Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Line 1 (Nanjing Metro)

From Wikipedia, the free encyclopedia
Metro line in Nanjing, China
Line 1
A Line 1 train leavingAndemen
Overview
Other nameTianyin Line
StatusIn operation
LocaleJiangning,Yuhuatai,Qinhuai,Gulou,Xuanwu andQixia districts
Nanjing,Jiangsu
Termini
Stations32
Service
TypeRapid transit
Rolling stockAlstom Metropolis
Daily ridership763,000 (2014 Avg.)
1.207 million (2019 Peak)[1]
History
OpenedAugust 12, 2005; 20 years ago (2005-08-12)
Technical
Line length45.4 km (28.2 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed65km/h (Normal), 80km/h (Maximum)
Route map

Erqiaogongyuan Depot
Baguazhoudaqiaonan
Badoushan
Yanziji
Jixiang'an
Xiaozhuang 7 
Maigaoqiao
Hongshan Zoo
Nanjing railway station 3  9 China Railway
Xinmofan­malu
Xuanwumen
Gulou 4 
Zhujianglu
Xinjiekou 2 
Zhangfuyuan
Sanshanjie 5 
Zhonghuamen
Andemen 10 
link line to 10 
Xiaohang Depot
Tianlongsi
Ruanjian­dadao
Huashenmiao
(Left arrow Gaojiachong S3 
Nanjing South Railway Station 3  6  S1  S3 
Shuanglong­dadao
Hedingqiao
Shengtailu
Baijiahu
Xiaolongwan
Zhushanlu 5 [a]
Tianyin­dadao
Longmian­dadao
NMU - JIETT
NJCI
CPU
CPU Depot
  1. ^Interchange outside fare zone
This diagram:

Line 1 of theNanjing Metro (Chinese:南京地铁1号线;pinyin:Nánjīng Dìtiě Yī Hào Xiàn) is a north-south line and the first operating metro line in theNanjing Metro system, inaugurated on September 3, 2005. After the opening of the 25.08 km (15.58 mi)-long south extension line on May 28, 2010,[2] the total length of Line 1 is now 37.9 km (23.5 mi),[3] running fromCPU toBaguazhoudaqiaonan.

A Line 1 train that has just passed underneath Changgan Gate

Opening timeline

[edit]
SegmentCommencementLengthStation(s)NameNote
Maigaoqiao — Andemen27 August 200521.72 km (13.50 mi)12Phase 1 (1st section)
Andemen — Xiaohang27 August 20052.1 km (1.30 mi)1Phase 1 (2nd section)
Xiaohang — Olympic Stadium3 September 20054.6 km (2.86 mi)3Phase 1 (3rd section)
Andemen — CPU28 May 201025.08 km (15.58 mi)14Southern extension
Nanjing South28 June 2011Infill station1
Andemen[a] — Olympic Stadium1 July 2014−6.7 km (−4.16 mi)-4Line 1 & 10 realignment projectLength and station decreases as this part no longer being part of Line 1
Baguazhoudaqiaonan — Maigaoqiao28 December 20226.524 km (4.05 mi)5Northern extension
  1. ^Not including Andemen (elevated) station.

Route

[edit]
This section needs to beupdated. Please help update this article to reflect recent events or newly available information.(July 2014)

This line mainly runs in a north-south direction. It starts atBaguazhoudaqiaonan station in the north, and continues southwards towardsCPU station which is located at the southeastern side of Nanjing.

Of the total 21.72 km (13.50 mi) of the main line track, 14.33 km (8.90 mi) of the Line 1 track runs underground, while 7.39 km (4.59 mi) of the track run on or above the ground. Of the total 16 stations, 11 of them are underground stations while the other 5 are either ground or elevated stations.The southern extension line of Metro Line 1 has a total length of 25.08 km (15.58 mi) with 15 stations (excluding Andemen station). Of the total 15 stations, 8 of them are underground and the other 7 are all elevated stations.[4]

The northern extension covers a length of 7.2 km (4.5 mi) (6.7 km (4.2 mi) underground and 0.5 km (0.31 mi) elevated) with 5 underground stations (excluding Maigaoqiao station).[5] It was completed in 2022.[6]

Stations

[edit]
Service
routes
Station nameConnectionsDistance
km
Location
EnglishChinese
Baguazhoudaqiaonan八卦洲大桥南---0.000Qixia
Badoushan笆斗山1.3701.370
Yanziji燕子矶1.2922.662
Jixiang'an吉祥庵1.1153.777
Xiaozhuang晓庄 7 1.0074.784
Maigaoqiao迈皋桥1.9106.694
Hongshan Zoo红山动物园1.1427.836Xuanwu
Nanjing Railway Station南京站 3  9 
Nanjing railway stationNanjing railway stationNJH
1.1238.959Gulou / Xuanwu
Xinmofan­malu新模范马路1.69110.650
Xuanwumen玄武门1.06111.711
Gulou鼓楼 4 1.25412.965
Zhujianglu珠江路0.86213.827
Xinjiekou新街口 2 1.14714.974Gulou / Xuanwu /Qinhuai
Zhangfuyuan张府园1.12516.099Qinhuai
Sanshanjie三山街 5 0.90917.008
Zhonghuamen中华门1.91418.922Qinhuai /Yuhuatai
Andemen安德门 10 2.09321.015Yuhuatai
Tianlongsi天隆寺1.45522.470
Ruanjian­dadao软件大道1.28323.753
Huashenmiao花神庙1.07624.829
Nanjing South Railway Station南京南站 3  6  S1  S3 Nanjing South railway stationNKH1.85326.682Yuhuatai /Jiangning
Shuanglong­dadao双龙大道2.27628.958Jiangning
Hedingqiao河定桥1.34530.303
Shengtailu胜太路0.90431.207
Baijiahu百家湖1.33232.539
Xiaolongwan小龙湾1.47534.014
Zhushanlu竹山路 5 [i]1.13535.149
Tianyin­dadao天印大道1.91937.068
Longmian­dadao龙眠大道1.31238.380
NMU /JIETT南医大·江苏经贸学院1.55039.930
NJCI南京交院2.72042.650
CPU中国药科大学1.96434.614
  1. ^Virtual transfer withline 5 – For passengers transfer within 30 minutes after exiting with a Passenger Code or a Public Transit Card, continuous billing is adopted; Passengers with token need to transfer just by putting the ticket into recycling port and afterwards repurchase a ticket; Passengers with UnionPay Quick Pass Card headed by 62 or Mobile Pay can transfer just by tapping in again after exiting.

References

[edit]
  1. ^南京地铁 (2019-03-09).【刷新纪录!妇女节南京地铁客流突破408万人次】.新浪微博 (in Chinese). Retrieved2019-03-12.
  2. ^"Nanjing Metro places €85·5m train order".Railway Gazette International. 2008-01-25. Archived fromthe original on 2016-10-22.
  3. ^南京地铁. www.nj-dt.com. Archived fromthe original on 2013-11-06. Retrieved2010-05-27.
  4. ^"南京地铁". www.nj-dt.com. Archived fromthe original on 2013-11-06. Retrieved2010-05-27.
  5. ^"苦等多时,1号线北延迎来重要进展,开通时间……".南京地铁1号线北延线工程南起地铁1号线迈皋桥站,北至二桥公园站,线路全长7.2km,其中高架线0.5km,地下线6.7km,全线设5座地下站
  6. ^"1号线北延线、7号线北段今日12时开通初期运营". 2022-12-28.

External links

[edit]
Public transportation in Jiangsu (JS)
Nanjing MetroNanjing MetroNanjing Metro
Lines in operation
Under construction
  •  4  (Phase 2)
  •  6 
  •  9 
  •  11 
  •  S2 
  •  S4  (Nanjing section)
  •  S5 
Under planning
  •  2  (eastern extension)
  •  3  (Phase 4)
  •  4  (Phase 3)
  •  8 
  •  9  (Phase 2)
  •  10  (Phase 3)
  •  16 
  •  18 
  •  S3  (eastern extension)
  •  S6  (western extension)
Suzhou Rail TransitSuzhou MetroSuzhou Metro
Lines in operation
Under construction
  •  2  (northern extension)
  •  4  (northern extension)
  •  7  (northern extension)
  •  10  (S5)
Under planning
Wuxi MetroWuxi MetroWuxi Metro
Lines in operation
  •  1 
  •  2 
  •  3 
  •  4  (Phase 1)
  •  S1 
Under construction
  •  S2 
  •  4  (Phase 2)
  •  5  (Phase 1)
  •  6  (Phase 1)
Under planning
  •  2  (Anzhen station)
  •  5  (Phase 2)
  •  6  (Phase 2)
  •  3  (North extension)
  •  3  (South extension)
  •  3  Branch line
  •  4  (Phase 3)
  •  7 
  •  8 
Changzhou MetroChangzhou Metro
Lines in operation
  •  1 
  •  2 
Under construction
  •  5 
  •  6 
Xuzhou MetroXuzhou Metro
Lines in operation
  •  1 
  •  2 
  •  3 
  •  6 
Under construction
  •  4 
Under planning
Nantong MetroNantong RT
Lines in operation
  •  1 
  •  2 
Shanghai MetroShanghai MetroShanghai Metro
(Jiangsu Section)
Lines in operation
 11  (Kunshan Section)
Mainline rail interchangeShanghai Suburban Railway
(Jiangsu Section)
Under construction
Trams in China LRT & trams
Lines in operation
Transportation hubs
List of airports in China Int'l airports
China Railway Railway stations
Line 1
Line 2
Line 3
Line 4
Line 5
Line 7
Line 10
Line S1
Line S3
Line S4
Line S6
Line S7
Line S8
Line S9
Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_1_(Nanjing_Metro)&oldid=1334305523"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp