Kennedy Space Center Launch Complex 39

Coordinates:28°36′30.2″N80°36′15.6″W / 28.608389°N 80.604333°W /28.608389; -80.604333
From Wikipedia, the free encyclopedia
Historic Apollo Moonport
"Launch Complex 39" redirects here. For the Proton launch complex at Baikonur, seeBaikonur Cosmodrome Site 200.

Launch Complex 39
LC-39A (foreground) and LC-39B (background) on April 6, 2022
Map
Interactive map of Launch Complex 39
LocationKennedy Space Center
Coordinates28°36′30.2″N80°36′15.6″W / 28.608389°N 80.604333°W /28.608389; -80.604333
Time zoneUTC−05:00 (EST)
• Summer (DST)
UTC−04:00 (EDT)
Short nameLC-39
Established1962; 63 years ago (1962)
Operator
  • LC-39A:
  • LC-39B:
    • NASA (1969–present)
Total launches276 (13 Saturn V, 4 Saturn IB, 135 Shuttle, 1 Ares I, 111 Falcon 9, 11 Falcon Heavy, 1 Space Launch System)
Launch pad6 (2 are Falcon landing zones)
Orbital inclination
range
28°–62°
Pad 39A (main) launch history
StatusActive
Launches216 (12 Saturn V, 82 Shuttle, 111 Falcon 9, 11 Falcon Heavy)
First launchNovember 9, 1967
Saturn VSA-501
Last launchNovember 21, 2025
Falcon 9 Block 5 /Starlink G6-78
Associated
rockets
Current:Falcon 9,Falcon Heavy
Retired:Saturn V,Space Shuttle
Plans cancelled:Ares V
Pad 39B launch history
StatusActive
Launches60 (1 Saturn V, 4 Saturn IB, 53 Shuttle, 1 Ares I-X, 1 SLS)
First launchMay 18, 1969
Saturn VSA-505
Last launchNovember 16, 2022
Space Launch System /Artemis I
Associated
rockets
Current:SLS
Retired:Saturn V,Saturn IB,Space Shuttle,Ares I-X
Plans cancelled:Ares I,OmegA
Pad 39C launch history
StatusUnused, functions transferred toLC-48
Launches0
Pad 39A OLP-x launch history
StatusUnder Construction
Associated
rockets
Pad 39A LZ-x landing history
StatusPlanned
Associated
rockets
Pad 39A LZ-x landing history
StatusPlanned
Associated
rockets
Launch Complex 39
Kennedy Space Center Launch Complex 39 is located in Florida
Kennedy Space Center Launch Complex 39
Show map of Florida
Kennedy Space Center Launch Complex 39 is located in the United States
Kennedy Space Center Launch Complex 39
Show map of the United States
LocationJohn F. Kennedy Space Center,Titusville, Florida
Area7,000 acres (2,800 ha)
Built1967
MPSJohn F. Kennedy Space Center MPS
NRHP reference No.73000568[1]
Added to NRHPMay 24, 1973

Launch Complex 39 (LC-39) is arocket launch site at theJohn F. Kennedy Space Center onMerritt Island inFlorida, United States. The site and its collection of facilities were originally built as theApollo program's "Moonport"[2] and later modified for theSpace Shuttle program.Launch Complex 39 consists of three launch sub-complexes or "pads"—39A,39B, and 39C—aVehicle Assembly Building (VAB), aCrawlerway used bycrawler-transporters to carrymobile launcher platforms between the VAB and the pads,Orbiter Processing Facility buildings, aLaunch Control Center which contains the firing rooms, anews facility famous for the iconic countdown clock seen in television coverage and photos, and various logistical and operational support buildings.[3]

SpaceX leases Launch Complex 39A from NASA and has modified the pad to supportFalcon 9 andFalcon Heavy launches.[4][5]NASA began modifying Launch Complex 39B in 2007 to accommodate the now defunctConstellation program, and is currently prepared for theArtemis program,[6][7] which was first launched in November 2022.[8] A pad to be designated 39C, which would have been a copy of pads 39A and 39B, was originally planned for Apollo but never built. A smaller pad, also designated 39C, was constructed from January to June 2015, to accommodatesmall-lift launch vehicles.[9]

NASA launches from pads 39A and 39B have been supervised from the NASALaunch Control Center (LCC), located 3 miles (4.8 km) from the launch pads. LC-39 is one of several launch sites that share the radar and tracking services of theEastern Test Range.

History

[edit]

Early history

[edit]

Northern Merritt Island was first developed around 1890 when a few wealthy Harvard University graduates purchased 18,000 acres (73 km2) and constructed a three-story mahogany clubhouse, very nearly on the site of Pad 39A.[10] During the 1920s, Peter E. Studebaker Jr., son ofthe automobile magnate, built a small casino at De Soto Beach eight miles (13 km) north of the Canaveral lighthouse.[11]

In 1948, the Navy transferred the former Banana River Naval Air Station, located south ofCape Canaveral, to the Air Force for use in testing captured German V-2 rockets.[12] The site's location on the East Florida coast was ideal for this purpose, in that launches would be over the ocean, away from populated areas. This site became the Joint Long Range Proving Ground in 1949 and was renamed Patrick Air Force Base in 1950 and Patrick Space Force Base in 2020. The Air Force annexed part of Cape Canaveral, to the north, in 1951, forming the Air Force Missile Test Center, the futureCape Canaveral Space Force Station (CCSFS). Missile and rocketry testing and development would take place here through the 1950s.[13] Later on, an "Orbital Launch Platform" for Starship with plans to accommodate twolanding zones forFalcon 9 andFalcon Heavy rockets to conduct to "Return-to-launch-site" landings.[14][15][16]

After thecreation of NASA in 1958, the CCAFS launch pads were used for NASA's civilian uncrewed and crewed launches, including those ofProject Mercury andProject Gemini.[17]

Apollo and Skylab

[edit]
Main article:Apollo program

In 1961, President Kennedy proposed to Congress the goal of landing a man on the Moon by the end of the decade. Congressional approval led to the launch of theApollo program, which required a massive expansion of NASA operations, including an expansion of launch operations from the Cape to adjacent Merritt Island to the north and west.[18] NASA began acquisition of land in 1962, taking title to 131 square miles (340 km2) by outright purchase and negotiating with the state of Florida for an additional 87 square miles (230 km2). On July 1, 1962, the site was named theLaunch Operations Center.[19]

Initial design

[edit]
Launch Complex Plan – 1963
Apollo-Saturn 506 withApollo 11 spacecraft being moved from the VAB to LC-39A (1969)
A restored crawler-transporter (2004)

The need for a new launch complex was first considered in 1961. At the time, the highest-numbered launch pad at CCAFS was Launch Complex 37. A proposed Launch Complex 38 had been set aside for the future expansion of theAtlas-Centaur program, but ultimately never built.[20] The new complex was thus designated Launch Complex 39.

The method of reaching the Moon had not yet been decided. The two leading alternatives weredirect ascent, which launched a single huge rocket; andEarth orbit rendezvous, where two or more launches of smaller rockets would place several parts of the lunar departure spacecraft which would be assembled in orbit. The former would require a hugeNova-class launcher and pads, while the latter would require several rockets to be launched in quick succession. Furthermore, the selection of the actual rockets was still ongoing; NASA was proposing the Nova design while their newly-acquired former Army group in Huntsville Alabama had proposed a series of slightly smaller designs known as Saturn.[21]

This complicated the design of the launch complex, as it had to encompass two very different possibilities and rockets. Accordingly, early designs from 1961 show two sets of launch pads. The first was a series of three pads for Saturn alongPlayalinda Beach, with the southernmost near the current Eddy Creek Boat Launch, and the northernmost around Klondike Beach. Far to the south was a similar set of three pads for Nova, the southernmost just south of theAstronaut Beach House and the northern roughly at the location of the current Pad A.[21]

The final selection oflunar orbit rendezvous and theSaturn V led to numerous changes. The Nova pads disappeared, and the three Saturn pads were moved southward. The southernmost was now at the current location of Pad A, while the northernmost was located between Patrol Road, the current boundary road for the LC39 site, and Playlandia Beach Road on the north. At the time, the original three were named from north to south: Pad A through Pad C.[22] The pads were evenly spaced 8,700 feet (2,700 m) apart to avoid damage in the event of an explosion on a pad.

In March 1963, plans were formalized to build only two of the three pads; the northernmost, furthest from the VAB, would not be built but reserved for future expansion. As the original Pad A would no longer be built, the naming was changed to run south-to-north, so that the two pads that would be built would be A and B. If the original 39A at the north end were ever built, it would now be known as 39C.

Some consideration for C's construction was made: theCrawlerway initially splits off from A toward B running north-northwest, and then bends north toward B a short distance north at Cochran Cove. Continuing straight north-northeast would have led to C after a similar northward bend. The original construction of the Crawlerway included an interchange between B and a short part of the extension northward for C, which remains intact as of 2022[update], and the traffic-light warning system for the Crawlerway has lights for Pad C.

The plans still set aside room for the remaining two pads, now known as D and E. Pad D would have been built due west of Pad C, some distance inland along Patrol Road. Access to D would have branched off westward from the crawlerway at the point where C's crawlerway turned north. Pad E would have continued the line of pads along the coast, north of C nearPlayalinda Beach, close to the original location of the southernmost pad in the original layout. No diagram of the access to E can be found. Had all of them been built, C, D and E would have formed a triangle.[23]

Integration of space vehicle stack

[edit]
Main article:Vehicle Assembly Building

Months before a launch, the three stages of theSaturn V launch vehicle and the components of theApollo spacecraft were brought inside the Vehicle Assembly Building (VAB) and assembled, in one of four bays, into a 363-foot (111 m)-tall space vehicle on one of threeMobile Launchers (ML). Each Mobile Launcher consisted of a two-story, 161-by-135-foot (49 by 41 m) launcher platform with four hold-down arms and a 446-foot (136 m)Launch Umbilical Tower (LUT) topped by a crane used to lift the spacecraft elements into position for assembly. The ML and unfueled vehicle together weighed 12,600,000 pounds (5,715 t).[24]

The umbilical tower contained two elevators and nine retractable swing arms that were extended to the space vehicle—to provide access to each of the three rocket stages and the spacecraft for people, wiring, and plumbing—while the vehicle was on the launch pad and were swung away from the vehicle at launch.[24][25] Technicians, engineers, and astronauts used the uppermost Spacecraft Access Arm to access the crew cabin. At the end of the arm, thewhite room provided an environmentally controlled and protected area for astronauts and their equipment before entering the spacecraft.[26]

Early diagrams of the proposed layout also included the Nuclear Assembly Building, NAB, northeast of the VAB. These would be used to prepare thenuclear rocket engines being developed under theNERVA program, before moving them to the VAB for assembly into a rocket stack. This program was cancelled and the NAB was not built.[27]

Transportation to the pad

[edit]

When the stack integration was completed, the Mobile Launcher was moved atop one of twocrawler-transporters, or Missile Crawler Transporter Facilities, 3–4 miles (4.8–6.4 km) to its pad at a speed of 1 mile per hour (1.6 km/h). Each crawler weighed 6,000,000 pounds (2,720 t) and was capable of keeping the space vehicle and its launcher platform level while negotiating the 5 percent grade to the pad. At the pad, the ML was placed on six steel pedestals, plus four additional extensible columns.[24]

Mobile Service Structure

[edit]
Saturn V with fixed (left) and mobile (right) service structures
Apollo-era walkway andwhite room, on display atKennedy Space Center Visitor Complex

After the ML was set in place, the crawler-transporter rolled a 410-foot (125 m), 10,490,000-pound (4,760 t) Mobile Service Structure (MSS) into place to provide further access for technicians to perform a detailed checkout of the vehicle, and to provide necessary umbilical connections to the pad. The MSS contained three elevators, two self-propelled platforms, and three fixed platforms. It was rolled back 6,900 feet (2,100 m) to a parking position shortly before launch.[24]

Flame deflector

[edit]

While the ML was sat on its launch pedestals, one of twoflame deflectors was slid on rails into place under it. Having two deflectors allowed for one to be used while the other was being refurbished after a previous launch. Each deflector measured 39 feet (12 m) high by 49 feet (15 m) wide by 75 feet (23 m) long, and weighed 1,400,000 pounds (635 t). During a launch, it deflected the launch vehicle's rocket exhaust flame into a trench measuring 43 feet (13 m) deep by 59 feet (18 m) wide by 449 feet (137 m) long.[24]

Launch control and fueling

[edit]

The four-storyLaunch Control Center (LCC) was located 3.5 miles (5.6 km) away from Pad A, adjacent to the Vehicle Assembly Building, for safety. The third floor had four firing rooms (corresponding to the four bays in the VAB), each with 470 sets of control and monitoring equipment.[clarification needed] The second floor contained telemetry, tracking, instrumentation, and data reduction computing equipment. The LCC was connected to the Mobile Launcher Platforms by a high-speed data link; and during launch a system of 62 closed-circuit television cameras transmitted to 100 monitor screens in the LCC.[24]

Large cryogenic tanks located near the pads stored the liquid hydrogen and liquid oxygen (LOX) for the second and third stages of the Saturn V. The highly explosive nature of these chemicals required numerous safety measures at the launch complex. The pads were located 8,730 feet (2,660 m) away from each other.[24] Before tanking operations began and during launch, non-essential personnel were excluded from the danger area.

Emergency evacuation system

[edit]

Each pad had a 200-foot (61 m) evacuation tube running from the Mobile Launcher platform to a blast-resistant bunker 39 feet (12 m) underground, nicknamedRubber room, equipped with survival supplies for 20 persons for 24 hours and reachable through a high-speed elevator.[28]

A further Emergency Egress System was installed to allow fast escape of crew or technicians from pad in case of imminent catastrophic failure of the rocket.[29] The system included seven baskets suspended from seven slidewires that extended from the fixed service structure to a landing zone 370 meters (1,200 ft) to the west. Each basket could hold up to three people, which slid down the wire reaching up to 80 kilometers per hour (50 mph), eventually reaching a gentle stop by means of a braking system catch net and drag chain which slowed and then halted the baskets.

The system was dismantled in 2012, as seen inthis video.

Pad Terminal Connection Room

[edit]

Connections between theLaunch Control Center,Mobile Launcher Platform, and space vehicle were made in the Pad Terminal Connection Room (PTCR), which was a two-story series of rooms located beneath the launch pad on the west side of the flame trench. The "room" was constructed of reinforced concrete and protected by up to 20 feet (6.1 m) of fill dirt.[30][31]

Apollo and Skylab launches

[edit]
Apollo 11, carrying the first humans to land on theMoon, lifts off from pad 39A, July 16, 1969
Final launch of aSaturn IB (AS-210) from pad 39B, carrying theApollo–Soyuz Test Project Command Module into orbit, July 24, 1975

The first launch from Launch Complex 39 came in 1967 with the first Saturn V launch, which carried the uncrewedApollo 4 spacecraft. The second uncrewed launch,Apollo 6, also used Pad 39A. With the exception ofApollo 10, which used Pad 39B (due to the "all-up" testing resulting in a 2-month turnaround period), all crewed Apollo-Saturn V launches, commencing withApollo 8, used Pad 39A.

A total of thirteen Saturn Vs were launched for Apollo, including the uncrewed launch of theSkylab space station in 1973. The mobile launchers were then modified for the shorterSaturn IB rockets, by adding a "milk-stool" extension platform to the launch pedestal, so that theS-IVB upper stage and Apollo spacecraft swing arms would reach their targets. These were used for three crewed Skylab flights and theApollo–Soyuz Test Project, since the Saturn IB pads 34 and 37 at Cape Canaveral SFS had been decommissioned.[32][33]

Space Shuttle

[edit]
Main article:Space Shuttle program
Space Shuttle Atlantis atLaunch Complex 39A

The thrust to allow the Space Shuttle to achieve orbit was provided by a combination of theSolid Rocket Boosters (SRBs) and theRS-25 engines. The SRBs used solid propellant, hence their name. The RS-25 engines used a combination ofliquid hydrogen andliquid oxygen (LOX) from theexternal tank (ET), as the orbiter did not have room for internal fuel tanks. The SRBs arrived in segments via rail car from their manufacturing facility inUtah, the external tank arrived from its manufacturing facility inLouisiana by barge, and the orbiter waited in theOrbiter Processing Facility (OPF). The SRBs were first stacked in the VAB, then the External tank was mounted between them, and then, with the help of a massive crane, the orbiter was lowered and connected to the External tank.

The payload to be installed at the launch pad was independently transported in a payload transportation canister and then installed vertically at the Payload Changeout Room. Otherwise, payloads would have already been pre-installed at the Orbiter Processing Facility and transported within the orbiter's cargo bay.

The original structure of the pads was remodeled for the needs of the Space Shuttle, starting with Pad 39A after the last Saturn V launch, and, in 1977, that of Pad 39B after theApollo–Soyuz in 1975. The first usage of the pad for the Space Shuttle came in 1979, whenEnterprise was used to check the facilities prior to the first operational launch.

Service structures

[edit]
Main article:Service structure § Kennedy Space Center

Each pad contained a two-piece access tower system, the Fixed Service Structure (FSS) and the Rotating Service Structure (RSS). The FSS permitted access to the Shuttle via a retractable arm and a "beanie cap" to capture vented LOX from the external tank.

Sound Suppression Water System

[edit]

A Sound Suppression Water System (SSWS) was added to protect the Space Shuttle and its payload from effects of the intense sound wave pressure generated by its engines. An elevated water tank on a 290-foot (88 m) tower near each pad stored 300,000 U.S. gallons (1,100,000 liters) of water, which was released onto the mobile launcher platform just before engine ignition.[34] The water muffled the intense sound waves produced by the engines. Due to heating of the water, a large quantity of steam and water vapor was produced during launch.

Swing arm modifications

[edit]
The doors to the White Room, which provided entry to the Shuttle crew compartment, are seen here at the end of the access arm walkway

The Gaseous Oxygen Vent Arm positioned a hood, often called the "Beanie Cap", over the top of the external tank (ET) nose cone during fueling.[when?] Heated gaseous nitrogen was used there to remove the extremely cold gaseous oxygen that normally vented out of the external tank. This prevented the formation of ice that could fall and damage the shuttle.[35]

The Hydrogen Vent Line Access Arm mated the External Tank'sGround Umbilical Carrier Plate (GUCP) to the launch pad hydrogen vent line. The GUCP provided support for plumbing and cables, called umbilicals, that transferred fluids, gases, and electrical signals between two pieces of equipment. While the External Tank was being fueled, hazardous gas was vented from an internal hydrogen tank, through the GUCP, and out a vent line to a flare stack where it was burned off at a safe distance. Sensors at the GUCP measured gas level. The GUCP was redesigned after leaks created scrubs ofSTS-127 and were also detected during attempts to launchSTS-119 andSTS-133.[36] The GUCP released from the ET at launch and fell away with a curtain of water sprayed across it for protection from flames.

Emergency pad evacuation equipment

[edit]

The launch complex was equipped with a slidewire escape basket system for quick evacuation. Assisted by members of the closeout team, the crew would leave the orbiter and ride an emergency basket to the ground at speeds reaching up to 55 miles per hour (89 km/h).[37] From there, the crew took shelter in a bunker.

M113 armored personnel carriers parked near LC-39

The pad fire station operated a fleet of four modifiedM113A2 Firefighting Vehicles, a variant of theM113 APC. Painted in a neon green rescue livery, these vehicles provided viable transportation to rescue personnel and firefighters should they need to approach the pad during a launch emergency. They could also be used to safely evacuate astronauts and crew from the vicinity of the pad. During launches, two manned APCs would be stationed less than a mile from the launch pad (holding firefighters at-the-ready), one unmanned would be stationed on the pad (for extra evacuation capacity), and the fourth provided a backup at the fire station.[38][39]

During the launch of Discovery onSTS-124 on May 31, 2008, the pad at LC-39A suffered extensive damage, in particular to the concrete trench used to deflect the SRB's flames.[40] The subsequent investigation found that the damage was the result of carbonation of epoxy and corrosion of steel anchors that held therefractory bricks in the trench in place. The damage had been exacerbated by the fact thathydrochloric acid is an exhaust by-product of the solid rocket boosters.[41]

Space Shuttle launches

[edit]

After the launch ofSkylab in 1973, Pad 39A was reconfigured for the Space Shuttle, with shuttle launches beginning withSTS-1 in 1981, flown by theSpace Shuttle Columbia.[42] After Apollo 10, Pad 39B was kept as a backup launch facility in the case of the destruction of 39A, but saw active service during all three Skylab missions, the Apollo–Soyuz test flight, and a contingency Skylab Rescue flight that never became necessary. After the Apollo–Soyuz Test Project, 39B was reconfigured similarly to 39A; but due to additional modifications (mainly to allow the facility to service a modifiedCentaur-G upper stage), along with budgetary restraints, it was not ready until 1986. The first shuttle flight to use it wasSTS-51-L, which ended with theChallenger disaster, after which the first return-to-flight mission,STS-26, was launched from 39B.

Just as for the first 24 shuttle flights, LC-39A supported the final shuttle flights, starting withSTS-117 in June 2007 and ending with theretirement of the Shuttle fleet in July 2011. Prior to the SpaceX lease agreement, the pad remained as it was whenAtlantis launched on the final shuttle mission on July 8, 2011, complete with amobile launcher platform.

After Space Shuttle retirement

[edit]

With theretirement of the Space Shuttle in 2011,[43]and the cancellation ofConstellation Program in 2010, the future of the Launch Complex 39 pads was uncertain.By early 2011, NASA began informal discussions on use of the pads and facilities byprivate companies to fly missions for the commercial space market,[44] culminating in a 20-year lease agreement with SpaceX for Pad 39A.[45]

Talks for use of the pad were underway between NASA andSpace Florida—theState of Florida'seconomic development agency—as early as 2011, but no deal materialized by 2012, and NASA then pursued other options for removing the pad from the federal government inventory.[46]

Constellation program

[edit]
Main article:Constellation program
Ares I-X launches from LC-39B, 15:30 UTC, October 28, 2009

The Constellation program planned to use LC-39A for uncrewed Ares V launches and LC-39B for crewed Ares I launches. In preparation for this, NASA began modifying LC-39B to support Ares I launches with 39A planned to be modified in the mid 2010s for Ares V launches. Prior to Ares I-X, the last Shuttle launch from pad 39B was the nighttime launch ofSTS-116 on December 9, 2006. To support the final Shuttle mission to the Hubble Space TelescopeSTS-125 launched from pad 39A in May 2009,Endeavour was placed on 39B if needed to launch theSTS-400 rescue mission.

After the completion ofSTS-125, 39B was converted to launch the single test flight of theConstellation ProgramAres I-X on October 28, 2009.[47] Pad 39B was then planned to have the FSS and RSS removed in preparation for Ares I. However, in 2010, the Constellation program was cancelled.

SpaceX

[edit]
This article or sectionmay need to be cleaned up or summarized. It has been split from/toKennedy Space Center Launch Complex 39A#SpaceX.
Main article:Kennedy Space Center Launch Complex 39A § SpaceX
KSC DirectorBob Cabana announces the signing of the pad 39A lease agreement on April 14, 2014.SpaceX COOGwynne Shotwell stands nearby.

By early 2013, NASA publicly announced that it would allow commercial launch providers to lease LC-39A,[48] and followed that, in May 2013, with a formal solicitation for proposals forcommercial use of the pad.[49]There were two competing bids for the commercial use of the launch complex.[50]SpaceX submitted a bid for exclusive use of the launch complex, whileJeff Bezos'Blue Origin submitted a bid for shared non-exclusive use of the complex, so that the launchpad would handle multiple vehicles, and costs could be shared over the long-term. One potential shared user in the Blue Origin plan wasUnited Launch Alliance.[51] Prior to the end of the bid period, and prior to any public announcement by NASA of the results of the process, Blue Origin filed a protest with theU.S.General Accounting Office (GAO) "over what it says is a plan by NASA to award an exclusive commercial lease to SpaceX for use of mothballed space shuttle launch pad 39A."[52] NASA had planned to complete the bid award and have the pad transferred by October 1, 2013, but the protest "will delay any decision until the GAO reaches a decision, expected by mid-December."[52] On December 12, 2013, the GAO denied the protest and sided with NASA, which argued that the solicitation contained no preference on the use of the facility as multi-use or single-use. "The [solicitation] document merely asks bidders to explain their reasons for selecting one approach instead of the other and how they would manage the facility."[53]

On April 14, 2014, the privately owned launch service providerSpaceX signed a 20-year lease for Launch Complex 39A (LC-39A).[54] The pad was modified to support launches of bothFalcon 9 andFalcon Heavy launch vehicles, modifications that included the construction of a largeHorizontal Integration Facility (HIF) similar to that used at existing SpaceX-leased facilities atCape Canaveral Space Force Station andVandenberg Air Force Base, horizontal integration being markedly difference from thevertical integration process used to assemble NASA's Apollo and Space Shuttle vehicles at the launch complex. Additionally, new instrumentation and control systems were installed, and substantial new plumbing was added for a variety of rocket liquids and gases.[55][56]

Modifications

[edit]

In 2015, SpaceX built the Horizontal Integration Facility just outside the perimeter of the existing launch pad in order to house both the Falcon 9 and the Falcon Heavy rockets, and their associated hardware and payloads, during preparation for flight.[57] Both types of launch vehicles will be transported from the HIF to the launch pad aboard aTransporter Erector (TE) which will ride on rails up the former crawlerway path.[46][57] Also in 2015, the launch mount for the Falcon Heavy was constructed on Pad 39A over the existing infrastructure.[58][59] The work on both the HIF building and the pad was substantially complete by late 2015.[60] A rollout test of the new Transporter Erector was conducted in November 2015.[61]

In February 2016, SpaceX indicated that they had "completed and activated Launch Complex 39A",[62] but still had more work yet to do to support crewed flights. SpaceX originally planned to be ready to accomplish the first launch at pad 39A—of a Falcon Heavy—as early as 2015,[55] as they had had architects and engineers working on the new design and modifications since 2013.[63][58] By late 2014, a preliminary date for awet dress rehearsal of the Falcon Heavy was set for no earlier than July 1, 2015.[46] Due to a failure in a June 2015 Falcon 9 launch, SpaceX had to delay launching the Falcon Heavy in order to focus on the Falcon 9's failure investigation and its return to flight.[64] In early 2016, considering the busy Falcon 9 launch manifest, it became unclear if the Falcon Heavy would be the first vehicle to launch from Pad 39A, or if one or more Falcon 9 missions would precede a Falcon Heavy launch.[62] In the following months, the Falcon Heavy launch was delayed multiple times and eventually pushed back to February 2018.[65]

In 2018, SpaceX made further modifications to LC 39A to prepare it to accommodate it for the crew Dragon 2 mission. These modifications included installing a new crew access arm,[66] refurbishing the emergency egress slidewire system, and raising it up to the level of the new arm. The LC 39A fixed service structure was also repainted during this work.

In 2019, SpaceX began substantial modification to LC 39A in order to begin work on phase 1 of the construction to prepare the facility to launchprototypes of the large 9 m (30 ft)-diametermethalox reusable rocket—Starship—from a launch stand, which would fly from 39A on suborbital test flight trajectories with six or fewerRaptor engines. However, these plans were later cancelled.

In 2021, SpaceX began construction of an orbital launch pad for Starship at 39A.[67] As of early 2023, the new launch pad is still undergoing construction and will accommodate launch operations for the fully stackedStarship rocket. Starship will lift off under the power of 33Raptor engines, with each engine producing 500,000 lbf of force each, or 16,500,000 lbf for the whole vehicle.[68]

Later on, an "Orbital Launch Platform" for Starship with plans to accommodate twolanding zones forFalcon 9 andFalcon Heavy rockets to conduct to "Return-to-launch-site" landings.[69][70][71]

Launch history

[edit]

The first SpaceX launch from pad 39A wasSpaceX CRS-10 on February 19, 2017, using a Falcon 9 launch vehicle; it was the company's 10th cargo resupply mission to the International Space Station,[72] and the first uncrewed launch from 39A since Skylab.

Artemis I, the first launch of the SLS rocket

WhileCape Canaveral's Space Launch Complex 40 (SLC-40) was undergoing reconstruction after the loss of theAMOS-6 satellite on September 1, 2016, all SpaceX's east coast launches were from Pad 39A until SLC-40 became operational again in December 2017. These included the May 1, 2017, launch ofNROL-76, the first SpaceX mission for theNational Reconnaissance Office, with a classified payload.[73]

On February 6, 2018, Pad 39A hosted the successful liftoff of the Falcon Heavy on itsmaiden launch, carryingElon Musk'sTesla Roadster car to space;[74] and the first flight of the human-rated spacecraftCrew Dragon (Dragon 2) took place there on March 2, 2019.

The second Falcon Heavy flight, carrying theArabsat-6A communications satellite for Arabsat of Saudi Arabia, successfully launched on April 11, 2019. The satellite is to provideKu band andKa band communication services for the Middle East and northern Africa, as well as for South Africa. The launch was notable as it marked the first time that SpaceX was able to successfully soft-land all three of thereusable booster stages, which will be refurbished for future launches.[75]

TheSpaceX Demo-2 − the first crewed test flight of theCrew Dragon "Endeavour" spacecraft, with astronautsBob Behnken andDoug Hurley on board launched from Complex 39A on May 30, 2020 and docked toPressurized Mating Adapter 2 on theHarmony module of theISS on May 31, 2020.[76][77]

Artemis program

[edit]

On November 16, 2022, at 06:47:44 UTC theSpace Launch System (SLS) was launched from Complex 39B as part of theArtemis I mission.[78][79]

Current status

[edit]
Facilities and geographic features ofKennedy Space Center
Map
About OpenStreetMaps
Maps: terms of use
4km
2.5miles
25
25 NASA Railroad (Wilson Junction)
25 NASA Railroad (Wilson Junction)
24
24 Space Systems Processing Facility
24 Space Systems Processing Facility
23
23 Multi-Payload Processing Facility
23 Multi-Payload Processing Facility
22
22 Launch Complex 39 Press Site
22 Launch Complex 39 Press Site
21
21 Orbiter Processing Facility 3
21 Orbiter Processing Facility 3
20
20 Orbiter Processing Facilities 1 and 2
20 Orbiter Processing Facilities 1 and 2
19
19 Launch Control Center
19 Launch Control Center
18
18 Crawlerway
18 Crawlerway
17
17 Blue Origin Ransom Road facility
17 Blue Origin Ransom Road facility
16
16 Exploration Park
16 Exploration Park
15
15 SpaceX Roberts Road Operations Center
15 SpaceX Roberts Road Operations Center
14
14 Launch Complex 48
14 Launch Complex 48
13
13 Operations and Checkout Building
13 Operations and Checkout Building
12
11
10
10 Astronaut Beach House
10 Astronaut Beach House
9
9 KSC Headquarters Building
9 KSC Headquarters Building
8
8 Indian River
8 Indian River
7
7 Banana River
7 Banana River
6
6 Apollo/Saturn V Center
6 Apollo/Saturn V Center
5
5 Kennedy Space Center Visitor Complex
5 Kennedy Space Center Visitor Complex
4
4 Shuttle Landing Facility
4 Shuttle Landing Facility
3
3 Vehicle Assembly Building
3 Vehicle Assembly Building
2
2 Launch Complex 39 (LC-39B)
2 Launch Complex 39 (LC-39B)
1
1 Launch Complex 39 (LC-39A)
1 Launch Complex 39 (LC-39A)

Launch Complex 39A

[edit]
Main article:Kennedy Space Center Launch Complex 39A § Current status

SpaceX has launchedtheir launch vehicles from Launch Complex 39A and built a new hangar nearby.[50][45][80]

SpaceX assembles its launch vehicles horizontally in a hangar near the pad, and transports them horizontally to the pad before erecting the vehicle to vertical for the launch.[63] Formilitary missions from Pad 39A,payloads will be vertically integrated, as that is required per launch contract with the U.S. Space Force.[63]

Pad 39A is used to host launches of astronauts on theCrew Dragon capsule in apublic–private partnership with NASA. In August 2018, SpaceX's Crew Access Arm (CAA) was installed on a new level, which was built at the necessary height to enter the Crew Dragon spacecraft atop a Falcon 9 rocket.[81]

In April 2024,Elon Musk announced that SpaceX would have a launch tower for theStarship completed and operational by mid 2025.[82] Later on, SpaceX presented plans to accommodate twolanding zones forFalcon 9 andFalcon Heavy rockets to conduct to "Return-to-launch-site" landings.[83][84][85]

Launch Complex 39B

[edit]
Main article:Kennedy Space Center Launch Complex 39B § Current status

Since the Artemis I in 2022, Launch Complex 39B is used by NASA'sSpace Launch System rocket, aShuttle-derived launch vehicle which is used in theArtemis program and subsequent Moon to Mars campaigns. The pad has also been leased for use by NASA to aerospace companyNorthrop Grumman, for use as a launch site for their Shuttle-derivedOmegA launch vehicle, forNational Security Space Launch flights and commercial launches, but the plans were cancelled.

Launch Complex 39C

[edit]

Launch Complex 39C is a new facility forsmall-lift launch vehicles. It was built in 2015 within the Launch Complex 39B perimeter. It was to serve as a multi-purpose site that allowed companies to test the vehicles and capabilities of the smaller class of rockets, making it more affordable for smaller companies to break into the commercial spaceflight market. However, its primary customerRocket Lab opted to launch theirElectron rocket fromWallops Island, instead. Several small-lift launch-vehicle companies also wanted to launch their rockets from a dedicated site atCape Canaveral instead of 39C.[86]

Construction

[edit]

Construction of the pad began in January 2015 and was completed in June 2015.Kennedy Space Center directorRobert D. Cabana and representatives from the Ground Systems Development and Operations (GSDO) Program and the Center Planning and Development (CPD) and Engineering directorates marked the completion of the new pad during a ribbon-cutting ceremony on July 17, 2015. "As America's premier spaceport, we're always looking for new and innovative ways to meet America's launch needs, and one area that was missing was small classpayloads", Cabana said.[9]

Capabilities

[edit]

The concrete pad measures about 50 feet (15 m) wide by about 100 feet (30 m) long and could support the combined weight of a fueledlaunch vehicle,payload, and customer-provided launch mount up to about 132,000 pounds (60,000 kg), and an umbilical tower structure, fluid lines, cables, and umbilical arms weighing up to about 47,000 pounds (21,000 kg). There is a universal propellant servicing system to provide liquid oxygen andliquid methane fueling capabilities for a variety of small-class rockets.[9]

With the addition of Launch Complex 39C, KSC offered the following processing and launching features for companies working with small-class vehicles (maximum thrust up to 200,000 lbf or 890 kN):[87]

Discontinued

[edit]

In 2016 a decision was made not to use LC-39C. Because the site was within the perimeter of LC-39B, Artemis use of that pad would make LC-39C unavailable to users.[88]

Future development

[edit]
This section needs to beupdated. Please help update this article to reflect recent events or newly available information.(March 2020)
A map shows the current and proposed elements on KSC.

Previous Kennedy Space Center (KSC) Master Plan recommendations—in 1966, 1972, and 1977—noted that an expansion of KSC's vertical launch capacity could occur when the market demand existed. The 2007 Site Evaluation Study recommended an additional vertical launch pad, Launch Complex 49 (LC-49), to be sited north of existing LC-39B.

As part of the Environmental Impact Study (EIS) process, this proposed launch complex was consolidated from two pads (designated in the 1963 plans as 39C and 39D) to one that would provide greater separation from LC-39B. The area was expanded to accommodate a wider variety of launch azimuths, helping to protect against potential overflight concerns of LC-39B. This LC-49 launch facility could accommodate medium to large launch vehicles.[89]

The 2007 Vertical Launch Site Evaluation Study concluded that a vertical launch pad could also be sited to the south of 39A, and to the north of pad 41, to accommodate small to medium launch vehicles. Designated asLaunch Complex 48 (LC-48), this area is best suited to accommodate small to medium class launch vehicles, due to its closer proximity to LC-39A and LC-41. Due to the nature of these activities, requiredquantity-distance arcs, launch hazard impact limit lines, other safety setbacks, and exposure limits will be specified for safe operations.[89] Details of the proposed launch pads were published in the Kennedy Space Center Master Plan in 2012.

The Master Plan also notes a proposed New Vertical Launchpad northwest of LC-39B and a Horizontal Launch Area north of the LC-49 and converting the Shuttle Landing Facility (SLF) and its apron areas into a second Horizontal Launch Area.[90][89]

Space Florida has proposed that Launch Complex 48 be developed for use by Boeing'sPhantom Express and that three landing pads be built for reusable booster systems, to provide more landing options for SpaceX'sFalcon 9 andFalcon Heavy, Blue Origin'sNew Glenn, and other potential reusable vehicles.[91] The pads would be located east of the Horizontal Launch Area and north of LC-39B[92]

In August 2019, SpaceX submitted an Environmental Assessment forStarship launch system at Kennedy Space Center.[93] This document included plans for the construction of additional structures at LC-39A to support Starship launches, including a dedicated pad, liquid methane tanks, and a Landing Zone.[94] These are separate from the existing structures that support Falcon 9 and Falcon Heavy launches.

Launch statistics

[edit]

LC-39A

[edit]
6
12
18
24
30
1965
1970
1975
1980
1985
1990
1995
2000
2005
2010
2015
2020
2025

Apollo and Apollo Applications

[edit]

All flights operated byNASA.

No.DateTime (UTC)Launch vehicleSerial numberMissionResultRemarks
19 November 196712:00Saturn VSA-501Apollo 4SuccessMaiden flight of the Saturn V and first launch from LC-39A.
24 April 196812:00Saturn VSA-502Apollo 6Partial failurePogo oscillations caused a failure of twoJ-2s in theS-II and a relight of theS-IVB, severely changing the planned mission trajectory of theApollo CSM.
321 December 196812:51Saturn VSA-503Apollo 8SuccessFirst crewed launch of the Saturn V and first crewed launch from LC-39A. First crewed launch going beyondlow Earth orbit, inserting intoLunar orbit.
43 March 196916:00Saturn VSA-504Apollo 9
(CSMGumdrop and LMSpider)
SuccessFirst launch of the Saturn V in its full Apollo configuration, flying with anApollo Lunar Module. First American manned flight with acall sign sinceGemini 3'sMolly Brown in 1965.
516 July 196913:32Saturn VSA-506Apollo 11
(CSMColumbia and LMEagle)
SuccessFirst fully operational Apollo flight. First crewedlanding on theMoon and on another celestial body.
614 November 196916:22Saturn VSA-507Apollo 12
(CSMYankee Clipper and LMIntrepid)
SuccessA lightning strike caused the shutdown of the CSM's computer systems, but was successfully restarted mid-flight. First surface rendezvous on another celestial body, landing next toSurveyor 3.
711 April 197019:13Saturn VSA-508Apollo 13
(CSMOdyssey and LMAquarius)
Partial failureLaunch was a success, but mission had to be aborted following a failure in the CSM's service module during the lunar transfer phase.
831 January 197121:03Saturn VSA-509Apollo 14
(CSMKitty Hawk and LMAntares)
Success
926 July 197113:34Saturn VSA-510Apollo 15
(CSMEndeavour and LMFalcon)
SuccessFirst flight of the extended Apollo missions, notably carrying theLunar Roving Vehicle.
1016 April 197217:54Saturn VSA-511Apollo 16
(CSMCasper and LMOrion)
SuccessSecond flight of the extended Apollo missions.
117 December 197205:33Saturn VSA-512Apollo 17
(CSMAmerica and LMChallenger)
SuccessLast crewed launch of the Saturn V, and last of the extended Apollo missions. Most recent crewed flight to the Moon.
1214 May 197317:30Saturn VSA-513SkylabSuccessLast flight of the Saturn V. The S-IVB was replaced with the space station module, while the S-II was modified to make orbit. Payload was extensively damaged during ascent, leading to the loss of the station's micrometeoroid shield and a solar panel.

Space Shuttle

[edit]

All flights operated byNASA.

No.DateTime (UTC)Launch vehicleShuttleMissionResultRemarks
1312 April 198112:00Space ShuttleColumbiaSTS-1SuccessMaiden flight of theSpace Shuttle program, and maiden flight of Space ShuttleColumbia. First Space Shuttle orbital test. First shuttle landing atEdwards.
1412 November 198115:10Space ShuttleColumbiaSTS-2SuccessSecond orbital test.
1522 March 198216:00Space ShuttleColumbiaSTS-3SuccessThird orbital test. Only shuttle landing atWhite Sands.
1627 June 198215:00Space ShuttleColumbiaSTS-4SuccessFourth and final Space Shuttle orbital test. First flight for theDepartment of Defense.
1711 November 198212:19Space ShuttleColumbiaSTS-5Success
184 April 198318:30Space ShuttleChallengerSTS-6SuccessMaiden flight of Space ShuttleChallenger. Launch and deployment ofTDRS-1 (as TDRS-A). First launch for theTracking and Data Relay Satellite System.
1918 June 198311:33Space ShuttleChallengerSTS-7SuccessFirst crewed American flight with a female astronaut,Sally Ride.
2030 August 198306:32Space ShuttleChallengerSTS-8SuccessFirst night launch and night landing of a Shuttle. First crewed flight with an African-American astronaut,Guion Bluford.
2128 November 198316:00Space ShuttleColumbiaSTS-9SuccessFirst mission usingSpacelab.
223 February 198413:00Space ShuttleChallengerSTS-41-BSuccessFirst shuttle landing at theShuttle Landing Facility.
236 April 198413:58Space ShuttleChallengerSTS-41-CSuccessRepair mission for theSolar Maximum Mission satellite launched in 1980. Also deployed theLong Duration Exposure Facility, aiming to study long-term data placed in an outer space environment.
2430 August 198412:41Space ShuttleDiscoverySTS-41-DSuccessMaiden flight of Space ShuttleDiscovery.
255 October 198411:03Space ShuttleChallengerSTS-41-GSuccessDeployment ofEarth Radiation Budget Satellite, aiming to studyEarth's energy budget.
268 November 198412:15Space ShuttleDiscoverySTS-51-ASuccess
2724 January 198519:50Space ShuttleDiscoverySTS-51-CSuccessDoD mission. Deployment ofMagnum satellite, also known as USA-8.
2812 April 198513:59Space ShuttleDiscoverySTS-51-DSuccess
2929 April 198516:02Space ShuttleChallengerSTS-51-BSuccess
3017 June 198511:33Space ShuttleDiscoverySTS-51-GSuccess
3129 July 198522:00Space ShuttleChallengerSTS-51-FSuccessMission was ultimately a success, but a faulty temperature reading caused an early shutdown of one of theRS-25s, forcing anabort to orbit. Insertion was thus much lower than planned altitude.
3227 August 198510:58Space ShuttleDiscoverySTS-51-ISuccess
333 October 198515:15Space ShuttleAtlantisSTS-51-JSuccessMaiden flight of Space ShuttleAtlantis. DoD mission. Deployment of twoDefense Satellite Communications System satellites, also known as USA-11 and USA-12.
3430 October 198517:00Space ShuttleChallengerSTS-61-ASuccessFinal successful flight of Space ShuttleChallenger.
3527 November 198500:29Space ShuttleAtlantisSTS-61-BSuccess
3612 January 198611:55Space ShuttleColumbiaSTS-61-CSuccessLast Space Shuttle flight before theChallenger disaster. Carried SenatorBill Nelson onboard.
379 January 199012:35Space ShuttleColumbiaSTS-32SuccessFirst flight from LC-39A following the Space Shuttle's return to flight in 1988. Retrieval of theLong Duration Exposure Facility.
3828 February 199007:50Space ShuttleAtlantisSTS-36SuccessDoD mission. Deployment ofMisty satellite, also known as USA-53. Shuttle mission with the highest inclination, at 62°. Originally planned to launch fromSLC-6 atVandenberg, prior to the West Coast shuttle program's cancellation post-Challenger.
3915 November 199023:48Space ShuttleAtlantisSTS-38SuccessDoD mission. Deployment ofSDS satellite, also known as USA-67.
4028 April 199111:33Space ShuttleDiscoverySTS-39SuccessDoD mission. Performed a variety of experiments.
412 August 199115:02Space ShuttleAtlantisSTS-43SuccessLaunch and deployment ofTDRS-5 (as TDRS-E) for theTracking and Data Relay Satellite System.
4212 September 199123:11Space ShuttleDiscoverySTS-48SuccessLaunch and deployment of theUpper Atmosphere Research Satellite.
4324 November 199123:44Space ShuttleAtlantisSTS-44SuccessDoD mission. Deployment ofDefense Support Program satellite, also known as USA-75.
4422 January 199214:52Space ShuttleDiscoverySTS-42Success
4524 March 199213:13Space ShuttleAtlantisSTS-45Success
4625 June 199216:12Space ShuttleColumbiaSTS-50Success
472 December 199213:24Space ShuttleDiscoverySTS-53SuccessLast flight for the DoD. Deployment ofSDS satellite, also known as USA-89.
4826 April 199314:50Space ShuttleColumbiaSTS-55Success
493 February 199412:10Space ShuttleDiscoverySTS-60SuccessFirst shuttle mission to fly with a Russian cosmonaut,Sergei Krikalev.
509 April 199411:05Space ShuttleEndeavourSTS-59SuccessFirst flight of Space ShuttleEndeavour from 39A.
518 July 199404:43Space ShuttleColumbiaSTS-65Success
5230 September 199411:16Space ShuttleEndeavourSTS-68Success
532 March 199506:38Space ShuttleEndeavourSTS-67Success
5427 June 199519:32Space ShuttleAtlantisSTS-71SuccessFirst Shuttle docking with theMir space station.
557 September 199515:09Space ShuttleEndeavourSTS-69Success
5612 November 199512:30Space ShuttleAtlantisSTS-74SuccessDocking withMir. Launch and delivery of theMir Docking Module to the station.
5716 September 199608:54Space ShuttleAtlantisSTS-79SuccessDocking withMir.
5811 February 199708:55Space ShuttleDiscoverySTS-82SuccessServicing mission for theHubble Space Telescope.
594 April 199719:20Space ShuttleColumbiaSTS-83SuccessMission cut short because of a fuel cell issue.
6015 May 199708:07Space ShuttleAtlantisSTS-84SuccessDocking withMir.
611 July 199718:02Space ShuttleColumbiaSTS-94SuccessReflight of STS-83.
627 August 199714:41Space ShuttleDiscoverySTS-85Success
6325 September 199714:34Space ShuttleAtlantisSTS-86SuccessDocking withMir.
6423 January 199802:48Space ShuttleEndeavourSTS-89SuccessDocking withMir.
652 June 199822:06Space ShuttleDiscoverySTS-91SuccessLast shuttle mission toMir.
664 December 199808:35Space ShuttleEndeavourSTS-88SuccessFirst flight to theInternational Space Station and first ISS assembly flight. Added theUnity Node 1 module.
6711 February 200016:43Space ShuttleEndeavourSTS-99Success
6819 May 200010:11Space ShuttleAtlantisSTS-101SuccessDocking with theISS.
6911 October 200023:17Space ShuttleDiscoverySTS-92SuccessISS assembly flight, adding theZ1 truss.
707 February 200123:13Space ShuttleAtlantisSTS-98SuccessISS assembly flight, adding theDestiny US Lab module.
7119 April 200118:40Space ShuttleEndeavourSTS-100SuccessISS assembly flight, adding theMobile Servicing System.
7210 August 200121:10Space ShuttleDiscoverySTS-105SuccessDocking with theISS.
731 March 200211:22Space ShuttleColumbiaSTS-109SuccessServicing mission for theHubble Space Telescope. Final successful flight of Space ShuttleColumbia.
745 June 200221:22Space ShuttleEndeavourSTS-111SuccessDocking with theISS.
7524 November 200200:49Space ShuttleEndeavourSTS-113SuccessISS assembly flight, adding theP1 truss. Last shuttle flight before theColumbia disaster.
7616 January 200315:39Space ShuttleColumbiaSTS-107FailureLaunch and orbital operations were a success, but damage to thethermal protection system during ascent resulted in breakup during reentry, causing theSpace ShuttleColumbia disaster.
778 June 200723:38Space ShuttleAtlantisSTS-117SuccessISS assembly flight, adding theS3/S4 truss and solar arrays. First launch from 39A following the shuttle's return to service in 2005.
788 August 200723:36Space ShuttleEndeavourSTS-118SuccessISS assembly flight, adding theS5 truss.
7923 October 200715:38Space ShuttleDiscoverySTS-120SuccessISS assembly flight, adding theHarmony Node 2 module.
807 February 200819:45Space ShuttleAtlantisSTS-122SuccessISS assembly flight, adding theColumbus European Laboratory module.
8111 March 200806:28Space ShuttleEndeavourSTS-123SuccessISS assembly flight, adding theExperiment Logistics Module-Pressurized Section andDextre.
8231 May 200821:02Space ShuttleDiscoverySTS-124SuccessISS assembly flight, adding theKibō Japanese Experiment Module.
8315 November 200800:55Space ShuttleEndeavourSTS-126SuccessDocking with theISS.
8415 March 200923:43Space ShuttleDiscoverySTS-119SuccessISS assembly flight, adding theS6 solar array and truss.
8511 May 200918:01Space ShuttleAtlantisSTS-125SuccessFinal servicing mission for theHubble Space Telescope, and final non-ISS Space Shuttle mission.
8615 July 200922:03Space ShuttleEndeavourSTS-127SuccessISS assembly flight, adding theJapanese Experiment Module Exposed Facility.
8729 August 200903:59Space ShuttleDiscoverySTS-128SuccessDocking with theISS. Final shuttle landing at Edwards.
8816 November 200919:28Space ShuttleAtlantisSTS-129SuccessDocking with theISS.
898 February 201009:14Space ShuttleEndeavourSTS-130SuccessISS assembly flight, adding theTranquility Node 3 module andCupola.
905 April 201010:21Space ShuttleDiscoverySTS-131SuccessDocking with theISS. Final night launch of the Space Shuttle.
9114 May 201018:20Space ShuttleAtlantisSTS-132SuccessISS assembly flight, adding theRassvet Mini-Research module.
9224 February 201121:53Space ShuttleDiscoverySTS-133SuccessISS assembly flight, adding theLeonardo Permanent Multipurpose Module. Final daytime shuttle landing, and final flight of Space ShuttleDiscovery.
9316 May 201112:56Space ShuttleEndeavourSTS-134SuccessISS assembly flight, adding theAlpha Magnetic Spectrometer. Final flight of Space ShuttleEndeavour.
948 July 201115:29Space ShuttleAtlantisSTS-135SuccessDocking with theISS. Final flight of Space ShuttleAtlantis, final manned launch from the United States until 2020, and the final flight of the Space Shuttle program.

Falcon 9 and Falcon Heavy

[edit]

All flights operated bySpaceX.

Falcon 9 and Falcon Heavy (2017-2022)

[edit]
No.DateTime (UTC)Launch VehicleBooster flight[a]Payload/missionResultRemarks
9519 February 201714:39Falcon 9 Full Thrust1031‑1SpaceX CRS-10SuccessISS resupply flight. FirstFalcon 9 launch from LC-39A, and first unmanned launch from 39A since Skylab in 1973. Originally planned to launch fromSLC-40, but theAMOS-6 preclusion rendered that pad out of use until repairs.
9616 March 201706:00Falcon 9 Full Thrust1030EchoStar 23SuccessFirst uncrewed launch not to the ISS from LC-39A since Apollo 6 in 1968. First stage expended.
9730 March 201722:27Falcon 9 Full Thrust1021‑2SES-10SuccessFirst ever reflight of a previously used Falcon 9 first stage, being previously flown in 2016 as part ofSpaceX CRS-8.
981 May 201711:15Falcon 9 Full Thrust1032‑1NROL-76SuccessNRO launch. Unknown satellite, also known as USA-276. First classified Falcon 9 flight and first SpaceX flight for theNational Reconnaissance Office.
9915 May 201723:21Falcon 9 Full Thrust1034‑1Inmarsat-5 F4Success
1003 June 201721:07Falcon 9 Full Thrust1035‑1SpaceX CRS-11SuccessISS resupply flight. Launched and deliveredROSA andNICER. First flight of a reusedDragon capsule, previously flown as part ofSpaceX CRS-4.
10123 June 201719:10Falcon 9 Full Thrust1029‑2BulgariaSat-1Success
1025 July 201723:38Falcon 9 Full Thrust1037Intelsat 35eSuccessFirst stage expended.
10314 August 201716:31Falcon 9 Block 41039‑1SpaceX CRS-12SuccessISS resupply flight. First Block 4 launch.
1047 September 201714:00Falcon 9 Block 41040‑1X-37B OTV-5SuccessFifth flight of theBoeing X-37B. First X-37B flight not launched on anAtlas V.
10511 October 201722:53Falcon 9 Full Thrust1031‑2SES-11 /EchoStar 105Success
10630 October 201719:34Falcon 9 Block 41042‑1Koreasat 5ASuccess
1076 February 201820:45Falcon Heavy1033 (core)
1023‑2, 1025‑2 (sides)
Falcon Heavy test flightSuccessMaiden launch of Falcon Heavy and first of twoNational Security Space Launch certification launches. PlacedElon Musk's Tesla Roadster intoheliocentric orbit. Boosters successfully recovered, but core stage was lost. First flight from LC-39A since SLC-40 was reactivated.
10811 May 201820:14Falcon 9 Block 51046‑1Bangabandhu-1SuccessFirst Block 5 launch.
10915 November 201820:46Falcon 9 Block 51047‑2Es'hail 2Success
1102 March 201907:19Falcon 9 Block 51051‑1Crew Dragon Demo-1
(Dragon C204)
SuccessMaiden flight ofCrew Dragon and first SpaceX demonstration flight for theCommercial Crew Program, docking with theISS. Only flight of Dragon C204 before it was accidentally destroyed during a test.
11111 April 201922:35Falcon Heavy1055 (core)
1052‑1, 1053‑1 (sides)
Arabsat-6ASuccessFirst Block 5 Falcon Heavy launch and second of twoNational Security Space Launch certification launches. All three cores safely landed, but the core stage tipped over during transport back toPort Canaveral.
11225 June 201906:30Falcon Heavy1057 (core)
1052‑2, 1053‑2 (sides)
STP-2SuccessFirst DoD flight for Falcon Heavy, and successful recovery of a fairing.
11319 January 202015:30Falcon 9 Block 51046‑4Crew Dragon in-flight abort test
(Dragon C205)
SuccessSuborbital flight. Falcon 9 was deliberately destroyed 85 seconds in to simulate a failure atmaxq. Dragon capsule then separated and followed an abort procedure. Only flight of Crew Dragon C205.
11418 March 202012:16Falcon 9 Block 51048‑5Starlink 5 (v1.0)SuccessFirstStarlink launch from LC-39A.
11522 April 202019:30Falcon 9 Block 51051‑4Starlink 6 (v1.0)Success
11630 May 202019:22Falcon 9 Block 51058‑1Crew Dragon Demo-2
(DragonEndeavour)
SuccessMaiden crewed flight of a Falcon 9 and the first crewed flight from the United States sinceSTS-135 in 2011, carrying astronautsBob Behnken andDoug Hurley to theISS. Maiden flight of Crew DragonEndeavour.
1177 August 202005:12Falcon 9 Block 51051‑5Starlink 9 (v1.0)Success
1183 September 202012:46Falcon 9 Block 51060‑2Starlink 11 (v1.0)Success
1196 October 202011:29Falcon 9 Block 51058‑3Starlink 12 (v1.0)Success
12018 October 202012:25Falcon 9 Block 51051‑6Starlink 13 (v1.0)Success
12116 November 202000:27Falcon 9 Block 51061‑1SpaceX Crew-1
(DragonResilience)
SuccessFirst crew rotation mission of theCommercial Crew Program to theISS and maiden flight of Crew DragonResilience.
1226 December 202016:17Falcon 9 Block 51058‑4SpaceX CRS-21SuccessISS resupply flight. Launched and delivered theNanoracks Bishop Airlock. Maiden flight ofCargo Dragon 2.
12319 December 202014:00Falcon 9 Block 51059‑5NROL-108SuccessNRO launch. Two reportedStarshield satellites, also known as USA-312 and USA-313.
12420 January 202113:02Falcon 9 Block 51051‑8Starlink 16 (v1.0)Success
1254 March 202108:24Falcon 9 Block 51049‑8Starlink 17 (v1.0)Success
12614 March 202110:01Falcon 9 Block 51051‑9Starlink 21 (v1.0)Success
12723 April 202109:49Falcon 9 Block 51061‑2SpaceX Crew-2
(DragonEndeavour)
SuccessISS crew rotation flight.
1284 May 202119:01Falcon 9 Block 51049‑9Starlink 25 (v1.0)Success
12915 May 202122:56Falcon 9 Block 51058‑8Starlink 25 (v1.0)Success
1303 June 202117:29Falcon 9 Block 51067‑1SpaceX CRS-22SuccessISS resupply flight. Launched and delivered the first set ofiROSA solar panels.
13129 August 202107:14Falcon 9 Block 51061‑4SpaceX CRS-23SuccessISS resupply flight.
13216 September 202100:02Falcon 9 Block 51062‑3Inspiration4
(DragonResilience)
SuccessFirst private crewed orbital spaceflight, being commanded by entrepreneurJared Isaacman. First non-ISS American crewed spaceflight sinceSTS-125 in 2009, first splashdown in theAtlantic Ocean sinceApollo 9 in 1969, and set highest crewed altitude record sinceSTS-103 in 1999.
13311 November 202102:03Falcon 9 Block 51067‑2SpaceX Crew-3
(DragonEndurance)
SuccessISS crew rotation flight. Maiden flight of Crew DragonEndurance.
1349 December 202106:00Falcon 9 Block 51061‑5Imaging X-ray Polarimetry ExplorerSuccessPart of theExplorers Program. Launch consisted of three identical telescope tasked with x-ray astronomy.
13521 December 202110:06Falcon 9 Block 51069‑1SpaceX CRS-24SuccessISS resupply flight.
1366 January 202221:49Falcon 9 Block 51062‑4Starlink Group 4–5Success
13719 January 202202:02Falcon 9 Block 51060‑10Starlink Group 4–6Success
1383 February 202218:13Falcon 9 Block 51061‑6Starlink Group 4–7Success
1393 March 202214:25Falcon 9 Block 51060‑11Starlink Group 4–9Success
1408 April 202215:17Falcon 9 Block 51062‑5Axiom Mission 1
(DragonEndeavour)
SuccessDocking with theISS. First private crewed flight to the ISS.
14127 April 202207:52Falcon 9 Block 51067‑4SpaceX Crew-4
(DragonFreedom)
SuccessISS crew rotation flight. Maiden flight of Crew DragonFreedom.
1426 May 202209:46Falcon 9 Block 51058‑12Starlink Group 4–17Success
14318 May 202210:59Falcon 9 Block 51052‑5Starlink Group 4–18Success
14417 June 202216:09Falcon 9 Block 51060‑13Starlink Group 4–19Success
14515 July 202200:44Falcon 9 Block 51067‑5SpaceX CRS-25SuccessISS resupply flight.
14624 July 202213:38Falcon 9 Block 51062‑8Starlink Group 4–25Success
14710 August 202202:14Falcon 9 Block 51073‑3Starlink Group 4–26Success
14811 September 202201:20Falcon 9 Block 51058‑14Starlink Group 4–20Success
1495 October 202216:00Falcon 9 Block 51077‑1SpaceX Crew-5
(DragonEndurance)
SuccessISS crew rotation flight.
1501 November 202213:41Falcon Heavy1066 (core)
1064‑1, 1065‑1 (sides)
USSF-44SuccessLaunch for theUnited States Space Force. Eight technology demonstration satellites, also known as USA-339, 340, 341, 344, 399, 546, 547, and 548. Core stage expended.
15126 November 202219:20Falcon 9 Block 51076‑1SpaceX CRS-26SuccessISS resupply flight. Launched and delivered the second set ofiROSA solar panels.
1528 December 202222:27Falcon 9 Block 51069‑4OneWeb Flight #15Success
15317 December 202221:32Falcon 9 Block 51058‑15Starlink Group 4–37Success

Falcon 9 and Falcon Heavy (since 2023)

[edit]
No.DateTime (UTC)Launch VehicleBooster flight[a]Payload/missionResultRemarks
15415 January 202322:56Falcon Heavy1070 (core)
1064‑2, 1065‑2 (sides)
USSF-67SuccessLaunch for theUnited States Space Force. CBAS satellite, also known as USA-342. Core stage expended.
1552 February 202307:58Falcon 9 Block 51069‑5Starlink Group 5–3Success
1562 March 202305:34Falcon 9 Block 51078‑1SpaceX Crew-6
(DragonEndeavour)
SuccessISS crew rotation flight.
15715 March 202300:30Falcon 9 Block 51073‑7SpaceX CRS-27SuccessISS resupply flight.
1581 May 202300:26Falcon Heavy1068 (core)
1052‑8, 1053‑3 (sides)
ViaSat-3 AmericasSuccessHeaviest all-electric satellite launched into orbit. All three boosters expended.
15921 May 202321:37Falcon 9 Block 51080‑1Axiom Mission 2
(DragonFreedom)
SuccessPrivate crewed docking to theISS.
1605 June 202315:47Falcon 9 Block 51077‑5SpaceX CRS-28SuccessISS resupply flight. Launched and delivered the third set ofiROSA solar panels.
16129 July 202303:04Falcon Heavy1074 (core)
1064‑3, 1065‑3 (sides)
EchoStar-24SuccessHeaviest geostationary satellite ever launched. Core stage expended.
16226 August 202307:27Falcon 9 Block 51081‑1SpaceX Crew-7
(DragonEndurance)
SuccessISS crew rotation flight.
1634 September 202302:47Falcon 9 Block 51073‑10Starlink Group 6–12Success
16413 October 202314:19Falcon Heavy1079 (core)
1064‑4, 1065‑4 (sides)
PsycheSuccessPart of theDiscovery Program, aimed at studying16 Psyche. First Falcon Heavy launch towards another celestial body. Core stage expended.
16510 November 202301:28Falcon 9 Block 51081‑2SpaceX CRS-29SuccessISS resupply flight.
16629 December 202301:07Falcon Heavy1084 (core)
1064‑5, 1065‑5 (sides)
X-37B OTV-7SuccessSeventh flight of theX-37B. First X-37B flight tomedium Earth orbit, and first flight on a Falcon Heavy. Core stage expended.
16718 January 202421:49Falcon 9 Block 51080‑5Axiom Mission 3
(DragonFreedom)
SuccessPrivate crewed docking to theISS.
168January 29, 202401:10Falcon 9 Block 51062‑18Starlink Group 6–38Success
16915 February 202406:05Falcon 9 Block 51060‑18IM-1SuccessPart of theCommercial Lunar Payload Services program. First launch ofIntuitive Machines'Nova-C Lunar lander. Second mission and first successful flight of the program. First launch to theMoon from 39A since Apollo 17 in 1972.
1704 March 202403:53Falcon 9 Block 51083‑1SpaceX Crew-8
(DragonEndeavour)
SuccessISS crew rotation flight.
17116 March 202400:21Falcon 9 Block 51062‑19Starlink Group 6–44Success
17224 March 202403:09Falcon 9 Block 51060‑19Starlink Group 6–42Success
17330 March 202421:52Falcon 9 Block 51076‑12Eutelsat 36DSuccess
1747 April 202423:16Falcon 9 Block 51073‑14Bandwagon-1SuccessFirst SpaceX dedicated rideshare mission from LC-39A.
17517 April 202421:26Falcon 9 Block 51077‑12Starlink Group 6–51Success
17628 April 202400:34Falcon 9 Block 51060‑20Galileo-L12SuccessPart of theGalileo satellite navigation system. First Gallileo launch from the United States, following development issues withAriane 6. First stage expended.
1778 May 202418:42Falcon 9 Block 51083‑3Starlink Group 6–56Success
17824 May 202402:45Falcon 9 Block 51077‑13Starlink Group 6–63Success
17925 June 202421:26Falcon Heavy1087 (core)
1072‑1, 1086‑1 (sides)
GOES-19SuccessPart of theGeostationary Operational Environmental Satellite system of satellites. Launched as GOES-U. First GOES launch on a SpaceX rocket. Core stage expended.
18027 July 202405:45Falcon 9 Block 51069‑17Starlink Group 10–9Success
1812 August 202405:01Falcon 9 Block 51078‑12Starlink Group 10–6Success
18212 August 202410:37Falcon 9 Block 51073‑17Starlink Group 10–7Success
18310 September 202409:23Falcon 9 Block 51083‑4Polaris Dawn
(DragonResilience)
SuccessFirst mission of the privatePolaris Program, commanded byJared Isaacman. First ever privatespacewalk, conducted by Isaacman andSarah Gillis. Set non-Apollo crewed altitude record sinceGemini 11 in 1966, and contributed to current record of most people in orbit, at 19.
18414 October 202416:06Falcon Heavy1089 (core)
1064‑6, 1065‑6 (sides)
Europa ClipperSuccessPart of theLarge Strategic Science Missions, aimed at studyingJupiter and its moonEuropa. First Falcon Heavy launch to another planet. All three boosters expended.
1855 November 202402:29Falcon 9 Block 51083‑5SpaceX CRS-31SuccessISS resupply flight.
18611 November 202417:22Falcon 9 Block 51067‑23Koreasat 6ASuccess
18717 November 202422:28Falcon 9 Block 51077‑16Optus-X/TD7Success
18827 November 202404:41Falcon 9 Block 51078‑15Starlink Group 6–76Success
1895 December 202416:10Falcon 9 Block 51076‑19SXM-9Success
19017 December 202422:26Falcon 9 Block 51090‑1O3b mPOWER 7 & 8Success
19123 December 202405:35Falcon 9 Block 51080‑14Starlink Group 12–2Success
19231 December 202405:39Falcon 9 Block 51078‑16Starlink Group 12–6Success
1938 January 202515:27Falcon 9 Block 51086‑3Starlink Group 12–11Success
19415 January 202506:11Falcon 9 Block 51085‑5Blue Ghost Mission 1 /Hakuto-R Mission 2SuccessPart of theCommercial Lunar Payload Services program for Blue Ghost, private mission for Hakuto-R. First launch ofFirefly Aerospace'sBlue Ghost and second launch ofispace'sHakuto-R Lunar landers. Blue Ghost became first completely successful CLPS mission. Hakuto-R crashed into lunar surface during final descent.
19521 January 202505:24Falcon 9 Block 51083‑8Starlink Group 13–1Success
19630 January 202501:34Falcon 9 Block 51073‑21Spainsat NG ISuccessFirst stage expended.
1974 February 202523:13Falcon 9 Block 51086‑4WorldView Legion 5 & 6Success
19827 February 202500:16Falcon 9 Block 51083‑9IM-2SuccessPart of theCommercial Lunar Payload Services program. Second flight ofNova-C. Flight contained secondary payloadsLunar Trailblazer,Brokkr-2, and Chimera-1.
19914 March 202523:03Falcon 9 Block 51069‑22SpaceX Crew-10
(DragonEndurance)
SuccessISS crew rotation flight.
2001 April 202501:46Falcon 9 Block 51085‑6Fram2
(DragonResilience)
SuccessPrivate crewed mission, commanded byChun Wang. First ever crewed mission to go intopolar orbit, and first polar launch from LC-39A.
20113 April 202500:53Falcon 9 Block 51083‑10Starlink Group 12–17Success
20221 April 202508:15Falcon 9 Block 51092‑3SpaceX CRS-32SuccessISS resupply flight.
20329 April 202502:34Falcon 9 Block 51094‑1Starlink Group 12–10Success
2044 May 202508:54Falcon 9 Block 51078‑20Starlink Group 6–84Success
20513 May 202505:02Falcon 9 Block 51067‑28Starlink Group 6–83Success
20628 May 202513:30Falcon 9 Block 51080‑19Starlink Group 10–32Success
20725 June 202506:31Falcon 9 Block 51094‑2Axiom Mission 4
(DragonGrace)
SuccessPrivate crewed docking to theISS. Maiden flight of Crew DragonGrace.
2081 July 202521:04Falcon 9 Block 51085‑9MTG-S1/Sentinel-4ASuccessSentinel-4A part ofESA'sCopernicus Programme series ofearth observation satellites. First Sentinel launch from Cape Canaveral.
2091 August 202515:43Falcon 9 Block 51094‑3SpaceX Crew-11
(DragonEndeavour)
SuccessISS crew rotation flight. Final booster landing atLZ-1.
21022 August 202503:50Falcon 9 Block 51092‑6X-37B OTV-8SuccessEighth flight of theBoeing X-37B, also known asUSSF-36. Third launch from Falcon.
21128 August 202508:12Falcon 9 Block 51067‑30Starlink Group 10–11SuccessFirst time a booster reached 30 flights.
2125 September 202512:32Falcon 9 Block 51069‑27Starlink Group 10-57Success
21324 September 202511:30Falcon 9 Block 51096‑2Interstellar Mapping and Acceleration ProbeSuccessPart of theSolar Terrestrial Probes program, designed to observeparticle acceleration andsolar wind interaction with theinterstellar medium. Launched alongsideSWFO-L1 and theCarruthers Geocorona Observatory.
2149 November 202508:10Falcon 9 Block 51069‑28Starlink Group 10‑51Success
21515 November 202503:08Falcon 9 Block 51092‑8Starlink Group 6‑89Success
21621 November 202503:39Falcon 9 Block 51080‑23Starlink Group 6‑78Success

Upcoming launches

[edit]
DateRocket TypeMission / Payload
30 November 2025Falcon 9 Block 5Starlink Group 6‑86

LC-39B

[edit]
1
2
3
4
5
6
1965
1970
1975
1980
1985
1990
1995
2000
2005
2010
2015
2020

Apollo and Apollo Applications

[edit]

All flights operated byNASA.

No.DateTime (UTC)Launch vehicleSerial numberMissionResultRemarks
118 May 196916:49Saturn VSA-505Apollo 10
(CSMCharlie Brown and LMSnoopy)
SuccessFirst launch, first crewed launch, and only Saturn V launch from LC-39B. Launch was conducted at the pad to practice high Saturn V launch cadence. Only crewed flight from 39B so far to go beyondlow Earth orbit.
225 May 197313:00Saturn IBSA-206Skylab 2SuccessFirst visit toSkylab, making emergency repairs sustained duringspace station's launch. First launch of the Saturn IB from LC-39B, and the first launch of the Saturn IB sinceApollo 7 in 1968.
328 July 197311:10Saturn IBSA-207Skylab 3SuccessSecond visit toSkylab.
416 November 197314:01Saturn IBSA-208Skylab 4SuccessLast visit toSkylab. Set American record for time in space that stayed until the advent ofISS expeditions.
515 July 197519:50Saturn IBSA-210Apollo–SoyuzSuccessThe Apollo component of the Apollo–Soyuz Test Project, complementing Soyuz 19. First crewed international spaceflight for NASA, and last flight of the Saturn IB,Saturn family, andApollo CSM.

Space Shuttle

[edit]

All flights operated byNASA.

No.DateTime (UTC)Launch vehicleShuttleMissionResultRemarks
628 January 198616:38Space ShuttleChallengerSTS-51-LFailureFirst Space Shuttle launch from LC-39B. Intended to launch and deployTDRS-B for theTracking and Data Relay Satellite System. A failure of thesolid rocket booster led to breakup 73 seconds after launch, causing theSpace ShuttleChallenger disaster.
728 September 198815:37Space ShuttleDiscoverySTS-26SuccessFirst Space Shuttle launch following theChallenger disaster. Launch and deployment ofTDRS-3 (as TDRS-C) for theTracking and Data Relay Satellite System.
82 December 198814:30Space ShuttleAtlantisSTS-27SuccessClassifiedDepartment of Defense mission. Deployment ofLacrosse satellite, also known as USA-34. Shuttle'sthermal protection system was extensively damaged during liftoff, but survived reentry.
913 March 198914:37Space ShuttleDiscoverySTS-29SuccessLaunch and deployment ofTDRS-4 (as TDRS-D) for theTracking and Data Relay Satellite System.
104 May 198914:46Space ShuttleAtlantisSTS-30SuccessLaunch and deployment ofMagellan, aiming to study and create a radar map ofVenus.
118 August 198912:37Space ShuttleColumbiaSTS-28SuccessDoD mission. Deployment ofSDS satellite and SSF satellite, also known as USA-40 and USA-41 respectively.
1218 October 198916:53Space ShuttleAtlantisSTS-34SuccessLaunch and deploymentGalileo. Part of theLarge Strategic Science Missions, designed to studyJupiter and its moons. First spacecraft to enter orbit of Jupiter and of an outer planet, and first spacecraft to enter the atmosphere of agas giant with atmospheric probe. First Shuttle launch with anRTG.
1323 November 198900:23Space ShuttleDiscoverySTS-33SuccessDoD mission. Deployment ofMagnum satellite, also known as USA-48.
1412 April 199012:33Space ShuttleDiscoverySTS-31SuccessLaunch and deployment of theHubble Space Telescope. Part of theLarge Strategic Science Missions, aspace telescope designed to conductoptical astronomy. Collaboration betweenNASA andESA. Was serviced five times over the following 20 years.
156 October 199011:47Space ShuttleDiscoverySTS-41SuccessLaunch and deployment ofUlysses. Collaboration between NASA and ESA, designed to study theSun from variousinclinations. First spacecraft to enterpolarheliocentric orbit, thanks to agravity assist fromJupiter.
162 December 199006:49Space ShuttleColumbiaSTS-35Success
175 April 199114:22Space ShuttleAtlantisSTS-37SuccessLaunch and deployment of theCompton Gamma Ray Observatory. Part of theLarge Strategic Science Missions, aspace telescope designed to conductgamma-ray astronomy.
185 June 199113:24Space ShuttleColumbiaSTS-40Success
197 May 199223:40Space ShuttleEndeavourSTS-49SuccessMaiden flight ofSpace ShuttleEndeavour. Servicing mission forIntelsat 603, following staging failure during launch on aCommercial Titan III in 1990. Onlyspacewalk so far to feature three astronauts.
2031 July 199213:56Space ShuttleAtlantisSTS-46Success
2112 September 199214:23Space ShuttleEndeavourSTS-47Success
2222 October 199217:09Space ShuttleColumbiaSTS-52Success
2313 January 199313:59Space ShuttleEndeavourSTS-54SuccessLaunch and deployment ofTDRS-6 (as TDRS-F) for theTracking and Data Relay Satellite System.
248 April 199305:29Space ShuttleDiscoverySTS-56Success
2521 June 199313:07Space ShuttleEndeavourSTS-57Success
2612 September 199311:45Space ShuttleDiscoverySTS-51Success
2718 October 199314:53Space ShuttleColumbiaSTS-58Success
282 December 199309:27Space ShuttleEndeavourSTS-61SuccessServicing mission for theHubble Space Telescope. Notable for correcting its optics caused by incorrect mirror grounding made before launch.
294 March 199413:53Space ShuttleColumbiaSTS-62Success
309 September 199422:22Space ShuttleDiscoverySTS-64Success
313 November 199416:59Space ShuttleAtlantisSTS-66Success
323 February 199505:22Space ShuttleDiscoverySTS-63SuccessFirst shuttle mission to the space stationMir. Rendezvoused, but did not dock.
3313 July 199513:41Space ShuttleDiscoverySTS-70SuccessLaunch and deployment ofTDRS-7 (as TDRS-G). Last Shuttle launch for theTracking and Data Relay Satellite System.
3420 October 199513:53Space ShuttleColumbiaSTS-73Success
3511 January 199609:41Space ShuttleEndeavourSTS-72Success
3622 February 199620:18Space ShuttleColumbiaSTS-75Success
3722 March 199608:13Space ShuttleAtlantisSTS-76SuccessDocking withMir.
3819 May 199610:30Space ShuttleEndeavourSTS-77Success
3920 June 199614:49Space ShuttleColumbiaSTS-78Success
4019 November 199619:55Space ShuttleColumbiaSTS-80SuccessLongest ever Space Shuttle flight, at 17 days and 15 hours.
4112 January 199709:27Space ShuttleAtlantisSTS-81SuccessDocking withMir.
4219 November 199719:46Space ShuttleColumbiaSTS-87Success
4317 April 199818:19Space ShuttleColumbiaSTS-90SuccessFinalSpacelab flight.
4429 October 199819:19Space ShuttleDiscoverySTS-95SuccessCarried senator andMercury-Atlas 6 veteranJohn Glenn into orbit.
4527 May 199910:49Space ShuttleDiscoverySTS-96SuccessFirst non-assembly Space Shuttle flight to theInternational Space Station.
4623 July 199904:31Space ShuttleColumbiaSTS-93SuccessLaunch and deployment of theChandra X-Ray Observatory. Part of theLarge Strategic Science Missions, aspace telescope designed to conductx-ray astronomy.
4719 December 199900:50Space ShuttleDiscoverySTS-103SuccessServicing mission for theHubble Space Telescope.
488 September 200012:45Space ShuttleAtlantisSTS-106SuccessDocking with theISS.
491 December 200003:06Space ShuttleEndeavourSTS-97SuccessISS assembly flight, adding theP6 solar array and radiators.
508 March 200111:42Space ShuttleDiscoverySTS-102SuccessDocking with theISS.
5112 July 200109:03Space ShuttleAtlantisSTS-104SuccessISS assembly flight, adding theQuest Joint Airlock.
525 December 200122:19Space ShuttleEndeavourSTS-108SuccessDocking with theISS.
538 April 200220:44Space ShuttleAtlantisSTS-110SuccessISS assembly flight, adding theS0 truss.
547 October 200219:45Space ShuttleAtlantisSTS-112SuccessISS assembly flight, adding theS1 truss.
5526 July 200514:39Space ShuttleDiscoverySTS-114SuccessDocking with theISS. First Space Shuttle flight following theColumbia disaster in 2003.
564 July 200618:37Space ShuttleDiscoverySTS-121SuccessDocking with theISS.
579 September 200615:14Space ShuttleAtlantisSTS-115SuccessISS assembly flight, adding theP3/P4 truss and solar arrays.
5810 December 200600:47Space ShuttleDiscoverySTS-116SuccessISS assembly flight, adding theP5 truss. Final Space Shuttle flight from LC-39B.

Constellation and Artemis

[edit]

All flights operated byNASA.

No.DateTime (UTC)Launch vehicleConfigurationSpacecraftMissionResultRemarks
5928 October 200915:30Ares IAres I-XBoilerplateAres I-XSuccessSuborbital launch. Carried a boilerplate upper stage andOrion spacecraft. Only launch of the Ares I and of theConstellation Program. First uncrewed launch from LC-39B.
6016 November 202206:47Space Launch SystemSLS Block 1CM-002Artemis ISuccessMaiden flight of SLS and first launch of theArtemis Program. Inaugural flight of a completed Orion spacecraft. First flight of a crewable spacecraft to the Moon sinceApollo 17 in 1972, and first 39B launch beyond LEO since Apollo 10 in 1969.

Upcoming launches

[edit]
DateLaunch vehicleMission
5 February 2026Space Launch SystemArtemis II

Gallery

[edit]
  • Space Shuttles Atlantis and Endeavour are placed at LC-39A and LC-39B in preparation for the final service mission to the Hubble Space Telescope (May 2009). Endeavour was ready for a contingency mission in case of trouble with Atlantis.
    Space ShuttlesAtlantis andEndeavour are placed at LC-39A and LC-39B in preparation for thefinal service mission to theHubble Space Telescope (May 2009).Endeavour was ready for acontingency mission in case of trouble withAtlantis.
  • Removal of the top floor of the fixed service structure on LC-39B (March 2011).
    Removal of the top floor of the fixed service structure on LC-39B (March 2011).
  • Storage tank for liquid hydrogen fuel located just to the Northeast of Kennedy Space Center's SLS launch pad 39B.
    Storage tank for liquid hydrogen fuel located just to the Northeast of Kennedy Space Center's SLS launch pad 39B.
  • The first Space Launch System rocket on LC-39B for Artemis I.
    The first Space Launch System rocket on LC-39B for Artemis I.

See also

[edit]

Notes

[edit]
  1. ^abFalcon 9 first-stage boosters have a four-digit serial number. A hyphen followed by a number indicates the flight count. For example, B1021‑1 and B1021‑2 represent the first and second flights of boosterB1021. Boosters without a hyphen were expended on their first flight.

References

[edit]
  1. ^"National Register Information System".National Register of Historic Places.National Park Service. July 9, 2010.
  2. ^Benson, Charles D.; Faherty, William B. (August 1977)."Preface".Moonport: A History of Apollo Launch Facilities and Operations. History Series. Vol. SP-4204. NASA.
  3. ^"KSC Facilities". NASA. Archived fromthe original on June 19, 2018. RetrievedJuly 6, 2009.
  4. ^D'Orazio, Dante (September 6, 2015)."After delays, SpaceX's massive Falcon Heavy rocket set to launch in spring 2016".The Verge. Vox Media.
  5. ^Foust, Jeff (February 4, 2016)."SpaceX seeks to accelerate Falcon 9 production and launch rates this year".SpaceNews.
  6. ^NASA (1993)."Launch Complex 39-A & 39-B".National Aeronautics and Space Administration. Archived fromthe original on April 3, 2019. RetrievedSeptember 30, 2007.
  7. ^NASA (2000)."Launch Complex 39". NASA. Archived fromthe original on September 27, 2012. RetrievedSeptember 30, 2007.
  8. ^Clark, Steven (October 22, 2021)."NASA targets February launch for Artemis 1 moon mission". Spaceflight Now. RetrievedOctober 23, 2021.
  9. ^abcHerridge, Linda (July 17, 2015)."New Launch Pad will Enable Smaller Companies to Develop and Launch Rockets from Kennedy".NASA. Archived fromthe original on July 20, 2015. RetrievedJuly 18, 2015.
  10. ^"NGS Datasheet for Clubhouse Southwest Gable". National Oceanic Atmospheric Administration (NOAA). RetrievedJanuary 20, 2013.
  11. ^Eriksen, John M.Brevard County, Florida: A Short History to 1955. See Chapter Ten on De Soto Grove, De Soto Beach, and Playa Linda Beach.
  12. ^"EVOLUTION OF THE 45TH SPACE WING". US Air Force.Archived from the original on June 13, 2011. RetrievedJuly 6, 2009.
  13. ^"The History of Cape Canaveral, Chapter 2: The Missile Range Takes Shape (1949–1958)". Spaceline.org. RetrievedJuly 6, 2009.
  14. ^Edwards, Brooke."SpaceX proposes increase in rocket launches from Cape Canaveral and new landing zone".Florida Today. RetrievedAugust 1, 2025.
  15. ^"ePermit".permitting.sjrwmd.com. RetrievedAugust 1, 2025.
  16. ^"SpaceX Starship-Super Heavy Project at Kennedy Space Center Launch Complex 39A | Federal Aviation Administration".www.faa.gov.Archived from the original on July 27, 2025. RetrievedAugust 1, 2025.
  17. ^"Cape Canaveral LC5". Astronautix.com. Archived fromthe original on April 14, 2009. RetrievedJuly 6, 2009.
  18. ^"The History of Cape Canaveral, Chapter 3: NASA Arrives (1959–Present)". Spaceline.org. RetrievedJuly 6, 2009.
  19. ^"Kennedy Space Center Visitor and Area Information | NASA". April 28, 2015. Archived fromthe original on October 30, 2016. RetrievedFebruary 11, 2017.
  20. ^Lethbridge, Cliff."LAUNCH COMPLEX 38 FACT SHEET | Spaceline".Spaceline.
  21. ^abSixth Semiannual Report to Congress July 1 - December 31, 1961 (Technical report). NASA. p. 126.
  22. ^The Saturn V Apollo Moon Rocket. NASA. 1963.
  23. ^Petrone, Rocco A. (1975)."Chapter 6: The Cape". InCortright, Edgar M. (ed.).Apollo Expeditions to the Moon. Washington, DC: Scientific and Technical Information Office,National Aeronautics and Space Administration. SP-350.
  24. ^abcdefgBenson, Charles D.; Faherty, William B. (August 1977)."Appendix B: Launch Complex 39"(PDF).Moonport: A History of Apollo Launch Facilities and Operations. History Series. Vol. SP-4204. NASA.
  25. ^"Swing Arm Engineer". NASA. Archived fromthe original on November 7, 2010.
  26. ^"Launch Complexes 39-A and 39-B". Archived fromthe original on December 31, 2016. RetrievedFebruary 11, 2017.
  27. ^"Plans for the Industrial Area". Archived fromthe original on March 26, 2023. RetrievedJuly 12, 2022.
  28. ^Maloney, Kelli.Launch Pad Escape System Design
  29. ^Warnock, Lynda."NASA - Emergency Egress System".www.nasa.gov. Archived fromthe original on March 26, 2023. RetrievedAugust 21, 2020.
  30. ^Warnock, Lynda."NASA - Pad Terminal Connection Room".www.nasa.gov. Archived fromthe original on February 24, 2021. RetrievedJune 22, 2023.
  31. ^Young, John; Robert Crippen (April 8, 2011).Wings in Orbit: Scientific and Engineering Legacies of the Space Shuttle 1971–2010. Government Printing Office. p. 82.ISBN 978-0-16-086847-4.
  32. ^"Launch Complex 34". Archived fromthe original on February 12, 2017. RetrievedFebruary 11, 2017.
  33. ^"Launch Complex 37". Archived fromthe original on March 2, 2017. RetrievedFebruary 11, 2017.
  34. ^"Sound Suppression System". Archived fromthe original on February 15, 2009. RetrievedOctober 22, 2007.
  35. ^"NASA – External Tank (ET) Gaseous Oxygen Vent Arm". nasa.gov. Archived fromthe original on May 24, 2017. RetrievedDecember 9, 2016.
  36. ^"GUCP troubleshooting continues as MMT push for launch on June 17". NASA Spaceflight. June 13, 2009.
  37. ^"SPACE.com – NASA Conducts Shuttle Astronaut Rescue Drill".Space.com. December 3, 2004. RetrievedOctober 22, 2007.
  38. ^M113: Armored Rescuer, February 2012, retrievedFebruary 22, 2023
  39. ^"NASA Field Journal by Greg Lohning". Archived fromthe original on February 4, 2009. RetrievedNovember 1, 2008.
  40. ^"NASA Eyes Launch Pad Damage for Next Shuttle Flight".Space.com. June 2, 2008.
  41. ^Lilley, Steve K. (August 2010)."Hit the Bricks"(PDF).System Failure Case Studies.4 (8). NASA:1–4. Archived fromthe original(PDF) on September 28, 2011. RetrievedJuly 20, 2011.
  42. ^NASA (2006)."Shuttle-Era Pad Modifications". NASA. Archived fromthe original on March 1, 2021. RetrievedSeptember 30, 2007.
  43. ^NASA: Lost in Space,Business Week, 2010-10-28, accessed 2010-10-31.
  44. ^Dean, James (February 6, 2011)."Up for grabs? Private companies eye KSC facilities".Florida Today. RetrievedFebruary 6, 2011.As the shuttle program nears retirement, KSC officials are evaluating whether other facilities that supported three decades of shuttle flights will transition to serve new vehicles or be discarded. The center is offering use of its launch pads, runway, Vehicle Assembly Building high bays, hangars and firing rooms to private companies expected to play a bigger role in NASA missions and a growing commercial space market.
  45. ^abDean, James (April 14, 2014)."SpaceX takes over KSC pad 39A". Florida Today. RetrievedApril 15, 2014.
  46. ^abcBergin, Chris (November 18, 2014)."Pad 39A – SpaceX laying the groundwork for Falcon Heavy debut".NASA Spaceflight. RetrievedNovember 17, 2014.
  47. ^"Pad 39B suffers substantial damage from Ares I-X launch – Parachute update | NASASpaceFlight.com".www.nasaspaceflight.com. October 31, 2009. RetrievedApril 15, 2016.
  48. ^"NASA not abandoning LC-39A" January 17, 2013, accessed February 7, 2013.
  49. ^NASA requests proposals for commercial use of Pad 39A,NewSpace Watch, May 20, 2013, accessed May 21, 2013.
  50. ^ab"Selection Statement for Lease of Launch Complex 39A"(PDF). NASA. December 12, 2013. Archived fromthe original(PDF) on May 11, 2015. RetrievedDecember 23, 2013.
  51. ^Matthews, Mark K. (August 18, 2013)."Musk, Bezos fight to win lease of iconic NASA launchpad".Orlando Sentinel. RetrievedAugust 21, 2013.
  52. ^abMessier, Doug (September 10, 2013)."Blue Origin Files Protest Over Lease on Pad 39A".Parabolic Arc. Archived fromthe original on September 25, 2013. RetrievedSeptember 11, 2013.
  53. ^Messier, Doug (December 12, 2013)."Blue Origin Loses GAO Appeal Over Pad 39A Bid Process".Parabolic Arc. Archived fromthe original on December 16, 2013. RetrievedDecember 13, 2013.
  54. ^Granath, Bob (April 22, 2014)."NASA, SpaceX Sign Property Agreement for Historic Launch Pad".NASA. Archived fromthe original on February 7, 2018. RetrievedJune 22, 2019.
  55. ^abDean, James (April 14, 2014)."With nod to history, SpaceX gets launch pad 39A OK".Florida Today. RetrievedApril 15, 2014.
  56. ^"First Launch from LC-39A at Kennedy Since 2011 – SpaceX".blogs.nasa.gov. February 19, 2017. RetrievedDecember 25, 2020.
  57. ^abClark, Stephen (February 25, 2015)."Falcon Heavy rocket hangar rises at launch pad 39A".Spaceflight Now. RetrievedFebruary 28, 2015.
  58. ^ab"NASA signs over historic Launch Pad 39A to SpaceX".collectSpace. April 14, 2014. RetrievedApril 15, 2014.
  59. ^Bergin, Chris (February 18, 2015)."Falcon Heavy into production as Pad 39A HIF rises out of the ground". NASASpaceFlight. RetrievedFebruary 19, 2015.
  60. ^Gebhardt, Chris (October 8, 2015)."Canaveral and KSC pads: New designs for space access".NASASpaceFlight.com. RetrievedOctober 11, 2015.
  61. ^Bergin, Chris (November 9, 2015)."SpaceX conducts test rollout for 39A Transporter/Erector".NASASpaceFlight.com. RetrievedNovember 11, 2015.
  62. ^abFoust, Jeff (February 4, 2014)."SpaceX seeks to accelerate Falcon 9 production and launch rates this year".SpaceNews. RetrievedFebruary 6, 2016.
  63. ^abcClark, Stephen (April 15, 2014)."SpaceX's mega-rocket to debut next year at pad 39A".SpaceflightNow. RetrievedApril 16, 2014.
  64. ^Clark, Stephen (July 21, 2015)."First flight of Falcon Heavy delayed again". spaceflightnow.com. RetrievedOctober 6, 2015.
  65. ^"SpaceX Performs Falcon Heavy Rocket Static Fire Test After Delays | Stock News & Stock Market Analysis - IBD".Investor's Business Daily. January 24, 2018. RetrievedFebruary 6, 2018.
  66. ^Gebhardt, Chris (August 17, 2018)."SpaceX readies for installation of LC-39A Crew Access Arm, previews Crew Dragon".NASASpaceFlight.com. RetrievedDecember 25, 2020.
  67. ^@elonmusk (December 3, 2021)."Construction of Starship orbital launch pad at the Cape has begun" (Tweet). RetrievedFebruary 13, 2023 – viaTwitter.
  68. ^"SpaceX".SpaceX. RetrievedFebruary 14, 2023.
  69. ^Edwards, Brooke."SpaceX proposes increase in rocket launches from Cape Canaveral and new landing zone".Florida Today. RetrievedAugust 1, 2025.
  70. ^"ePermit".permitting.sjrwmd.com. RetrievedAugust 1, 2025.
  71. ^"SpaceX Starship-Super Heavy Project at Kennedy Space Center Launch Complex 39A | Federal Aviation Administration".www.faa.gov.Archived from the original on July 27, 2025. RetrievedAugust 1, 2025.
  72. ^spacexcmsadmin (January 29, 2016)."CRS-10 MISSION".SpaceX. RetrievedFebruary 18, 2017.
  73. ^Bergin, Chris (March 9, 2017)."SpaceX Static Fires Falcon 9 for EchoStar 23 launch as SLC-40 targets return".NASASpaceFlight.com. RetrievedMarch 18, 2017.
  74. ^Wattles, Jackie."SpaceX launches Falcon Heavy, the world's most powerful rocket".CNNMoney. RetrievedFebruary 6, 2018.
  75. ^"Launch Schedule – Spaceflight Now".Spaceflightnow.com. RetrievedFebruary 20, 2019.
  76. ^"Upcoming Spaceflight Events".nextspaceflight.com. RetrievedMay 1, 2020.
  77. ^Potter, Sean (April 20, 2020)."NASA to Host Preview Briefings for First Crew Launch with SpaceX".NASA. RetrievedApril 30, 2020.Public Domain This article incorporates text from this source, which is in thepublic domain.
  78. ^Artemis I Launch to the Moon (Official NASA Broadcast) - Nov. 16, 2022, November 16, 2022, retrievedNovember 16, 2022
  79. ^"NASA Prepares Rocket, Spacecraft Ahead of Tropical Storm Nicole, Re-targets Launch".NASA. November 8, 2022. RetrievedNovember 8, 2022.
  80. ^Gwynne Shotwell (March 21, 2014).Broadcast 2212: Special Edition, interview with Gwynne Shotwell (audio file). The Space Show. Event occurs at 20:00–21:10. 2212. Archived fromthe original(mp3) on March 22, 2014. RetrievedMarch 22, 2014.
  81. ^Clark, Stephen (August 20, 2018)."SpaceX's astronaut walkway installed on Florida launch pad".Spaceflight Now. RetrievedAugust 22, 2018.
  82. ^Foust, Jeff (April 6, 2024)."Musk outlines plans to increase Starship launch rate and performance".SpaceNews. RetrievedApril 7, 2024.
  83. ^Edwards, Brooke."SpaceX proposes increase in rocket launches from Cape Canaveral and new landing zone".Florida Today. RetrievedAugust 1, 2025.
  84. ^"ePermit".permitting.sjrwmd.com. RetrievedAugust 1, 2025.
  85. ^"SpaceX Starship-Super Heavy Project at Kennedy Space Center Launch Complex 39A | Federal Aviation Administration".www.faa.gov.Archived from the original on July 27, 2025. RetrievedAugust 1, 2025.
  86. ^Bergin, Chris (September 11, 2020)."OmegA Launch Tower to be demolished as KSC 39B fails to become a multi-user pad". RetrievedSeptember 13, 2020.
  87. ^abNASA (2015)."Launch Complex 39C".NASA. Archived fromthe original on July 19, 2015. RetrievedJuly 18, 2015.
  88. ^Anthony Iemole (December 22, 2020)."Kennedy Space Center Expands as Launch Complex 48 Opens for Operations".
  89. ^abc"Vertical Launch". NASA. Archived fromthe original on December 9, 2019. RetrievedJune 4, 2018.
  90. ^"Kennedy Space Center Master Plan Map by Nasa".masterplan.ksc.nasa.gov. August 1, 2017. Archived fromthe original on August 3, 2020. RetrievedAugust 19, 2018.
  91. ^Dean, James (August 5, 2018)."Space Florida proposes launch landing pads at KSC".Florida Today. RetrievedAugust 19, 2018.
  92. ^Holton, Tammy (May 22, 2017)."Vertical Landing".masterplan.ksc.nasa.gov. Archived fromthe original on December 9, 2019. RetrievedAugust 19, 2018.
  93. ^"Draft Environmental Assessment for the SpaceX Starship and Super Heavy Launch Vehicle at Kennedy Space Center (KSC)"(PDF).NASA Public NEPA Documents. SpaceX. RetrievedSeptember 20, 2019.
  94. ^Ralph, Eric (September 18, 2019)."SpaceX prepares to break ground on Starship launch facilities at Pad 39A".TESLARATI. RetrievedSeptember 20, 2019.

Public Domain This article incorporatespublic domain material fromLaunch Pad 39C.National Aeronautics and Space Administration.

External links

[edit]
Facilities
Payload manufacture
and processing
Launch Complex 39
Other facilities
Launch sites
Launch sites
Active
Inactive (leased)
Inactive (not leased)
Permanently removed
Landing sites
Related
  • indicates that the launch pad's use is currently not as a launch site. indicates that the launch pad is under construction or renovation.
NASA programs
Launch complexes
Emblem of the Apollo program
Ground facilities
Launch vehicles
Spacecraft and rover
Flights
Uncrewed
Crewed
Saturn
development
Abort tests
Pegasus flights
Apollo 8 specific
Apollo 11 specific
Apollo 12 specific
Apollo 13 specific
Apollo 14 specific
Apollo 15 specific
Apollo 16 specific
Apollo 17 specific
Post-Apollo
capsule use
Related
  • Symbol indicates failure or partial failure
Components
Orbiters
Add-ons
Sites
Operations
and training
Testing
Disasters
Support
Special
Space suits
Experiments
Derivatives
Replicas
Related
Missions
Uncrewed
Crewed
Emblem of the Artemis program
Agencies
Facilities
Rockets
Crewed spacecraft
Robotic spacecraft
Primary 10 centers
Space flight
Research
Other facilities
Related
Policy and history
History
(creation)
General
Human spaceflight
programs
Past
Current
Robotic programs
Past
Current
Individual featured
missions
(human and robotic)
Past
Currently
operating
Future
Communications
and navigation
NASA lists
NASA images
and artwork
Related
Launch vehicles
Current
In development
Retired
Cancelled
Spacecraft
Cargo
Crewed
Test vehicles
Current
Retired
Rocket engines
Lists of missions
Launch facilities
Landing sites
Other facilities
Support
Contracts
R&D programs
Key people
Related
* denotes unflown vehicles or engines, and future missions or sites. † denotes failed missions, destroyed vehicles, and abandoned sites.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Kennedy_Space_Center_Launch_Complex_39&oldid=1323339163"