Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Line 5 (Chengdu Metro)

From Wikipedia, the free encyclopedia
Metro line in Chengdu, China
Line 5
 5 
A Line 5 train entering atBaishuichang station
Overview
StatusIn operation
OwnerCity of Chengdu
LocaleChengdu,Sichuan
Termini
  • Huagui Road
  • Huilong
Stations48
Service
TypeRapid transit
SystemChengdu Metro
Services2
Operator(s)Chengdu Metro Corporation
Depot(s)Huagui Road Depot
Rolling stock8-car Type A
History
Opened27 December 2019; 5 years ago (2019-12-27)
Technical
Line length49.018 km (30.5 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines, 1,500 VDC
Operating speed80 km/h (50 mph)
Route map

Huagui Road
Dafeng depot
Baishuichang
Liaojiawan
Beibu Shopping Mall
Xingfuqiao
Jiudaoyan
Dujianian
Dafeng
Shixi Park
Huanghuayuan
Lujiaqiao 9 
← Outer
Inner →
Quanshui Road
Dongzikou
Funing Road
Wukuaishi
Saiyuntai
2nd Beizhan West Road 7 
← Outer
Inner →
Xibei Bridge 6 
← Wangcongci
Lanjiagou →
Huapaifang
Fuqin 17 
← Wansheng
Xihe →
← Xipu
Longquanyi →
Chengdu University of TCM &
Sichuan Provincial People's Hospital
 2  4 
Qingyang Taoist Temple
Provincial Orthopaedics Hospital
Gaoshengqiao 3 
← Shuangliu West Station
Chengdu Medical College →
Keyuan
Jiuxing Avenue 8 
← Lianhua
Shilidian →
Shenxianshu 7 
← Inner
Outer →
Shiyang Flyover
Chengdu First People's Hospital
Jiaozi Avenue
Jincheng Avenue 9 
← Inner
Outer →
Yuanhua depot
Jincheng Lake
Dayuan
Minle
Qilong
The Police College
Erjiang Temple
Nanhu Flyover
Yixin Lake
Longma Road
Huilong 6 
← Lanjiagou
Wangcongci →
Huilong depot
Maojiawan Forest Park
Wenwuhui
Yong'an North
Yong'an
This diagram:

Line 5 of theChengdu Metro (Chinese:成都地铁5号线;pinyin:Chéngdū Dìtiě Wǔ Hào Xiàn) is arapid transit line inChengdu. It starts at Huagui Road and ends at Huilong. The total length is 49.018 km (30.5 mi).

Line 5's color ispurple. This line began construction on 14 September 2015,[1] was opened on 27 December 2019, from Huagui Road to Huilong.

Originally, the line was planned to use 6-car Type A rolling stock. However, anticipating high demand as the line will provide relief for the older Line 1 and connect several important business and residential areas, the line was redesigned to allow for expansion to use 8-car Type A rolling stock.[2] This will allow for an ultimate configuration of the line to reach capacities of 64,300 people per hour per direction.[3][4]

Progress

[edit]
  • 2015
    • July 6, Phase 1 & 2 are officially approved.[5]
    • In August, all stations started construction.
  • 2016
    • August 18, firsttunnel boring machine started tunneling betweenJiudaoyan andDujianian.[6]
    • November 3, first tunnel section is finished.[7]
    • November 4, to accommodate the projected high demand, Line 5 was redesigned from supporting 6-car A-Type trains to 8-car A-Type trains.[8]
    • November 12,Dujianian topped out, being the first station on the line to do so.[9]
  • 2017
  • 2018
    • April 17, first trainbody was completed byCRRC Chengdu. It is the first A-type train for Chengdu Metro.[12]
    • September 9, tunnel construction is finished.
    • November 10, first train for Dafeng Depot arrived.
    • November 22, elevated sections finished sound barrier work.
    • December 11, Elevated sections finished power-off testing fromHuagui Road toXingfuqiao.
    • December 15, Elevated sections and Dafeng Depot finished testing.
    • December 28, Phase 1 & 2 finished track-laying.
  • 2019
    • October 30, 41 stations are fully functional and finished station testing; all stations are now operating by Chengdu Metro Company.
    • November 22, all escalators passed government assessment.
    • December 9, Phase 1 & 2 passed safety assessment.
    • December 25, Chengdu Metro officially announced Line 5's opening date scheduled for December 27 is the opening time.
    • December 27, Phase 1 & 2 started public operation.
  • 2020
    • August 8, Line 5 trains will have differentair conditioning settings in each car. Riders can choose between the center four cars which are set to 27 degrees or the two cars on each end which are set to 25 degrees.[13]
  • 2022
    • On 16 February 2020, in order to fix the noise issue of Line 5,Xingfuqiao toBeibu Shopping Mall toLiaojiawan sections now limits operational speed of 60 km/h on average, minimizing the noise to environment and neighbourhoods.[14]

Timeline

[edit]
SegmentCommencementLengthStation(s)Name
Huagui Road — Huilong27 December 201949.018 km (30.5 mi)41Phase 1 & 2

Stations

[edit]
Service

routes

Station

No.

Station nameTransferDistance
km
Location
EnglishChinese
0501Huagui Road华桂路-0.000Xindu
0502Baishuichang柏水场1.1391.139
0503Liaojiawan廖家湾0.8561.995
0504Beibu Shopping Mall北部商贸城1.9833.978Jinniu
0505Xingfuqiao幸福桥1.5825.560
0506Jiudaoyan九道堰0.9326.492
0507Dujianian杜家碾 S11 0.7667.258
0508Dafeng大丰0.8488.106Xindu
0509Shixi Park石犀公园1.7119.817
0510Huanghuayuan皇花园0.81610.633
0511Lujiaqiao陆家桥1.12311.756Jinniu
0512Quanshui Road泉水路1.29913.055
0513Dongzikou洞子口 27 1.03814.093
0514Funing Road福宁路0.76914.862
0515Wukuaishi五块石0.92115.783
0516Saiyuntai赛云台0.76516.548
05172nd Beizhan West Road北站西二路 7 Chengdu BRTChengdu BRT0.77517.323
0518Xibei Bridge西北桥 6 1.49918.822
0519Huapaifang花牌坊0.90619.728
0520Fuqin抚琴0.99820.726
0521Chengdu University of TCM &
Sichuan Provincial People's Hospital
中医大·省医院 2  4 1.29322.019Qingyang
0522Qingyang Taoist Temple青羊宫 13 0.67622.695
0523Provincial Orthopaedics Hospital省骨科医院 17 0.91523.610
0524Gaoshengqiao高升桥 3  10 1.35824.968Wuhou
0525Keyuan科园1.40026.368High-Tech Zone
0526Jiuxing Avenue九兴大道 8 0.95927.327
0527Shenxianshu神仙树 7 Chengdu BRTChengdu BRT1.59928.926
0528Shiyang Flyover石羊立交1.81130.737
0529Chengdu First People's Hospital市一医院 30 0.66231.399
0530Jiaozi Avenue交子大道0.85132.250
0531Jincheng Avenue锦城大道 9 0.85833.108
0532Jincheng Lake锦城湖1.33434.442
0533Dayuan大源1.50335.945
0534Minle民乐1.02736.972
0535Qilong骑龙1.72238.694Tianfu New Area
0536The Police College警官学院1.44940.143
0537Erjiang Temple二江寺1.47941.622
0538Nanhu Flyover南湖立交1.29242.914
0539Yixin Lake怡心湖 19 2.03444.948
0540Longma Road龙马路1.64946.597
0541Huilong回龙 6 1.60548.202

See also

[edit]

References

[edit]
  1. ^成都地铁5号线设41个站 2019年开通运营 [Chengdu Metro Line 5 str 41 stations To be opens in 2019] (in Chinese). Sichuan News. 21 May 2015. Retrieved2015-07-04.
  2. ^成都地铁5号线将采用“8A”车辆编组 每列车定员2144人_网易新闻.163.com news. Archived fromthe original on 2016-11-13. Retrieved2018-07-04.
  3. ^成都地铁5号线将进行扩容 运能提高约70% ——凤凰房产成都.cd.house.ifeng.com. Retrieved2016-11-20.
  4. ^"Sina Visitor System"1号线太挤?“大肚子”5号线救急. 2018-04-18.
  5. ^"成都地铁5号线一、二期工程获批 工期四年半" (in Chinese). 四川新闻网. 2015-07-06. Retrieved2015-07-06.
  6. ^"成都最长在建地铁线路5号线 首台盾构下井(图)" (in Chinese). 凤凰网. 2016-08-19. Retrieved2016-08-19.
  7. ^"成都地铁5号线一、二期工程首段盾构区间贯通" (in Chinese). 网易. 2016-11-03. Archived fromthe original on 2018-04-27. Retrieved2016-11-03.
  8. ^"成都地铁5号线将采用"8A"车辆编组 每列车定员2144人" (in Chinese). 网易. 2016-11-04. Archived fromthe original on 2016-11-13. Retrieved2016-11-04.
  9. ^"成都地铁5号线一、二期工程首个车站主体结构顺利封顶" (in Chinese). 四川在线. 2016-11-13. Retrieved2016-11-13.
  10. ^"成都地铁5号线科园站-高升桥站间双线贯通 已17站封顶" (in Chinese). 四川新闻网. 2017-05-26. Retrieved2017-05-26.
  11. ^"成都地铁5号线一二期工程正式开始铺轨(图)" (in Chinese). 凤凰网. 2017-12-05. Retrieved2017-12-05.
  12. ^"首列"成都造"地铁5号线A型铝合金车体下线" (in Chinese). 搜狐. 2018-04-18. Retrieved2018-04-18.
  13. ^"怕冷的中间走,怕热的两头去!成都地铁5号线"分区控温"来了" (in Chinese). 四川在线. 2020-08-08. Retrieved2020-08-08.
  14. ^"关于成都地铁5号线幸福桥至廖家湾地铁噪音问题,已降低列车运行". 2020-08-07.
Public transportation inSichuan Province (SC)
Chengdu MetroChengdu MetroChengdu Metro
Lines in operation
Under construction
Planned
  •  5  (phase III)
  •  9  (phase II)
  •  10  (phase IV)
  •  12 
  •  16 
  •  18  (phase IV)
  •  20 
  •  22 
  •  23 
  •  27  (phase II)
  •  S13 
Guang'an MetroGuang'an Metro
Under construction
Planned
Yibin ART
Lines in operation
  • T1
  • T4
Under construction
  • T2
China Railway C-train
Lines in operation
China Railway Intercity rails
Lines in operation
Chengdu Trams
Lines in operation
Under construction
Under planning
Other rail transits
Under construction
Chengdu BRT
Lines in operation
Transportation hubs
List of airports in China Int'l airports
China Railway Railway stations
Line 5
Note: Stations inItalic are under construction.
※only interchange service available, no entrance/exit
Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_5_(Chengdu_Metro)&oldid=1322263834"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp