https://en.wikipedia.org/w/index.php?title=List_of_tallest_buildings_in_Charlotte&oldid=1337210981"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp