Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Line 7 (Guangzhou Metro)

From Wikipedia, the free encyclopedia
Line of the Guangzhou Metro
Line 7
Line 7 train
Overview
Other namesM7 (plan name)
Panyu line (番禺线)
StatusOperating
OwnerPhase 1 West Extension: Guangdong Shunguang Rail Transit Co., Ltd.
Others: Guangzhou Metro Group Co., Ltd.
LocaleGuangzhou (Panyu District andHuangpu District),Foshan (Shunde District)
Guangdong
Termini
Stations28 (including 1 complete but unopened)[a]
Service
TypeRapid transit
SystemGuangzhou MetroGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Group
Daily ridership163,200 (2017 daily average)[1]
History
OpenedDecember 28, 2016; 8 years ago (2016-12-28)
Technical
Line length54.24 km (33.70 mi)
Track gauge1,435 mm (56.5 in)
Operating speed90 km/h (56 mph)
Route map

Yanshan
Shuixi Stabling Yard(Line 21)
Shuixi
 21  THP1 
Luogang
 6 
Kefeng Lu
Jiazhuang
Jitang Stabling Yard
Jitang
Line reservation
Dashadong
 5 
Yufengwei
 13 
 13 
Left arrow toYuzhu
toXinshaRight arrow
Hongshengsha
Changzhou
 8 
Connection to Line 8/ 8 
Left arrow toJiangfu
toLianhuaRight arrow
Shenjing
Connection to Line 4/ 4 
Left arrow toHuangcun
toNansha Passenger PortRight arrow
Higher Education
Mega Center South
 4  12 
Higher Education Mega Center South
Stabling Yard(Line 12)
Lijiao Stream
Banqiao
Yuangang
Nancun Wanbo
 18 
Hanxi Changlong
 3 
Zhongcun
Xiecun
Guangfo circular IR
Shibi
 2 
Guangzhou South Railway Station
 2  22 Foshan Metro 2 
Dazhou Stabling Yard (Line 2)
Dazhou Depot (Line 7)
Dazhou
Guangzhou
Foshan
Chengchun Stream
Chencunbei
Foshan Metro 11 
Guangfo circular IRFoguan IRGuangfozhao IR
Chencun
Jinlong
Nanchong
Midea
Beijiao Park
Foshan Metro 3 
Foshan Metro 3 Right arrowtoZhen'an
Meidi Dadao
Yifeng Stabling Yard
This diagram:
Line 7
Simplified Chinese广州地铁7号线
Traditional Chinese廣州地鐵7號線
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Qī Hào Xiàn
Yue: Cantonese
Jyutpinggwong2zau1 dei6tit3 cat1 hou6 sin3
Map of Line 7 drawn to scale

Line 7 of theGuangzhou Metro is arapid transit line inGuangzhou andFoshan,Guangdong Province, China. It is envisioned as a tangential line that runs across southeast Guangzhou and Foshan, allowing for orbital traffic between the suburbs ofShunde,Panyu andHuangpu to avoid the crowded stations in the city center. Line 7's color islight green.

Sections

[edit]

Phase 1

[edit]

The first phase opened on December 28, 2016, and starts atGuangzhou South Railway Station and ends atHigher Education Mega Center South. It has interchanges with Line 2 atGuangzhou South Railway Station andShibi, Line 3 atHanxi Changlong, Line 18 atNancun Wanbo and Line 4 atHigher Education Mega Center South and a total length is 18.6 km (11.56 mi) with 10 stations.

Phase 1 west extension

[edit]
Platform ofChencun

The plan for west extension of the first phase fromGuangzhou South Railway Station to Meidi Dadao inShunde District,Foshan was approved in October 2015.[2] The construction of the west extension to Shunde began in June 2016.[3] The west extension opened on 1 May 2022.[4][5][6] The extension is 13.447 km (8.356 mi) in length with 8 stations.[7] It has an interchange withFoshan Metro Line 3 atBeijiao Park.

Phase 2

[edit]

The Northern extension toYanshan opened on 28 December 2023. It extends the line intoHuangpu District, having a total length of 22.2 km (13.79 mi) with 11 stations, 10 of which are operational[8] (Hongshengsha station is complete, but was not opened pending development in the area). It has interchanges with Line 13 atYufengwei, Line 5 atDashadong, Line 6 atLuogang and Line 21 and Huangpu Tram Line 1 atShuixi.

History

[edit]
SegmentCommencementLengthStation(s)Name
Guangzhou South Railway Station
— Higher Education Mega Center South
28 December 201618.6 km (11.56 mi)9Phase 1
Meidi Dadao
— Guangzhou South Railway Station
1 May 202213.4 km (8.33 mi)[7]8Phase 1 West extension
Higher Education Mega Center South
— Yanshan
28 December 202322.2 km (13.79 mi)[8]10Phase 2

Planning

[edit]

Line 7 started in 2002 as the Fangcun-Panyu-Huangpu Line which started fromXilang station on Line 1 and heads south to Panyu District. The line then roughly follows the existing first phase of Line 7 but runs slightly north, connecting to Line 2 and 3 at what today isNanpu andDashi Stations respectively. The line then heads east to serve and encourage development around the Xinzao and Hualong areas and cross the Pearl River to terminate at theGuangzhou Economic and Technological Development Zone,[9] which today will be served by the under constructionLine 5 Phase II extension.

Subsequently, Line 7's design was greatly revised in 2003, with the alignment east of Dashi was shifted north toHuangpu District via Shaxi,University Town andChangzhou Island. The interchange station with Line 3 was changed from Dashi toHanxi Changlong station as constructed today. Additionally, the western terminus was changed to Guangzhou New Passenger Station, what is nowGuangzhou South railway station. This shifted Line 7's plan to roughly follow what Line 7's Phase 1 and 2 are today.

During initial planning, Line 7 considered the use of 4 car L-typelight metro trains for operation. However, severe congestion issues were created after the opening ofLine 3, which only uses low capacity 3 car Type B trains andLine 6 which uses even lower capacity 4 car L-shaped trains, prompted heavy public criticism. Planners subsequently reevaluated the passenger flow forecasts for the entire line of Line 7, and upgraded the design to use 6 car B-type trains. Therefore, at the time of construction of Line 7, the partly completed station structures of Line 7 platforms at Guangzhou South Railway Station andHigher Education Mega Center South station were expanded to accommodate the longer trains.

Stations

[edit]
Station
No.
Station nameConnectionsFuture ConnectionsDistance
km
Location
EnglishChinese
701-8Meidi Dadao美的大道-0ShundeFoshan
701-7Beijiao Park北滘公园Foshan Metro 3 F3132.32.3
701-6Midea美的2.24.5
701-5Nanchong南涌1.35.8
701-4Jinlong锦龙2.07.8
701-3Chencun陈村PRDIR Guangzhao 1.69.4
701-2Chencunbei陈村北Foshan Metro 11 1.510.9
701-1Dazhou大洲1.512.4PanyuGuangzhou
701Guangzhou South Railway Station广州南站 2 201 22 2203
Foshan Metro 2 F227
Guangzhou South railway stationIZQ Guangzhu  GSH 
PRDIRPYA Guangzhao  GH  ER 
1.413.8
702Shibi石壁 2 2021.114.9
703Xiecun谢村1.916.8
704Zhongcun钟村2.219.0
705Hanxi Changlong汉溪长隆 3 303PRDIR GH 1.620.6
706Nancun Wanbo南村万博 18 18042.122.7
707Yuangang员岗2.425.1
708Banqiao板桥2.427.5
709Higher Education Mega Center South大学城南 4 418 12 12253.831.3
710Shenjing深井PRDIR PL 3.334.6Huangpu
711Changzhou长洲 8 2.336.9
712Hongshengsha[a]洪圣沙1.638.5
713Yufengwei裕丰围 13 13251.940.4
714Dashadong大沙东 5 5231.541.9
715Jitang姬堂2.944.8
716Jiazhuang加庄1.746.5
717Kefeng Lu科丰路1.948.4
718Luogang萝岗 6 631
Trams in China Civic Square: THP1 THP104
2.751.1
719Shuixi水西 21 2110
Trams in China THP1 THP106
1.352.4
720Yanshan燕山1.053.4

Rolling stock

[edit]

Type B9 trains were equipped with 36.6-inch LCD displays at the end of each car and above each door.[10]

  • Interior of a B5 series train.
    Interior of a B5 series train.
  • Interior of a B9 series train.
    Interior of a B9 series train.
  • LCD screens on the ends of each B9 series car.
    LCD screens on the ends of each B9 series car.
  • LCD passenger information display over each door of a B9 series train.
    LCD passenger information display over each door of a B9 series train.
TypeTime of manufacturingSeriesSetsNotes
Type B2015–2016B523Manufactured byCRRC Guangzhou for Phase I.[11][12][13]
Type B2021–2022B912Manufactured byCRRC Qingdao Sifang for the Phase I West Extension.[10][14]
Type B2023B1219Manufactured byCRRC Zhuzhou Locomotive for Phase II.[15]

Notes

[edit]
  1. ^abHongshengsha station is complete, but it is not open pending development in the area.

References

[edit]
  1. ^运营跃变 · 越便民(PDF). RetrievedNovember 23, 2022.
  2. ^国家发展改革委办公厅关于同意调整广州市轨道交通7号线一期工程建设方案的复函.中华人民共和国国家发展和改革委员会 (in Chinese). 2015-10-08.
  3. ^Liu, Yong 刘勇 (2015-10-11).未来7条地铁 无缝连通广佛.广州乐居网 (in Chinese).[dead link]
  4. ^"【官宣来了!#七号线西延段5月1日开门迎客#】".weibo.com. 2022-04-30.
  5. ^顺德落实省委"1+1+9"工作部署部分重点项目.zwgk.shunde.gov.cn (in Chinese). 2019-04-03.
  6. ^广州市軌道交通七號線一期工程西延順德段項目環境影響報告書(PDF).
  7. ^ab"广州地铁七号线西延顺德段工程正式开通初期运营". 2022-05-02. Archived fromthe original on 2022-05-02.全长约13.447千米,总投资约99.01亿元,全线地下,共设8座车站
  8. ^ab广州地铁 (2023-12-27)."【开通官宣:#广州两条地铁新线开通#时间敲定】".weibo.com (in Chinese). Retrieved2023-12-28.
  9. ^"广州地铁规划方案征集市民意见".Archived from the original on 2017-04-11. Retrieved2017-04-11.
  10. ^ab"羊城晚报-广州南站到美的大道 仅22分钟".ep.ycwb.com. Retrieved2022-11-23.
  11. ^"南车株机获广州138辆地铁订单 首列明年11月交付" (in Chinese). 2013-11-18. Archived fromthe original on 2016-12-29. Retrieved2016-12-28.
  12. ^广州地铁 (2016-05-04)."七号线一期首批列车5月4日交付广州地铁调试" (in Chinese).Archived from the original on 2017-01-04. Retrieved2016-12-28.
  13. ^李骏; 李春明 (2015-05-20). "广州轨道交通七号线地铁车辆".电力机车与城轨车辆.38 (3):11–15.doi:10.16212/j.cnki.1672-1187.2015.03.003.
  14. ^徐振天; 梁正杰 (2022-04-26)."广州南站到美的大道 仅22分钟".羊城晚报.
  15. ^广州市轨道交通十一号线及十三五线路车辆监理采购项目招标公告Archived 2021-03-29 at theWayback Machine 廣州公共資源交易中心
Public transport in Guangdong, Hong Kong and Macau
Guangzhou MetroGuangzhou Metro
Lines in operation
Under construction
  •  8  (Far North & East)
  •  10  (Remaining)
  •  12  (Middle)
  •  13  (Phase 2 remaining)
  •  14  (Phase 2 remaining)
  •  18  (North & Southwest)
  •  22  (Remaining & North)
  •  24 
Under planning
Foshan MetroFoshan Metro
Lines in operation
Under construction
  •  3  (unopened section)
  •  4 
Under planning
Line 7
Stations unopened or under construction are shown initalics.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_7_(Guangzhou_Metro)&oldid=1314607561"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp