Lake Washington Ship Canal

Coordinates:47°38′35″N122°20′05″W / 47.64319°N 122.33482°W /47.64319; -122.33482
From Wikipedia, the free encyclopedia
Waterway in Seattle, Washington, United States

Lake Washington Ship Canal
TheFremont Cut as seen from theFremont Bridge
The route of the canal
Map
Interactive map of Lake Washington Ship Canal
LocationSeattle, Washington
CountryUnited States
Specifications
Length8 miles (13 km)
Maximumboat draft29 feet (8.8 m)
Totalrise20 feet (6.1 m)
History
Current ownerU.S. Army Corps of Engineers
Construction began1911
Date completed1934
Geography
Start pointShilshole Bay,Puget Sound
End pointUnion Bay,Lake Washington
United States historic place
Chittenden Locks and Lake Washington Ship Canal
Aerial view of theHiram M. Chittenden Locks
LocationSalmon Bay,Seattle
Built1911–1934
ArchitectBebb and Gould
Architectural styleLate 19th And 20th Century Revivals
NRHP reference No.78002751[1]
Added to NRHPDecember 14, 1978

TheLake Washington Ship Canal is acanal that runs through the city ofSeattle and connects the fresh water body ofLake Washington to the salt water inland sea ofPuget Sound. TheHiram M. Chittenden Locks accommodate the approximately 20-foot (6.1 m) difference in water level between Lake Washington and the sound. The canal runs east–west and connectsUnion Bay, theMontlake Cut,Portage Bay,Lake Union, theFremont Cut,Salmon Bay, andShilshole Bay, which is part of the sound.

History

[edit]
Timeline
1854Thomas Mercer proposes connecting lakesUnion andWashington toPuget Sound
1860Landowner Harvey L. Pike tries to dig a ditch by himself, to transport logs betweenPortage Bay andUnion Bay
1871Pike,Thomas Burke andDaniel Gilman incorporate the Lake Washington Canal Company, which builds tramway, not canal
October Army recommends Naval base on Lake Washington with northern canal toElliott Bay
1883David Denny and Burke hire Chinese laborers to dig Portage Canal, a 16-foot (4.9 m) channel with a lock for floating logs
1880sCanal is dug from Lake Union toSalmon Bay, with a wooden lock nearFremont
1893Eugene Semple attempts to build a canal across the southern end ofBeacon Hill and fill the south Elliott Bay tidelands; what isHarbor Island today
1900State Legislature endorses northern route, through Lake Union
1901Due to delays, planned freshwater Navy base on Lake Washington scrapped in favor ofNavy Yard inBremerton
1902Corps of Engineers rejects Semple's Canal route.Rivers and Harbors Act appropriates funds and assigns 3 officers to study possible canal in Seattle
1904After financing dries up and Semple resigns, work on Beacon Hill canal stops, though filled tidelands are useful
1906DeveloperJames A. Moore getsCongressional approval for private canal project fromSalmon Bay toShilshole Bay
AprilHiram M. Chittenden is new Corps of Engineers Seattle District Commander; supports Moore's canal route but criticizes his plans as too modest and underfunded
1908Chittenden retires but continues to lobby Congress for Ballard Locks
1910Congress appropriates $2,275,000 for locks;King County is responsible for rest of canal
1911November 10 construction of Locks begins
1912July Locks close, turningSalmon Bay freshwater
1916Temporary dam atMontlake is breached
1917May 8 Government (or Ballard) Locks officially open for boat traffic
1934Lake Washington Ship Canal complete
1956Government Locks renamed in memory of Chittenden (d. 1917)

The ship canal project began in 1911 and was officially completed in 1934. Prior to construction of the Lake Washington Ship Canal, otherwise known as the Salmon Bay Waterway, water used to exit Lake Washington via theBlack River which flowed from the south end of Lake Washington into the Duwamish River.

As early as 1854, there was discussion of building a navigable connection between Lake Washington and Puget Sound for the purpose of transporting logs, milled lumber, and fishing vessels. Thirteen years later, theUnited States Navy endorsed a canal project, which included a plan for building a naval shipyard on Lake Washington. In 1891 theUS Army Corps of Engineers started planning the project. Some preliminary work was begun in 1906, and work began in earnest five years later. The delays in canal planning and construction resulted in the U.S. Navy building thePuget Sound Naval Shipyard inBremerton, Washington, which is located across the Sound from Seattle.

Early efforts

[edit]

For centuries, people had been dragging boats between the lakes, giving names like "carry a canoe"sxWátSadweehL to the crossing points.[2] In 1854 Seattle pioneerThomas Mercer proposed canals connectingLake Union andLake Washington toPuget Sound in a speech at the firstIndependence Day celebration of the Seattle area's first permanent white settlement, shortly after its founding.[3] Mercer gave the lakes the names they are presently called, over the originalLushootseed names used by theDuwamish,tenas Chuck orXáXu7cHoo ("small great-amount-of-water") for Lake Union andhyas Chuck orXacuabš ("great-amount-of-water") for Lake Washington. Lake Union was chosen to suggest the future canals merging the waters, and Lake Washington forGeorge Washington.[2][4][5]

Montlake Portage Canal in 1908

In 1860 local landowner Harvey L. Pike tried to dig a ditch by himself with pick and shovel atMontlake to transport logs betweenPortage Bay andUnion Bay, in the hopes of increasing the value of his property along the route.[6] Giving up on digging the first Portage Canal himself, in 1871 he joinedThomas Burke andDaniel Gilman in incorporating the Lake Washington Canal Company, deeding his land to the company. Instead of finishing the canal, the company instead built a tramway to carry coal brought by barge across Lake Washington.[6] In 1883,David Denny and Burke hired a crew of Chinese laborers to complete the canal at Montlake, creating a 16-foot (4.9 m) channel that included a lock, capable of floating logs down from Lake Washington to Lake Union.[6]

TheArmy Corps of Engineers investigated Puget Sound for military defense purposes and chose Lake Washington as the best location for a Naval base, due to the security of the waters, proximity to supplies of fresh water, coal and timber, and the less corrosive effect on wooden ship hulls of afresh water port.[3][7] A report by Lieutenant Thomas H. Hardy of October 13, 1871, forwarded to Congress by Army GeneralBarton S. Alexander of the Board of Engineers of the Pacific Coast said the coal fields ofSeattle Coal and Transportation Company, two miles east ofLake Sammamish, supplied 1,500 tons per month ofsteam ship grade coal, and potentially twice this amount.[7] The route directly across the narrowest part of Seattle, that is,Semple's Canal fromLeschi straight across to present-dayHarbor Island, was rejected in this report because of the 200 to 300 foot height of the hills that would have to be cut through.[7] The route via the Black andDuwamish Rivers would be crooked and several miles in length, would let out intoshoals rather than deep water, and would have to be frequently dredged to remove sand brought by river flooding.[7] As to connecting Lake Union toShilshole Bay—the route ultimately chosen—Gen. Alexander had "serious objections", including the expense and the need for dredging a channel, and that the canal line let out in shoal water that was exposed to heavy seas, and would be less defensible in wartime, being "exposed to the cannonade of an enemy".[7] Alexander was less opposed to digging straight south fromSalmon Bay throughInterbay toSmith Cove, but would still terminate in shoals and be just as costly as his preferred route from Lake Union through Mercer's Farm into Elliott Bay, while being less defensible.[3][7] The estimated cost for the project was $4.7 million.[3]

In theRivers and Harbors Act of 1902,Congress directed the Secretary of War to appoint a committee of three officers to study the feasibility of a canal and lock system to connect Puget Sound to Lake Washington. Lieutenant Colonel William H. Heuer, CaptainWilliam C. Langfitt and Lieutenant Robert P. Johnson met August, 1902 in Seattle and conducted a survey of possible routes.[8] They examined the route of the Lake Washington Waterway Company, via Shilshole Bay, as well as a route from Lake Union toSmith Cove, the Montlake coal tramway, and Thomas Mercer's farm. In November 1902, a public meeting was called in the Chamber of Commerce hall, but was quickly adjourned because no one came to speak.[8]

Proposed canal routes included theBlack River,Semple's Canal acrossBeacon Hill, two possible routes fromLake Union toElliott Bay viaLower Queen Anne andBelltown, theMontlake Cut, andSalmon Bay toSmith Cove viaInterbay.

In 1906, as local debate over the location of the canals continued, and funding from Washington, D.C. was delayed, Seattle developerJames A. Moore, known today for theMoore Theatre andMoore Haven, Florida, proposed a canal that could accommodate small ships, with two wooden locks connectingSalmon Bay toShilshole Bay.[9]: 23–25  Moore secured Congressional approval for his project, granting him rights to build.[3] In April of the same year,Hiram M. Chittenden came to Seattle as the new Army District Engineer.[9]: 23–25  Chittenden favored the same route to Shilshole Bay as Moore, but found the plan too modest, and potentially unsafe.[3][9]: 26  Chittenden said Moore's hope-for budget of $500,000 was insufficient, and the locks should be built to accommodate larger vessels, and that the wooden locks would eventually deteriorate and collapse, draining Lake Washington into Puget Sound.[9]: 26 

Instead, Chittenden proposed a double concrete lock with steel gates, allowing small craft to pass with less waste.[9]: 27  A single set of locks on the western end of Salmon Bay would be used in place of the small wooden lock near Fremont Avenue, which would lower Lake Washington to the same level as Lake Union.[9]: 27  Having a single lock between Puget Sound and the freshwater lakes would reduce the risk of flooding and reduce overall cost of the project.[9]: 27  Before he could move forward, Chittenden had to sway local leaders away from supporting Moore's project.[3] After enthusiasm for his canal eroded and funding dried up, Moore transferred his rights to a public-private entity, the Lake Washington Canal Association, in 1907.[3][9]: 29  Though Chittenden hoped to cap his career with the construction of the Locks, ill health forced him to retire in 1909, though he continued lobbying Congress for the project, and served as a consulting engineer and as a Seattle port commissioner until his death in October 1917.[9]: 31 

Lake Washington Ship Canal and theBlack River, showing course of river in 2013 and before 1916

Ballard Locks construction

[edit]
Main article:Hiram M. Chittenden Locks § Construction

Navigation

[edit]

Traffic

[edit]

Navigation starts at Webster Point in Lake Washington and continues to Shilshole Bay. Speed limit is 7 knots with more restrictions including 2.5 knots for entering and exiting the locks. Canal traffic signals present 1,000 feet (304.8 m) each side of the Montlake Bridge and east of theFremont bridge and west of theBallard Bridge. Vessels 300 tons (272.15 metric tons) and vessels with a tow may not pass a red signal. Other Vessels should use caution for on coming large commercial traffic.[10]

Drawbridges

[edit]

All bridges can be contacted on channel 13 for an opening or use horn. Horn blasts of one long, at least four seconds, and one short, of about a second, can be used to request an opening. A reciprocal response from a bridge is acknowledgement that the information has been received and the bridge will open in time. Bridges may hold for up to ten minutes before opening, and longer at certain times of the day[11] five short blast from a bridge means that the bridge will not be opening.[12]

Non-self-propelled vessels must be towed by a suitable self-propelled vessel past the bridge.

Sewage and stormwater mitigation

[edit]

During heavy or prolonged rain,stormwater runoff and overflowing wastewater from neighborhoods along the Ship Canal is dumped into the waterway. The practice was found to be polluting Salmon Bay and Puget Sound with an average of 130 spills per year dumping 90 million US gallons (340 Ml) of untreated wastewater. The U.S.Environmental Protection Agency andWashington State Department of Ecology ordered the Seattle city government to address the issue, signing aconsent decree in 2016 to plan a diversion system.[13][14] The system will use a 2.7-mile (4.3 km) tunnel running along the north side of the canal with access stations at five sites in Fremont, northern Queen Anne, and Ballard before reaching a pump station, where wastewater can continue to theWest Point sewage treatment plant.[14] The pump station in Ballard is planned to be a 65-foot-tall (20 m) cylinder covered in a steel lattice structure that reaches 80 feet (24 m) in height; it is expected to cost $100 million. The tower's design evokes the local maritime industry and is inspired bycrab pots; the lattice will includelight-emitting diodes that are programmed to display colors that represent local weather or the pumping station's status.[15]

The project is expected to cost $570 million to construct, with 65 percent of funding sourced fromSeattle Public Utilities and the remaining 35 percent from the King County government.[14] The project had originally been estimated to cost $423 million, but limited supply in the area's busy construction market caused cost overruns.[13] Construction on the 19-foot-wide (5.8 m) tunnel began in June 2021 with the launch of atunnel boring machine,[14] named "Mudhoney" in honor of the localgrunge band following a public contest.[16][17] Tunnel boring from Ballard to Wallingford was completed in June 2023 and construction is scheduled to be completed in 2026.[18]

Canal crossings

[edit]
Looking the opposite direction, theBallard Bridge and, at top of frame,Northern Pacific Railroad Ship Canal Bridge (bascule bridge, open here), 1950.

The Canal's crossings, from east to west, are:

An additional crossing for transit, bicycles, and pedestrians between the Ballard and Fremont bridges was proposed by MayorMike McGinn in 2012, but funding to study its feasibility were rejected by theSeattle City Council.[19] A newLink light rail crossing, carrying theBallard Link Extension near the existing Ballard Bridge, is planned to be constructed in the 2030s.[20]

Seattle's waterways before the canal was built. (Note: It is likely that this map is incorrectly labeled as "1902".)[21]
Seattle's waterways in the 1990s, showing the effect of the canal (and of other projects, such as the undergrounding of many streams and the re-routing, dredging, and industrialization of theDuwamish River). (The map remains essentially accurate as of 2009.)

Seattle landmarks

[edit]

The Lake Washington Ship Canal and the Hiram M. Chittenden Locks are listed on theNational Register of Historic Places. TheMontlake Cut, along with theMontlake Bridge areCity of Seattle Designated Landmarks (ID #107995).[22]

Notes

[edit]
  1. ^"National Register Information System – (#78002751)".National Register of Historic Places.National Park Service. January 23, 2007.
  2. ^abThrush, Coll-Peter (2009),Native Seattle: Histories from the Crossing-Over Place, University of Washington Press,ISBN 978-0-295-98812-2
  3. ^abcdefghFicken, Robert E. (January 1986), "Seattle's "Ditch": The Corps of Engineers and the Lake Washington Ship Canal",Pacific Northwest Quarterly,77 (1):11–20
  4. ^Crowley, Walt (July 1, 1999),"Seattle residents celebrate July 4, 1854, and adopt names for Lake Union and Lake Washington",HistoryLink, retrievedJuly 27, 2015
  5. ^Crowley, Walt (July 1, 1999),"Lake Washington Ship Canal",HistoryLink
  6. ^abcLong, Priscilla (June 24, 2001),"Harvey Pike starts to dig a canal connecting Seattle's Union and Portage bays in 1860",HistoryLink, archived fromthe original on November 10, 2013, retrievedJuly 27, 2015
  7. ^abcdefAlexander, B.S; Handbury, Thomas H., Lt. (May 1, 1884),"Report to accompany bills S. 1202, 2135",Congressional Edition, vol. 2176{{citation}}: CS1 maint: multiple names: authors list (link)
  8. ^abOffice of Chief Engineers (January 27, 1903),Report of a Board of Engineers upon the feasibility and advisability of constructing a canal with necessary locks and dams, connecting Puget Sound with Lakes Union and Washington, of sufficient width and depth to accommodate the largest commercial and Naval vessels, with plans and estimates of cost thereof, United States Army, pp. 2340–, retrievedAugust 23, 2015
  9. ^abcdefghiWoog, Adam (2008),Images of America; The Ballard Locks, Arcadia Publishing,ISBN 978-0738559179
  10. ^"Boater Information".US Army Corps of Engineers Seattle District Website. US Army Corps of Engineers. 2014. RetrievedAugust 13, 2022.
  11. ^"Title 33 / Chapter I / Subchapter J / Part 117 / Suboart B / Washington 117.1051".Code of Federal Regulations. National Archives. June 30, 1998. RetrievedAugust 13, 2022.
  12. ^"Part 117 - Drawbridge Operation Rgulations".Code of Federal Regulations. National Archives. June 30, 1998. RetrievedAugust 13, 2022.
  13. ^abBeekman, Daniel (May 23, 2018)."Cost estimate hits $570 million for Seattle sewage tunnel".The Seattle Times. RetrievedMay 4, 2021.
  14. ^abcdGutman, David (March 27, 2021)."MudHoney? Sir Digs-A-Lot? Seattle wants your help in naming its next massive tunnel machine".The Seattle Times. RetrievedMay 4, 2021.
  15. ^Beekman, Daniel (March 25, 2022)."New sewage pump station in Ballard will feature 80-foot-tall steel lattice with shimmering lights".The Seattle Times. RetrievedNovember 8, 2022.
  16. ^Chan, Anna (April 12, 2021)."Mudhoney Is No Longer Just the Name of a Band in Seattle: 'This Is Anything But Boring'".Billboard. RetrievedMay 4, 2021.
  17. ^Gutman, David (April 12, 2021)."'MudHoney' is the winning name for Seattle Public Utilities' newest tunnel-boring machine".The Seattle Times. RetrievedMay 4, 2021.
  18. ^Beekman, Daniel (June 27, 2023)."Machine is done digging Seattle's huge sewage and stormwater tunnel".The Seattle Times. RetrievedJune 27, 2023.
  19. ^Lindblom, Mike (February 14, 2013)."Ship Canal transit bridge back on McGinn's agenda".The Seattle Times. RetrievedSeptember 3, 2021.
  20. ^"West Seattle and Ballard Link Extensions".Sound Transit. RetrievedSeptember 3, 2021.
  21. ^Salmon Bay Harbor Map, Seattle Public Library, SEAMAP G4284.S4 P53 1892.S6
  22. ^Landmarks Alphabetical Listing for MArchived 2011-07-21 at theWayback Machine, Individual Landmarks, Department of Neighborhoods, City of Seattle. Accessed December 28, 2007.

External links

[edit]
Wikimedia Commons has media related toLake Washington Ship Canal.
Works
Landforms
Crossings
People
Lists
by county


map
Other lists
International
National
Other

47°38′35″N122°20′05″W / 47.64319°N 122.33482°W /47.64319; -122.33482

Retrieved from "https://en.wikipedia.org/w/index.php?title=Lake_Washington_Ship_Canal&oldid=1308531335"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp