| Line 3 | |
|---|---|
| 3 | |
| Overview | |
| Status | Operational |
| Owner | Shijiazhuang |
| Locale | Shijiazhuang,Hebei,China |
| Termini | |
| Stations | 22 |
| Service | |
| Type | Rapid transit |
| System | Shijiazhuang Metro |
| Services | 1 |
| Operator(s) | Shijiazhuang Metro Corporation |
| History | |
| Opened | 26 June 2017; 8 years ago (2017-06-26) |
| Technical | |
| Line length | 26.7 km (16.6 mi) |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 of theShijiazhuang Metro (Chinese:石家庄地铁三号线;pinyin:Shíjiāzhuāng Dìtiě Sān Hào Xiàn) is arapid transit line inShijiazhuang. It was officially open on 26 June 2017. The line is currently 26.7 km long with 22 stations.
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Shierzhong — Shijiazhuangzhan | 26 June 2017 | 6.4 km (4.0 mi)[1] | 6 | Phase 1 (initial section) |
| Xisanzhuang — Shierzhong | 20 January 2020[2] | 5.4 km (3.4 mi)[2] | 4 | Phase 1 (Northern section) |
| Shijiazhuangzhan — Lexiang | 6 April 2021[3] | 14.9 km (9.3 mi)[3] | 12 | Phase 1 (Eastern section) & Phase 2 |
| Station name | Connections | Distance km | Location | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Xisanzhuang | 西三庄 | Xinhua | |||
| Gaozhu | 高柱 | ||||
| Bailinzhuang | 柏林庄 | ||||
| Shizhuang | 市庄 | ||||
| Shierzhong | 市二中 | ||||
| Xinbaiguangchang | 新百广场 | 1 | Qiaoxi | ||
| Dongli | 东里 | ||||
| Huai'anqiao | 槐安桥 | ||||
| Xisanjiao | 西三教 | ||||
| Shijiazhuangzhan | 石家庄站 | Qiaoxi/Yuhua | |||
| Huitonglu | 汇通路 | ||||
| Suncun | 孙村 | Yuhua | |||
| Tazhong | 塔冢 | ||||
| Dongwang | 东王 | ||||
| Nanwang | 南王 | ||||
| Weitong | 位同 | ||||
| Dong'erhuannanlu | 东二环南路 | ||||
| Xiyangling | 西仰陵 | ||||
| Zhongyangling | 中仰陵 | ||||
| Nandou | 南豆 | ||||
| Taihangnandajie | 太行南大街 | ||||
| Lexiang | 乐乡 | Gaocheng | |||