Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Kodibeesanahalli metro station

Coordinates:12°56′42″N77°41′53″E / 12.94504°N 77.69810°E /12.94504; 77.69810
From Wikipedia, the free encyclopedia
Upcoming Namma Metro station under Blue Line

‹ ThetemplateInfobox station is beingconsidered for merging. ›
Kodibeesanahalli
Under Construction of this metro station as of March 2025 under Phase 2A ofBlue Line ofNamma Metro
General information
LocationKodibeesanahalli, Bengaluru, Karnataka 560103
Coordinates12°56′42″N77°41′53″E / 12.94504°N 77.69810°E /12.94504; 77.69810
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineBlue Line
PlatformsSide platform(TBC)
Platform-1 →Central Silk Board
Platform-2 →Krishnarajapura /KIAL Terminals
Platform Numbers (TBC)
Tracks2(TBC)
ConnectionsMainline rail interchange Belandur Road Railway station
Construction
Structure typeElevated,Double track
Platform levels2(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeKODI(TBC)
History
OpeningJune 2026; 6 months' time (June 2026)(TBC)
Electrified(TBC)
Services
Preceding stationNamma MetroFollowing station
KadubeesanahalliBlue Line
(Future Service)
Marathahalli
Route map
Central Silk Board
HSR Layout
Agara
Ibbaluru
Bellandur
Embassy TechVillage Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways TowardsUpperLeft arrowHosur and
LowerRight arrowBanaswadi orBaiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
KrishnarajapuraKrishnarajapuram railway station
Indian Railways TowardsLeft arrowKrishnarajapuram and
Down arrowYelahanka Jn orBengaluru Cantt.Right arrow
Mainline rail interchangeBaiyappanahalli Depot(U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura
HebbalaHebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation(no scope)
Indian Railways Towards
Left arrowKSR Bengaluru andYelahanka JnRight arrow
Yelahanka
Bagalur Cross
Bettahalasuru(no scope)
Chikkajala(future)
Doddajala
Indian Railways Towards
Left arrowKolar andYelahanka JnRight arrow
Mainline rail interchangeDoddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals
Location
Map

Kodibeesanahalli is an upcoming elevated metro station on the North-South corridor of theBlue Line[1] ofNamma Metro inBangalore, India. Around this metro station holds the IT Companies like JP Morgan Chase,Adobe,Nutanix Technologies Pvt. Ltd followed by Prestige Tech Park containing corporate and IT companies such as CoinSwitch, Amadeus Software Labs, Juniper Networks,Oracle Tech Hub andByju's - The Learning App. This metro station is slated to become operational around June 2026.[2][3][4][5]

History

[edit]

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Kodibeesanahalli metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 kmBlue Line of Namma Metro. On 13 October 2020,Shankaranarayana Constructions (SNC) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates.[6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

[edit]

Station Layout - To Be Confirmed

Kodibeesanahalli track layout(TBC)
P#
P#
Station with two tracks and two side platforms
** Under Construction
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2Side platform | Doors will open on the leftDisabled access
Platform #
Northbound
Towards →Krishnarajapura**
Next Station:Marathahalli
Platform #
Southbound
Towards ←Central Silk Board
Next Station:Embassy TechVillage Kadubeesanahalli
Side platform | Doors will open on the leftDisabled access
L2Note:** To be further extended toKIAL Terminals in future

Connections

[edit]
[icon]
This section is empty. You can help byadding to it.(December 2023)

Entry/Exit

[edit]
[icon]
This section is empty. You can help byadding to it.(December 2023)

See also

[edit]
Portals:

References

[edit]
  1. ^"Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty".timesproperty.com.Archived from the original on 12 January 2024. Retrieved14 December 2023.
  2. ^"L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today".Metro Rail Today: Gateway to Rail & Metro Industry.Archived from the original on 7 June 2023. Retrieved14 December 2023.
  3. ^"Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar".The Indian Express. 6 June 2023.Archived from the original on 8 September 2023. Retrieved14 December 2023.
  4. ^"Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026".TimesNow. 7 June 2023. Retrieved14 December 2023.
  5. ^"Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL".The New Indian Express.Archived from the original on 14 December 2023. Retrieved14 December 2023.
  6. ^"Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work".The Metro Rail Guy. 13 October 2020.Archived from the original on 16 April 2024. Retrieved24 October 2024.

External links

[edit]
Phase-2A
Phase-2B
Not in Scope
Depot(s)
  • Baiyappanahalli & Doddajala
See also
*Stations initalics are Under Construction
Retrieved from "https://en.wikipedia.org/w/index.php?title=Kodibeesanahalli_metro_station&oldid=1321932981"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp